HomeMy WebLinkAbout6604-1; Romeria Drainage Improvements; Report of Compaction Testing; 2016-04-12April 12, 2016 Project No. 107544010 Ms. Sherri Howard, PE City of Carlsbad 1635 Faraday Avenue Carlsbad, California 92008 Subject: Report of Compaction Testing Romeria Drainage Improvements (66041) Carlsbad, California References: City of Carlsbad, 2015, Improvement Plans for Romeria Drainage Improvements: dated April 30. Ninyo & Moore, 2008, Geotechnical Evaluation La Costa Avenue Slope Failure, Carlsbad, California, Project No. 106270001: dated February 25. Dear Ms. Howard: In accordance with your request, we are providing this letter summarizing our observations and testing performed for the earthwork operations associated with the subject project. The project site is located within the drainage south of La Costa Avenue, approximately 150 feet west of Romeria Street (Figure 1). The project generally consisted of the reconstruction of the drainage channel and construction of a new maintenance road. This report presents a summary of the results from our field and laboratory testing services performed for the project. SUMMARY OF EARTHWORK OPERATIONS Earthwork operations that were observed and tested by our field representative took place between November 20, 2015 and March 10, 2016. The earthwork operations that our personnel observed and tested generally included subgrade preparation for the new drainage channel, fill placement for the embankment for the maintenance road, and the aggregate base materials for the maintenance road. Earthwork operations were primarily performed utilizing an excavator, a backhoe, and a walk behind roller. In the process of clearing and grubbing, the contractor encountered wet and soft soil Romeria Drainage Improvements (66041) April 12, 2016 Carlsbad, California Project No. 107544010 107544010 L Romeria.doc 2 conditions that were yielding. Due to the yielding conditions, the contractor stabilized the soil prior to placing the embankment fills. At the location of the proposed maintenance road, the contractor excavated and removed approximately 18 inches of the existing organic material, then replaced it with a combination of 3-inch-minus rock, geogrid, and aggregate base materials. Subsequent to stabilization, the fill was moisture conditioned and placed over the aggregate base materials. Rock was placed using the excavator bucket. For the drainage channel, our representative observed the placement 3-inch rock and geogrid for the subgrade associated with the drainage channel. Once the embankment and drainage channel were constructed, our field technician observed and tested the aggregate base materials and geogrid used for the maintenance road. LABORATORY AND FIELD TESTING Laboratory testing was performed on the soil and aggregate base materials used by the contractor during the earthwork operations. Testing of the fill and aggregate base materials included an evaluation of the modified proctor density/optimum moisture content relationship. Testing was performed in general accordance with the ASTM International (ASTM) Test Method D 1557. The results of the modified proctor density tests are presented in Table 1. Our field representative was generally on-site on an on-call basis to observe and test the earth- work operations. In-place density and moisture content testing was performed by our field representative in general accordance