Loading...
HomeMy WebLinkAboutCD 2017-0003; KAISER CARLSBAD PARKING LOT EXPANSION; PRIORITY DEVELOPMENT PROJECT (PDP) AMENDED STORM WATER QUALITY MANAGEMENT PLAN (SWQMP);; 2019-01-14CITY OF CARLSBAD PRIORITY DEVELOPMENT PROJECT (PDP) AMENDED STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR KAISER CARLSBAD PARKING LOT EXPANSION DWG 504-2A CD 2017-0003 I GR2017-0030 I DEV2017-0024 ENGINEER OF WORK: GREGP . LANG, P.E. RCE 68075 PASCO LARET SUITER & ASSOCIATES, INC. 535 N. HIGHWAY 101, SUITE A SOLANA BEACH, CA 92075 PREPARED FOR: KAISER PERMANENTE 6860 Avenida Encinas Carlsbad, CA 92011 619-528-5000 PREPARED BY: PASCO LARET SUITER & ASSOCIATES CIVIL ENGINEERING + LAND PLANNING+ LAND SURVEYING 535 N. HIGHWAY 101, SUITE A SOLANA BEACH, CA 92075 858-259-8212 DATE: JUNE 14, 2017 Updated: January 14, 2019 1-14-2019 EXP: 06-30-19 :~~~;. ~~ .. · •.' ~ .. )l(f,. •11 ,..., .... ,., ~;, == ~ I--~ c:) c..:, STORM WATER QUALITY MANAGEMENT PLAN TABLE OF CONTENTS ENGINEER'S CERTIFICATION PROJECT VICINITY MAP STORM WATER STANDARD QUESTIONNAIRE SITE INFORMATION SUMMARY OF PDP STRUCTURAL BMPs ATTACHMENT 1 -Backup for PDP Pollutant Control BMPs JUNE 2017 Attachrnent la ......................................................................................................... DMA Exhibit Attachment I b ............... Tabular Summary of DMAs and Design Capture Volume Calculations Attachment 1 c .................................................................. Harvest and Use Feasibility Screening Attachment 1 d .............................................. Categorization of Infiltration Feasibility Condition Attachment 1 e ................................... Pollutant Control BMP Design Worksheets / Calculations ATTACHMENT 2 -Backup for PDP Hydromodification Control Measures Attachment 2a ................................................................. Hydromodification Exemption Exhibit Attachment 2b ....................................... Potential Critical Coarse Sediment Yield Areas Exhibit Attachment 2c ................................................................................ Flow Control Facility Design ATTACHMENT 3 -Structural BMP Maintenance Plan Attachment 3a ...... Structural BMP Maintenance Thresholds and Actions and BMP Fact Sheets Attachment 3b .............................................................................. Draft Maintenance Agreement ATTACHMENT 4 -City of Carlsbad Standard Single Sheet BMP Exhibits Attachment 4a ................................................................. Single Sheet BMP Exhibit KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 2 STORM WATER QUALITY MANAGEMENT PLAN CERTIFICATION PAGE Project Name: Kaiser Permanente Carlsbad -Parking Lot Expansion Project ID: JUNE 2017 I hereby declare that I am the Engineer in Responsible Charge of design of storm water BMPs for this project, and that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the requirements of the BMP Design Manual, which is based on the requirements of SDRWQCB Order No. R9-2013-0001 (MS4 Permit) or the current Order. I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the BMP Design Manual. I certify that this SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this SWQMP by the City Engineer is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design. G~n~;'fa= RCE 68075 Pasco Laret Suiter & Associates 535 N. Highway 101 , Suite A Solana Beach, CA 92075 KAISER PERMANENTE CARLSBAD PAR.KING LOT EXPANSION 4 01/14/2019 Exp: 06-30-19 Date STORM WATER QUALITY MANAGEMENT PLAN CITY OF OCEANSIDE PACIFIC OCEAN ?a KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION CITY OF ENCINITAS Figure 1 -Vicinity Map 4 JUNE 2017 CITY OF VISTA VICINITY MAP N.T.S. {_ City of Carlsbad STORM WATER STANDARDS QUESTIONNAIRE Develo ment Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www .carlsbadca.gov E-34 1 1NSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: Kaiser Carlsbad Parking Lot Expansion PROJECT ID: DWG 504-2A/U>'l-04?-ooo· r ADDRESS: 6860 Avenida Encinas AP N: 214-450-19-00 The project is (check one): D New Development Ill Redevelopment I The total proposed disturbed area is: 20,962 ft2 ( 0.48 ) acres The total proposed newly created and/or replaced impervious area is: 13,404 ft2 ( 0 31 ) acres ~If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: }'.Project ID CD2017-0003/Pw·~ ,;0 -t ,'-A SWQMP #: r Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. E-34 Page 1 of 4 REV 02/16 STEP1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or stnir.turP. th;:it do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? YES NO □ Ill If you answered "yes" to the above question, provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): STEP2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3}, please answer the following questions: Is your project LIMITED to one or more of the following: 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; b) Designed and constructed to be hydraulically disconnected from paved streets or roads; c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets uidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? YES NO □ □ Ill □ If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If ou answered "no" to the above uestions, our ro·ect is not exem t from PDP E-34 Page 2 of 4 REV 02/16 To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )): 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and ublic develo ment ro ·ects on ublic or rivate land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public develo ment ro ·ects on ublic or rivate land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption , including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification SIC code 5812 . 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside develo ment ro·ect includes develo ment on an natural slo e that is twent -five ercent or reater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the trans ortation of automobiles, trucks, motorc cles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the ro ·ect to the ESA i.e. not commin led with flows from ad·acent lands . " 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC} codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a} 5,000 square feet or more or (b} a project Average Daily Traffic ADT of 100 or more vehicles er da . 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pacific Ocean and (1 ) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC 21.203.040 YES NO □ IZl IZl □ □ IZl □ [ZJ Ill □ IZl □ □ [ZJ □ IZl □ IZl □ [ZJ □ IZl If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the second box statin "M ro·ect is a 'STANDARD PROJECT' ... " and com lete a licant information. E-34 Page 3 of 4 REV 02/16 STEP4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = ___ +_l-_9_1_, 1_8_7 _____ sq. ft. Total proposed newly created or replaced impervious area (B) = ___ 13_,_4o_4 _______ sq. ft. Percent impervious area created or replaced (B/A)*100 = _1_4_·_7 ___ % YES NO □ If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no," the structural BMP's required for PDP apply to the entire development. Go to step 5, check the check the first box statin "M ro·ect is a PDP ... " and com lete a licant information. STEPS CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION !ll My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. 0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. D My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: Gregory W. Lang Applicant Title: _P_._E_., _P_ri_n_ci_p_al ________ _ Date: fll/lAf ( J • Environmentally Sensitive Areas include b are not llmtted to all Cle , Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments): areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been Identified by the City. Th " B fl c ·t U O I IS ox or ny se mv YES NO City Concurrence: □ □ By: Date: Project ID: E-34 Page 4 of 4 REV 02/16 STORM WATER QUALITY MANAGEMENT PLAN JU £ 2017 SITE INFORMATION CHECKLIST Proiect Summarv Information Project Name Kaiser Carlsbad Parking Lot Expansion Project ID CD2017-0003 Project Address 6860 Avenida Encinas Carlsbad, CA 92009 Assessor's Parcel Number(s) (APN(s)) 214-450-19-00 Hydrologic Unit: Carlsbad Hydrologic Area: San Marcos Hydrologic Sub-Area Name: Batiquitos Project Watershed (Hydrologic Unit) Hydrologic Sub-Area#: 904.51 Watershed: San Marcos Creek-Frontal Gulf of Santa Catalina Subwatershed: San Marcos Creek Parcel Area 3.16 Acres ( ±137,650 Square Feet) Existing Impervious Area ±2.1 Acres ( ±91,187 Square Feet) (subset of Parcel Area) Area to be disturbed by the project 0.56 Acres ( 24,594 Square Feet) (Project Area) Project Proposed Impervious Area 0.31 Acres ( 13,543 Square Feet) (subset of Project Area) Project Proposed Pervious Area (including 0.25 Acres ( 11 ,051 Square Feet) D.G., Deminimus, and Self-MitiQatinQ Area) Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project. This may be less than the Parcel Area. KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 5 STORM WATER QUALITY MANAGEMENT PLAN Descrlntlon of Existing Site Condition and Dralnaae Patterns Current Status of the Site (select all that apply): [!I Existing development D Previously graded but not built out D Agricultural or other non-impervious use D Vacant, undeveloped/natural JUNE 2017 Description/ Additional Information: The existing site is comprised of two (2) medical office buildings and an elevator/stair building, with an interior courtyard between the buildings. To the north and south of the existing buildings are patient and staff parking lots, respectively. The Avenida Encinas frontage of the site is parkway landscaping with an open landscape area in front of building 'B.' (See further discussion below on site topograghy and drainage). Existing Land Cover Includes (select all that apply): lg) Vegetative Cover D Non-Vegetated Pervious Areas [!I Impervious Areas Description / Additional Information: See discussion above regarding the current status of the site. Underlying Soil belongs to Hydrologic Soil Group (select all that apply): D NRCS Type A 00 NRCS Type B (99.5% Per NRCS Custom Soil Resource Report for 6860 Avenida Encinas) D NRCS Type C [g)NRCS Type D (0.5% Per NRCS Custom Soil Resource Report for 6860 Avenida Encinas) Approximate Depth to Groundwater (GW): D GW Depth < 5 feet □ 5 feet < GW Depth < 1 O feet D 1 0 feet < GW Depth < 20 feet [g)GW Depth > 20 feet (Groundwater not encountered during Geotechnical Investigation) Existing Natural Hydrologic Features (select all that apply): D Watercourses □ Seeps □ Springs □Wetlands ~ None Description/ Additional Information: N/A KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 6 STORM WATER QUALITY MANAGEMENT PLAN JUNE 2017 Description of Existing Site Topography and Drainage [How is storm water runoff conveyed from the site? At a minimum, this description should answer (1) whether existing drainage conveyance is natural or urban; (2) describe existing constructed storm water conveyance systems, if applicable; and (3) is runoff from offsite conveyed through the site? if so, describe]: The existing site drainage conveyance for the project site is urban, with area drains located throughout the site in landscape planter areas and in strategic parking lot locations to drain hardscape areas. The northerly parking lot area on the site drains to the NW corner of the parking lot and outlets via surface drainage to the Avenida Encinas right-of-way. Offsite drainage from the Caltrans right-of-way to the directly east of the site is conveyed through the project site via an underground 18" RCP storm drain. Just before reaching Avenida Encinas the 18" RCP confluences at a Type A-4 Cleanout with a 12" PVC storm drain from the southerly parking area and then continues to the west across Avenida Encinas. Flow then continues north along Avenida Encinas for a short distance where the storm drain then turns west into Poinsettia Properties, Planning Area 5 (Ref. C.O.C. DWG 378-9), and then to Poinsettia Properties, Planning Areas 2, 3, &4 (Ref. C.O.C. DWG 396-7), via increasingly larger storm drain piping until a 60" RCP outlets to an existing 72" RCP storm drain within the San Diego Northern Railway right-of-way. This large main trunk line storm drain continues southerly in the railroad right-of-way and then along N. Coast Hwy 101 for a total of approximately 1 mile until its ultimate outlet via an 84" RCP storm drain to a rip-rap energy dissipater at Batiquitos Lagoon. (Ref. C.O.C. DWGs 399-7 and 337-9). KAISER PERMANENTE CARLSBAD PARKJNG LOT EXPANSION 7 STORM WATER QUALITY MANAGEMENT PLAN JUNE 2017 DescrlDtlon of ProDOSed Site Development and Drainage Patterns Project Description I Proposed Land Use and/or Activities: The project site is located at Latitude 33°06'27"N and Longitude 117°18'52"W and has a