Loading...
HomeMy WebLinkAbout6-10; EL CAMINO MESA UNIT NO. 4; COMPACTION TEST; 1966-10-27ENGINEERING PLANNING SURVEYING SOIL MECHANICS. (J_l° TANNER, MARQUARDT AND ASSOCIATES, INC. 230 West Third Avenue . Escondido, California 92025 . (714) 745-7720 October 27, 1966 Job No. 7515 City of Carlsbad 2960 Plo Pico Drive Carlsbad, California 92008. Gentlemen: .- At the request of Mr. Westree,. we have performedone laboratory compaction-test and nine field densities in the utility line backfills in El Cámino Mesa No. 4. V Results are as follows: Laboratory compaction test: ASTM D155.7-58T -' V Soil: Light brown, sandy clay mixed with light grey, sandy clay. V V Maximum Density: r 124.3 pcf V V Optimum Moisture: 11.1 To Depth below .'Field Dry Relative V Test existing . Moisture, Density, - Compaction, V No.. VLocation ground, ft. -% V pcf % V V V V V V 1{24+75Trieste VV power &gas 1.1 . 7.7 107.5 86.5.. 2 - 26+00 Trieste V •V V power &.gas 0.9 12.1, 99.2 V 80.0 • V 3 4+78 Trieste V sewer 1.2 • 11.2 103.2 83.0 4 Lot 127 sewer V lateral at curb 10 • 21.1 93.9 V - 'Sewer 13' E of V radius pt. V V V Sti'ombergCircle 0.9. V 10.5 - 112.7 V 907 6 1+72 sewer V • V Stromberg Circle 1.1 - 11.1 104.6 • 84.2 V JOHN FVTANNER V • • V • . V RVCVEV V V V DEAN K. MARQUARDT V V V R. C. E. V V V - V V :V VV V V V V •• V . •V• V ' V V V S Job No. 7515 City of Carlsbad - October 27, 1966 Page 2. 'Depth below Field Dry Relative Test existing Moisture, Density, Compaction, No. Location ground, ft. pcf 7 4+85 Trieste sewer -main 1.1 5.9 111.3 90.0 8 Trieste Dr. sewer main opp. corner Lots 129-130 0.6 9.2 112.1 90.2 9 0+52 Stromberg Circle sewer 'main .0.9 12.9 114.0 . 91.7 Sincerely y0u1s, John F. Tanner R'.C.E. #9525 JFT:mlc (4 copies)