with ASTM D 6938 (Nuclear Gauge Method). During the earthwork operations, when a field density test was performed that resulted in less than the speci- fied allowable relative compaction, the area was generally reworked and a retest was taken. The specified relative compaction for embankment fill and initial layer of aggregate base materials was 90 percent. The specified relative compaction for the secondary and tertiary layers of aggre- gate base material was 95 percent. A summary of our field density test results are presented in Attachment A and the approximate locations of the tests are indicated on Figure 2. Romeria Drainage Improvements (66041) April 12, 2016 Carlsbad, California Project No. 107544010 107544010 L Romeria.doc 1 of 1 Table 1 – Modified Proctor Density Test Result Soil Type No. Description Laboratory Dry Density (pcf) Optimum Moisture Content (%) 1 Clayey SAND (Import) 123.0 10.5 2 Recycled Aggregate Base (Import) 121.5 11.0 Note: pcf – pounds per cubic foot. Romeria Drainage Improvements (66041) April 12, 2016 Carlsbad, California Project No. 107544010 107544010 L Romeria.doc ATTACHMENT A SUMMARY OF FIELD DENSITY TESTS Tested material does does NOT meet the requirements of the approved project documents. The material was was NOT sampled and tested as required by the approved project documents. 5710 Ruffin Road, San Diego, CA 92123 Test Type:Aggregate Base Finer Fraction (%) 5 9 6 7 SEE FIGURE 2 SEE FIGURE 2 99.0 SEE FIGURE 2 SEE FIGURE 2 SEE FIGURE 2 Test Date 2/18/16 2/22/16 2/22/16 2/18/16 Test No. 1 2 3 99.0 WET DENSITY & ROCK CONTENTTare (lbs) Sand in Cone (lbs) / (MC) Soil + Rock + Tare (lbs) Coarse Fraction (%) 4 649 NG 2180 604 1005 149 PASS FAILPASS PASS Retest on (if applicable) 129 Pass/Fail PASS Specified Relative Compaction (%) Coarse/Finer Fraction in Max (%) Optimum Moisture (%) PASS PASS PASS PASS Wet Density (pcf) 604604650 1793 692 Project Name:ROMERIA DRAINAGE IMPROVEMENTS Project No:107544010 784 AB 2043 10 NG 1892 2180 2180 9 SEE FIGURE 2 SEE FIGURE 2 SUMMARY OF FIELD DENSITY TESTS 2/29/16 Permit No.: Project Street Address: Jurisdiction:CITY OF CARLSBAD Plan File No.: ROMERIA ST & LA COSTA AVE, CARLSBAD, CA 92008 66041 Laboratory Maximum Density (pcf) 99.0 2071 650 8 SEE FIGURE 2 1888 23 10 Dry Density (pcf) Percent Moisture 127.1 130.4 162 197 2109 2116 NG 690 1888 NG 690 6 AB AB AB 11431878 731 1189 692 5 210 153 126 108 NG 1892 NGNG 120 125.4 125.6 124.4129.4131.4 126.1 123.7 7.7 7.8 8.4 10.414.0 9.7 114.9 9.7 2 95 95 121.5 121.5121.5 121.5 11.0 22 95 22 95 95 95 11.0 93 11.0 11.0 11.0 11 11.0 11.0 10.6 12.8 121.5 Sand + Bottle After (lbs) / (MS) 10.3 Coarse Fraction (lbs) 126.9 100.0 100.0 100.0 AB2/23/16 2/23/16 2/29/16 100.0 98.0 AB AB Test No. 391 Sand + Bottle Before (lbs) / (DS) 3/1/16 1 2/29/16 STANDARD& TEST COUNTS155 Sand in Cone + Hole (lbs) / (DC) 2071 MOISTURE 95 121.5 115.0 Corrected Maximum Density (pcf) 90 95 PASS Relative Compaction (%)TEST RESULTS2 121.5 Soil Type Number 95 96 22 Initials Test Location SEE FIGURE 2 SEE FIGURE 2 Elev. or Depth (ft) 98.0 98.0 LFV 90 11.0 Test Of Block No. AB AB AB AB BHJ LFV BHJ LFV BTM BHJ BTM BTM BHJ NG 359 AB AB AB NG Test Of AB AB AB Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge) AB AB AB NG 95 114.9 9595 121.5 11.0 95 115.6 121.5 121.5 114.9 115.3 96 11.0 95 2 95 2 116.3 115.9 117.2 113.4 NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.107544010_FDT_TEST OF AB #1.xls Field Density Test Sheet 2013 v 3.0 Tested material does does NOT meet the requirements of the approved project documents. The material was was NOT sampled and tested as required by the approved project documents. NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content. 