total area of 3.16 acres. The surrounding area has been developed and is comprised of existing commercial uses to the north and south. Interstate 5 is directly east of the project with Avenida Encinas directly west of the site and existing residential just west of Avenida Encinas. The project site land use will remain unchanged in the proposed condition. For the proposed condition, portions of the existing landscape area will be removed and replaced with asphalt parking area and a sidewalk connection added for pedestrian access to the Avenida Encinas right-of-way sidewalk. Storm water from the newly created impervious area will be treated via biofiltration BMPs along the project street frontage and be connected to the existing site storm drain. Associated utilities for the site parking area will also be installed, as necessary. Total disturbed area is 0.48 acres. List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): For the proposed condition, portions of the existing landscape area will be removed and replaced with asphalt parking area and a sidewalk connection added for pedestrian access to the Avenida Encinas right-of-way sidewalk. The proposed project's drainage infrastructure will not significantly alter the existing site's drainage patterns on-site or discharge points. List/describe proposed pervious features of the project (e.g., landscape areas): Pervious areas of the proposed improvements include the addition of parking area trees and landscaping along the project frontage, including the addition of required BMPs for stormwater quality as presented in this report. Does the project include grading and changes to site topography? l!I Yes □ No Description / Additional Information: The project will include precise grading for placement of pavement for parking, driveways and pedestrian access throughout the site. KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 8 STORAf WATER QUA LITY MANAGEMENT PLAN Does the project include changes to site drainage (e.g ., installation of new storm water conveyance systems)? ~ Yes □ No Description / Additional Information: JUNE 201 7 Storm water from the newly created impervious area will be treated via biofiltration BMPs along the project street frontage and be connected to the existing site storm drain on site. Runoff from the new impervious area will drain via sheet flow to one of two (2) BMPs located along the project frontage. The new parking area and sidewalk areas (OMA 1) will drain via overland flow (gutters, and concrete swale) to the larger BMP. And at the southerly end of the parking lot, where the new parking area entrance and 2 parking stalls are proposed (OMA 2), a trench drain has been added to capture flow from these areas and direct it to the smaller BMP at the project frontage. The outlet of the larger BMP will be an 18" RCP, connecting to a proposed re-built cleanout, while the smaller BMP will outlet to an 8" PVC pipe and connect to the existing 12" PVC storm drain from the parking lot. Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply): l!l On-site storm drain inlets □ Interior floor drains and elevator shaft sump pumps □ Interior parking garages □ Need for future indoor & structural pest control 00 Landscape/Outdoor Pesticide Use □ Pools, spas, ponds, decorative fountains, and other water features □ Food service □ Refuse areas □ Industrial processes □ Outdoor storage of equipment or materials □ Vehicle and Equipment Cleaning □ Vehicle/Equipment Repair and Maintenance □ Fuel Dispensing Areas □ Loading Docks □ Fire Sprinkler Test Water □ Miscellaneous Drain or Wash Water 00 Plazas, sidewalks, and parking lots KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 9 STORM WATER QUALITY MANAGEMENT PLAN JUNE2017 Identification of Recelvlna Water Pollutants of Concern Describe path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable): The outlet of the larger BMP will be an 8" PVC, connecting to a proposed re-built cleanout, while the smaller BMP will outlet to an 8" PVC pipe and connect to the existing 12" PVC storm drain from the southern parking lot confluencing at the Type A-4 Cleanout with a 12" PVC storm drain from the southerly parking area and then continues to the west across Avenida Encinas via 18" RCP storm drain. Flow then continues north along Avenida Encinas for a short distance where the storm drain then turns west into Poinsettia Properties, Planning Area 5 (Ref. C.O.C. DWG 378-9), and then to Poinsettia Properties, Planning Areas 2, 3, &4 (Ref. C.O.C. DWG 396-7), via increasingly larger storm drain piping until a 60" RCP outlets to an existing 72" RCP storm drain within the San Diego Northern Railway right-of-way. This large main trunk line storm drain continues southerly in the railroad right-of-way and then along N. Coast Hwy 101 for a total of approximately 1 mile until its ultimate outlet via an 84" RCP storm drain to a rip-rap energy dissipater at Batiquitos Lagoon. (Ref. C.O.C. DWGs 399-7 and 337-9). List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)lstressor(s) causing impairment, and identify any TMDLs for the impaired water bodies: 303(d) Impaired Water Body Pollutant( s )/Stressor( s) TMDLs None Identification of Project Site Pollutants Identify pollutants anticipated from the project site based on all proposed use(s) of the site (see BMP Design Manual Aooendix B.6): Not Applicable to Pollutant the Proiect Site Sediment Nutrients Heavy Metals Organic Compounds X Trash & Debris Oxygen Demanding Substances Oil & Grease Bacteria & Viruses X Pesticides KAISER PERMANENTE CARLSBAD PARKJNG LOT EXPANSION Also a Receiving Anticipated from the Water Pollutant of Proiect Site Concern X NIA X NIA X N/A X NIA X NIA X NIA X NIA 10 STORJvf WATER QUA LITY MANAGEMENT PLAN JUNE 2017 Hvdromodlflcatlon Manaaement Raaulrementa Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? D Yes, hydromodification management flow control structural BMPs required. 00 No, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. □ No, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. □ No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides. Description / Additional Information (to be provided if a 'No' answer has been selected above): The drainage from this project site is conveyed via underground storm drain pipe from the point of discharge until it outlets at Batiquitos Lagoon, an enclosed embayment, which is included in the Carlsbad Watershed Management Area Water Quality Improvement Plan (WQIP), dated June 2016, as an exempt water body. Within the Carlsbad WQIP, reference Appendix F entitled, "Hydromodification Exemption Analyses for Select Carlsbad Watersheds" by Chang Consultants dated September 17, 2015. The HMP Exemption Exhibit from this report is included as Attachment 2a for reference, and highlights the project site shown within the HMP exemption area. KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 11 STORM WATER QUALITY MANAGEMENT PLAN JUNE 201 7 ~his Section onl ulrements a Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries? □ Yes (See discussion below) 00 No, No critical coarse sediment yield areas to be protected based on WMAA maps If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed? □ 6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite □ 6.2.2 Downstream Systems Sensitivity to Coarse Sediment □ 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite □ No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps If optional analyses were performed, what is the final result? □ No critical coarse sediment yield areas to be protected based on verification of GLUs onsite □ Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required. Documentation attached in Attachment 28 of the SWQMP. □ Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit. Discussion / Additional Information: See Attachment 2b for a Potential Critical Coarse Sediment Yield GIS overlay of the project area and surrounding areas. KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 12 STORM WATER QUALITY MANAGEMENT PLAN JUNE 2017 Flow Control for Post-Project Runofr ~hi• Section onlv raaulred If hvdrornodlflcatlon manaaement reaulrements annlv List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1 ). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit. *Hydromodification management requirements do not apply. See discussion on page 11 . Has a geomorphic assessment been performed for the receiving channel(s)? □ No, the low flow threshold is 0.1 Q2 (default low flow threshold) □ Yes, the result is the low flow threshold is 0.1 Q2 □ Yes, the result is the low flow threshold is 0.3Q2 o Yes, the result is the low flow threshold is 0.5Q2 If a geomorphic assessment has been performed, provide title, date, and preparer: Discussion/ Additional Information: (optional) KA ISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 13 STORM WATER QUALITY MA NAGEMENT PLAN JUNE 2017 Other Site Raaulrements and Constraints When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or City codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements. ODtlonal Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed. KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 14 STORM WATER QUALITY MANAGEMENT PLAN KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION JUNE 201 7 15 ( City of Carlsbad STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project lnfonnatlon Project Name: Kaiser Carlsbad Parking Lot Expansion Project ID: CD20 17-0003 DWG No. or Building Permit No.: DWG 504-2A Source Control BMP• Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www .carlsbadca.gov All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required. • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. • "NIA" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement Applled? SC-1 Prevention of Illicit Discharges into the MS4 ~ Yes □ No □ NIA Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage ~Yes □ No □ NIA Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind ~ Yes □ No □ NIA Dispersal Discussion/j ustification if SC-3 not implemented: E-36 Page 1 of 4 Revised 03/16 Source Control Reaulrement (continued) lnnlled? SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and 121Yes D No D N/A Wind Dispersal Discussion/justification if SC-4 not implemented: SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal 121Yes D No D N/A Discussion/justification if SC-5 not implemented: SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Aooendix E.1 of BMP Manual for guidance). 121 On-site storm drain inlets 121Yes D No D N/A D Interior floor drains and elevator shaft sump pumps □Yes D No 121 N/A □ Interior parking garages D Yes D No 121 N/A D Need for future indoor & structural pest control □Yes D No 121 N/A 121 Landscape/Outdoor Pesticide Use 121Yes D No D NIA □ Pools, spas, ponds, decorative fountains, and other water features □ Yes D No 121 N/A D Food service D Yes D No 121 N/A D Refuse areas D Yes D No 121 N/A D Industrial processes D Yes D No 121 N/A □ Outdoor storage of equipment or materials D Yes D No l2l N/A □ Vehicle and Equipment Cleaning □ Yes D No l2l N/A □ Vehicle/Equipment Repair and Maintenance D Yes D No l2l N/A D Fuel Dispensing Areas □Yes D No 121 N/A □ Loading Docks D Yes D No 121 N/A □ Fire Sprinkler Test Water □Yes O No 121 N/A □ Miscellaneous Drain or Wash Water □ Yes D No 121 N/A 121 Plazas, sidewalks, and parkinQ lots '2]Yes 0 No 0 N/A For "Yes" answers, identify the additional BMP per Appendix E.1. Provide justification for "No" answers. Storm Drain Inlets: *Mark all inlets with the words, "No Dumping! Flows to Ocean I" See attached sheet for continuation of "Yes" answers E-36 Page 2 of 4 Revised 03/16 Standard Project Requirement Checklist E-36 Continuation of SC-6: Landscape/Outdoor Pesticide Use: *For Landscape/Outdoor Pesticide use, final landscape plans will: 1) Preserve existing drought tolerant trees, shrubs, and ground cover to the maximum extent possible, 2) Design landscaping to minimize irrigation and runoff, to promote surface infiltration where appropriate, and to minimize the use of fertilizers and pesticides that can contribute to storm water pollution, 3) Specify plants that are tolerant of periodic saturated soil conditions where landscape areas are used to retain or detain storm water, 4) Use pest resistant plans adjacent to hardscape, and 5) Select plants appropriate to site soils, slopes, climate, sun, wind, rain, land use, air movement, ecological consistency, and plant interactions. Plazas, sidewalks, and parking lots: *Plazas, sidewalks, and parking lots shall be swept regularly to prevent the accumulation of litter and debris. *Debris from pressure washing shall be collected to prevent entry into the storm drain system. Washwater containing any cleaning agent or degreaser shall be collected and discharged to the sanitary sewer and not discharged to a storm drain. Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion / justification is not required. • "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. • "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Source Control Requirement I Applied? SD-1 Maintain Natural Drainage Pathwavs and Hydrologic Features I D Yes I 0 No I 0 NIA Discussion/justification if SD-1 not implemented: No existing natural drainage pathways exist onsite. SD-2 Conserve Natural Areas, Soils, and Vegetation I 0 Yes I D No I D N/A Discussion/justification if SD-2 not implemented: SD-3 Minimize lmoervious Area I 0 Yes I D No ID N/A Discussion/justification if SD-3 not implemented: Only impervious areas required to gain additional parking were added to the site along with pedestrian walkway connections. SD-4 Minimize Soil Compaction I 0 Yes I D No ID N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion I 0Yes I 0 No I D N/A Discussion/justification if SD-5 not implemented: E-36 Page 3 of 4 Revised 03/16 Source Control Raoulrement (continued) I Annlled? SD-6 Runoff Collection I 0 Yes l □ No I □ N/A Discussion/justification if SD-6 not implemented: SD-7 LandscaoinCI with Native or DrouC1ht Tolerant Species I 0 Yes I □ No I □ N/A Discussion/justification if SD-7 not implemented: SD-8 HarvestinCI and UsinCI Precioitation I □ Yes 1 0 No I □ N/A Discussion/justification if SD-8 not implemented: Harvesting precipitation and using precipitation is not planned for the project. Proper BMP implementation will treat storm water runoff, as required. (See completed Form 1-7 in Attachment 1c) E-36 Page 4 of 4 Revised 03/16 STORM WATER QUALITY MANAGEMENT PLAN JUNE 2017 SUMMARY OF PDP STRUCTURAL BMPS PDP Structural BMPs All PDPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s). PDP structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owner's representative to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). PDP structural BMPs must be maintained into perpetuity, and the City must confirm the maintenance (see Section 7 of the BMP Design Manual). Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below. Then complete the PDP structural BMP summary information sheet for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP). KA ISER PERMANENTE CA RLSBAD PARKING LOT EXPANSION 17 STORM WATER QUAl/TY MANAGEMENT PLAN JUNE20l7 Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated together or separate. BIOFILTRATION (BF-1) Using section 5.1 of the City of Carlsbad BMP Design Manual (Fi gure 5-1 and 5-2) Biofiltration was selected as the treatment control BMP for the project and integrated as storm water flow control (HMP s izing) and w ill include outlet contro l at the downstream outlet of the facilities. With infiltration infeasible at the project location, the facilities will be lined in order for surface waters to discharge via underdrain or overflow to the downstream conveyance system. Per C ity of Carlsbad Fact Sheet BF-I, "Biofiltration (Bioretention with underdrain) facilities are vegetated surface water systems that fi lter water through vegetation, and soil or engineered media prior to discharge via underdrain or overflow to the downstream conveyance system. Bioretention with underdrain facilities are commonly incorporated into the s ite within parking lot landscaping, along roadsides, and in open spaces. Because these types of facilities have limited or no infiltration, they are typically designed to provide enough hydraulic head to move flows through the underdrain connection to the storm drain system. Treatment is achieved through filtration, sedimentation, sorption, biochemical processes and plant uptake." Biofiltration systems are effective at removing sediments and pollutants which are associated with fine particles by fi ltration through surface vegetation and underly ing engineered soil media. These systems can also delay runoff peaks by providing detention and/or retention capacity in the media layer and ponding area through the controlled release of treated runoff. The addition of vegetation not only increases the aesthetic value of these areas, but also enhances the fi ltration component of the system through plant uptake and helps maintain the porosity of the engineered soil layer. Biofiltration systems can be constructed as either large or small scale devices with native or amended soils. Biofiltration systems, like the systems designed for this project, collect storm water from impervious areas (roof areas and other impervious surfaces) through the site's grading design. The biofiltration systems for this project have been integrated into the drainage design to meet poll utant control requirements for the site by minimizing directly connected impervious areas. The proposed parking lots, building roof areas, and hardscape associated with the project drain to the proposed biofiltration planter systems through the use of roof drain downspouts or piping, which allow runoff to flow directly into the biofiltration areas for water quality treatment. Rip rap energy dissipaters will be located at points where concentrated flow enters the biofiltration basins from roof drain downspouts or pipe outfalls to minimize erosion from occurring. Biofiltration systems are designed to allow ponding to occur. A soil layer, gravel layer, under drain system, and impermeable liner was designed for the systems due to the poor infiltration rates of the in situ soil and the systems' close proximity to t he proposed improvements and building foundations. (Continued on next page) KAISER PERMANENTE CARLSBAD PARKJNG LOT EXPANSION 18 STORM WATER QUALITY MANAGEMENT PLAN JUNE 2017 Biofiltration systems function by allowing ponded runoff to infiltrate down through the mulch layer, amended soil layer, and the gravel layer; ultimately discharging to the private storm drain system through the system's perforated under drain. The biofiltration system areas will be landscaped with a combination of ground covers, shrubs and/or trees as selected by the project's landscape architect. The biofiltration systems w ill provide water quality treatment for the calculated DCV for each DMA. The project is exempt from hydromodification management requirements. (See discussion of Hydromodification Management Requirements on page 11 ). KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 19 STORM WATER QUALITY MANAGEMENT PLAN Structural BMP Summary Information Structural BMP ID No.: 1 (OMA 1) DWG 504-2A Sheet No. 3, 5, & 7 Type of structural BMP: □ Retention by harvest and use (HU-1) □ Retention by infiltration basin (INF-1 ) □ Retention by bioretention (INF-2) □ Retention by permeable pavement (INF-3) □ Partial retention by biofiltration with partial retention (PR-1) ~ Biofiltration (BF-1) (BMP ID No. 1) □ Flow-thru treatment control included as pre-treatment/forebay biofiltration BMP (provide BMP type/description and indicate biofiltration BMP it serves in discussion section below) □ Detention pond or vault for hydromodification management □ Other (describe in discussion section below) Purpose: l!l Pollutant control only □ Hydromodification control only □ Combined pollutant control and hydromodification control □ Pre-treatment/forebay for another structural BMP □ Other (describe in discussion section below) Discussion (as needed): Biofiltration BMP for treatment of DCV with 36-hour drawdown. KAISER PERMANENTE CA RLSBAD PARKING LOT t.,-XPANSION 20 JUNE 201 7 for an onsite retention or which onsite retention or STORM WATER QUALITY MANAGEMENT PLAN Structural BMP Summary Information Structural BMP ID No.: 2 (OMA 2) DWG 504-2A Sheet No. 3, 6, & 7 Type of structural BMP: □ Retention by harvest and use (HU-1) □ Retention by infiltration basin (INF-1) □ Retention by bioretention (INF-2) □ Retention by permeable pavement (INF-3) o Partial retention by biofiltration with partial retention (PR-1) ~ Biofiltration (BF-1) (BMP ID No. 2) JUNE 20/7 □ Flow-thru treatment control included as pre-treatmenUforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) □ Detention pond or vault for hydromodification management □ Other (describe in discussion section below) Purpose: ~ Pollutant control only □ Hydromodification control only □ Combined pollutant control and hydromodification control □ Pre-treatment/forebay for another structural BMP □ Other (describe in discussion section below) Discussion (as needed): Biofiltration BMP for treatment of DCV with 36-hour drawdown. KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 21 STORM WATER QUALITY MANAGEMENT PLAN JUNE 2017 ATTACHMENT 1 BACKUP FOR PDP POLLUTANT CONTROL BMPS Attachment Contents Sequence Attachment 1 a OMA Exhibit (Required) See OMA Exhibit Checklist on the back of this Attachment cover sheet. (24"x36" Exhibit typically required) Checklist 00 Included Attachment 1 b Tabular Summary of DMAs Showing 00 Included as Attachment 1 b OMA ID matching OMA Exhibit, OMA separate from OMA Exhibit Attachment 1 c Attachment 1 d Area, and OMA Type (Required)* *Provide table in this Attachment OR on OMA Exhibit in Attachment 1 a Form 1-7, Harvest and Use Feasibility Screening Checklist (Required unless the entire project will use infiltration BMPs) Refer to Appendix B.3-1 of the BMP Design Manual to complete Form 1-7. Form 1-8, Categorization of Infiltration Feasibility Condition (Required unless the project will use harvest and use BMPs) Refer to Appendices C and D of the BMP Design Manual to complete Form 1-8. 00 Included □ Not included because the entire project will use infiltration BMPs 00 Included □ Not included because the entire project will use harvest and use BMPs Attachment 1e Pollutant Control BMP Design 00 Included Worksheets / Calculations (Required) Refer to Appendices B and E of the BMP Design Manual for structural pollutant control BMP design guidelines KA ISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 22 DMAExhibit \ \ LOT13 I MAP10899 <::!. 11.: I - 20· 1 o· o 20· 40• 1~~1----1_~1 SCALE: 1" = 20' s @ I BUILD/NGA I I I I _ (EX/STING 2-STORY I MEDICAL OFFICE) ,o ~~=~ -=~-::_~-~~-~-~ ~ r;:0 J-.;~o/=(,:__".:'.~_']~=~-~= LOT 12 --~ . ~ I _ MAP 10899 '--~../'+-'\ I ) s ' EXISTING DRIVEWAY RJW~' EXISTING CURB EXISTING PARKING TO REMAIN LOT TO REMAIN •• ,o I • , f , 0 @ ,.,.-;.=r:.XIST/NG PARKING ---__..-"-../ LOT TO REMAIN EXISTING RIBBON 0 GUTTER TO REMA/ 0 ---0 ( \Zl --~+r- 1~ \ •@ u EXJS11NG ELEVATOR AND STAIRS --· LINED BIOF'/L TRA TION BMP (360 SF') 64,0 F'G ;':' ! ~II BUILDINGS (EX/STING 2-STORY MEDICAL OFFICE) AVENIDA 111 ENCINAS s s ~ -s -tr---c/L ii i PLAN VIEW -OMA AREAS SCALE: 1" = 20' WIDTH VARIES PER PLAN s BIO-FIL TRAT/ON BASIN WITH IMPERMEABLE LINER DETAIL NOT TO SCALE j • I I I I "'"""' I I I I I I I I I / LOT11 MAP10899 7 / I \ I I I I I I I I I I I I I I I I I I I I I I#,,==="" I I I I I \ I I _ 1/ / V EXISTING PARKING ' LOT TO REMAIN I \ i I I I 11:,,__-----=::::-t.J-l-EXISTING CURB \ TO REMAIN \ PROPOSED TRENCH DRAIN I \ EXISTING STORM DRAIN INLET \ I I I "' \ EXISTING DRIVEWAY 1 "'0 BF LINED 8/0F'IL TRA TION BMP ( 45 SF') 63. 9 F'G -~"' "'"'=r-----------0 I I I I I I I I I t I Know what's below. Call before you dig. LEGEND PROPOSED STORM DRAIN =---so_== - PROPOSED HARDSCAPE/ IMPERVIOUS AREA PROPOSED LANDSCAPING/ PERVIOUS AREA DRAINAGE MANAGEMENT AREA (DMA) BOUNDARY TREATMENT CONTROL BMP NUMBER FLOW DIRECTION ARROW TREATMENT CONTROL BMPS BIOFIL TRA TION WITH IMPERMEABLE LINER SELF-MmGA TING DMA DE MINIMIS DMA SOURCE CONTROL BMPS INLET STENCILING 0 SOIL INFORMATION 80/L: TYPE B SITE INFORMATION: IMPERVIOUS AREA: PERVIOUS AREA= TOTAL DISTURBED AREA: 85TH PERCENTILE STORM DEPTH= 0.31AC 0.17 AC 0.48AC 0.57in OMA SUMMARY DRAINAGE IMPERVIOUS MANAGEMENT BMP TYPE AREA (AC) AREA (OMA) 1 8/0FIL TRA TION 0.28 2 8/0FIL TRA TION 0.03 3* SELF-MIT/GA TING 0.00 4 SELF-MIT/GA TING 0.00 5 DE MIN/MIS 0.00 6 SELF-MIT/GA TING 0.00 PERVIOUS AREA (AC) 0.05 0.02 0.09 0.01 0.00 0.09 TOTAL AREA (ACRES) 0.33 0.05 0.09 0.01 0.00 0.09 *LANDSCAPING TO 8£ REPLACED WITH NON-INVASIVE DROUGHT TOLERANT SPECIES PER SECTION 5.2.1 OF' TH£ CITY OF' CARLSBAD BMP DESIGN MANUAL. BIOFIL TRATION BMP SUMMARY BMP ID BMP TYPE REQUIRED BMP PROVID ED BMP AREA (SF) AREA (SF) 1 BIOFIL TRA TION 337 360 2 8/0FIL TRA TION 36 45 PASCO LARET SUITER & ASSOC I ATES KAISER PERMANENTE -CARLSBAD PARKING LOT EXPANSION SWQMP OMA EXHIBIT CIVI L ENGINEER IN G + LAND PLANNI NG+ LAN D SUR VEYIN G 535 North Highway 101 , Suite A Solana Beach, CA 92075 ph 858.259.8212 I fx 858.259.4812 I plsaengineering.com CARLSBAD, CALIFORNIA PROJECT NUMBER: PE 2512 SCALE: 1" = 20' DATE: JANUARY 2019 SHEET 1 OF 1 DMASummary I I I I PASCO LARET SUITER & ASSOCIATES CIVIL ENGINEERING + LAND PLANNING+ LAND SURVEY NG DMA DCV Summary Kaiser Carlsbad Parking Lot Expansion May 2017 Where: C = Runoff factor (unitless) d = 85th percentile, 24-hr storm event rainfall depth (inches), refer to section B.1 .3. A= Tributary area draining to the BMP BASIN AREAS (SF) Impervious Pervious D.G. Total 1 12,128 2,289 0 14,417 2 1,313 740 0 2,053 *DCV = 3630 x C(ocvJ x d (inches) x A (acres) AREAS (acre) Impervious Pervious D.G. 0.28 0.05 0.00 0.03 0.02 0.00 DCV Surface Runoff Factors* Proposed Biofiltration BMP Section Impervious Area 0.9 Section Thickness (in) Porosity Volume/sf Pervious Area/Landscape 0.10 Ponding 10 1.0 0.83 Decomposed Granite 0.30 Engineered Soil 18 0.1 0.15 *See Table 8.1-1 Gravel 12 0.4 0.40 Total Volume/SF 1.38 d Total (In) 0.33 0.57 0.05 0.57 DCV Area Sizing C Design Capture (DCV) Volume (DCV)* (no unit) (cf) 0.78 533 0.58 60 Project: Kaiser Carlsbad Job No.: PE 2512-01 Cale. By: RT Date: May 2017 Checked: RT Date: May 2017 Sheet: 1._of 1 ~ __ Harv~t and Use Feasibili!Y (Form 1-7) PASCO LARET SUITER & ASSOCIATES CIVIL ENGINEERING+ LAND PLANNING + LAND SURVEYING Kaiser Permanente Carlsbad Parking Lot Expansion Harvested Water Demand Toilet and Urinal Flushing Land Use Type: Commercial/Parking Per Capita Use Total Usage Demand # of Employees per Day* per Day 36-hour Demand N/A --- *Gallons per employee per day for office land use type (See Table B.3-1) Landscape Irrigation Landscape Area 36-hour TOTAL Irrigation Demand (Gal lons/36 (Acres) Demand** hour) 0.17 1470 249.9 Project: Kaiser Carlsbaed Job No.: PE 2512 Cale. By: RT Date: May 2017 Checked:RT Date: May 2017 Sheet: 1 of 1 **Gallons per irrigated acre per 36-hour period (See Table B.3-3, Hydrozone -Moderate Plant Water Use) -. Harvest and'Usc Feasibility Screening Form 1-7 -~ ~ ~ -' .. 