HomeMy WebLinkAbout62-2; LAGUNA RIVIERA NO. 4; LOTS 81 THOUGH 138 SOIL ENGINEERING; 1969-08-05o I WOODWARD-CLYDE & ASSOCIATES RECE IV ED CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS 1JGi3 1909 August 5, 1969 Project No. 6237 CITY OF CARLSBAD . Engfneefing Department Kamar Construction Company, Inc. 325 Elm Avenue - Post Box 71 Carlsbad, California 92008 Attention: Mr. Jerry L. Rombotis LAGUNA RIVIERA UNIT NO. 4 LOTS 81 THROUGH 138 CARLSBAD, CALIFORNIA Lc . D uo :\YI In accordance with your request, we have provided soil engineering ser- vices in conjunction with the grading of the subject site. These ser . vices included engineering observation of the grading operation and the taking of. 'field density tests in the fill, placed and compacted on the, subject site. We also observed the removal 'of compressible silts and clays from proposed lots. Site preparation, compaction and testing were done between May 5-and July 8, 1969 in accordance with the "Specifications for Controlled Fill',' presented in the preliminary soil report dated July 29, 1965 for the project prepared by Dresselhaus Engineers, Oceanside, California, and the addendum dated January 6., 1966, except as noted below. Page 5, Second paragraph of the, above report. Expansive soils were under- cut 2 feet in lieu of 3 feet as recommended. Page 2, Item 6 of the above addendum. Undercutting cut portions of cut-fill lots was omitted. S Page '2, Paragraph (e) of "Specifications "for Construction of Controlled Fills" 'portion of the above addendum. This section was modified to substitute rolling in lieu of overfilling and cutting back of fill slopes. Fill was placed, compacted and tested on Lots 81 through 88, 92 through 100., 105 through 107, 110 through 120, 122, 124, and 130 through 138. ..As the site grading progressed, the compaction procedures were observed and field density tests were made to determine the relative compaction of the fill in place. 'Field observations and field density test results indicate that the fill has been compacted to 90 percent or more of maxi.- mum laboratory density. The results, of field density tests and of relative compaction, expressed as a'percent of maximum labo.ratory'density, are given, on the attached forms. Kamar Construct Coirpany, Inc Proi.c.± No 66-2 7 L969 2 WOOD WARD -CLYDE. & ASSOCIATES . CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS La Wy tests to determine moisture-density relationships, maximum 4 de X pi'', optimum moisutre content, grain size distribution, plas- 1i10aracteristics and strength and swell characteristics were ptiti°on representative samples of the material used for fill. The rétltcW laboratory tests are given.on the attached forms. Laboratory tests indicate that ibnexpansive fill-was placed within 2 feet of rough grade on all fill lots, noted above. During grading'of Lots 81,, '82, 112, 113, 114, 115, 122, and 124 potentially expansive soil was replaced with nonexpansive'fill to a depth