Loading...
HomeMy WebLinkAbout3907; RANCHO SANTA FE ROAD WIDENING; SITE OBSERVATION REPORT 7; 2009-11-18DUDEK SITE OBSERVATION REPORT 605 Third Street Encinitas, California 92024 ,4 T800.450.1818 '- o 2009 F 760.632.0164 I iN( Project: Rancho SantaFe Rd Bridge--- Report No.: Offsite Mitigation 7 Job No.: 3385-01-07 Owner: City of Carlsbad City Project Representatives: Duane Soileau Landscape Côiitiàctôr: AdlistëfCoonëy -GreeiiHorizôns - Biological Monitor: Stuart Fraser Monitoring 11/16/09 Date(s): 11/17/09 Time Varies 11/18/09 mm mmnn - Weather sunny - cloudy overcast rain x Day Temp. Field Notes/Activities/Observations: . • <55 55-70 70-85 > 85 x x On November 16th, 17th and 18th, 2009, Dudek habitat restoration specialist Stuart Fraser conducted plant inspections for the Rancho Santa Fe Road Bridge Offsite Mitigation Area. Plant inspections included inspecting delivered plants and verifying placement of container shrub species. Dudek met with Green Horizon representative Antonio for all coordination. Comments and recommendations are included below. , Plant Inspections: 1. The November 16th inspection consisted of checking in shrub container plants and assisting the contractor in placement. Visits on the 17th and 18th included follow-up discussions regarding plant placement and progress updates. All plants delivered appeared to be healthy and adequately rooted in their container but not root bound. All containers appeared free from weeds and non-beneficial insects. Dudek made recommendations for placing particular wetland plants, based on site hydrology and tree placement. Dudek recommended immediate planting of all shrub spebies. The following plants were inspected: Anernopsis californica (1 gal.) - 1414 Scirpus califonica (1 gal.) - 1162 Iva hayesiana (1 gal.) -424 2. Dudek recommended protecting all container plants from herbivore browsing while in the storage area. A protective barrier will discourage animals from browsing on plants concentrated in the staging area prior to planting is recommended. 3. Vandalism over the weekend was conducted on site. Several willow container plants were dug up and thrown into the creek. These plants were replanted by Green Horizons, but appeared streesed into the following days. Dudek will monitor the survival of these plants and recommends replacement if mortality occurs Additional Recommendtions 4 .4 -: .'' . - . •.. .,. 4 .'' .-, - .. ' - . - 1 Dudek recommended securing all equipment overnight and weekends to protect against vandalism Dudek recommends avoiding storage of materials in and directly adjacent to native habitat. This may impact existing native species. Dudek recommends consolidating and properly disposing offsite any waste generated from construction. :'' . . DUDEK S SITE OBSERVATION REPORT 605 Third Street ,Encinitas, California 92024 1800.450.1818 F 760.632.0164 . Please contact John Minchin at 760.479.4279 if you have any questions or would like to discuss the project further. Distribution: S Duane Soileau, Construction Vanagement& Inspection Consultants John Maashoff, City of Carlsbad Doug Helming, City of Carlsbad John Cahill, City of Carlsbad • Allister Cooney, Green Horizons John Minchin, Dudek. Signed: 'Date: 11/18/2009 Environmental Monitor Dudek S 2