1. Is there a demand for harvested water (check all that apply) at the project site that is reliably present during the wet season? Demand for harvested water is present at the project site and currently in use for site irrigation by way of existing retention basins (water hazards) on the golf course. D Toilet and urinal flushing ~ Landscape irrigation D Other: ________ _ 2. If there is a demand; estimate the anticipated average wet season demand over a period of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. 33.4 cubic feet (250 gallons) / 2. Calculate the DCV using worksheet B.2.1 593 cubic feet (4,436 gallons) 3a. Is the 36-hour demand greater than or equal to the DCV? No Harvest and use appears to be feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 36. Is the 36-hour demand greater than 0.25DCV but less than the full DCV? No Harvest and use may be feasible. Conduct more detailed evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture targets while draining in longer than 36 hours. 3c. Is the 36-hour demand less than 0.25DCV? Yes New harvest and use is considered to be infeasible. Attachment 1 d ________ Infiltration Feasibility f' · -··· -.,-... ,,, -,., i .----·;-. ':.~j' '• .~· '1::..:--.-~. -.. -.-..c ._ ~ ., ~ Catcgorizatior' of,_Jnfil~r.*i.01~-Fcis}bility f.:ori~i_t\on ) .. : . ' F~nn 1-8 ' , Part 1 -Full Infiltration Feasibility Screening Criteria Would infiltration of the full design volume be feasible from a physical perspective without any undesirable consequences that cannot be reasonably mitigated? Criteria Screening Question Is the estimated reliable infiltration rate below proposed facility locations greater than 0.5 inches per hour? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D. Provide basis: Yes No X Measured infiltration rates ranged from 0.0 in/hr to 0.84 in/hr. With application of the minimum factor of safety the klesign infiltration rates would be 0.0 in/hr to 0.32in/hr. This form is included with site infiltration report prepared b)' IIU,1A Group. (Ref. Preliminary Soil Infi ltration Testing and Pavement Structural Section Report, Kaiser Carlsbad Parking Lot Expansion, dated May 10, 2017 by RMA Group, RMA Project No. 17-0497-0 1 ). Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability. 2 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: X !Not applicable. Measured infiltration rates ranged from 0.0 in/hr to 0.84 in/hr. With application of the minimum factot k>f safety the design infiltration rates would be 0.0 in/hr to 0.32in/hr. Infiltration at the site will not impact slope stability since there are no nearby slopes at the site, the soils onsite an !medium dense to dense silty sand and sand ,vith silt and are not subject to hydrocollapse or consolidation based upo1 \SPT blow counts, are non-expansive and not subject to liquefaction. Groundwater mounding would not be expectec lbased on the separation between the bottom of the proposed basins being greater than 10 feet and the slow infiluat:ior rates obtained in our testing. Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability. • I", • ..., ...., ~. -- Form f {Page 2 of 4 · · • • • \ ' • .. > ' ~ Criteria Screening Question 3 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of groundwater contamination (shallow water table, storm water pollutants or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Yes No X Not applicable. Measured infiltration rates ranged from 0.0 in/hr to 0.84 in/hr. With application of the minimum factoi of safety the design infiltration rates would be 0.0 in/hr to 0.32in/hr. Ground water beneath the site was not encountered in or exploratory borings that extended to a depth of 16.5 feet below the existing ground surface. According to the Geotracker website (http://geotracker.warerboards.ca.gov), groundwater was encountered in a monitoring well located approximately 1 mile nortl1west of the site was at a depth of 28 feet in 2005. Due to the slow infiltration rate and the separation between the groundwater level and the proposed basin bottom levation and the proposed use as vehicle parking, an increased risk of groundwater contamination is considered very ow. Summarize fu1dings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability. 4 Can infiltration greater than 0.5 inches per hour be allowed without causing potential water balance issues such as change of seasonality of ephemeral streams or increased discharge of contaminated groundwater to surface waters? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: X Not applicable. Measured infiltration rates ranged from 0.0 in/hr to 0.84 in/hr. Witl1 application of the mininium factot of safety the design infiltration rates would be 0.0 in/hr to 0.32in/hr. Due to the slow infiltration rate and the separation between the groundwater level and the proposed basin bottom elevation and the proposed use as vehicle parking, and increase potential water balance issues such as change of seasonality of ephemeral stream s or increased discharge of contaminated groundwater to surface waters is considered very low. No ephemeral streams are located onsite or nearby and the Geotracker website does not indicate a source of known contamination within a mile of the site. Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability. Part 1 Result* If all answers to rows 1 -4 are "Yes" a full infiltration design is potentially feasible. The feasibility screening category is Full Infiltration If any answer from row 1-4 is "No", infiltration may be possible to some extent but would not generally be feasible or desirable to achieve a "full infiltration" design. Proceed to Part 2 See Part 2 *To be completed using gathered site information and best professional judgment considering the definition of:tvIEP in the MS4 Permit. Additional testing and/or studies may be required by City Engineer to substantiate findings. r. ,, --~~,,._... \.t-.4'...._,,,._ ·-,,_ -. -\;;• 11.· 11 < ; , Form'l,-8 P1g~ 3·of1 _ ; . _ ·, · Part 2 -Partial Infiltration vs. No Infiltration Feasibility Screening Criteria Would infiltration of water in any appreciable amount be physically feasible without any negative consequences that cannot be reasonably mitigated? Criteria Screening Question 5 Do soil and geologic conditions allow for infiltration in any appreciable rate or volume? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D . Provide basis: Yes No X Measured infiltration rates ranged from 0.0 in/hr to 0.84 in/hr. With application of the minimum factor of safety the design infiltration rates would be 0.0 in/hr to 0.32in/hr. This form is included with site infiltration report prepared by RMA Group. (Ref. Preliminary Soil Infiltration Testing and Pavement Structural Section Report, Kaiser Carlsbad Parking Lot Expansion, dated May I 0, 2017 by RMA Group, RMA Project No. 17-0497-0 I). Swnmarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability and why it was not feasible to mitigate low infiltration rates. 6 Can Infiltration in any appreciable quantity be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: X nfiltration at the site will not impact slope stability since there are no nearby slopes at the site, the soils onsite are n edium dense to dense silty sand and sand with silt and are not subject to hydrocollapse or consolidation based upon SPT blow counts, are non-expansive and not subject to liquefaction. Groundwater mounding would not be expected based on the separation between the bottom of the proposed basins being greater than 10 feet and the slow infiltration rates obtained in our testing. Would increase risk to existing undergrow1d utilities (particularly to electrical and telephone utilities) servicing the existing Medical Office Building. S=arize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative kliscussion of study/ data source applicability and why it was not feasible to mitigate low infiltration rates. f'" ' ; I .-f --.~ : -~--; .. ,.-;, • •~r~-ti .• _,. •--y -1, i -:T-;t: , · . Fo~·I;.S;Page,4 of 4 ~~• • b },...._,.; .. ~ ,,, ... ., ,._ " I Criteria Screening Question 7 Can Infiltration in any appreciable quantity be allowed without posing significant risk for groundwater related concerns (shallow water table, storm water pollutants or other factors)? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Yes No X Infiltration at the site will not impact slope stability since there are no nearby slopes at the site, the soils onsite are dense silty sand and sand with silt and are not subject to hydrocollapse or consolidation based upon SPT blow counts, are 1non-expansive and not subject to liquefaction. Grow1dwater mounding would not be expected based on the separation oetween the bottom of the proposed basins being greater than 10 feet and the slow infiltration rates obtained in ow testing. Swnmarize findings of studies; provide reference to studies, calculations, maps, data sources, etc, Provide narrative discussion of study/ data source applicability and why it was not feasible to mitigate low infiltration rates. 8 Can infiltration be allowed without violating downstream water rights? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: X The site is not up gradient from a stream course and is located about ½ mile from the ocean. Also, no known watet wells are located within a 1/2 from the site. Evaluation of downstream water rights is outside of the purview ol geotechnical engineering. Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability and why it was not feasible to mitigate low infiltration rates. Part 2 Result-I' If all answers from row 1-4 are yes then partial infiltration design is potentially feasible, The feasibility screening category is Partial Infiltration. If any answer from row 5-8 is no, then infiltration of any volwne is considered to be infeasible within the drainage area. The feasibility screening category is No Infiltration. Infiltration "To be completed using gathered site information and best professional judgment considering the definition of i'v1EP 111 the MS4 Permit Additional testing and/or studies may be required by City Engineer to substantiate findings. ,____ ______ B_MP Des~ Worksheets Kaiser Carlsbad Parking Lot Expansion PE 2512-01 5/6/2017 DMAl W orks heet 8 .5-1: Simple Sizing Method for Biofiltration BMPs 1 Remaining DCV After implementing retention BMPs 533.0 Partial Retention 2 Infiltration rate from Worksheet D.5-1 if partial infiltration is feasible 0.00 3 Allowable drawdown time for aggregate storage below the underdrain 36 4 Depth of runoff that can be infiltrated (Line 2 x Line 3] 0.00 5 Aggregate pore space 0.40 6 Required depth of gravel below the underdrain [Line 4 / Line 5] 0.00 7 Assumed surface area of the biofiltration BMP 360.0 8 Media retained pore storage 0.1 9 Volume retained pore storage 54.00 10 DCV that requires biofiltration (Line 1 -Line 9] 479.0 BMP Parameters 11 Surface Poding (6 inch minimum, 12 inch maximum] 10 12 Media Thickness (18 in Min], also add mulch layer thicknes to this line 18 13 Aggregate Storage above underdrain inver (12 inches typical) -Use O inches for 12 sizing if the aggregate is not over the entire bottom surface area 14 Freely drained pore storage 0.4 Media filtration rate to be used tor sizing (5 in/hr. with no outlet control; if the 15 filtration rate is controlled by the outlet, use the outlet controlled rate which will 5 be less than 5 in/hr.) Baseline Calculations 16 Allowable Routing Time for sizing 6 17 Depth filtered during storm [Line 15 x Line 16] 30 Depth of Detention Storage 22.00 18 [Line 11 + (Line 12 x Line 14) + (Line 13 x Line 5)] 19 Total Depth Treated [Line 17 + Line 18] 52.00 Option 1 -Biofilter 1.5 times t he DCV 20 Required biofiltered volume (1.5 x Line 10] 719 21 Required Footprint [Line 20 / Line 19] x 12 165.8 Option 2 -Store 0.75 of remaining DCV in pores and poding 22 Required Storage (surface+ pores) Volume (0. 