Submittal Sheet
' From: Mitch Darwish
Project Manager
Attn: Alison Luedtke, Project Inspector
Ref.: SIMSBURY SEWER PIPELINE EXTENSION; PROJECT NO. 5533
Shop Drawings: El Product Detail: LI Color Chart: Li
Documents: Sample: LI Submittals: LII
This statement certifies that the attached submittal has been reviewed for completeness and conforms to the
specified requirements. We further certify that: 1) Field measurements have been determined and verified, 2)
Field construction criteria have been verified, 3) Catalog numbers and similar data are correct, 4)
Conformance with requirements of Contract Drawings and Specifications is confirmed, and 5) All deviations
from requirements of Drawings and Specifications have been identified and noted, and product is available.
No. Description Specification Qty Resubmittals
6 Traffic Control Plan
-
Contract
agreement
1
II
2
6-21-18
Signature of Preparer Date
Page 1 of 1 - submittals sheet #6 Traffic
Control Plan 6/21/2018
LEGENDS
RESION EI'fl I Wy APPROVALI
!!i I CHI Construction SHEETS
I.mc CotroI rtn tot,
SIMSBURY SEWER PIPELINE EXTENSION
ACP1EO BY
5!2IflH
BAIt
DYM BY: - PRO.ECT NO. DRAWING NO. 0,0 -----
RWO 8I 5533
TRAFFIC SIGN LEGEND
hIDEWALKi
]] CLOSED
Ron-R0A5I
TH umcjICLO$EDI'
øEWAILOSEi
( CROSS mom JJ 4k
'
14 112 C27(CA) P.941
1eteOt
CITY OF
'CARLSBAD
Public Works www.carlsbadca.gov
Submittal Review
Project Name: NW Quad Storm Drain Program - (Roosevelt North)
Project No.: 66082 (PWS1667TRANS)
Submittal Title: SWPPP
Submittal No.: 10217-02
Contractor: Blue Pacific
Date Received: 8/3/2016 Date of Return: 8/4/2016
CITY OF CARLSBAD
SHOP DRAWING REVIEW
THIS REVIEW BY THE ENGINEER IS FOR GENERAL CONFORMANCE WITH THE PROJECT DESIGN CONCEPT AND
GENERAL COMPLIANCE WIT THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SHALL NOT IN ANY
WAY RELEASE THE CONTRACTOR FROM FULL RESPONSIBILITY FOR COMPLETE AND ACCURATE PERFORMANCE
OF THE WORK IN ACCORDANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS NEITHER SHALL THIS
REVIEW AND RESPONSE RELEASE AND CONTRACTOR FROM ANY LIABILITY PLACED UPON HIM BY ANY
CONTRACTUAL PROVISIONS. ALL DEVIATIONS FROM THE PROJECT CONTRACT DOCUMENTS SHALL BE
SPECIFICALLY CALLED TO THE ATTENTION OF THE ENGINEER.
O REJECTED/RESUBMIT
O AMEND AND RESUBMIT
MAKE CORRECTIONS NOTED
O NO EXCEPTIONS TAKEN
o RETAINED ON FILE
By: SHoward 8/4/2016
Engineer Date
By:
Construction Manager Date
Comments:
Ciawftr
JOtA) fNt4M31 c(-ry ff&3Sri.
CM&I Engineering
5950 El Camino Real 1635 Faraday Avenue
Carlsbad, CA 92008 Carlsbad, CA 92008
760-602-2780 760-602-2765
Development Services
City of STORM WATER COMPLIANCE FORM Land Development Engineering
TIER I CONSTRUCTION SWPPP 1635 Faraday Avenue
760-602-2750 .rs Odu E-29
STORM WATER POLLUTION PREVENTION NOTES
ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
STORM WATER COMPLIANCE CERTIFICATE
V My project is not in a category of permit types exempt from the Construction
SWPPP requirements
V My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
V My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code)
V My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
OWNER(S)/OWNER'S AGENT NAME (PRINT)
OWNER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE
PROJECT INFORMATION -
Site Address: Roosevelt St., Carlsbad, CA 92008
Assessor's Parcel Number:
Project ID: 2-16
Construction Permit No.:
Estimated Construction Start Date July 11, 2016
Project Duration 2 Months
Emergency Contact:
Name: Jesus Fierro
24 hour Phone: (619) 704-6868
Perceived Threat to Storm Water Quality
Medium
Low X
If medium box is checked, must attach a site plan
sheet showing proposed work area. and location
of proposed structural BMPs
For City Use Only
CITY OF CARLSBAD
STANDARD TIER 1 SWPPP
Approved By:
Date:
E-29 Page 1 of 3 REV 07/14
Erosion Control Sediment Control BMPs
Tracking
Control Non-Storm Water Waste Management and Materials
BMPs BMPs Management BMPs Pollution Control BMPs
Best Management Practice
I ! j5
E.
5
(BMP) Description 4 0 V .
..0 C L
U•• o O O O. o >'. D $2ø CC 1 o LU C (l) Z C/) C/) . 0 .- U- 0 Cl) (1) (1)0 1).
CO
(l)O CL 00 o a) .2 >c 2. Cr.Cl) C .5 C/)( acL o i 0
CASQA Designation 4 '" 9 C? C? Ir 0? C? 1 (9 (9 0? o 0 0 LU LU LU LU LU w LU LU LU of Q Cl) Cl) Cl) 0)
Construction Activity LU LU O UJ z
C/) Cl) Cl) Cl) Cl) Cl) Cl) Cl) - - Z Z Z Z
( Grading/Soil Disturbance X — X X X X — - — - - Y X X X -
.KTrenching/Excavation -X X XXX X X X XXXXX
X Stockpiling X --X X — X - — — - - xXxXx x x Drilling/Boring
Concrete/Asphalt Saw X X x X X X X X X X X X X X X cuttinq
X Concrete flatwork --X X X X - x - — — — - x — X Paving x x- r — — - x X
X Conduit/Pipelnstallation
Stucco/Mortar Work
-x
X Waste Disposal XXXXX X Staging/Lay Down Area X x x x - - — x - -x- -x- - x x x x x- x - X Equipment Maintenance
-
x x x x x x x x x and Fueling
X Hazardous Substance
X Dewatering
Site Access Across Dirt X X - X - - X X — - _X X x x x x x
-I Other (list): - -
-
-x -- --
Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was
checked off and for each of the selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review
the list for something that applies such as 'Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction
Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice
measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 of 3 REV 07/14
Legend
Scale of map
Site Map
Features displayed on the map must include:
An outline of the entire property
Location and brief description of construction activity areas (e.g.
grading, building, trenching, fueling areas, waste container area,
wash racks, hazardous material storage areas, etc.)
Location and flow direction arrows for existing drainage facilities
(ditches, channels, inlets, storm drains, etc.)
Location of existing storm water BMP controls (sediment basins,
oil/ water separators, sumps, etc.)
Location of proposed storm water BMP controls with brief
description or legend reference
E-29 Page 3 of 3 REV 07/14