of 2 feet within the limits of the entire level lot pad. The results of loaded swell tests indicate that two feet of undercut replaced with select ma- terial is sufficient to prevent detrimental heaving of the proposed structures. . •• . . . • A visual inspection of cut Lots .89, 90, 91, 101,102, 103, 104, 108 9 109,, 121, 123, and 125 through 129 'at completion of grading indicates - that potentially expansive soil is not evident at the rough grade surface. A visual inspection of the subject site at the completion of grading indicates that potentially expansive soil is not evident at finish grade on either cut or fill lots. Based on an inspection of the materials on cut-fill lots at finish , grade, it is our opinion that undercutting the cut 'portion of the 1t 12 inches,and replacing it with 12 inches of compacted fill is not.. 'necessary. Foundations may be designed in accordance with the recommendations made •. in the above-mentioned soil investigation report by Dresseihaus Engineers,.. dated July 29, 1965. The elevations of compaction tests shown as finished grade (FG) tests .correspond to the elevations shown.on the grading plans for "Laguna Riviera Unit No. 4", dated September 1968, corrected to March 26, .1969, . prepared by Raymond R. Ribal, 770 South Brea Boulevard, Brea, California. It is our Understanding that the settlement monuments as recommended .in our letter dated November 25, 1968 will be installed by your organization. Other recommendations pertaining to inspection pits were followed at the time of grading. This report covers the fill placed under our observation during the dates' specificed above. Additional fill placed 'after these dates,' as well as the backfill in utility trenches located within 5 feet of a building and. greater than 12 inches deep, or any trench 5 feet or more' from a building and in excess' of 5 feet in depth, should be compacted under the observation of this'office and tested to assure compliance with the' earthwork specifications of' the project. This office should ,WOODWARD .CLYDE & ASSOCIATES - • , Consulting Soil and Foundation Engineers and Geologists Kamar Construction Company, Inc. : Project No 66-237 Auaust . 196 - Page 3 be contacted at least 24 hours prior to backfilling operations. Utility service trenches 'within 5 feetof a building that are perpendicular to the building footings and are less than 12 inches wide and less than 3 feet deep are not subject to this recommendation. Struclires. that will not tolerate differential settlements (such as foundations, swimming pools, concrete decks, walls, etc.) should not be located within 5 feet of the top of a slope. Footings located closer than 5 feet from the top of-the slope should be extended in • depthintil the outer bottom edge of the footing is 5 feet horizon- tally from the outside face of the slope. 