Loading...
HomeMy WebLinkAbout3866; LAKE CALAVERA BOARDWALK & WETLAND MITIGATION; BUILDING ENERGY ANALYSIS REPORT; 2016-09-21BUILDING ENERGY ANALYSIS REPORT W5 t PROJECT: Lake Calavera Restrooms Carlsbad, CA Project Designer: Precision Structural Engineering, Inc. 250 Main St. , Ste. A Klamath Falls, Oregon 97601 541-850-6300 Report Prepared by: Adrian Starr A 5 Starr Energy Corporation 2809 Bechelli Lane Redding, CA 96002 530-275-3350 Job Number: 1609-014 Lake Calavera Restrooms Date: 9/21/2016 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 6.7 by EnergySoft User Number: 3895 ID: 1609-014 Lake CaIav TABLE OF CONTENTS Cover Page I Table of Contents 2 Form LTI-01-E Indoor Lighting 3 Form LTI-02-E Lighting Controls 9 Form LTI-03-E Indoor Lighting Power Allowance 12 Form LTO-01-E Outdoor Lighting 16 Form LTO-02-E Outdoor Lighting Controls 20 Form LTO-03-E Outdoor Lighting Power Allowances 23 EnergyPro 6.7 by EnergySoft Job Number: ID: 1609-014 Lake Calavera Restroom User Number. 3895 1 CALIFORNIA ENERGY COMMISSION 40 NRCC-LTI-01-E - (Page 1 o 6) red: 9/21/2016 O Hotel/Motel ii Unconditioned Spaces Alteration Tailored published by the California Energy Commission. I on plans for all submittals. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 08/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 2 of 6) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 C. Summary of Allowed Lighting Power Conditioned and Unconditioned space Lighting must not be combined for compliance Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting Installed Lighting NRCC-LTI-01-E, page 4L - NRCC-LTI-01-E, page 4 + 0 15 PORTABLE ONLY FOR OFFICES NRCC-LTI-01-E, page 3 + 3 Minus Lighting Control Credits - 0 Minus Lighting Control Credits - 0 • NRCC-LTI-02-E, page 2 - NRCC-LTI-02-E, page 2 Adjusted Installed Lighting Power - 0 Adjusted Installed Lighting Power - 15 4• (row 1 plus row 2 minus row 3) (row 1 minus row 3) - 5. Complies ONLY if Installed :5 Allowed Complies ONLY if Installed :5 Allowed Allowed Lighting Power 0 I Allowed Lighting Power 40 6• Conditioned NRCC-LTI-03-E, page 1 'Unconditioned NRCC-LTI-03-E, page 1 D. Declaration of Required Installation Certificates Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.) YES NO Form/Title NRCI-LTI-01-E - Must be submitted for all buildings 0 Field Inspector NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), 0 Field Inspector to be recognized for compliance. NRCI-LTI-03-E - Must be submitted for a line-voltage track lighting integral current limiter, or for a supplementary 0 Field Inspector overcurrent protection panel used to energize only line-voltage track lighting, to be recognized for compliance. NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a • 0 Field Inspector conference room, a multipurpose room, or a theater to be recognized for compliance. NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. 0 Field Inspector NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for 0 Field Inspector compliance. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 201 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 08/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E I Indoor Lighting (Page 3 of 6) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 Declaration of Required Certificates of Acceptance Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.) YES NO Form/Title / NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. 0 Field Inspector j NRCA-LTI-03-A - Must be submitted for automatic daylight controls. 0 Field Inspector ,.' NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. 0 Field Inspector A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: 0 CONDITIONED SPACE 0 UNCONDITIONED SPACE Indoor Lighting Schedule and Field Inspection Energy Checklist The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems. When Complete Building Method is used for compliance, list each different type of luminaire on separate lines. When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines 0 Alsoinclude track lighting in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line-voltage track lighting is installed. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 08/15) U/kLIOKNIA LNLKUY UUMMlbIUN CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 4 of 6) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 G. Installed Portable Luminaires in Offices - Exception to Section 140.6(a) This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of this compliance form. This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office El Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance shall not be traded between offices having different lighting systems. Office Portable Luminaire Schedule Office Installed Portable Luminaire Watts Per Square Foot Office Location Field Inspector 1 2 3 4 5 6 7 8 9 10 Installed If F S 0.3, portable Watts enter luminaire CU per zero; Identify Office area in cu -0 . watts in 0 square G05 x G07 which these portable Pass Fail Complete Luminaire Description E E this office . - foot if G06> luminaires are installed (i.e., LED, under cabinet, furniture mounted Watts per (G02 x '.' o (G04 / 0.3, direct/indirect) Luminaire G03) G05) (G06-0.3) D E o o 0 0 El 0 o o Enter sum total of all pages into NRCC-LTI- Total installed portable luminaire watts that are greater than 0.3 watts per square foot per office: 01-E; Page 1 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 08/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTl-01-E Indoor Lighting (Page 5 of 6) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: 0 CONDITIONED SPACE D UNCONDITIONED SPACE H. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Luminaire Schedule Installed Watts Location Field Inspector 1 A B C D E F G H How wattage was determined a) bD Complete Luminaire Description . 00 42 < o = E Z C .E 5) E E (i.e. 3 lamp fluorescent troffer, C G) E E Primary Function area in which a) Z F32T8, one dimmable electronic ballast) > - w 0 -) ' < '°' -j 0 I— > these luminaires are installed Pass Fail LF-2 (1) Lithonia OLVTWM 4000K 15Wt, LED 15.0 ______ 0 1 15 Bathroom 0 0 o o 0 0 o 0 0 0 o o 0 0 - 0 0 0 0 o o 0 0 o 0 0 0 o o 0 0 o o 0 0 INSTALLED WATTS PAGE TOTAL: Enter sum total of all pages into 15 NRCC-LTI701-E; Page 2 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STATE OF CALIFORNIA INDOOR LIGHTING 3 CEC-NRCC-LTI-01-E (Revised 08/15) UALIfrUP(NIA ENERGY U(JMMISSIUN I CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E I I Indoor Lighting (Page 6 of 6) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 DOCUMENTATION AUTHORS DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Adrian Starr Documentation Author Signatur - Company: A 5 Starr Energy Corporation Signature Date: 9/21/2016 Address: - 2809 Bechelli Lane CEA Certification Identification (if applicable): City/State/zip. Redding, CA 96002 Phone: 530-275-3350 RESPONSIBLE PERSONS DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: The information provided on this Certificate of Compliance is true and correct. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part land Part 6 of the California Code of Regulations. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is requir e i iluded with the documentation the builder the at occupancy. _provides _to _building _owner Responsible Designer Name: (Bill) Nabil Taha Responsible Designer Signature: A Company: . Precision Structural Engineering, Inc. Date Signed: 9/22/2016 V Address: 250 Main St. License: C60802 City/State/Zip: Klamath Falls, OR 97601 Phone: 541-850-6300 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STATE OF CALIFORNIA INDOOR LIGHTING - LIGHTING CONTROLS 1 not CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 1 of 3) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 The NRCC-LTI-02-E shall be used to document all mandatory and prescriptive lighting controls that are applicable to the project. Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.) YES NO Control Requirements Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance ' Efficiency Regulations in accordance with Section 110.9. Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate shall be submitted in accordance with Section 130.4(b). One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and §130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b). A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an Installation Certificate shall be installed in accordance with Section 130.4(b). All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's instructions in accordance with Section 130.1. All luminaires shall be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a). General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental, and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display, ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4. The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the multi-level lighting control requirements in accordance with Section 130.1(b). All installed indoor lighting shall be equipped with controls that meet the applicable Shut-OFF control requirements in Section 130.1(c). .' Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans. Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in accordance with Section 130.1(e). Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in : accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut-OFF controls, and demand responsive controls. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING - LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05115) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls . (Page 2 of 3) Project Name: Lake Calavera Restrooms Date Prepared. 9/21/201 6 A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: 0 CONDITIONED SPACES IZI UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST PAF Credit Calculation I . 1 oQ aJ 0 -g Standards Complying With 0 E. rD Lighting Control Schedule V all that apply, or enter 'E' if Exempted), CD a a -i c a CD a- _ g A B C D E F G H I J K I M N 0 Type! Description of Lighting Control (i.e.: occupancy sensor, Location in Building automatic time switch, of W P w P W P w P U) P - P . P -o dimmer, automatic daylight, Units . etc...) El El El El El El El El El El El El El El Control Credit PAGE TOTAL (Sum of Column M): 0 IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M): 0 Enter Control Credit total into NRCC-LTI-01-E; Page 1. §130.1 (a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) =Auto Shut-Off; §130.1(d) =Mandatory Daylight; §130.1(e) =Demand Responsive; §140.6(d) = Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required- to be filled out, signed, and submitted. - - CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 201 STATE OF CALIFORNIA INDOOR LIGHTING - LIGHTING CONTROLS NOW.. -EC-NRCC-LTi-02-E (Revised 05/15) UALII-(JXNIA bNbj-((jY L;UMMlbb W CERTIFICATE OF COMPLIANCE NRCC-LTl-02-E Indoor Lighting - Lighting Controls (Page 3 of 3) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Adrian Starr Documentation Author c5'.4A' Company: A 5 Starr Energy Corporation Signature Date: 9/21/2016 Address: 2809 Bechelli Lane CEA certification Identification (if applicable): City/State/Zip: Redding, CA 96002 Phone: 530-275-3350 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: The information provided on this Certificate of Compliance is true and correct. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part land Part 6 of the California Code of Regulations. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is reqjj uded with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: (Bill) Nabil Taha Responsible Designer Signature: Company. Precision Structural Engineering, Inc. DateSigned. 9/22/2016 Address: 250 Main St. License: C60802 City/State/Zip: Klamath Falls, OR 97601 Phone: 541-850-6300 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING POWER ALLOWANCE P, I CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 1 of 4) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 A separate page must be filled out for Conditioned and Uncnditioned Spaces. This page is only for: 0 CONDITIONED spaces El UNCONDITIONED spaces A. SUMMARY TOTALS OF LIGHTING POWER ALLOWANCES El If using Complete Building Method for compliance, use only the total in column (a) as total allowed building watts. If using Area Category Method, Tailored Method, or a combination of Area Category and Tailored Method for compliance, use only the total in column (b) as the total allowed building watts (a) (b) Complete Building Method Allowed Watts. Documented in section B of NRCC-LTI-03-E (below on this page) Area Category Method Allowed Watts. Documented in section C-i of NRCC-LTI-03-E (below on this page) - 40 Tailored Method Allowed Watts. Documented in section A of NRCC-LTI-04-E - 0 TOTAL ALLOWED BUILDING WATTS. Enter number into correct cell on NRCC-LTI-01, Page 2, Row 1 - 40 El Check here if building contains both conditioned and unconditioned areas. B. COMPLETE BUILDING METHOD LIGHTING POWER ALLOWANCE 1 2 3 - 4 TYPE OF BUILDING (From §140.6 Table 140.6-B) WATTS PER (ft) COMPLETE BLDG. AREA ALLOWED WATTS Total Area: Total Watts. Enter Total Watts into section A, row 1 (Above on this page) C -1 AREA CATEGORY METHOD TOTAL LIGHTING POWER ALLOWANCES (D plus E) Watts Total from section C-2 . 40 Total from section C-3 . o Total Watts. Enter Total Watts into section A, row 2 (Above on this page) . 