75 x Line 10] 359 23 Required Footprint (Line 22 / Line 18] x 12 196 Footprint of the BMP 24 Area draining to the BMP 14417.0 Adjusted Runoff Factor for drainage area (Refer 0.78 25 to Appendix B.1 and B.2) 26 BMP Footprint Sizing Factor (Default 0.03 or an alternative minimum footprint 0.03 sizing factor from Worksheet B.5-2, Line 11) 27 Minimum BMP Footprint (Line 24 x Line 25 x Line 26] 337 28 Footprint of the BMP = Maximum (Minimum(Line 21, Line 23), Line 27) 337 Check for Volume Reduction [Not applicable for No Infiltration Condition] ~ GalE1:1late tl=le fFaEtiaA af QGV FetaiAea iA tl=le 8MP (biAe 9 I-biAe 1l ~ ~ MiAiFAl:IFA FeE!l:liFea fFaEtiaA af QGV FetaiAea faF 13aFtial iAfiltFatiaA E8Aaiti8A5 ~ Is tl=le ~etaiAea QGV::. Q.371if If tl=le aAs1,1,1eF is Ra iAEFease tl=le faat13FiAt sii!iAg ~ 3-1 faEtaF iA biAe ;!G 1:1Atil tl=le aAs1,..,eF is •;es faF tl=lis EFiteFiaA. cu-ft in/hr hours inches in/in inches sq-ft in/in cu-ft cu-ft inches inches inches in/in in/hr hours inches inches inches cu-ft sq-ft cu-ft sq-ft sq-ft sq-ft sq-ft 1:1Aitless 1:1Aitless ~ J:\Active Jobs\2512 KAISER CARLSBAD\CIVIL\REPORTS\SWQMP-Final\Appendices\Appendix le-BMP Design Worksheets\2512_Worksheet B.5-l_Biofiltration BMP Sizing Kaiser Carlsbad Parking Lot Expansion PE 2512-01 5/6/2017 DMA2 Works heet B.5-1: Simple Sizing Method for Biofiltration BMPs 1 Remaining DCV After implementing retention BMPs 60.0 Partial Retention 2 Infiltration rate from Worksheet D.5-1 if partial infiltration is feasible 0.00 3 Allowable drawdown time for aggregate storage below the underdrain 36 4 Depth of runoff that can be infiltrated [Line 2 x Line 3) 0.00 5 Aggregate pore space 0.40 6 Required depth of gravel below the underdrain [Line 4 / Line SJ 0.00 7 Assumed surface area of the biofiltration BMP 46.0 8 Media retained pore storage 0.1 9 Volume retained pore storage 6.90 10 DCV that requires biofiltration [Line 1 -Line 9) 53.1 BMP Parameters 11 Surface Poding (6 inch minimum, 12 inch maximum) 10 12 Media Thickness (18 in Min], also add mulch layer thicknes to this line 18 13 Aggregate Storage above underdrain inver {12 inches typical) -Use O inches for 12 sizing if the aggregate is not over the entire bottom surface area 14 Freely drained pore storage 0.4 Media filtration rate to be used for sizing (5 in/hr. with no outlet control; if the 15 filtration rate is controlled by the outlet, use the outlet controlled rate which will 5 be less than 5 in/hr.) Baseline Calculations 16 Allowable Routing Time for sizing 6 17 Depth filtered during storm [Line 15 x Line 16) 30 Depth of Detention Storage 22.00 18 [Line 11 + (Line 12 x Line 14) + (Line 13 x Line 5)) 19 Total Depth Treated [Line 17 + Line 18) 52.00 Option 1 -Biofilter 1.5 times the DCV 20 Required biofiltered volume [1.5 x Line 10) 80 21 Required Footprint [Line 20 / Line 19) x 12 18.4 Option 2 -Store 0.75 of remaining DCV in pores and poding 22 Required Storage (surface+ pores) Volume [0.75 x Line 10) 40 23 Required Footprint [Line 22 / Line 18) x 12 22 Footprint of the BMP 24 Area draining to the BMP 2053.0 Adjusted Runoff Factor for drainage area (Refer 0.58 25 to Appendix 8.1 and 8.2) 26 8MP Footprint Sizing Factor (Default 0.03 or an alternative minimum footprint 0.03 sizing factor from Worksheet 8.5-2, Line 11) 27 Minimum BMP Footprint [Line 24 x Line 25 x Line 26) 36 28 Footprint of the 8MP = Maximum (Minimum(Line 21, Line 23), Line 27) 36 Check for Volume Reduction [Not applicable for No Infiltration Condition] ~ Galeulate tl:le fFaetieA ef QGV FetaiAeel iA tl:le 8MP fbiAe 9 ./-biAe :J:l ~ ~ ~ Mi Ai FA UFA Fe~uiFeel fFaetieR ef QGV FetaiReel feF J'laFtial iRfiltFatieR eeAelitieAs Is tl:le ~etaiReel QG!,£ ~ Q.37§'.? If tl:ie aRsweF is Ae iAeFease tl:ie feetJ'lFiRt sieiRg AA ~ faeteF iR biRe ;!6 uRtil tl:le aRsweF is •,es feF tRis eFiteFieR. cu-ft in/hr hours inches in/in inches sq-ft in/in cu-ft cu-ft inches inches inches in/in in/hr hours inches inches inches cu-ft sq-ft cu-ft sq-ft sq-ft sq-ft sq-ft uAitless uAitless AA J:\Active Jobs\2512 KAISER CARLS8AD\CIVIL\REPORTS\SWQMP-Final\Appendices\Appendix le-8MP Design Worksheets\2512_Worksheet 8.5-l_Biofiltration BMP Sizing STORM WATER QUALITY MANAGEMENT PLAN JUNE2017 ATTACHMENT 2 BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES Attachment Contents Sequence Attachment 2a Hydromodification Management Exhibit (Required) Attachment 2b Management of Critical Coarse Sediment Yield Areas (WMAA Exhibit is required, additional analyses are optional) See Section 6.2 of the BMP Design Manual. Attachment 2c Geomorphic Assessment of Receiving Channels (Optional) See Section 6.3.4 of the BMP Design Manual. Attachment 2d Flow Control Facility Design and Structural BMP Drawdown Calculations (Required) See Chapter 6 and Appendix G of the BMP Desion Manual KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 23 Checklist 00 Included {Project is exempt from Hydromodification Control Requirements) 00 Exhibit showing project drainage boundaries marked on WMAA Critical Coarse Sediment Yield Area Map (Required) Optional analyses for Critical Coarse Sediment Yield Area Determination D 6.2.1 Verification of Geomorphic Landscape Units Onsite D 6.2.2 Downstream Systems Sensitivity to Coarse Sediment D 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite 00 Not performed □ Included 00 Included .______~Hydromodification Exem tion Exhibit r •• , .. ·. HMP LEGEND: --••••• V//21 WJ1 EXEMPTION GRAPHIC SCALE 500 1000 I I 1 INCH = 500 FEET MAJOR DRAINAGE BASIN BOUNDARY NATURAL FLOW PATH HYDROMODIFICA TION EXEMPT AREA HYDROMODIFICATION EXEMPT AREA IF FUTURE DRAINAGE IM PROVEMENTS ARE CONSTRUCTED EXHIBIT *Exhibit take from the, "Hydromodification Exemption Analyses for Select Carlsbad Watersheds" by Chang Consultants dated September 17, 2015 Attachment 2b Potential Critical Course Sedimen Yield Areas Exhibit -----~i : l=P otential Criti~I Coarse . Sediment Yield Area* ·-------·... ---, __ _ [Source: Project Clean Water Watershed t;,1 anagement Area Analysis 2015 ~egional Potential Critical Coarse e ediment Yield Area Mapping NWW.projectcleanwater.org) ____ 11 Attachment 2c Flow Control and BMP Drawdown Calculations PASCO LARET SUITER & ASSOCIATES CIVIL ENGINE[RING + LAND PLANNING+ LAND SURVEYING Flow Control Facility Design and Structural BMP Drawdown Calculations The following BMP Sizing and Orifice outflow calculations are intended to show only that the orifice outflow meets the requirements of the BMP Design Manual. The BMP design worksheets provided in Attachment 1 match the surface volume for biofiltration BMP areas (1 O" ponding) for the respective DMAs, however these calculations are not intended to show the or subsurface (HMP) storage volume for biofiltration (shown as flow-through planter) areas in the spreadsheets. Note, the project is HMP Exempt. 535 N Coast Highway IOI Ste A Solana Beach, California 92075 [ ph 858.259.82 12 [ fx 858.259.4812[ plsaengineering.com BMP Sizing Spreadsheet Vl.04 Project Name: Kaiser Parking Lot Expansion Project Applicant: Kaiser Foundation Health Plan, Inc. Jurisdiction: City of Carlsbad Parcel (APN): 214-450-19-00 Hydrologic Unit: 904.51 Rain Gauge: Lindbergh Total Project Area (sf): 20,962 Channel Susceptibility: Low The BMP Sizing Spreadsheet user should attempt to account for all elements of a project site through the definition of Drainage Management Areas {DMAs) and BMPs. The total area of the DMAs and BMPs should be equal to the total site area. Including all areas - even those portions of the project site that will not be developed -will help the plan reviewer assess the completeness of the BMP sizing effort in the project application. This BMP Sizing Spreadsheet has been developed in accordance with the San Diego BMP Sizing Calculator Methodology Directions to User: 1. Fill out project information on this sheet . Rain gauge information can be found at http://bit.ly/ln HsW Je 2. Map and measure DMA's. Include a copy of the map with your submittal. 3. The entire site shall be divided into separate drainage management areas {DMAs), with each area identified as one of the following: self-treating, self-retaining, draining to a self- retaining area, or draining to a BMP. Each area should be clearly marked with a unique identifier. 4. For each BMP within your project, copy the BMP and Orifice tabs simultaneously. Both tabs must be copied together for linked formulas to work properly. 5. On the BMP tab, select BMP type and list all DMA's draining to the BMP. 6. Enter the information for each OMA. 7. Open the orifice tab and enter the exiting condition information for each OMA. 8. Enter a proposed orifice size. 9. Return to BMP tab and confirm selected BMP depth. 10. Return to orifice tab and confirm adequacy of drawdown time. 11. Make sure the BMP on your plans, specifications, and details match the proposed BMP dimensions. Frequently Asked Questions 1. When sizing the orifice, it does not seem to account for existing impervious area. On the orifice tab, existing impervious areas are accounted for by selecting "Impervious" for the soil type and "N/ A" for the cover. 2. What does it mean when the drawdown time is blank? This means that additional user information is need. The most common cause is a lacks of input for the proposed vault or cistern volume on the BMP tab. BMP Sizing Spreadsheet Vl.04 Project Name: Kaiser Parking Lot Expansion Hydrologic Unit: 904.51 Project Applicant: Kaiser Foundation Health Plan, Inc Rain Gauge: Lindbergh Jurisdiction: City of Carlsbad Total Project Area: 20962 Parcel (APN): 214-450-19-00 Low Flow Threshold: 0.SQ2 BMP Name: 1 (DMAl) BMPType: Flow-Through Planter BMP Native Soil Type: N/A -Impervious liner BMP Infiltration Rate (in/hr): N/A Areas Draining to BMP HMP Sizing Factors OMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area Surface Volume Subsurface Volume Surface Area (sf) 1 -Landscape 2289 B Flat Landscape 0.1 N/A N/A N/A N/A 1 -Impervious 12128 B Flat Impervious 0.9 N/A N/A N/A N/A Total BMP Area 14417 Minimum BMP Size Proposed BMP Size' 360 Soil Matrix Depth Minimum Ponding Depth Maximum Ponding Depth Selected Ponding Depth Describe the BM P's in sufficient detail in your SWMP to demonstrate the area, volume, and other criteria can be met within the constraints of the site. BM P's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Surface Volume Subsurface Volume (cf) (cf) N/A N/A N/A N/A 300 216 18.00 in in S928.43 in 10.00 in BMP Sizing Spreadsheet Vl.04 Project Name: iser Parking Lot Expansi Hydrologic Unit: 904.51 Project Applicant: Foundation Health Pia Rain Gauge: Lindbergh Jurisdiction: City of Carlsbad Total Project Area: 20962 Parcel (APN): 214-450-19-00 Low Flow Threshold: 0.SQ2 BMP Name 1 (OMA 1) BMPType: Flow-Through Planter OMA Rain Gauge Existing Condition Q2 Sizing Factor OMA Area (ac) Name Soil Type Cover Slope (ds/ac) 1 -Landscape Lindbergh B Scrub Flat 0.011 0.053 1 -Impervious Lindbergh B Scrub Flat 0.011 0.278 Orifice Flow -%Q2 (cfs) 0.000 0.002 0.002 Tot. Allowable Orifice Flow (cfs) 0.515 Actual Orifice Flow (cfs) Orifice Area (in2) 0.01 0.04 0.04 0.24 Tot. Allowable Max Orifice Orifice Area Diameter (in2) (in) 12.57 4.00 Actual Orifice Area Selected Orifice Diameter (in2) (in) Drawdown (Hrs) 0.2 BMP Drawdown time < 36 hours with no orifice control, therefore, OK. BMP Sizing Spreadsheet Vl.04 Project Name: Kaiser Parking Lot Expansion Hydrologic Unit: 904.51 Project Applicant: l(aiser Foundation Health Plan, Inc Rain Gauge: Lindbergh Jurisdiction: City of Carlsbad Total Project Area: 20962 Parcel (APN): 214-450-19-00 Low Flow Threshold: 0.SQ2 BMPName: 2(0MA2) BMPType: flow-Through Planter BMP Native Soil Type: N/A -Impervious Liner BMP Infiltration Rate (in/hr): N/A Areas Draining to BM P HMP Sizing Factors OMA Post Project Runoff Factor Name Area (sf) Soil Type Slope Surface Type (Table 4-2) Surface Area Surface Volume Subsurface Volume Surface Area (sf) 2 -Landscape 740 B Flat Landscape 0.1 N/A N/A N/A N/A 2 -Impervious 1313 B Flat Impervious 0.9 N/A N/A N/A N/A Total BMP Area 2053 Minimum BMP Size Proposed BMP Size• 3319 Soil Matrix Depth Minimum