Loading...
HomeMy WebLinkAbout3956; SAN MARCOS BOULEVARD TRANSMISSION MAIN; REPORT OF CONCRETE STRENGTH TEST; 2007-03-22EK,LNC. 1384 Poinsettia Ave. Suite A Vista, CA. 92081-8505 760-599-0509 39 REPORT OF CONCRETE STRENGTH TEST GeoTek,Inc. . . .. . San Marcos Blvd. Transmission Line Replacement. 'Report Date: 3122/07. .' RECEIVED 'APR O.22007 Project Number 3063SD1 Report Number 8 NOLTE ASSOCIAT Project San Marcos Blvd Transmission Line Replacement Client Nolte Associates Address: : •. 43620 Ridge Park Drive San Marcos, CA . . . . Attn: Lori INC.' FIELD TEST CONDITIONS AND RESULTS (A Location of Sample:,Wall-Apr 173+000-173+25 TICKET INFORMATION . • .. FIELD TEST DATA Date Sampled: 2/22/2007 • Water Added: 6 gal. Supplier: Palomar ,, Slump: 3 14" Truck Number 599 Air Content NA Tiàket Number: 216347 . ' , -Ambient Temp: 68 Mix-Number: 304002 Concete Temp: 70 Design Sffèngth: 4000 •, Sampled By: N. Toma Time Batched: 9:16 Time Sampled:-10:25 Batch Size' 3.0 äy . Time Emptied: 10:35 Placement Method: Direct Time In Mixer: Date Delivered to Lab: 2/23/2007 Weather: (flMPRFIflN TFST RFSIILTS (ASTM r'q Specimen Test Date . Age Load Diamete Area Strength Percent of Design Type of Fracture 6237A 3/1/2007 7 118900 600 2827 4210 105% E 6237B .3/22/2007 28 137800 6.00 . 28.27 4870 • . 122% C 6237C 3/22/2007 28 141200 600 2827 4990 125% C 6237H 4/19/2007 56 Meets Specified Strength:, : Yes U N : ' • . 28-day Average Strength 4870 TYPES OF FRACTURE E z 11' [H. Remarks I A B C. D E Cone Cone & Cone & Shear Columnar , * Split Shea Reported by Dave Cliff Laboratory Manager - * .