40 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 201. STATE OF CALIFORNIA INDOOR LIGHTING POWER ALLOWANCE EC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 2 of 4) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: 0 CONDITIONED spaces 121 UNCONDITIONED spaces C -2 AREA CATEGORY METHOD GENERAL LIGHTING POWER ALLOWANCE Do not include portable lighting for offices. Portable lighting for offices shall be documented only in section B of NRCC-LTI-01-E. Separately list lighting for each primary function area as defined in §100.1 of the Standards. A B C AREA CATEGORY (From §140.6 Table 140.6-C) WATTS Location in Building Primary Function Area per Table 140.6-C PER (ft) X AREA (ft) Zone 1 - Restrooms Bathroom 0.60 67 D ALLOWED = WATTS 40 TOTALS 167 Enter sum total Area Category allowed watts into section C-i of NRCC-LTI-03-E (this compliance form) 40 WATTS CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA - INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE N RCC-LTl-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 3 of 4) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 - A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: 0 CONDITIONED spaces 10 UNCONDITIONED spaces C-3 AREA CATEGORY METHOD ADDITIONAL LIGHTING WATTAGE ALLOWANCE (from Table 140.6-C Footnotes) A B C 2 D E F G ALLOWED Additional Wattage WATTS Primary Sq Ft or Watts Allowance Description(s) and Quantity of Special Total Design Smaller of Function linear ft 1 Allowed (B XC) LuminaireTypes in each Primary Function Area Watts D or F TOTALS - Enter into TOTAL AREA CATEGORY METHOD ADDITIONAL ALLOWANCES - Section C-i . 0 1. Use linear feet only for additionalaIlowance for white board or chalk board. All other additional Area Category allowances shall use watts per square foot. 2 Additional watts are available only when allowed according to the footnotes on bottom of Table 146-C, which include: Specialized task work; Ornamental lighting; Precision commercial and industrial work; Per linear foot of white board or chalk board; Accent, display and feature lighting; and Videoconferencing Studio lighting.. 3. Luminaire classification andwattage shall be determined in accordance with §130.0(c) of the Standards. - CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015. STATE OF CALIFORNIA INDOOR LIGHTING POWER ALLOWANCE F11 CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 4 of 4) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Adrian Starr Documentation AuthorSinature Company: A 5 Starr Energy Corporation Signature Date: 9/21/2016 Address: 2809 Bechelli Lane CEA Certification Identification (if applicable): City/state/zip: Redding, CA 96002 . Phone: 530-275-3350 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: The information provided on this Certificate of Compliance is true and correct. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part land Part 6 of the California Code of Regulations. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is r i to included with the documentation the builder provides to the building owner at occupancy. / / / Responsible Designer Name: (Bill) Nabil Taha Responsible Designer Signature: f Company: Precision Structural Engineering, Inc. Date Signed: 9/22/2016 Address: 250 Main St. License: C60802 City/State/Zip: Klamath Falls, OR 97601 Phone: 541-850-6300 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 l,.kIt L) L,,\LlrurcuNut\ OUTDOOR LIGHTING "d, CEC-NRCC-LTO-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTO-61-E Outdoor Lighting (Page 1 of 4) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 Project Address: Carlsbad, CA Total Illuminated Hardscape Area 0 General Information Phase of Construction: R1 New Construction 0 Addition 0 Alteration Outdoor Lighting Zone (OLZ) 0 OLZ-1 0 OLZ-2 E21 OLZ-3 0 012-4 I have confirmed with the AHJ which OLZ applies to this site. For default lighting zone designations, see Title 24 Part 6, §10-114 LIGHTING COMPLIANCE DOCUMENTS (check box for each document included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission. 121 NRCC-LTO-01-E Certificate of Compliance Q 'NRCC-LTO-02-E Outdoor Lighting Controls Certificate of Compliance 121 NRCC-LTO-03-E Outdoor Lighting Power Allowance Certificate of Compliance Summary of Allowed Outdoor Lighting Power Watts Sum Total ALLOWED Outdoor LightingWattage from NRCC-LTO-03-E, page 1 = 30 Complies ONLY if Installed <Allowed Sum Total INSTALLED Outdoor lighting Wattage from NRCC-LTO-01-E, page 3 T 30 Declaration of Required Installation Certificates -,Declare by checking all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.) 