115.6 116.3115.0 121.5121.5 95 121.5 96 NG 1026 Test Of AB AB AB LFV BHJ BHJ Test Of Block No. AB AB AB AB LFV 95 11.0 Test Location SEE FIGURE 2 SEE FIGURE 2 Elev. or Depth (ft) 100.0 99.0 95 95 115.2 95 TEST RESULTS2 121.5 Soil Type Number 95 95 MOISTURE 95 121.5 115.0 11 STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG 174 Sand in Cone + Hole (lbs) / (DC) 2043 Test No. 11.6 Coarse Fraction (lbs) 128.3 104.0AB3/10/16 BHJ 1037 Sand + Bottle Before (lbs) / (DS) Sand + Bottle After (lbs) / (MS) 11.0 11.0 12.0 8.5 PASS 95 2222 11.0 11.0 12.6 10.2 130.9 126.9 157194 AB 1897 1849 2060 NG 688 1897 NG 688 180 136 129.5 124.8 Percent Moisture Laboratory Maximum Density (pcf) 2043 649 18 1897 12 13 20 688 Permit No.: Project Street Address: Jurisdiction:CITY OF CARLSBAD Plan File No.: ROMERIA ST & LA COSTA AVE, CARLSBAD, CA 92008 66041 SUMMARY OF FIELD DENSITY TESTS 5710 Ruffin Road, San Diego, CA 92123 Test Type: 1916 Project Name:ROMERIA DRAINAGE IMPROVEMENTS Project No:107544010 103.014 Test Date 3/1/16 100.0 Initials 3/1/16 Test No. 11 12 649 SEE FIGURE 2 SEE FIGURE 2 20 Coarse/Finer Fraction in Max (%) Wet Density (pcf) Corrected Maximum Density (pcf) Relative Compaction (%) Dry Density (pcf) PASS PASSPASSPass/Fail 17 1814 AB 2330 15 NG Soil + Rock + Tare (lbs) Retest on (if applicable) Optimum Moisture (%) PASS Specified Relative Compaction (%) Coarse Fraction (%) 13 WET DENSITY & ROCK CONTENTTare (lbs) Sand in Cone (lbs) / (MC) 15 19 16 17 3/10/16 3/10/16 SEE FIGURE 2 Finer Fraction (%) Aggregate Base 107544010_FDT_TEST OF AB #1.xls Field Density Test Sheet 2013 v 2.9 Tested material does does NOT meet the requirements of the approved project documents. The material was was NOT sampled and tested as required by the approved project documents. 5710 Ruffin Road, San Diego, California 92123 Test Type:Fill Finer Fraction (%) 5 9 6 7 SEE FIGURE 2 SEE FIGURE 2 99.5 SEE FIGURE 2 SEE FIGURE 2 SEE FIGURE 2 Test Date 11/20/15 11/23/15 11/23/15 11/20/15 Test No. 1 2 3 101.0 WET DENSITY & ROCK CONTENTTare (lbs) Sand in Cone (lbs) / (MC) Soil + Rock + Tare (lbs) Coarse Fraction (%) 4 592 NG 1961 587 1249 169 PASS PASSPASS PASS Retest on (if applicable) 120 Pass/Fail PASS Specified Relative Compaction (%) Coarse/Finer Fraction in Max (%) Optimum Moisture (%) PASS PASS PASS PASS Wet Density (pcf) 587587592 1309 587 Project Name:ROMERIA DRAINAGE IMPROVEMENTS Project No:107544010 784 CF 1970 10 NG 1961 1961 1961 9 SEE FIGURE 2 SEE FIGURE 2 SUMMARY OF FIELD DENSITY TESTS 11/24/15 Permit No.: Project Street Address: Jurisdiction:CITY OF CARLSBAD Plan File No.: ROMERIA ST & LA COSTA AVE, CARLSBAD, CA 92008 66041 Laboratory Maximum Density (pcf) 101.0 1963 592 8 SEE FIGURE 2 1961 23 10 Dry Density (pcf) Percent Moisture 132.3 122.0 156 151 1381 1353 NG 587 1961 NG 587 6 CF CF CF 15991232 1329 1229 587 5 148 152 141 124 NG 1961 NGNG 125 120.3 124.8 129.7123.6125.0 126.4 125.7 10.1 8.6 8.8 8.110.8 11.2 114.2 11.7 1 93 93 123.0 123.0123.0 123.0 10.5 11 90 11 92 90 90 10.5 94 10.5 10.5 10.510.5 10.5 11.1 11.2 123.0 Sand + Bottle After (lbs) / (MS) 9.5 Coarse Fraction (lbs) 