HomeMy WebLinkAbout6607-1; CAMEO RD STORM DRAIN REPAIR; DAILY FIELD REPORT WITH DENSITY TESTING; 2011-12-010 *y4f" DAILY REPORT OF HELD OBSERVATION DATE 1211/2011 DAY Thursday AUTHOR Julio C. Guzman PROJ. NAME Storm Drain Repair . . PROJ. NO. 107238001 CLIENT City of Carlsbad NO. 2 EQUIPMENT: Cat 305C ME compact excavator. Cat 287C skid steer loader . CONTRACTOR HRS FOREMAN Kevin WEATHER Clear/650 PERMIT NO. 6607 CODE DESCRIPTION OF WORK PERFORMED On-site @ 09:00 hrs at Mallorca Place in Carlsbad Ca, as requested to perform observation and relative Compaction testing during backfill operations for 18" diameter PVC storm drain r e p l a c e m e n t . T h e 5 4 ' linear feet section was located between the storm drain clean-out at station 1 1 + 2 7 t o t h e p o i n t o f connection at station 11+81. . . . . . Upon arrival, contractor was observed placing 3/4" crushed aggregate in the pipe zone to ± 12" over the top of pipe. Excavated material from stockpile was placed as backfill. Material was placed in ±1 2 " l o o s e l i f t s a n d t h e compaction efforts were applied utilizing a compaction wheel attachment mounted in t h e 3 0 5 C e x c a v a t o r . Contractor was observed placing metallic warning tape at ± 2' Over the top of pipe. Performed four in-place density tests utilizing a Troxler® 3430 Moisture-Density G a u g e . T e s t s r e s u l t s were in conformance with the project requirements of 90% relative compaction. Tests data was as follows: Station Elevation Dry Density Moisture %RC 11+40 196.0 103.3 20.0% 94% 11+60 198.2 99.3 20.7% 90% 11+50 . 206.0 103.4 19.4% 94% 11+72 202.0 . 102.4 . 19.8% 93% FIELD TECHNICIAN . . HOURS Julio C. Guzman 1 8.0 O.T. VISITORS CLIENT REP THE MATERIAL wAS 0 WAS NOT, SAMPLED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF T H E Ciiv APPROVED DOCUMENTS. THE TESTED MATERIAL DOES 0 DOES NOT, MEET THE REQUIREMENTS OF THE Crry APPROVED PROJECT DOCUMENTS. Distribution: Project Architect, Structural Engineer, Project Inspector .