121 NRCl-LTO-01-E - Must be submitted for all buildings 0 Field Inspector Q NRCl-LTO-02-E - Must be submitted for a lighting control system, or for-an 0 Field Inspector Energy Management Control System (EMCS), to be recognized for compliance. Declaration of Required Certificates of Acceptance - Declare by checking all of the Certificates of - Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.) 121 NRCA-LTO-02-A -Must be submitted for outdoor lighting controls. 0 Field lnspectdr CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 iII t ur 4-kLlrurcINu,-\ OUTDOOR LIGHTING CEC-NRCC-LTO-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTO-01-E Outdoor Lighting (Page 2 of 4) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 Schedule of luminaires exempt from the outdoor lighting power requirements in §140.7 Name or Symbol Description of exempt luminaire in accordance with the exemptions Schedule of luminaires exempt from the cutoff requirements in §130.2(b) Name or Symbol Description of exempt luminaire in accordance with the exemptions Schedule of luminaires exempt from the outdoor lighting control requirements in §130.2(c) Name or Symbol Description of exempt luminaire in accordance with the exemptions CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 Fail 000000DDDD00000D000 CL Pass 000000000000000UDU0 o i BUG Rating 0 LI 0 to - - -c --- Co - C Co.0 Co Cu >< CL a; -- to o C0C0 W 0 Co (5 W .2. - ci) 0 0 C - U o _ (0 0 -FO 41 Co o0 —l Ca LU c. ELuO 41 cr Total Installed LL Watts in this area (r t X 1 U) U) 0 Cr) Number of I— . Lu Luminaires I— 0 ,-.,-- I- -ui U, According DDDDDDDDDDDDDDDDDDD I . Cu a; tko C §130.0(c) U (5 >- w - 3:CECDefault lQ o o 0 o o o o o o o o o o o o o o LU LU z 0 fromNA8 2 Watts per - I— U U Luminaire Q 0 LU L6 L6 00 ww LU LL - LO LO LU —1 W 00 00 00 LU Qi E U U D H Id,II - >> U 00 CL E (0cd Xc o EE 00 EE STATE OF CALIFORNIA OUTDOOR LIGHTING CEC-NRCC-LTO-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION -. CERTIFICATE OF COMPLIANCE NRCC-LTO-01-E Outdoor Lighting (Page 4 of 4) ProjectNarne: Lake Calavera Restrooms Date Prepared: 9/21/2016 DOCUMENTATION AUTHORS DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Adrian Starr Documentation Author Signatu :5'zi.t4, Company: A 5 Starr Energy Corporation Signature Date :9/21/2016 Address: 2809 Bechelli Lane CEA Certification Identification (if applicable): City/State/Zip: Redding, CA 96002 Phone: 530-275-3350 RESPONSIBLE PERSONS DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: The information provided on this Certificate of Compliance is true and correct. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part land Part 6 of the California Code of Regulations. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be includ42SbrfIhed ocumentation the builder provides to the - building _owner _at_occupancy. Responsible Designer Name: (Bill) Nabil Taha Responsible Designer Signature: Company: Precision Structural Engineering, Inc. Date Signed: 9/22/2016 Address: 250 Main St. License: C60802 City/State/Zip: Klamath Falls, OR 97601 Phone: 541-850-6300 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance June 2013 STATE OF CALIFORNIA OUTDOOR LIGHTING CONTROLS CEC-NRCC-LTO-02-E (Revised 05115) CALIFORNIA ENERGY COMMISSION —14~00— CERTIFICATE OF COMPLIANCE NRCC-LTO-02-E Outdoor Lighting Controls (Page 1 of 3) ProjectName: Lake Calavera Restrooms Date Prepared: 9/21/2016 The NRCC-LTO-02-E shall be used to document all mandatory outdoor lighting controls that are applicable to the project. Mandatory Outdoor Lighting Control Declaration Statements Check all that apply: Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance Efficiency Regulations in accordance with §110.9(a). Lighting shall be controlled by a lighting control system or energy management control system in accordance with §110.9. An Installation Certificate shall be submitted in accordance with §130.4(b). El All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's instructions in accordance with §130.1 Part-Night Outdoor Lighting Controls, as defined in Section 100.1(b), shall meet the requirements in Section 110.9(b)5 O All outdoor incandescent luminaires rated over 100 watts, determined in accordance with Section 130.0(c), shall be controlled by a motion sensor. 