127.0 102.0 103.0 96.5 CF11/23/15 11/23/15 11/24/15 101.5 103.0 CF CF Test No. 1092 Sand + Bottle Before (lbs) / (DS) 12/1/15 1 11/24/15 STANDARD& TEST COUNTS139 Sand in Cone + Hole (lbs) / (DC) 1963 MOISTURE 94 123.0 116.0 Corrected Maximum Density (pcf) 90 97 FAIL 4 Relative Compaction (%)TEST RESULTS1 123.0 Soil Type Number 90 90 11 Initials Test Location SEE FIGURE 2 SEE FIGURE 2 Elev. or Depth (ft) 101.0 98.0 JVC 90 10.5 Test Of Block No. CF CF CF CF JVC JVC JVC JVC JVC JVC JVC JVC JVC NG 991 CF CF CF NG Test Of CF CF CF Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge) CF CF CF NG 90 113.7 9289 123.0 10.5 90 109.7 123.0 123.0 119.1 112.8 93 10.5 90 1 90 1 110.8 114.7 114.3 116.1 NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.107544010_FDT_TEST OF CF_1.xls Field Density Test Sheet 2013 v 2.9 Tested material does does NOT meet the requirements of the approved project documents. The material was was NOT sampled and tested as required by the approved project documents. 111.3 NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content. 114.6 114.0113.2 123.0123.0 92 123.0 93 123.0 123.0 96 123.0 123.0 113.6 115.0 NG 1657 NG CF CF Test Of CF CF CF JVC JVC JVC JVC JVC JVC JVC JVC Test Of Block No. CF CF CF CF JVC 90 10.5 Test Location SEE FIGURE 2 SEE FIGURE 2 Elev. or Depth (ft) 97.0 103.0 90 92 11 123.0 90 90 115.6 94 TEST RESULTS1 123.0 Soil Type Number 90 93 MOISTURE 91 123.0 112.5 11 12/8/15 STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG 162 Sand in Cone + Hole (lbs) / (DC) 1970 12/8/15 CF Test No. 11.4 Coarse Fraction (lbs) 125.3 99.0 100.0 97.0 CF12/2/15 12/2/15 12/2/15 CF JVC 1754 Sand + Bottle Before (lbs) / (DS) Sand + Bottle After (lbs) / (MS) 10.5 10.5 11.6 11.4 93 94 10.5 PASS 10.5 90 10.5 9090 1 90 1111 90 90 11 10.5 10.5 10.5 10.5 114.2 11.310.9 118.0 10.6 10.9 10.510.1 9.6 125.5 126.7 126.6 123.9130.4125.6 127.5 159153135 148 144 1970 140 17311759 1798 1689 CF CF CF NG 1970 CF 1728 1797 NG 592 1970 NG 592 167 162 127.9 126.1 Percent Moisture Laboratory Maximum Density (pcf) 1970 592 18 SEE FIGURE 2 1970 12 13 20 592 CF 12/8/15 Permit No.: Project Street Address: Jurisdiction:CITY OF CARLSBAD Plan File No.: ROMERIA ST & LA COSTA AVE, CARLSBAD, CA 92008 66041 SUMMARY OF FIELD DENSITY TESTS 5710 Ruffin Road, San Diego, California 92123 Test Type: 1916 CF CF Project Name:ROMERIA DRAINAGE IMPROVEMENTS Project No:107544010 98.0 96.0 14 Test Date 12/1/15 101.5 Initials 12/1/15 Test No. 11 12 592 SEE FIGURE 2 SEE FIGURE 2 1974 20 NG 1970 NG Coarse/Finer Fraction in Max (%) Wet Density (pcf) Corrected Maximum Density (pcf) Relative Compaction (%) Dry Density (pcf) PASS PASS PASS PASS PASS PASSPASS PASSPass/Fail 17 1814 CF 1750 15 NG 592 1974 NG 1974 594 1665 Soil + Rock + Tare (lbs) Retest on (if applicable) 149 Optimum Moisture (%) PASS Specified Relative Compaction (%) Coarse Fraction (%) 594594592 13 WET DENSITY & ROCK CONTENTTare (lbs) Sand in Cone (lbs) / (MC) 15 19 16 17 12/1/15 12/2/15 SEE FIGURE 2 SEE FIGURE 2 98.0 SEE FIGURE 2 SEE FIGURE 2 SEE FIGURE 2 101.0 Finer Fraction (%) Fill 107544010_FDT_TEST OF CF_1.xls Field Density Test Sheet 2013 v 2.9 Tested material does does NOT meet the requirements of the approved project documents. The material was was NOT sampled and tested as required by the approved project documents. Fill 29 26 27 SEE FIGURE 2 SEE FIGURE 2 100.0 SEE FIGURE 2 SEE FIGURE 2 SEE FIGURE 2 12/10/15 