'The inspections and tests of compaction made during the period.of our services on the subject site were ih'a'ccordance with the local accept-, able standards for this period. The conclusions' or opinions drawn from the' tests and site inspections apply only to our work with respect' to grading andrepresent conditions at the date of our final inspection. • We will 'accept no -responsibility for any subsequent changes made to - the site by others or by,uncontrolled action of water or by failure of others to properly repair damages caused by uncontrolled action of. water. • ' EHP/JLH/LJL/jsk Attachments. • • • (5) Kamar Construction Company, Inc.' (1) City of Carlsbad 0) Security Title Insurance Company WOODWARD - CLYDE, & ASSOCIATES - Conulting Soil and 'Foundation Esiginccrs and Gcotogists OMPACTION TEST RESULT* JOB NAME JOB NUMBER DATES COVERED LAGUNA RIVIERA 66-237 . June 2 through UNIT NO .-4 July 8,1969. . DATE REPORTED 8-5-69 PAGE l OF 4 BATE TEST NUMBER - - RETEST - OF LOCATION . . . - ELEVATION -- . OF TEST MOISTURE CONTENT % DRY WT. - FIELD DENSITY. PCF LABORATORY RELATIVE DENSItY . COMPACTION PCF % OF LAB. DENS. • . . 0 LOT: JUN 2 1 . -• . 97 15.0' . '9.3 113.2 124.5 91.0 2 98 13 0' 11.7 104.5 116 0 90 1 3 . .95 ..--- 1.9.O 11.1 111.5 122.5 91.0 4 133 . . 33.0' 12..3 . 117.9 125.0 . 94.2 5 138 21.0' 8.7 11,1.1 2.5,. 90.7 JUN 3 6 . . 94 ' . . 29.0' 11.1 112.1 122.5 91.5 7 . 131 37.0' 10.5 11-5.8 125.0 92.6 8 ' . . 134 32.0' 11.7 115.1 125.0 92..1 9 135 39 0' 12 .3, 114 .8, 12.5.-0 91.7 JUN 4 10 132 31 0' 7.9 112.5. 122.5 91.7 11 . 130 . ' ' 45.0' 13.6 . .110.0 125.0 . 87.9 12 . = 131 . 41.0' 12.3.. ' 114.5 1.22.5 93.3 13 11 130 45.0' 13.0 114.1 125.0 91.3 14 ' ' . . 133. . 37.0' . 8.7 , 111.2 122.5 ' 91.0 15 . 137. 29.0' 6.9 122.1 124.5 98.2 JUN 5 16 . ., . . '138 25.0' 8.7 115.1: .122.5 ' 94.1 17 . ' 132- .35.0' iLl 112.0 124.5 . 90.0 18 . . 134 . 36.0'. 11.3 . . . 114.2 124.5 91.8 19 131 45.0' 13.0 114.8 122.5 93.6 20 . ' ' 133 . . 41.0' 11.1 ' 114,0 122.5 -. 93.0 21 ' 132 ' . 39.0' .. 10.5 . . 112.0 122.5 ' 91.4 22 130 . .FG 47.0' 11.1 115.3 122.5 94.2 JUN 6 23 . ' . 118 -, . , 17.0' 12.3 113.5 122.5 , 92.7 24 . . . 138, .: 29.0' 7.5 119.2. .122.5 .. 97.4 25 . . ' 117 15.0' . '14.3 - 103.5 110.0 '' 94.2 :26 - - . . 116 13.0' .. 13.6 103.7 . 110.0 94.2 27 ' '. 118' . 21.0' - 17.0 - 99.6 ' 110.0 90.7 JUN 9 28 - 92 - 29.0' 10.5 111.2 122.5. 90.9 29 . 119 23.0! 9.3 111.8 122.5 - 91.2 30 118 - . 25.0'' 10.5 - 114.1 124.5 91.8 . 120- ' - 42.0'. 11.1 .107.3 . 116.0 - 92.7 - ' ' . . . - 117 FG 18.0' - 10.5 11.9 122.5 95.5 - JUN ii 33 . . 138 - ' 33:0' - 8.7 . .119.0 ' 128.0 - ' 93.0 - 34 - 137 . 33.0'. - 8.1. 106.0 117.0 90.6 35- - 136' - - 27.0' . .9.3 105.0 117.0 90.2 - 36 ' 137 - 37.0' - 11.7 113.0'' 122.5 92.3 - - WOOD WARD -CLYDE & ASSOCIATES - Consulting Soil and Foundatirn, Engineers and Geologists OMPACTION TEST RESULT• JOB NAME LAGUNA RIVIERA UNIT NO. 4 DATE REPORTED 875-69 Jon NUMBER 66-237 DATES COVERED June 2 through July 8, 1969 PAGE 2 OF 4 DATE TEST NUMBER RETEST LOCATION OF . LUI: ELEVATION OF TEST - MOISTURE CONTENT % DRY WT. FIELD DENSITY PCF LABORATORY RELATIVE DENSITY COMPACTION PCP % OF LAB. DENS. :JUN 12 . 