0 All outdoor luminaires rated for use with lamps greater than 150 lamp watts, determined in accordance with Section 130.0(c), shall comply with Backlight, Uplight, and Glare (collectively referred to as "BUG") in accordance with Section 130.2(b) O All installed- outdoor, lighting shall be controlled by a photocontrol or outdoor astronomical time-switch control in accordance with Section 130.2(c)1 D All-installed outdoor lighting shall be circuited and independently controlled from other electrical loads by an automatic scheduling control in accordance with Section 130.2(c)2 All installed outdoor lighting, where the bottom of the luminaire is mounted 24 feet or less above the ground, shall be controlled with automatic lighting controls in accordance with Section 130.2(c)3 O For-Outdoor Sales Frontage, Outdoor Sales Lots, and Outdoor Sales Canopies lighting, an automatic lighting control in accordance with Section 130.2(c)4 For Building Facade, Ornamental Hardscape and Outdoor Dining lighting, an automatic lighting control in accordance with Section 130.2(c)5 El Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in accordance with §130.4.(a). OutdOor lighting controls shall comply with the applicable requirements of Section 130.2(c) and Reference Nonresidential Appendix NA7.8 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 Fail DDDDDDDDDDDDDDDD Field Inspector 0 ------ Pass DDDDDDDDD 11 DflDDDDD / if Acceptance Test Required z — §130.2(c)5 4-I -- CL I §130.2(c)4 LU to LU w §130.2(c)3 - E U 0 -- U- §130.2(c)2 w §130.2(c)1 (0 LU o T §130.2(a) z 0 IM 'U tn U :m - LU 0 to - 0 _c 0 - 0 C 4-I - 4-I 4-I LU U—( -) 0) _I 4-I N) L( 0 C LU .Po P Ui, 0 U CO - 4- a) (0 0 c 0C E . 0 LA _I Q 0)0 0 U.E 0 04I I-. C o U Qi 0 Ui, V( 0) 0 (0 o o c 4I (fl C 0)0 COQ) W Z LXO p ______ I w - ________ - - 4-I 0 - H I a) U CL (0 E 0 U (0 4-I a) U, 0) C 0 z m -1 0 (N STATE OF CALIFORNIA OUTDOOR LIGHTING CONTROLS CEC-NRCC-LTO-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTO-02-E Outdoor Lighting Controls (Page 3 of 3) Project Name : Lake Calavera Restrooms - Date Prepared: 9/21/2016 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Adrian Starr Documentation Author Company: A 5 Starr Energy Corporation Signature Date: .9/21/2016 Address: 2809 Bechelli Lane CEA Certification Identification (if applicable): City/State/Zip: Redding, CA 96002 Phone: 530-275-3350 RESPONSIBLE PERSONS DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: The information provided on this Certificate of Compliance is true and correct. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part land Part 6 of the California Code of Regulations. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificat fç mpliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: (Bill) Nabil Taha Responsible Designer Signature: Company: Precision Structural Engineering, Inc. Date Signed: - Address: 250 Main St. License: C60802 City/State/Zip: Klamath Falls, OR 97601 Phone: 541-850-6300 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA OUTDOOR LIGHTING POWER ALLOWANCES , N CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 1 of 4) Project Name: Lake Calavera Restrooms Date Prepared: 9/21/2016 A. OUTDOOR LIGHTING POWER ALLOWANCE SUMMARY General Hardscape Lighting Power Allowance (Site Total from Section B of NRCC-LTO-03-E) I ' 0 Additional Specific "use it or lose it" Lighting Power Allowances listed in each of these cells shall be identical to total allowed watts determined in Section C-i to C-4 of NRCC-LTO-03-E. PER APPLICATION PER UNIT LENGTH PER HARDSCAPE AREA PER SPECIFIC AREA from Section C-i (SALES FRONTAGE) (ORNAMENTAL LIGHTING) from Section C-4. from Section C-2 from Section C-3 30 0 0 0= 2. 30 Sum Total ALLOWED Outdoor Lighting Wattage (add rows i and 2) 3. 30 B. GENERAL HARDSCAPE LIGHTING POWER ALLOWANCE FROM TABLE 140.7-A - Area Wattage Allowance (AWA) Linear Wattage Allowance (LWA) Initial Wattage Allowance (lWA) - Total General Hardscape - Lighting Allowance A B C D E F -G TI H I Nameofarea Illuminated Hardscape Area AWA Per Square Foot AWA(BxC) Perimeter Length of General Hardscape LPA per Linear Foot LWA (E x F) WA (Watts) D+G+H TOTAL 0 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA OUTDOOR LIGHTING POWER ALLOWANCES FAR CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances . (Page 2 of 4) ProjectName: Lake Calavera Restrooms Date Prepared: 9/21/2016 C. -ADDITIONAL "USE IT OR LOSE IT" OUTDOOR LIGHTING POWER ALLOWANCES FOR SPECIFIC APPLICATIONS The additional specific outdoor lighting power allowance shall be the smaller of the allowed lighting power or the actual lighting power used. El Use Outdoor Lighting Zone (OLZ) that is documented on page 1 of NRCC-LTO-01-E to calculate the specific wattage allowances. C-i. WATTAGE ALLOWANCE PER APPLICATION -Table 140.7-113 - Available only for qualifying locations, which include Building Entrances or Exits; Primary Entrances to Senior Care Facilities, Police Stations, Hospitals, Fire Stations, and Emergency Vehicle Facilities; Drive