Loading...
HomeMy WebLinkAbout62-2; LAGUNA RIVIERA NO. 4; STREET BASE TESTS; 1970-07-13WOODWARD CLYDE & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS L.'L9) uflo( Ri viet,. W J'Jo.LJ 3467 Kurtz Street July -13 1970 P. E.0 E I V• E D San Diego Project No. 66-237 California 92110 (714) 2242911 JU L 14 1970 Kamar Construction, Inc CITY OF CARLSBAD P.O. Box 71 Engineenng Depart Department Carlsbad, California 92008 Attention Mr Jerry L Rombotis LAGUNA RIVIERA-UNIT. NO. 4 STREET BASE TESTS~ Attached are the results of field density tests taken at the subject project under the direction of Mr N E Westree, City Public Works Inspector, on the dates indicated and at the locations given Also. attached are the results of laboratory tests performed on a*. sample of the material used for fill Henry EHP/JLH/jm . Attachments (4) Kamar Construction Company (2) City. of Carlsbad P / COMPACTION TEST RESUL• JOB NAME LAGUNA RIVIERA UI'Ul NO 4 (Streets) DATE REPORTED 7-13.70 JOB NUMBER 66-237 DATES COVERED July 3,..-19.70.''. PAGE 1 Or ] - BATE - -. -- TEsT - - RETEST - - LOCATION NUMBER or - -- -- - - UOIDTUE ELEVATION CONTENT OF TEST % CRY WT. YIELD -SORATORY - RETIVZ DENSITY - DENSITY - COMPACTION- YCY % OF LAB. CEllS. - JULY 3 B-i VALENCIA ST OPP lop LOT 95 of 4 7 134.0 129 0 100+ B-2 BEINVENIDO ST OPP Base LOT 133 .7 .5 127.0 129.0 98.7.'. B-3 ALONDRA ST OPP LOT 120 9.3.. .1.32.0 129.0 100+ B-.4 PARK ST OPP LOT 114 4. 8 1 131.2 129.0 100+ WOODWARD CLYDE & ASSOCIATES Consulting Soil and Foundation Engineers and Geologists F . . . . .. . . MECHAN I CAL AHALYSI 3 -d 4 10 40 .200 DIRECT SHEAR TEST DATA j. Dry Density, pcf. . •. Initial Water Content. .% Final Water. content. % . ____________________ _____ _____ _____ • ,.., . Apparent Cohesion. psf . . . . . Apparent Friction Angle. 80 C,) 60 - a. w 40 . 20 0 i'm _________ . .. . .. . ,.. . . .. 000 100 ID . 1.0 0.1 00I 0.00$ GRAIN SIZE H MILLIMETERS ICoBBLES1GArE 1 i -JSILT & CLAY ] IIiL FNEEM PLASTICITY CHARACTERISTICS Liquid L1mit, % . . Plasticity Index. % Classification by'Unified Soil Classification System . . . I I I'f'\)\ iiQ6 SWELL: TEST DATA . Initial Dry Density.. pcf Initial Water Content, % Load. psf . . . . . . . Percent Swell . II 100 '' . I. . .•--- - 2.70 SPECIFIC GRAVITY 50 90 MAXIMUM DRY 1 DENSITY, pcf 29 ..0 .—.ZERO AIR VOIDS CURVES OPTIMUM MOISTURE.. . : . . . •. . . . . . . . CONTENT % MOISTURE CONTENT, % . . . . ,. . . .• . .. .80o . .. . 10 20. .30 40 LTORY .:COMpAcTION TEST. .. . .. . FILL SUITABILITY TESTS LABORATORY COMPACTION.: . . . . . . .. . . TEST METHOD:ASTM D17-4T . .. . . . S • THIBODO PIT . . WOOE14ARD• CLYDE & ASSOCIATES CONSULTING SOIL ENGINEERS AND GEOLOGISTS SAN DIEGO, CALIFORNIA . DR. BY: . LOS SCALE: -- PROJ. N069103122 CK'D BY: OL DATE: 7-13-70 .. Paqe lof 1..