37 . 136 31.0' . 9.7 106.7 117.0 91.1 38 . 137'.FG 40.0' . 11.1 114.5 122.5 93.5 .39. . 85 . 21.0' 11.1 .118.0 . 128.0 92.1 40 83 19.0' 10.5 117.0 . 128.0 91.4 41 81 . . 13.0' 11.7 113.3 122.5 92.5 42 . 84 27.0' 12.3 112.3 122.5 . 91.7 43 . 82 . 18.0' 8.7 113.1 122.5 92.4. 44' 86 . 29.0' 13.1 116.1 125.0 93.1 JUN 13 45 87 31.0' 10.3 112.9 122.5 92.1 46 88 . ' 40.0' 8.7 115.2 . 122.5 95.0 47'" . . . 137 . ' FG 40.0' .10.5. 120.3 122.5 98.3 .. ' 48 ' . .. 136 . 35.0' 14.9. 104.1 117.0 ' '89.2 49 ' 82 22.0' 9.9 117.9 ' 124.5 . 94.7 . 50. . .84 . . 27.0' 13.6 113.0 124.5 90.7 51 ' 86 33.0' . 8.1' 105.0 117.0 90.7 JUN 16 52 48 136 •' 5.0' 8.1 111.0 117.0 94.7 53 . , 138 FG 37.0' 11.1 117.7 . 122.5 96.0 54 . 135 FG 43.0' 8.7 113.9 122.5 ' 92.9 55 .. : 134 40.0' 6.4 113.8 122.5 92.7 56, ' 132. 43.0' 8.7 114.2 122.5 93.3 7 . .. . . . 131 FG 47.0' ' 9.9 114.0 122.5 . 93.0 58 ' . . 81 16.0' . 8.1 112.0 "122.5 91.5 JUN 17 59,. , . 136 39.0' 13.0 117.5 124.5 ' 94.4 60 83 ' ' ' 23.0' 13.1 11.1.8 122.5 • • 91.2 61. . . 133 45.0' 8.1 113.2 122.5 '. 92.4 62 . . 85 • 25.0' 11.1 ' 120.1 128.0" • 94.0 63 . . • . 87 • . 35.0' 9.3 116.5 1.28.0 91.0 64 . •' . .' • 86 37.0' . 9.9 114.7 122.5 ' 93.5 65' . . 81 ' 20.0' 58 111.8 122.5 91.2 66 , . . • . 82 • ' 23.0' 6.4 • 111.5 122.5: S 91.1 JUN 18 67 . • 82 . 26.0' 9.3 . 115.0 122.5 93.9 68 83 27.0' 9.3 •. 112.0 ' 122.5 91.4 69 . 85 ' 29.0' 6.9. 113.9 122.5 92.9 70 . 87 . 39.0' 8.7 109.8 1,17.0 93.7 71 . • 119 " : 27.0' 9.9 118.2 128.0 92.4 .72 • ' , 95 • 23.0' 9.3 .' '117.3 .. 122.5 95.8 WOOD WARD -CLYDE & ASSOCIATES Con.iuUing Soil and Foundation Engineers and Geologists OMPACTION TEST RESULTS Joa NAME LAGUNA RIVIERA UNIT M. 4 DATE REPORTED 8569 JOB NUMBER 66-237 DATES COVERED )une 2 through July 8, 1969 PAGE 3 O 4 DATE - TEST, .' NUMBER -: RETEST .' LOCATION OF - ELEVATION OF TEST MOISTURE CONTENT %' DRY -WT. FIELD DENSITY PCI' LABORATORY DENSITY ' PCI' .. RELATIVE COMPACTION % OF LAB. DENS.' LOT: •. . JUN 19 . 73 . .. 97 19.0' 9.3 113.9 122.5 92.9 74 . . ' :96 .19.0' 8.1 111.0 122.5 '. 90.6 75 95 27.0' 8.1 114.0 122.5 93.0 76 118 . 29.0' 8.1 1128 . 122.5 92.0' 77, . ,. '. 119 27.0' 7.5 114.2' 122.5 .. 93.4 78 116 17.01 7.5 112.0 117.0 95 7 .79 . ' . , 105 17.0' 7.5 111.8 112.5 91.1 JUN 20 80 83 28 5' 8.7 118 1 122.5 96.3- 81 . , '. 106 ' 19.0' 9.9 . .. 113.0 122.5 92.1 , .82 ' . . 84 ' 31.0'' 9.3 . ' 114.0 122.5 93.0 ' 83 .. . ' . ' 87' ' 39.011: 8.7 111.0. 122.5 90.6 84 -- . 92 '- ' 33.0" 10.5 ' 117.0 124.5 93.8, 85. ' '. , . . . 94 ' 33.0' . .11.1 ' . ' 116.0 124.5 93.1 JUN 23 86 ' ' 93 ' . . ' 35.0' ' 9.9 ' 117.0 124.5' . 94:0' 87 ' . 94 ' . . 33.0' ' 9.3 . . 117.3 -1245 944 88 ' 96. 23.0' 9.3 117.5 , . 128.0 ., 91.8 JUN 24 89' . - ' 134 , FG 44O' 8.7 116.0 122.5 ' 94.6' 90 . . . 120 FG 44.0' 5.8 118.2 122.5 96.6 91 ' ' , 132 FG 46.5! 8..1 115.0 , 122.5. 94.0 92 ' 124 37.0' 5.2 ' ' .110.2 122.5. 90.0 JUN 26. 