Ponding Depth Maximum Ponding Depth Selected Ponding Depth Describe the BM P's in sufficient detail in your SWMP to demonstrate the area, volume, and other criteria can be met within the constraints of the site. BM P's must be adapted and applied to the conditions specific to the development project such as unstable slopes or the lack of available head. Designated Staff have final review and approval authority over the project design. This Sizing Calculator has been developed in compliance with the Countywide Model SUSMP. For questions or concerns please contact the jurisdiction in which your project is located. Minimum BMP Size Surface Volume Subsurface Volume (cf) (cf) N/A N/A N/A N/A 2766 1991 18.00 in in 643.04 in 10.00 in BMP Sizing Spreadsheet Vl.04 Project Name: iser Parking Lot Expansi Hydrologic Unit: 904.51 Project Applicant: Foundation Health Pia Rain Gauge: Lindbergh Jurisdiction: City of Carlsbad Total Project Area: 20962 Parcel (APN): 214-450-19-00 Low Flow Threshold: O.SQ2 BMP Name 2 (DMA2) BMPType: Flow-Through Planter OMA Rain Gauge Existing Condition Q2 Sizing Factor OMA Area (ac) Name Soil Type Cover Slope (cfs/ac) 2 -Landscape Lindbergh D Scrub Flat 0.05 0.017 2 -Impervious Lindbergh D Scrub Flat 0.05 0.030 Orifice Flow -%Q2 (cfs) 0.000 0.001 0.001 Tot. Allowable Orifice Flow (cfs) 0.515 Actual Orifice Flow (cfs) Orifice Area (in2) 0.01 0.02 0.03 0.19 Tot. Allowable Max Orifice Orifice Area Diameter (in2) (in) 12.57 4.00 Actual Orifice Area Selected Orifice Diameter (in2) (in) I Drawdown (Hrs) 1.5 BMP Drawdown time < 36 hours with no orifice control, therefore, OK. I Attachment 3a BMP Maintenance Thr~holds and BMP Fact Sheets STORM WATER QUALITY MA NAGEMENT PLAN JUNE 2017 ATTACHMENT 3 Structural BMP Maintenance Information OWNERSHIP AND MAINTENANCE FOR STRUCTURAL BMPs The operations and maintenance of the treatment control BMPs will be the responsibility of the owner. The current contact information for the responsible party is: Kaiser Permanente 6860 Avenida Encinas Carlsbad, CA 92011 (619) 528-5000 A training program will be administered and implemented by Kaiser Permanente and shall occur at a minimum of once annually. The training program shall consist of, at a minimum: the disbursement of the brochures and flyers included in this SWQMP and a copy of the maintenance plan to all operation and maintenance staff associated with the project. A training log shall be filled out at each training session and kept for a minimum of five (5) years. Kaiser Permanente will complete and maintain operation and maintenance forms to adequately document all maintenance performed on the project's treatment control BMPs. These records should be kept on file for a minimum of five (5) years and shall be made accessible to the City of Carlsbad, the State Water Resources Control Board or any other authority regulating storm water discharges for inspection upon request at any time. All waste generated from the Kaiser Permanente Parking Lot Expansion project site is ultimately the responsibility of Kaiser Permanente Disposal of sediment, debris, and trash will comply with applicable local, county, state, and federal waste control programs. Suspected hazardous waste will be analyzed to determine proper disposal methods. The following Operation and Maintenance Plan has been developed for each type of pollutant control BMP used on this project. These are minimum requirements only. Their frequency and/or scope may be increased, if necessary, to meet and/or maintain the level of storm water quality treatment required of this project. All costs associated with the operation and maintenance of the pollutant control BMPs will be funded by Kaiser Permanente in perpetuity or until the project is sold to another entity where the responsibility would transfer with the sale of the property or an individual parcel. The project's owner, Kaiser Permanente, will enter into a Stormwater Facility Maintenance Agreement as required by the City of Carlsbad, which will be executed prior to grading permit issuance. KA ISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 24 STORM WATER QUALITY MANAGEMENT PLAN Biofiltration System Inspection Activities Inspect biofiltration system Inspect soil and repair eroded areas Inspect for erosion or damage to vegetation, preferably at the end of the wet season to schedule dry season maintenance and before major wet season runoff to be sure the areas are ready for the wet season. However, additional inspection after periods of heavy runoff is recommended. Inspect to ensure grasses, ground covers, vegetation is well established. If not, either prepare soil and reseed or replant with appropriate alternative species. Install erosion control blankets if necessary. C heck for debris and litter, areas of sediment accumulation Inspect health of trees and shrubs and vegetation Inspect system cleanouts and outfall structures Inspect for standing water and vectors Biofiltration System Maintenance Activities Remove litter and debris in conjunction with regularly scheduled landscape maintenance Irrigate biofiltration area(s) during dry season (April through October) and as necessary to maintain vegetation during the rainy season. Physically remove weeds Remove sediment Apply mulch to areas devoid of mulch, especially prior to the wet season Replace damaged or diseased trees and shrubs Mow turf areas, if any Repair erosion at inflow points Unclog under drain system Remove and replace dead and diseased vegetation Replace tree stakes and wires, if any Mulch should be replaced every 2 to 3 years or when bare spots appear Rototill or cultivate the surface if the system does not draw down in 48 hours KAISER PERMANENTE CARLSBAD PARKING LOT EXPANSION 25 JUNE 2017 Recommended Frequency -Before/after rainy season -Bi-weekly during the rainy season -After a rainfall event of 0.5'' or more Monthly Prior to rainy season & every other month Every other month Every other month Every other month Every other month Every other month Recommended Frequency As part of routine, regular landscape maintenance Every 2-3 years, or as needed As needed E.12 BF-1 Biofiltration Location: 43rd Street and Logan Avenue, San Diego, California Description Appendix E: BMP Design Fact Sheets MS4 Permit Category Biofiltration Manual Category Bio filtration Applicable Performance Standard Pollutant Control Flow Control Primary Benefits Treatment Volume Reduction (Incidental) Peak Flow Attenuation (Optional) Biofiltration (Bioretention with underdrain) facilities are vegetated surface water systems that filter water through vegetation, and soil or engineered media prior to discharge via underdrain or overflow to the downstream conveyance system. Bioretention with underdrain facilities are commonly incorporated into the site within parking lot landscaping, along roadsides, and in open spaces. Because these types of facilities have limited or no infiltration, they are typically designed to provide enough hydraulic head to move flows through the underdrain connection to the storm drain system. Treatment is achieved through filtration, sedimentation, sorption, biochemical processes and plant uptake. Typical bioretention with underdrain components include: • Inflow distribution mechanisms (e.g, perimeter flow spreader or filter strips) • Energy dissipation mechanism for concentrated inflows (e.g., splash blocks or riprap) • Shallow surface ponding for captured flows • Side slope and basin bottom vegetation selected based on expected climate and ponding depth • Non-floating mulch layer (Optional) • Media layer (planting mix or engineered media) capable of supporting vegetation growth • Filter course layer consisting o f aggregate to prevent the migration of fines into uncompacted native soils or the aggregate storage layer • Aggregate storage layer with underdrain(s) • Impermeable liner or uncompacted native soils at the bottom of the facility E-66 February 2016 • Overflow structure CURB · .. · .. · .. · .. ~ APRON FOR ENERGY • •DISSIPATION ♦ + ♦ + .. .. ,.3H:1V (MIN.) .. • ·:~ ~; : • • + + : ~·-·· .. :I/f :::::•:· ♦ + • + + + + + PLAN NOTTO SCALE 4-6" DROP FROM CURB CUT TO APRON APRON FOR ENERGY DISSIPATION 6" MIN. TO 12" MAX. SURFACE PONDING CURB CUT CLEANOUT . , Appendix E : BMP Design Fact Sheets • ... + + MAINTENANCE • ACCESS SAS ~EEpED) + + ... + ... .. + .. + MEDIA SURFACE AREA 2" MIN. FREEBOARD 3" WELL-AGED, SHREDDED HARDWOOD MULCH (OPTIONAL) MAINTENANCE ACCESS (AS NEEDED) EXISTING UNCOMPACTED SOILS SECTION A-A' NOTTO SCALE Typical plan and Section view of a Biofiltration BMP E-67 February 2016 Appendix E: BMP Design Fact Sheets Design Adaptations for Project Goals Biofiltration Treatment BMP for storm water pollutant control. The system is lined or un-lined to provide incidental infiltration, and an underdrain is provided at the bottom to carry away filtered runoff. This configuration is considered to provide biofiltration treatment via flow through the media layer. Storage provided above the underdrain within surface ponding, media, and aggregate storage is considered included in the biofiltration treatment volume. Saturated storage within the aggregate storage layer can be added to this design by raising the underdrain above the bottom of the aggregate storage layer or via an internal weir structure designed to maintain a specific water level elevation. Integrated storm water flow control and pollutant control configuration. The system can be designed to provide flow rate and duration control by primarily providing increased surface ponding and/ or having a deeper aggregate storage layer above the underdrain. This will allow for significant detention storage, which can be controlled via inclusion of an outlet structure at the downstream end of the underdrain. Design Criteria and Considerations Bioretention with underdrain must meet the following design criteria. Deviations from the below criteria may be approved at the discretion of the City E ngineer if it is determined to be appropriate: Siting and Design □ □ □ Placement observes geotechnical recommendations regarding potential hazards (e.g., slope stability, landslides, liquefaction zones) and setbacks (e.g., slopes, foundations, utilities). An impermeable liner or other hydraulic restriction layer is included if site constraints indicate that infiltration or lateral flows should not be allowed. Contributing tributary area shall be :S 5 acres (:S 1 acre preferred). E-68 Intent/Rationale Must not negatively impact existing site geotechnical concerns. Lining prevents storm water from impacting groundwater and/ or sensitive environmental or geotechnical features. Incidental infiltration, when allowable, can aid in pollutant removal and groundwater recharge. Bigger BMPs require additional design features for proper performance. Contributing tributary area greater than 5 acres may be allowed at the discretion of the City Engineer if the following conditions are met: 1) incorporate design features (e.g. flow spreaders) to minimizing short circuiting of flows in February 2016 Siting and Design □ Finish grade of the facility is :S 2%. Surface Ponding □ □ □ □ Surface ponding is limited to a 24-hour drawdown time. Surface ponding depth is 2: 6 and :S 12 inches. A minimum of 2 inches of freeboard is provided. Side slopes are stabilized with vegetation and are = 3H:1 V or shallower. Vegetation E-69 Appendix E: BMP Design Fact Sheets Intent/Rationale the BMP and 2) incorporate additional design features requested by the City Engineer for proper performance of the regional BMP. Flatter surfaces reduce erosion and channelization within the facility. Surface ponding limited to 24 hours for plant health. Surface ponding drawdown time greater than 24-hours but less than 96 hours may be allowed at the discretion of the City Engineer if certified by a landscape architect or agronomist. Surface ponding capacity lowers subsurface storage requirements. Deep surface ponding raises safety concerns. Surface ponding depth greater than 12 inches (for additional pollutant control or surface outlet structures or flow- control orifices) may be allowed at the discretion of the City Engineer if the following conditions are met: 1) surface ponding depth drawdown time is less than 24 hours; and 2) safety issues and fencing requirements are considered (typically ponding greater than 18" will require a fence and/ or flatter side slopes) and 3) potential for elevated clogging risk is considered. Freeboard provides room for head over overflow structures and minimizes risk of uncontrolled surface discharge. Gentler side slopes are safer, less prone to erosion, able to establish vegetation more quickly and easier to maintain. February 2016 Appendix E: BMP Design Fact Sheets Siting and Design Intent/Rationale Plantings are suitable for