12/9/15 Test No. 21 22 23 25 WET DENSITY & ROCK CONTENTTare (lbs) Sand in Cone (lbs) / (MC) Soil + Rock + Tare (lbs) Coarse Fraction (%) Finer Fraction (%) NG 1974 594 1141 CF 1771 25 NG 594 CF CF 594 PASSFAIL PASS Retest on (if applicable) 151 Pass/Fail PASS Specified Relative Compaction (%) Coarse/Finer Fraction in Max (%) Optimum Moisture (%) PASS PASS PASS PASS Wet Density (pcf) 594594594 Project Name:ROMERIA DRAINAGE IMPROVEMENTS Project No:107544010 98.024 Test Date 12/9/15 12/9/15 12/9/15 2926 CF CF NG SEE FIGURE 2 SEE FIGURE 2 27 2824 SUMMARY OF FIELD DENSITY TESTS 5710 Ruffin Road, San Diego, California 92123 Test Type: 12/10/15 Permit No.: Project Street Address: Jurisdiction:CITY OF CARLSBAD Plan File No.: ROMERIA ST & LA COSTA AVE, CARLSBAD, CA 92008 66041 98.0 1974 594 28 1974 22 23 30 30 Percent Moisture Laboratory Maximum Density (pcf) 126.2 118.9 164 162 2060 1770 NG 594 1974 NG 594 CF NG 1215 1087 1125 1974 1974 1974 151 153 152 152 1974 145 129.2 127.6 126.8126.4 125.0 125.3 11.2 11.8 11.5 11.4 10.5 11.1 11 90 90 111 10.5 1 90 10.5 90 10.5 10.5 10.5 91 94 90 165 10.5 10.5 13.0 12.713.1 Coarse Fraction (lbs) 122.0 12/10/15 100.0 101.0 Sand + Bottle After (lbs) / (MS) Test No. 12/10/15 STANDARD& TEST COUNTSSand in Cone + Hole (lbs) / (DC)1946 Sand + Bottle Before (lbs) / (DS) 100.0 99.0 CF12/9/15 21 1974 CF MOISTURE 88 123.0 107.9 91 FAIL 24 90 86 TEST RESULTS1 123.0 22 90 Dry Density (pcf) Relative Compaction (%) 123.0 123.0 Corrected Maximum Density (pcf) Soil Type Number 90 94 11 Initials Test Location SEE FIGURE 2 SEE FIGURE 2 Elev. or Depth (ft) 96.0 96.0 JVC 90 10.5 Test Of Block No. CF CF CF CF JVC JVC JVC JVC JVC JVC JVC CF CF CF JVC Test Of CF CF CF Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG 1776 NG 111.8 91 112.4 116.0 123.0 92 123.0 123.0 10.5 115.5 114.1111.7 113.7105.5 123.0123.0 93 NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.107544010_FDT_TEST OF CF_1.xls Field Density Test Sheet 2013 v 2.9 Tested material does does NOT meet the requirements of the approved project documents. The material was was NOT sampled and tested as required by the approved project documents. NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content. Test Of ST Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG Test Of Block No. ST 95 10.5 Initials Test Location SEE FIGURE 2 Elev. or Depth (ft) 98.0BTM Soil Type Number Relative Compaction (%)TEST RESULTS1 MOISTURE 98 123.0 120.0 Corrected Maximum Density (pcf) 1 STANDARD& TEST COUNTS163 Sand in Cone + Hole (lbs) / (DC) 2180 Test No. 565 Sand + Bottle Before (lbs) / (DS) Sand + Bottle After (lbs) / (MS) 11.3 Coarse Fraction (lbs) 133.6 65 Dry Density (pcf) Percent Moisture Laboratory Maximum Density (pcf) 604 8 23 10 Permit No.: Project Street Address: Jurisdiction:CITY OF CARLSBAD Plan File No.: ROMERIA ST & LA COSTA AVE, CARLSBAD, CA 92008 66041 SUMMARY OF FIELD DENSITY TESTS 109 Project Name:ROMERIA DRAINAGE IMPROVEMENTS Project No:107544010 784 Wet Density (pcf) Pass/Fail Specified Relative Compaction (%) Coarse/Finer Fraction in Max (%) Optimum Moisture (%) PASS Retest on (if applicable)WET DENSITY & ROCK CONTENTTare (lbs) Sand in Cone (lbs) / (MC) Soil + Rock + Tare (lbs) Coarse Fraction (%) 4 Test Date 2/29/16 Test No. 1 2 3 5 9 6 7 Finer Fraction (%) 5710 Ruffin Road, San Diego, CA 92123 Test Type:Subgrade 107544010_FDT_TEST OF SG _1.xls Field Density Test Sheet 2013 v 3.0