93 84 PG 32.51 87 1107 1225 903 94 . . 94 FG 35.5' 9.3- 111.9 122.5 91.2 95 .. . 85 ' ', 33.0''. 11.7 110.9 - .122.5 '90.4 JUN 26 96 ' : .122 43.0' 5.2' 114.1 1225 .. 93.3 97 . ' 96 ' FG 26.01 ,. 8.7. 114.1 122.5 '93.3 98 ' . , . -. 86 ' 37.0" ' 7.5 113.9 122.5 92.8' JUN 27 99 86 39 0' 6.9 113.0 122'5 92.3 1.00 . '. . 87 ' ' ''39.0' 7.5- 116.0 ' 122.5 94.7 101 . ' . . 88 . 43.0'', .8.7 . 113.7. 122.5 . 92.7 102-. 95 - ' , 31.5'. - 6.9. 122.2 , :122.5 99.7 JUN 28 103 , - . - 95 FG 34.5' 6.4 114.8 122.5 ' 93.6 104 ' - 119 ' ' ' 27.0' 9.3 113.0 122.5 - 92.3 105' - ' 97. - ' FG 20.8' - 8.1 108.0: - 117.0 92.5 106 - 105 FG 21.0' 6.4 115.0 - 122.5 93.9 107" - ,. ' 1O6'' ' FG 21.0' ' 6.9. 114.2: - 122.5 93.2, 108 - - ' ...83. - ' FG 31.5' 7.5' 113.4 122.5 . 92.6 109 - -. '92 . - - FG 37.0' 9.3 113.8 122.5 92.7 - 1.10 . - - - 93 - FG 36.5' 9.3 120.5. ' 12.2.5 98.3 111 94 FG-35.01 :5.2 112.0 122.5 91.4 WOODWRRD CLYDE & ASSOCIATES Consulting Soil and Foundation Engineers and Geologists OMPACTION TEST RESULT JOB NAME LAGUNA RIVIERA UNIT NO 4 DATE REPORTED'.8-5-69 JoB NUMBER 66-237 . DATES COVERED June 2 through July 8, 1969 PAGE 4 OF 4 DATE TEST HUMBER RETEST . LOCATION ' OF - - ELEVATION OF TEST MOISTURE . CONTENT . % DRY WT. YIELD DENSITY PCF. LADORATORY- DENSITY .-PCF RELATIVE COMPACTION % OF LAB. DENS. LOT:. JUN 30 . 112 . . . 118 . FG 33.0' 6.4 . 111.1 . 122.5 90.8 113 119 31.01 7.5 115.4 122 5 94.3 . 114 . 112 . FG 20.0' 10.5 114.5 122.5'. 93.4 115 . 113 FG 19.5' 9.3 . 113.2 122.5 92.5 .116 114 13.0' 8.1 112.3 122.5 . . 91.8. 117 . 115 '. 11.0' 9.9 110.1 122.5: 9OO-- 118 11.9 35.0' 7.5 115.3 122.5 94.1 119 136 TG 41. 0' 99 1113 1225 910 JUL 1 120 1 19 FG 37.01,9.9 112.8- 122.5 91.9 121 .. . 85. -: 37.0' 8.1 116.2 122.5 94.8 • 122 . 86 . . 41.0' 9.3 112.0 122.5- 91.3 • 123 . -. 87 . 43' .8.7 111.5 . 122.5 91.2 124 . . '.. 107 FG 18.0' 10.5 114.0 - 124.5 91.6 125 . .. 110 FG 19.0' - 9.9 - 113.6 124.5 . 91.3 126 . . 111. - FG20.0' 9.3 114.3 124.5 91.9 JUL .2 127 . : 115 . 15.0' 9.3 105.5 117.0 90.2 128 . 5 --fG 41.0' 9.9 113.3 122.5 . . 92.5 129 114 17.0' - 8.7 106.5 117.0 - 91.0 130- . 116. 17.0' . 8.7 107.0 117.0 91.5 131 . 86--- FG 45.0' 9.3 115.1 122.5 94.1 JUL 3 132 . 87. . - FG47.0' 105 115.4 1245 . 92.7 133 . : 88 FG '' 9.9 116.9 124.5 93.8 134 - . 98- FG 15.0'. 11.1- 111.4 122.5 91.0 135 . . -. 99 - FG 15.0' 11.7 111.1. 122.5 90.7 JUL 7 136 . 114 FG 19.0' 8.7 116.9 122.5 953 137 115 FG.18.0'.- 9.9 . 115.9 122.5 94.5 138 . . 116 - FG 18.0' 9.3 114.3 122.5 . 934 139-- -.100- - FG 15.0'- 10.5 111.5 122.5'. 9.1.1 JUL 8 140 122 FG 44.51 10.5 115.3 122.5. 94.1 - 141 . . - 124 . FG 38.5' 99 .114.8 -.122.5 93.7 OMPACTION TEST RESULT* Joa NAME LAGUNA RIVIERA UNIT NO 4 (Streets) DATE REPORTED 8-5-69 JOB NUMBER 66-237 . . DATES COVERED June 3 through, June 27, 1969 PAGE 1 Or DATE TEST RETEST LOCATION NUMBER OF . . . ELEVATION - OF TEST MOISTURE CONTENT- % DRY'WT. YIELD - DENSITY PCP LABORATORY RELATIVE DENSITY COMPACTION PCF •.. S OF LAB. DENS. JUNE 3 S-i 100' N of. Alondra Way : . . on Valencia . 