Up Windows; Vehicle Service Station Uncovered Fuel Dispenser 0 If more than one luminaire type is used per location, use multiple rows for that location A B .0 D El F G H I J Name of Location for which allowance is claimed ALLOTTED WATTS DESIGN WATTS Number of qualifying - locations Wattage Allowance per qualifying location Allotted Watts (B x C) Luminaire Code or Symbol Luminaire Description Luminaire Quantity Watts per luminaire Design Watts (G x H) Allowed Watts (smaller of D or I) Front Wall 1 90 90 LF-1 (1) Lithonia OLVTWM 4000K 1 1 15.0 15 15 Back Wall 1 90 90 LF-1 (1) Lithonia OLVTWM 4000K 1 1 15.0 - - 15 15 Sum total allowance per application on this site: 30 C-2. WATTAGE ALLOWANCE PER UNIT LENGTH (Sales Frontage) from Table 140.7-13 0 If more than one luminaire type is used per location, use multiple rows for that location A B lC D E F G H I J Name of Location for which allowance is claimed ALLOTTED WATTS DESIGN WATTS Linear feet of Sales Frontage Wattage Allowance per - linear foot Allotted Watts (B XC) Luminaire Code or Symbol Luminaire Description Luminaire Quantity Watts per luminaire Design Watts (G x H) Allowed Watts (smaller of D or I) Sum total allowance for sales frontage on the site:. 0 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA OUTDOOR LIGHTING POWER ALLOWANCES 01- CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 3 of 4) Project Name: Lake Calavera Restrooms Date Prepared. 9/21/2016 C-3. WATTAGE ALLOWANCE PER SQUARE FOOT OF HARDSCAPE AREA (Ornamental Lighting) - Table 140.7-13 Allowance for the total site illuminated hardscape area. Luminaires qualifying for this allowance shall be rated for 100 watts or less as determined in accordance with Section 130.0(c), and shall be post-top luminaires, lanterns, pendant luminaires, or chandeliers. 0 If more than one luminaire type is used per location, use multiple rows for that location A B I C D E F G H I Name of area for which ornamental allowance is claimed ALLOTTED WATTS . DESIGN WATTS Square feet of Hardscape Wattage Allowance per square foot Allotted Watts (B XC) Luminaire Code or Symbol Luminaire Description Luminaire Quantity Watts per luminaire Design Watts (G x H) Allowed Watts (smaller of D or I) Sum total allowance for ornamental lighting on the site:. 11 0 C-4. WATTAGE ALLOWANCE PER SQUARE FOOT OF SPECIFIC AREA -Table 140.7-13 Allowances for Building Facades; Outdoor Sales Lots; Vehicle Service Station Hardscape; Vehicle Service Station Canopies; Sales Canopies; Non-sales Canopies; Guard Stations; Student Pick-up/Drop-off zone: Outdoor Dining; Special Security Lighting for Retail Parking and Pedestrian Hardscape. If more than one luminaire type is used per location, use multiple rows for that location A B I C D E F G H I i Name of Location for which allowance is claimed ALLOTTED WATTS DESIGN WATTS Illuminated Area of Application Wattage Allowance per square foot Allotted Watts (B XC) Luminaire Code or Symbol Luminaire Description Luminaire Quantity Watts per luminaire Design Watts (G x H) Allowed Watts (smaller of D or I) Sum total allowance for specific area on the site: CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA OUTDOOR LIGHTING POWER ALLOWANCES 'EC-NRCC-LTO-03-E (Revised 05/15) UALU-OI<NIA ENERGY UUMMISION W CERTIFICATE OF COMPLIANCE - NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 4 of 4) Project Name :Lake Calavera Restrooms - I Date Prepared: 9/21 /2016 DOCUMENTATION AUTHORS DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Adrian Starr Documentation Author Signatu Company: A 5 Starr Energy Corporation Signature Date: 9/21/2016 Address: 2809 Bechelli Lane CEA Certification Identification (if applicable). City/State/Zip: Redding"CA 96002 Phone: 530-275-3350 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: The information provided on this Certificate of Compliance is true and correct. I am eligible under Division 3of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer)., The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part land Part 6 of the California Code of Regulations. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the b Iding, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is require incy6ed with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: (Bill) Nabil Taha Responsible Designer Signature: OF s-I Company: Precision Structural Engineering, Inc. - Date Signed: 9/22/2016 - _._-1.__-- •f Address: 250 Main St. License: C60802 City/State/Zip: Klamath Falls, OR 97601 Phone: 541-850-6300 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015;