Loading...
HomeMy WebLinkAboutCDP 02-28; KIKO RESIDENCE; BLUFF EDGE DETERMINATION; 2002-07-31GEOTECHNICAL EXPLORATION; INC. SOIL & FOUNDATION ENGINEERING • GROUNDWATER HAZARDOUS MATERIALS MANAGEMENT • ENGINEERING GEOLOGY 31 July 2002 Frederick and Jessica Kiko 3561 Donna Drive Carlsbad, CA 92008 Subject: Bluff Edge Determination Proposed Kiko Residence 2649 Ocean Street Carlsbad, California Dear Mr. and Mrs. Kiko: Job No. 02-8201 In accordance with your request, we are hereby submitting this letter as clarification of our position regarding determination of the coastal bluff edge at the subject site. As previously mentioned in our geotechhical investigation report, we excavated five test pits and three borings. to help locate the existing coastal terrace bluff edge. As indicated on the geologic cross-section A-A', we determined that the bluff edge is located along contour elevation 18 feet above mean sea level (MSL). This point on the site is where the marine t~rrace deposits slope steeply down to the west and come in contact with the relatively flat surface of beach sand deposits. The bluff face is currently covered with iceplant, so it is not visible. As indicated during our meeting with the City of Carlsbad, our bluff edge evaluation utilized information included in the "Coastal Bluffs and Beaches Guidelines," dated February 1, 1996. According to the referenced report, " ... the bluff edge means the upper termination of a b/'uff face where the down gracfient pf the top of the bluff increases more or 7 420 TRADE STREET • SAN DIEGO, CA 92i 21 • (858) 949-7222 • FAX: (858) 549-1604 • E-MAIL: geotech@ixpres.com Kiko Property Carlsbad; California Job No. 02-8201 Page 2 less continuously, until it reaches the general gradient of the bluff face. The bluff edge· is the upper termination of a bluff face. When the top edge of the bluff is rounded away from the bluff face, the edge ·shall be defined as the point at the top of bluff nearest the bluff face beyond which the downward gradient of the land surff,ice increases more or less continuously until it reaches the general gradient of the bluff face.~' This statement refers to the portion along the top of bluff that is actually rolling over to meet the bluff face. On the Kiko property, this point is at the 18 feet elevation contour. As such, it is our opinion that the mapped bluff edge is correct and should be adhered to in determining the co'nstruction setbacks for this project. This opportunity to be of service is sincerely appreciated. Should you have any questions regarding this matter, please feel free to contact our office. Reference to our Job No. 02-8201 will help to expedite a response to your inquiries. Respectfully submitted, GEOTECHNICAL EXPLORATION, INC. Jay~ isei-; Senior Project Ge JKH/LDR/pj