29.0 13.0 114.1 122.5 . 932 S-2 175' N -of Park Drive . . . on Valencia 17 0' 13 2 112.5- 122.5 91.8 JUNE 9 .. S-3 . Intersection of Park . . . -. . Drive & Alôndra Way . 14.0' 12.3 . 112.3 122.5 91.8 JUNE 11 S-4 . S6f Lot 86 onAlondra Way .-' . 380' .11.1 115.5 .-. 122.5 94.3 S-5 . S of Lot 83 on Alondra- . . . . Way . 22.0' 12.3 112.0- 122.5 -.. 91.4 JUNE 19 -S6 . Eof --Lot 81 .on Pa'k 12.0'- 11.1 .115.2 -122.5 93.8 JUNE 20 S-7 S of Lot 116 or, Park 13.0' 14.9 102.0 . fl . 92.8 • S-8 . S of Lot 116 on Alondra 14.0' . 9.9 112.1 124.5. JUNE 24 S-9 S of Lot 94 on Alondra 27.0' 11.1 116.0 125.0 92.8 JUNE 25 'S-10 W of Lot 82 on Alondra' 22.0' 12.3 113.1 122.5 92.4 • S-li W of Lot 95 on Valencia 27.0' 11.1 114.3 122.5 . 93.4 JUNE 27 S-12 S of Lot 85 on Alàndra 33.0' 8.1 - 117.9.. 128.0- 92.1 S-13 - S of Lot 84 on Alondra 29.0' 8.7 .1-18.7 128.0 - - 92.7 WOODWARD -CLYDE & ASSOCIATES Consulting Soil and Foundation Engineers and Geologists Tkt 80 60 20 ' MECHANICAL ANALYSIS 3 *a It IO '40.. 200 DIRECT SHEAR TEST DATA I 2' 3 Dry Density, pcf 112.1 107:5 110.2 Initial Water Content, % 11.2 11.0 9.5 Final Water Content. % 16.5 18.7 17.9 Apparent Cohesion. 'psf , 730 270 340 Apparent Friction Angle. 0 .25. 1 20 q 20 ~mmbllmmmmm ~mmmmm KEN OVENRIEN GRAIN SIZE IN MILLIMETERS COBBLES IRAVEL f !SILT & CLAY j 11 130 130 ACTERISTICS I ,1 2': ' 3., 43 43'' 36 % ' 21'. 24' 18 y Unified Soil System CL CL CL 1 120: - .100 90 4 I 23 sity. pci --- 112.1 115.6 ontent, % .11.1 . 9.9 160 160 8.7 9.1 IFIC GRAVITY I AIR VOIDS CURVES 80 0 10 ' 20 30 ' 40 LABORATORY COMPACTION TEST . FILL SUITA LABORATORY COMPACTION ' . . LAGUNA 'R TEST METHOD; ASTM D1557-64T 'WOOD4ARD • CL'i CONSULTING SOIL EN( SAN DIEGO, DR. BY: L.DS 1. SCALE: CK'D BY: oJ" JATE: 8- 'SWELL TEST DATA **** '. 6 Initial Dry Density. pcf , 116'5 117.7 Initial 'Water Content, % - '14.4 10-2- Load. psf -' 160 160 Percent Swell - 7. 3 . 1 .9 I ki iuiuuumi•a MECHANICAL' ANALYS IS DIRECT SHEAR TEST DATA 4 5 6 Dry Density, pcf 110.3 - Initial Water Content, % 12.5 - Final Water-Content. % 17.3 ,- - Apparent Cohesion. psf 1290 1 - - Apparent Friction Angle. ° 28 - 0 1110 - - 1000' 100 10 1.0 0.1 0.01 0.001 . GRAIN SIZE IN MILLIMETERS - - - -\ kLESIGAYE L ISILT & CLAY 1 120 130E , PLASTICITY CHARACTERISTICS .4 5.'. ' 6 Liquid Limit, % - 28 Plasticity Index. % NP* - 11 Classification by Unified Soil Classification System ' - CL I100 I 1 I I , 'Special Test . = 2.70 2.60 SPECIFIC GRAVITY 2.50 90 MAXIMUM DRY :4 5 6 DENSITY, pcf 122 5 117 0 129 5 \ZERO AIR VOIDS CURVES OPTIMUM MOISTURE ' , .,. ' CONTENT '% ' 11 2.0 I•)•J 9. 5. 80 - MOISTURE CONTENT, % 0. tO '20 30 110 . LABORATORY COMPACTION TEST FILL SUITABILITY TESTS. 'LABORATORY COMPACTION • . • ' ' ' LAGUNA RIVIERA #4 TEST METHOD: ASTM D-155764T ' ' ' . ' W001Y4ARD CLYDE & ASSOCIATES: ' ' V CONSULTING SOIL ENGINEERS AND OEOLOGISTS' V , ' SAM DIEGO, CALIFORNIA. DR. B: L DS SCALE: --- ' ' JPROJ. NO:66-237