the climate and □ Plants suited to the climate and ponding expected ponding depth. A plant list to aid in depth are more likely to survive. selection can be found in Appendix E.20. □ An irrigation system with a connection to water supply should be provided as needed. Mulch (Optional) □ A minimum of 3 inches of well-aged, shredded hardwood mulch that has been stockpiled or stored for at least 12 months is provided. Media Layer □ □ Media maintains a minimum filtration rate of 5 in/hr over lifetime of facility. An initial filtration rate of 8 to 12 in/hr is recommended to allow for clogging over time; the initial filtration rate should not exceed 12 inches per hour. Media is a minimum 18 inches deep, meeting either of these two media specifications: City of San Diego Storm Water Standards Appendix F (February 2016, unless superseded by more recent edition) or County of San Diego Low Impact Development Handbook: Appendix G -Bioretention Soil Specification Qune 2014, unless superseded by m ore recent edition). Alternatively, for proprietary designs and custom media mixes not meeting the media specifications contained in the 2016 City of San Diego Storm Water Standards or County LID Manual, the media meets the pollutant treatment performance criteria in Section F .1. E-70 Seasonal irrigation might be needed to keep plants healthy. Mulch will suppress weeds and maintain moisture for plant growth. Aging mulch kills pathogens and weed seeds and allows the beneficial microbes to multiply. A filtration rate of at least 5 inches per hour allows soil to drain between events. The initial rate should be higher than long term target rate to account for clogging over time. H owever an excessively high initial rate can have a negative impact on treatment performance, therefore an upper limit is needed. A deep media layer provides additional filtration and supports plants with deeper roots. Standard specifications shall be followed. For non-standard or proprietary designs, compliance with F.1 ensures that adequate treatment performance will be provided. February 2016 Siting and Design □ □ Media surface area is 3% of contributing area times adjusted runoff factor or greater. Where receiving waters are impaired or have a TMDL for nutrients, the system is designed with nutrient sensitive media design (see fact sheet BF-2). Filter Course Layer □ □ □ A filter course is used to prevent migration of fines tluough layers of the facility. Filter fabric is not used. Filter course is washed and free of fines. Filter course calculations assessing suitability for particle migration prevention have been completed. Aggregate Storage Layer □ Class 2 Permeable per Caltrans specification 68-1.025 is recommended for the storage layer. Washed, open-graded crushed rock may be __ u_sed, however a 4-6 inch washed pea grave_] __ E-71 Appendix E: BMP Design Fact Sheets Intent/Rationale Greater surface area to tributary area ratios: a) maximizes volume retention as required by the MS4 Permit and b) decrease loading rates per square foot and therefore increase longevity. Adjusted runoff factor is to account for site design BMPs implemented upstream of the BMP (such as rain barrels, impervious area dispersion, etc.). Refer to Appendix B.2 guidance. Use Worksheet B.5-1 Line 26 to estimate the minimum surface area required per this criteria. Potential for pollutant export is partly a function of media composition; media design must minimize potential for export of nutrients, particularly where receiving waters are impaired for nutrients. Migration of media can cause clogging of the aggregate storage layer void spaces or subgrade. Filter fabric is more likely to clog. Washing aggregate will help eliminate fines that could clog tl1e facility and impede infiltration. Gradation relationship between layers can evaluate factors (e.g., bridging, permeability, and uniformity) to determine if particle sizing is appropriate or if an intermediate layer is needed. Washing aggregate will help eliminate fines that could clog the aggregate storage layer void spaces or subgrade. February 2016 Siting and Design □ fil ter course layer at the top of the crushed rock is required. The depth of aggregate provided (12-inch typical) and storage layer configuration is adequate for providing conveyance for underdrain flows to the outlet structure. Inflow, Underdrain, and Out.iow Structures □ □ □ □ □ □ □ □ Inflow, underdrains and outflow structures are accessible for inspection and maintenance. Inflow velocities are limited to 3 ft/ s or less or use energy dissipation m ethods. (e.g., riprap, level spreader) for concentrated inflows. Curb cut inlets are at least 12 inches wide, have a 4-6 inch reveal (drop) and an apron and energy dissipation as needed. Underdrain outlet elevation should be a minimum of 3 inches above the bottom elevation of the aggregate storage layer. Minimum underdrain diameter is 6 inches. Underdrains are made of slotted, PVC pipe conforming to ASTM D 3034 or equivalent or corrugated, HDPE pipe conforming to AASHTO 252M or equivalent. Ao underdrain cleaoout with a minimum 6- inch diameter and lockable cap is placed every 250 to 300 feet as required based on underdrain length. Overflow is safely conveyed to a downstream storm drain system or discharge point Size overflow structure to pass 100-year peak flow ------ E-72 Appendix E: BMP Design Fact Sheets Intent/Rationale Proper storage layer configuration and underdrain placement will minimize facility drawdown time. Maintenance will prevent clogging and ensure proper operation of the flow control structures. High inflow velocities can cause erosion, scour and/ or channeling. Inlets must not restrict flow and apron prevents blockage from vegetation as it grows in. Energy dissipation prevents erosion. A minimal separation from subgrade or the liner lessens the risk of fines entering the underdrain and can improve hydraulic performance by allowing perforations to remain unblocked. Smaller diameter underdrains are prone to clogging. Slotted underdrains provide greater intake capacity, clog resistant drainage, and reduced entrance velocity into the pipe, thereby reducing the chances of solids migration. Properly spaced cleanouts will facilitate underdrain maintenance. Planning for overflow lessens the risk of property damage due to flooding. February 2016 Siting and D esign for on-line infiltration basins and water quality peak flow for off-line basins. Appendix E: BMP Design Fact Sheets Intent/Rationale ---~-----~- Conceptual Design and Sizing Approach for Storm Water Pollutant Control Only To design bioretention with underdrain for storm water pollutant control only (no flow control required), the following steps should be taken: 1. Verify that siting and design criteria have been met, including placement requirements, contributing tributary area, maximum side and finish grade slopes, and the recommended media surface area tributary ratio. 2. Calculate the D CV per Appendix B based on expected site design runoff for tributary areas. 3. Use the sizing worksheet presented in Appendix B.5 to size biofiltration BMPs. Conceptual Design and Sizing Approach when Storm Water Flow Control Is Applicable Control of flow rates and/ or durations will typically require significant surface ponding and/ or aggregate storage volumes, and therefore the following steps should be taken prior to determination o f storm water pollutant control design. Pre-development and allowable post-project flow rates and durations should be determined as discussed in Chapter 6 of the manual. 1. Verify that siting and design criteria have been met, including placement requirements, contributing tributary area, maximum side and finish grade slopes, and the recommended media surface area tributary ratio. 2. Iteratively determine the facility footprint area, surface ponding and / or aggregate storage layer depth required to provide detention storage to reduce flow rates and durations to allowable limits. Flow rates and durations can be controlled from detention storage by altering outlet structure orifice size(s) and/ or water control levels. Multi-level orifices can be used within an outlet structure to control tl1e full range of flows. 3. If bioretention with underdrain cannot fully provide tlle flow rate and duration control required by this manual, an upstream or downstream structure with significant storage volume such as an underground vault can be used to provide remaining controls. 4. After bioretention with underdrain has been designed to meet flow control requirements, calculations must be completed to verify if storm water pollutant control requirements to treat the DCV have been met. E-73 February 2016 Appendix E: BMP Design Fact Sheets E.13 BF-2 Nutrient Sensitive Media Design Some studies of bioretention with underdrains have observed export of nutrients, particularly inorganic nitrogen (nitrate and nitrite) and dissolved phosphorus. This has been observed to be a short-lived phenomenon in some studies or a long term issue in some studies. The composition of the soil media, including the chemistry of individual elements is believed to be an important factor in the potential for nutrient export. Organic amendments, often compost, have been identified as the most likely source of nutrient export. The quality and stability of organic amendments can vary widely. The biofiltration media specifications contained in the County of San Diego Low Impact Development Handbook: Appendix G -Bioretention Soil Specification CTune 2014, unless superseded by more recent edition) and the City of San Diego Low Impact Development Design Manual (page B-18) CTuly 2011, unless superseded by more recent edition) were developed with consideration of the potential for nutrient export. These specifications include criteria for individual component characteristics and quality in order to control the overall quality of the blended mixes. As of the publication of this manual, the June 2014 County of San Diego specifications provide more detail regarding mix design and quality control. The City and County specifications noted above were developed for general purposes to meet permeability and treatment goals. In cases where the BMP discharges to receiving waters with nutrient impairments or nutrient TMDLs, the biofiltration media should be designed with the specific goal of minimizing the potential for export of nutrients from the media. Therefore, in addition to adhering to the City or County media specifications, the following guidelines should be followed: 1. Select plant palette to minimize plant nutrient needs A landscape architect or agronomist should be consulted to select a plant palette that minimizes nutrient needs. Utilizing plants with low nutrient needs results in less need to enrich the biofiltration soil mix. If nutrient quantity is then tailored to plants with lower nutrient needs, these plants will generally have less competition from weeds, which typically need higher nutrient content. The following practices are recommended to minimize nutrient needs of the plant palette: • Utilize native, drought-tolerant plants and g rasses where possible. Native plants generally have a broader tolerance for nutrient content, and can be longer lived in leaner/lower nutrient soils. • Start plants from smaller starts or seed. Younger plants are generally m ore tolerant o f lower nutrient levels and tend to help develop soil structure as they grow. Given the lower cost o f smaller plants, the project should be able to accept a plant mortality rate that is somewhat higher than starting from larger plants and providing high organic content. 