Loading...
HomeMy WebLinkAbout3905; HIGHLAND DRIVE STORM DRAIN REPLACEMENT; LABORATORY TEST REPORT NO. 1; 2005-03-25Sample No Date Sampled Location Description 1 3/1/2005 Import Superior Ready Mix Plant at Dark Gray BASE with Little San Marcos - Fines Maxium density, and optimum moisture values determined in accordance with the ASTM D- 1557-91 laboratory test standard for subsequent compaction monitonng purposes were as follows:.' - •_; . Sample Classification Max bry, Optimun No (USCS) Density Moisture (pcf)... %. 1. .Rock°Báse . 145.0. 6Q. :. .: S •' An evaluation of the grain-size distribution of selected soil sample(s) was performed in general accordance with the latest version of ASTM 4)422 These test results were utilized in evaluating thesoil classifications in accordance with the Umfied Soil Classification System The results are L presented below Sample No.1 Sieve Size. Pércént Passing. .94 1/21in, 61 3/8in. . 41;,,.,.5. 30 #10: 22 #20. . 18 #40: '' . ".1.4. 0' '' 1:1 . #100' 4200 ,.' :55 It should 'be. noted tht test results contain ed heeiñ. are"for geotechnical' purposes and. do ñQt reflect compliance with United States Environmental Protection Agency and State of California regulations regarding environmental concerns Testing and subsequent approval of any import source applies only to the sample provided It is the contractor's responsibility to import materials that are consistent with the sample 'tested. 'many case, final: approval is continnt.upon the, Actual materials as hauled to the 'site. :' • ' S . S 5 5 2 • . -: - - --- S The laboratory test results indicate compliance with the project r?lans and sp&cifications excluding any exceptions, as noted under individual tables These laboratory test were performed in accordance with generally accepted standards and do not constitute engineenng L opiions orproject control It is the responsibility, of the contractor to schedule retests, or re- inspections of any areas that do not meet project specifications asl a result of the attached information TE-USL neither controls nor supervises the work at the site We are not responsible for errors and omissions of the contractor, nor for the contractor's failure to keep the work on schedule or carry it out in accordance with the project plans, specifications, and all applicable codes Respectfully submitted, - TESTINGENGI-N-EERS U.S. Labs, Inc. S . S Van W Olin, GE 2578 Geotechmcal Department Manager csfvo Distribution (1) Addressee (1) Field File - S T:\GotechnicaI Files\Projects\Contract Numbers\8 1789 Carlsbad-Highland Storm Droin\Lab Reports\81789 Lab Rêpot No ].doc S - S 555 3 .5 --