Loading...
HomeMy WebLinkAboutCDP 03-10; JOHANNSEN RESIDENCE; GRADING PLAN REVIEW; 2004-12-20'Geotechnical -,Geologic - Environmental 5741 Palmer Way • Carlsbad, California 92008 • (760) 438-3155 • FAX (760) 931-0915 December 20,. 2004 W.O. 4340-A-SC Mr. Lance Johannsen P.O. Box300 San Jacinto, California 92581 Subject: Grading Plan Review, Lot 129, Map 3312, Johannsen Residence, Carlsbad Boulevard, Carlsbad, San Diego County, California References: 1. "Grading Plansfor: Lot 129, 'Map 3312, Carlsbad Boulevard; Johansen Residence," Project No. CDP03-1 0, Drawing No. 423-5A, undated, by Lance Johannsen. 2. ,"Preliminary Geotechnical Evaluation, Vacant Lot Located in 5400 Block of Carlsbad Boulevard, City of Carlsbad, San Diego County, California," W.O. 4340-A-SC, dated May 18, 2004, by GeoSoils, Inc. 3. "Standards for design and Construction 'of Public Works Improve ents in the City of Carlsbad," dated 1993, by The City of Carlsbad. Dear Mr. JOhannsen: In accordance with your request, GeoSoils, Inc. (GSI) has performed a geoechnical review of the grading plans prepared by your office (see Reference No. 1), with respect to geotechnical site conditions presented and discussed in our report (see Rference No. 2). Unless specifically superceded in the text of this report, recommendations presented in Reference No. .2 are considered valid and applicable. The plans reviewed (see Reference No. 1) appear to bein general conformance with the recommendations provided by this office and presented in Reference No. 2, with the following additional comments/recommendations. • 'The minimum distance from a given structure to the flow line of sidq yard drainage, per City Standard Drawing GS-15 (see Reference, No. 3), may be reduced from 5 feet to a minimum, of 3 feet, provided that the footings for adja1cent structures and/or all settlement-sensitive improvements are embedded at leasi 6 inches below the flow line for the adjacent drainage swale. Trenching for any utilities adjacent to a footing should remain above a 1:1 projection downward from the outside bottom edge 'of the footing. All trenches should be compacted to a minirrum 90 percent relative' compaction. • '• - - .• - -. - - - I' CLOSURE The rdateriAls encountered on the project site and utilized for our analysis are believed ; representative of the area; however, soil and bedrock materials vary in character between excavations and natural outcrops or conditions' exposed during mas4 grading. Site conditions may vary due to seasonal changes or other factors. Inasmuch as our study is based upon our review and engineering analyse 3 and laboratory data, the conclusions and recommendations are professional opinions. These opinions., have been derived in accordance with current standards of practice, a id. no warranty, either express or implied, is given. Standards of practice. are subject to ck uangé with time. GSI assumes no responsibility or liability for work or testing performed by others, or their, inactidn; or work performed when GSI is not requested to be onsite, to,evaluate,if our recommendations have been properly implemented. Use of this repoit constitutes an agreement and consent by the user to all the limitations outlined above, riotwithstanding any other agreements that may be in pIece. in-addition, this report m4y be subject to review by the controlling authorities. Thus, this report brings tocomplet on our scope of ' services for this portion of the project. . . -, . -• The opportunity to be ofservice is greatly appreciated. If you have any questions, please do not hesitate to call our office. ResPectfullY submitted r ::::; 57' ACE 4 5457 Engineering Geoiogist,.-CE - - Civil Engineer, -RC E 47857 -. RGC/DWS/JPF/jk 1, •. •-,. . Distnbuton: 4) Addressee • - .- • • - 4 - Mr. Lance Johannsen . - ' • • W.O. 4340-A-SC . Carlsbad Boulevard, Carlsbad - •• • December 20, 2004 File:e:\wp9\4300\4340a.gpr • • Page 2