2. Minimize excess nutrients in media mix Once the low-nutrient plant palette is established (item 1), the landscape architect and/ or agronomist should be consulted to assist in the design of a biofiltration media to balance the interests of plant E -74 February 2016 Appendix E: BMP Design Fact Sheets establishment, water retention capacity (irrigation demand), and the potential for nutrient export. T he following guidelines should be followed: • The mix should not exceed the nutrient needs of plants. In conventional landscape design, the nutrient needs of plants are often exceeded intentionally in order to provide a factor of safety for plant survival. This practice must be avoided in biofiltration media as excess nutrients will increase the chance of export. The mix designer should keep in mind that nutrients can be added later (through mulching, tilling of amendments into the surface), but it is not possible to remove nutrients, once added. • The actual nutrient content and organic content of the selected organic amendment source should be determined when specifying mix proportions. utrient content (i.e., C:N ratio; plant extractable nutrients) and organic content (i.e, % organic material) are relatively inexpensive to measure via standard agronomic methods and can provide important information about mix design. If mix design relies on approximate assumption about nutrient/ organic content and this is n ot confirmed with testing ( or the results o f prior representative testing), it is possible that the mix could contain much more nutrien t than intended. • Nutrients are better retained in soils with higher cation exchange capacity. Cation exchange capacity can be increased through selection of organic material with naturally high cation exchange capacity, such as peat or coconut coir pith, and/ or selection of inorganic material with high cation exchange capacity such as some sands or engineered minerals (e.g., low P-index sands, zeolites, rhyolites, etc). Including higher cation exchange capacity materials would tend to reduce the net export of nutrients. Natural silty materials also provide cation exchange capacity; however potential impacts to permeability need to be considered. • Focus on soil s tructure as well as nutrient content. Soil structure is loosely defined as the ability of the soil to conduct and store water and nutrients as well as the degree of aeration of the soil. Soil structure can be more important than nutrient content in plant survival and biologic health of the system. If a good soil structure can be created with very low amounts of organic amendment, plants survivability should still be provided. While soil structure generally develops with time, bio filtration media can be designed to promote earlier development of soil structure. Soil structure is enhanced by the use of amendments with high humus content (as found in well-aged organic material). In addition, soil structure can be enhanced through the use of organic material with a distribution o f particle sizes (i.e., a more heterogeneous mix). • Consider alternatives to compost. Compost, by nature, is a material that is continually evolving and decaying. It can be challenging co determine whether tests previously done on a given compost stock are still representative. It can also be challenging to determine how the properties of the compost will change once placed in the media bed. More stable materials such as aged coco coir pith, peat, biochar, shredded bark, and/ or other amendments should be considered. With these considerations, it is anticipated that less than 10 percent organic amendment by volume E-75 February 2016 Appendix E: BMP Design Fact Sheets could be used, while still balancing plant survivability and water retention. If compost is used, designers should strongly consider utilizing less than 10 percent by volume. 3. Design with partial retention and/ or internal water storage An internal water storage zone, as described in Fact Sheet PR-1 is believed to improve retention of nutrients. For lined systems, an internal water storage zone worked by providing a zone that fluctuates between aerobic and anaerobic conditions, resulting in nitrification/ denitrification. In soils that will allow infiltration, a partial retention design (PR-1) allows significant volume reduction and can also promote nitrification/ denitrification. Acknowledgment: This fact sheet has been adapted from the Orange County Technical Guidance Document (May 2011). It was originally developed based on input from: Deborah Deets. City of Los Angeles Bureau of Sanitation. Drew Ready. Center for Watershed Health, Rick Fisher. ASLA. City of Los Angeles Bureau of Engineering. Dr. Garn Wallace. Wallace Laboratories. Glen Dake. GDML. and Jason Schmidt, Tree People. The guidance provided herein does not reflect the individual opinions of any individual listed above and should not be cited or otherwise attributed to those listed. E-76 February 2016 Appendix E: BMP Design Fact Sheets E.14 BF-3 Proprietary Biofiltration Systems The purpose of this fact sheet is to help explain the potential role of proprietary BMPs in meeting biofiltration requirements, when full retention of the DCV is not feasible. The fact sheet does not describe design criteria like the other fact sheets in this appendix because this information varies by BMP product model. Criteria for Use of a Proprietary BMP as a Blofiltratlon BMP A proprietary BMP may be acceptable as a "biofiltration BMP" under the following conditions: (1) The BMP meets the minimum design criteria listed in Appendix F, including the pollutant treatment performance standard in Appendi'C F.1; (2) The BMP is designed and maintained in a manner consistent with its performance certifications (See explanation in Appendix F.2); and (3) T he BMP is acceptable at the discretion of the City Engineer. In determining the acceptability of a BMP, the City Engineer should consider, as applicable, (a) the data submitted; (b) representativeness of the data submitted; (c) consistency of the BMP performance claims with pollutant control objectives; certainty of the BMP performance claims; (d) for projects within the public right of way and/ or public projects: maintenance requirements, cost of maintenance activities, relevant previous city experience with operation and maintenance of the BMP type, ability to continue to operate the system in event that the vending company is no longer o perating as a business; and (e) other relevant factors. Guidance for Sizing a Proprietary BMP as a Biofiltration BMP Proprietary biofiltration BMPs must meet the same sizing guidance as non-proprietary BMPs. Sizing is typically based on capturing and treating 1.50 times the DCV not reliably retained. Guidance for sizing biofiltration BMPs to comply with requirements of this manual is provided in Appendix F.2. E-77 February 2016 r - r I I I rl ~ l [ r - ,,.. L - - r ( r [ [ - €1) TREATMENT CONTROL BMP VERIFICATION FORM . Pursuant to CMC 15.12.100 - GENERAL INFORMATION Owner Name Owner Address City and Zip Contact Name Contact Phone New Contact New Phone BMP INFORMATION BMPType BMPID# I Prioritv I BMP Description Manufacturer BMP Location BMP Address BMP Approval Date I Last Inspection Date Maintenance Freauencv I Comments BMP VERIFICATION AND MAINTENANCE en 0 !:"" 3: ~ w zo >-z Oz z 0 ~ BMP ACTIVITY COMMENTS Has the BMP been installed? Has the BMP been removed? Is the BMP ooeratina orooerlv? Has the BMP been reolaced? If so when? Is BMP covered under a maintenance agreement? Is the BMP on a reaular maintenance schedule? Has trash or other debris accumulated in or around BMP? Has the BMP been insoected durina the last vear? Has the BMP been maintained or cleaned durina the last vear? Are discharae ooints free of litter and debris? Has it rained since the last time the BMP was maintained? D Leaking Vehicles D Erosion/Sediments D Trash and Debris What are the sources of pollution that could impact the BMP? D Over Irrigation D Improvement Projects (paint, concrete wash, landscaping, etc.) □ Pet/Animal Waste □ Lawn clippings and yard waste □ Other Certification Statement "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system to assure that the responsible party gathered and evaluated the information submitted. Based on my inquiry of the person or person who managed the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief true, accurate and complete, I am aware that there are sianificant oenalties for submittina false information inc/udina the possibilitv of fines and other enforcement actions." PRINT NAME: SIGNATURE Please return the completed and signed form to the City of Carlsbad CMI -Storm Water Compliance 5950 El Camino Real Carlsbad, CA 92008 760-602-2780 or FAX 760-438-7178 DATE .,.~ .... Attachment 3b _Draft Stormwater Maintenance Agreement EXHIBIT "A " PR PROPERTY LEGAL DESCRIPTION LOTS 11, 12 AND 13 OF CARLSBAD TRACT NO. 81-5, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STA TE OF CALIFORNIA, MAP NO. 10899, RECORDED , APRIL 11, 1984. PAUL E. GOEBEL, PLS 8548 5/8/17 -------------------------------DATE: PASCO LAREY SUITER ------n ASSOCIATES PH. 858.259.8212 I PLSAENGINEERING.COM PLSA JOB NO. 2512 KAISER M.O.8.-PARKING LOT EXPANSION STORM WATER MANAGEMENT AGREEMENT SHEET 1 OF 1 EXHIBIT "B" PR CITY OF OCEANSIDE NOT TO SCALE la SITE CITY OF ENCINITAS ~ VICINITY MAP NO SCALE NOTE OWNER/APPLICANT REFER TO DWG NO. ______ ON KAISER FOUNDATION HEAL TH PLAN, INC. 8010 PARKWAY DRIVE FILE WITH THE CITY OF CARLSBAD FOR ADDITIONAL DETAILS. LA MESA, CA 91942 -------------------------------PAUL E. GOEBEL, PLS 8548 5/8/17 -------------------------------DATE: CITY OF VISTA PASCO LAREY SUITER KAISER M.O.B.-PARKING LOT EXPANSION STORM WATER MANAGEMENT AGREEMENT n ASSOCIATES PH. 858.259.8212 I PLSAENGINEERING.C0M PLSA JOB NO. 2512 SHEET 1 OF 3 ~ EXHIBIT PR ~ V r9' y -~ \ ~ ~ C) \ ')> ~ \ () \ z. \ 1n \ \ \ \ ~ () ? \ " \ \ \ .I \ SCALE: 1 "=40' 40' 20· 0 40' 80' 120· I ~ i I l GRAPHIC SCALE: 1''=40' PASCO LARET SUITER -----■ & ASSOCIATES PH. 858.259.8212 I PLSAENGINEERING.COM PLSA JOB NO. 2512 ,, B,, BU/LDINGA ,,,, \ (EXISTING 2-STORY MEDICAL OFFICE) BUILDINGS (EXISTING 2-STORY MEDICAL OFFICE) 0 __, _;, \.-- ------.-!.------------------,, ---\ _,,,,. - KAISER M.O.8.-PARKING LOT EXPANSION STORM WATER MANAGEMENT AGREEMENT SHEET 2 OF 3 EXHIBIT "B" PR I~, ~c%'11(cs 100-YR PONDING 0~JscS DEPTH (VARIES) WIDTH VARIES PER PLAN 2% Ml!i. -- EXTEND P~~ ~ --- LINER UP T~ I I I I - PONDING DEP7tf 1 I l-rrili-!rnlllml--Uia--=----18-INCH THICK LA YER OF BIORETENTION SOIL MEDIA. SANDY LOAM, POROSITY=0.4 11 8 11-THICK STORAGE LAYER OF #57 STONE 4" PERFORATED SUBDRAIN 3"-THICK STORAGE LA YER OF #57 STONE, BELOW OUTLET FIELD CAPACITY=0.2 WILTING POINT=0.1 CONDUCTIVITY=5IN/HR I -4"-THICK LA YER OF "BIRDSEYE" WASHED PEA GRAVEL-CHOKER STONE LAYER BROOKS BOX INLET STRUCTURE SIZED PER PLANS. TOP OF GRATE AND INVERT ELEVATIONS VARY PER PLANS. BIO-FILTRATION BASIN WITH IMPERMEABLE LINER DETAIL NOT TO SCALE PASCO LAREY SUITER ------n ASSOCIATES PH. 858.259.8212 I PLSAENGINEERING.COM PLSA JOB NO. 2512 KAISER M.O.B.-PARKING LOT EXPANSION STORM WATER MANAGEMENT AGREEMENT SHEET 3 OF 3 Attachment 4 ,______ City Standard Single Sheet BMP Exhibit @ I \ \ \ I LOT13 MAP10899 ~ IL I I 0 0 @ - \ \ • ( EXISTING DRIVEWAY I ~ ~ @ ' 0 I I 0 ,- ( •• 0 / 0 @ ~ UOH. a RJW=-~~=.J/4~-~-~~-b..__ -/.-, +-- VAULT I I I I I BU/L.DINGA (EXJST1NG 2-STORY MEDICAL OFFICE) ---- LOT 12 --~ MAP10899 0 @ w I I lo w • -• 0 ' --- LINED BIOFIL TRA TION BMP (360 SF) AVENIDA u ~I (/) BUILDINGS (EXJST1NG 2-STORY MEDICAL OFFICE) -0- ~-LANDSCAPING----,'/----''>:" o - + + + ~II~ Ill ~ ENCINAS _111 -C/L 1'1 PLAN VIEW SCALE: 1" = 20' j • I / LOT11 MAP10899 I @ 7 I I / l I I I I \ I I \ I I \ I I I I I I I I I I I I I I I I,-;====- / "' I "====7 I I I I \ I/ I~ / I I I ' I \ I \ I / \/ \ I I \ \ I I I I \ \ / / \ I ~~~=i0.i I I \ "'\ I ~ + I I I I PROPOSED TRENCH DRAIN I \ EXISTING STORM DRAIN INLET LINED BIOFIL TRA T/ON BMP (46 SF) IL ' PASCO LARET SUITER & ASSOCIATES CIVIL ENGINEERING + LAND PLANNING + LAND SURVEYING 535 North Highway 101, Ste A, Solana Beach, CA 92075 ph 858.259.8212 I fx 858.259.4812 I plsaengineering.com GR2017-0030 I CD2017-0003 PARTY RESPONSIBLE FOR MAINTENANCE: KAISER FOUNDATION HEAL TH PLAN, INC, 8010 PARKWAY DRIVE LA MESA, CA 91942 (619) 315-9316 CONTACT: KATH ERINE CLARK PLAN PREPARED BY: PASCO LARET SUITER & ASSOCIATES 535 N. HWY 101, SUITE A SOLANA BEACH, CA 92075 (858~259-8212 BMPNOTES: 1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS OR THESE PLANS, 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER 3. NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER 4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFF HAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTION AND INSTALLATION. 5. REFER TO MAINTENANCE AGREEMENT DOCUMENT. 6. SEE PROJECT SWQMP FOR ADDITIONAL INFORMATION. BMP TABLE BMP ID# BMPTYPE SYM BOL CASQA NO. QUANTITY DRAWING NO. SHEET NO.(S) INSPECTION FREQUENCY TREATMENT CONTROL (PROJ ECT IS EXEMPT FROM HYDROMODIFICAITON REQUIREMENTS) G)&(I) BIORETENTION (~) TC-32 406 SF. 504-2A 5&6 QUARTERLY AREA SOURCE CONTROL @-® STENCILS NO DUMPING SD-13 ANNUALLY DRAJ NS TO OCEAN ----- @) SITE DESIGN AND LANDSCAPE -SD-10 11,051 SF. 504-2A 5&6 QUARTERLY PLANNING 20' 10· 0 I ~ SCALE: MAINTENANCE FREQUENCY SEMI-ANNUALLY AS-NEEDED '\ SEMI-ANNUALLY < / 20' 40' I I 1,, = 20' ~ CITY OF CARLSBAD I SHEETS -1 l----+----+----------------+-------11-----+--+-----t L_l_J ENGI NEERING DEPARTMENT f 1----+----+----------------+-------11-----+--+-----t SINGLE SHEET BMP SITE PLAN KAISER PERMANENTE M.O.B. (PARKING LOT EXPANSION ) RECORD COPY PROJECT NO, Ii\ REPLACES DWG 504-2SW APPROVED ON 11-08-2018 CD2017-0003 ADDEO SITE DESIGN AND LANDSCAPE PLANNING AREA DATE IN ITIAL ENGINEER OF WORK REVISION DESCRIPTION f--D_ATE_~IN_IT_IA_L-+-_D_ATE_~IN_ITI_A_L_. '----C..C..C.--=-----~~-~ I 50DRt:1N2GSNWO, I OTHER APPROVAL CITY APPROVAL INlllAL DA TE _ "+ _