Loading...
HomeMy WebLinkAbout69-16; EL CAMINO MESA UNIT NO. 5; ITERIM REPORT; 1970-08-134 -- WOOD WARD - CLYDE & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINES AND GEOLOGISTS 3467 Kurtz Street August 13 1970 San Diego.. . . .. . . . California 92110 Project No 66-230 (714) 2242911 Kamar Construction Company, Inc JIECEIVEJJ P.O. Box 71 . .. - •. S . :. Carlsbad, California AUG 171970 Attention Mr Jerry L Rombotis CITY OF CARL SBAD ngIneerIng Department INTERIM REPORT EL CAMINO MESA UNIT NO 5 LOTS 1 THROUGH 10 CARLSBAD, CALIFORNIA In accordance with your request, we have provided soil engineering services in conjunction nth the grading of the subject lots These services included the following Engineering observation of the grading operation Taking of field density tests in the fill placed and compacted on the subject site Site preparation, compaction and testing were done between June 22 and August 7, 1970 in accordance with the "Specifications for Controlled Fill" in our report entitled, "Soil Investigation for the Proposed Subdivision El Camino Mesa, Unit No 5, Carlsbad, California," dated January 17, 1967 Fill was placed, compacted and tested on Lots 1 through 10 As the site grading progressed, the compaction procedures were ob- served and field density tests were made to determine the relative compaction of the fill in place Field observations and field den- sity test results indicate that the fill has been compacted to 90 percent or more of maximum laboratory density The results of field density tests and of relative compaction, expressed as a percent of maximum laboratory density will be submitted with our final report Laboratory tests to determine moisture-density relationships, maximum dry density, optimum moisture content, grain size distribution, plas- ticity characteristics and strength and swell characteristics were performed on representative samples of the material used for fill -.... .- 1 L . - Kamar Construction Company Project No. 66-230 'f August 13, 1970 Page 2 The results of laboratory tests will be submitted in our final report Laboratory tests indicate that nonexpansive fill was placed within 2 feet of rough grade on all fill lots noted above During grading of Lots £1, 5 and 6, potentially expansive soil was replaced with nonexpansive fill to a depth of 2 feet within the limits of the entire level lot pad A visual, inspection of the 'subject site at the completion of grading indicates that potentially expansive soil is not evident at finish grade on either cut or fill lots Foundations for structures placed on nonexpansive undisturbed soil or nonexpansive properly compacted till may be designed for a bearing pressure of 1,500 pounds per square foot at a depth of 8 inches, or 2,000 pounds per square foot at a depth of 12 inches below compacted f'll or undisturbed cut lot grade-..Footings should have a minimum width of 12 inches The elevations of compaction tests shown as finished grade (FG) tests correspond. to the elevations shown, on .the 'grading plans for El Camino: ' Mesa Unit 5 datee June 8, 1970 preparea by Roy L Iciema, San Diego, Cali forni a This report covers the fill placed under our observation during the dates specified above..'. Additional, fill placed.-after these dates, as.". well as the backfill in utility trenches located within 5 feet of a building and greater than 12 inches deep,, or any trench 5 feet or more from a buildinq and in excess of 5 feet in depth, should be com- pacted under the observation of this office and tested to assure com- pliance with the earthwork specifications of the project This office should be contacted at least 24 hours prior to backfilling operations Utility service trenches within 5 feet of a building that are DerDfldicular to the building footinas and are less than 12 inches wide and less than 3 feet deep are not subject to this recom- mendation . Structures that will not tolerate differential settlements (such as foundations, swimming pools, concrete decks, walls, etc Y should not be located within 5 feet of the top of a slope Footings located closer than 5 feet from the top of a slope should be extended in depth until the'outer.bottom'edge' of the•footing is 5 'feet horizon- ' .•• ' tally from the outside face of the slope The inspections and tests of compaction made during the period of our services on the subject site were in accordance with the local accep- table standards for this period The conclusions or opinions drawn WOOD WARD CLYDE & ASSOCIATES Consulting Soil and Foundation Engineers and Geologists \ LI