Loading...
HomeMy WebLinkAboutCDP 04-42; North County Pontiac/GMC; Geotechnical Engineering Investigation; 2004-04-08Geotechnical Engineering investigation North County GMC/Pontiac Expansion Development 5425 Paseo Del Norte Carlsbad, California Prepared For: The Automotive Group 450 West Vista Way Vista, California 92083 Attn.: Mr. Frank Johnson Project Number 11282-04 April 8, 2004 LJ \ NorCal Engineering Soils and Geotechnical Consultants 10641 Humbolt Street Los Alamitos, CA 90720 (562) 799-9469 Fax (562) 799-9459 April 8, 2004 Project Number 11282-04 The Automotive Group 450 West Vista Way Vista, California 92083 Attn.: Mr. Frank Johnson RE: Geotechnical Engineering Investigation - Proposed North County GMC/Pontiac Expansion Development - Located at 5425 Paseo Del Norte, in the City of Carlsbad, California Dear Mr. Johnson: Pursuant to your request, this firm has performed a Geotechnical Engineering Investigation for the above referenced project in accordance to our signed proposal dated March 10, 2004. The purpose ofthis investigation is to evaluate the subsurface conditions of the subject site and to provide recommendations for the proposed development. The scope of work included the following: 1) site reconnaissance; 2) subsurface geotechnical exploration and sampling; 3) laboratory testing; 4) engineering analysis of field and laboratory data; 5) and preparation of a geotechnical engineering report. It is the opinion of this firm that the proposed development is feasible from a geotechnical standpoint provided that the recommendations presented in this report are followed in the design and construction of the project. April 8 2004 p^^- ^ ^^^^^^^ 11282-04 rage 2 10 Proiect Description It is proposed to construct a new service and part storage building and an addition to the existing showroom for the North County GMC/Pontiac Dealership as shown on the conceptual site plan. The new buildings are anticipated to have conventional slab-on- grade foundation systems with perimeter-spread footings and isolated interior footings. It is assumed that the proposed grading for the development will include minor cut and fill procedures. Final building plans shall be reviewed by this firm prior to submittal for city approvai to determine the need for any additional study and revised recommendations pertinent to the proposed development, if necessary. 2.0 Site Description The subject automobile dealership is situated within the North County Automobile Center located within the 5400 block and west side of Paseo Del Norte, in the City of Carlsbad. The generally triangular shaped parcel is elongated in a north to south direction with topography of the relatively level property descending slightly from north to south on the order of a few feet. The proposed development areas are situated toward the northern portion of the dealership and are currently covered with asphalt pavement and or landscaping. 3.0 Site Exploration The investigation consisted of the placement of four (4) subsurface exploratory borings by a hand-operated auger to a maximum depth of 15 feet below current ground elevations. The explorations were visually classified and logged by a field engineer with locations of the subsurface explorations shown on the attached Site Plan. The exploratory borings revealed the existing earth materials to consist of a fill and natural soil. NorCal Engineering ,^PgLV°°' Project Number 11282-04 A detailed description of the subsurface conditions are listed on the excavation logs in Appendix A. It should be noted that the transition from one soil type to another as shown on the borings logs is approximate and may in fact be a gradual transition. The soils encountered are described as follows: Fill: A fill soil classifying as a brown to grey brown, silty SAND was encountered and ranged in depth from 5 to 6 feet. These soils were noted to be dense and moist. Natural: An undisturbed alluvium soil classifying as a brown, silty SAND was encountered beneath the fill soils. These native soils were observed to be dense and moist. The overall engineering characteristics of the earth material were relatively uniform with each boring. No groundwater was encountered to the depth our borings and no caving occurred. 4.0 Laboratorv Tests Relatively undisturbed samples of the subsurface soils were obtained to perform laboratory testing and analysis for direct shear, consolidation tests, and to determine in- place moisture/densities. These relatively undisturbed ring samples were obtained by driving a thin-walled steel sampler lined with one-inch long brass rings with an inside diameter of 2.42 inches into the undisturbed soils. Bulk bag samples were obtained in the upper soils for expansion index tests and maximum density tests. Wall loadings on the order of 4.000 lbs./lin.ft. and maximum compression loads on the order of 100 kips were utilized for testing and design purposes. All test results are included in Appendix B, unless otherwise noted. 4.1 Field moisture content (ASTMiD 2216) and the dry density of the ring samples were determined in the laboratory. This data is listed on the logs of explorations. NorCal Engineering April 8, 2004 Project Number 11282-04 Page 4 4.2 IVIaximum density tests (ASTM: D-1557-00) were perfomied on typical samples of the upper soils. Results of these tests are shown on Table I. 4.3 Expansion Index tests in accordance with the Uniform Building Code Standard No. 18- 2 were performed on remolded samples of the upper soils. Results of these tests are provided on Table II. 4.4 Atterberg Limits (ASTM: D 4318-84) consisting of liquid limit, plastic limit and plasticity index were performed on representative soil samples. Results are shown on Table III. 4.5 Corrosion tests consisting of sulfate, pH, resistivity and chloride analysis to determine potential corrosive effects of soils on concrete and underground utilities were performed in the laboratory. Test results are provided on Table IV. 4.6 Direct shear tests (ASTM: D-3080) were performed on undisturbed and disturbed samples of the subsurface soils. The test is performed under saturated conditions at loads of 500 Ibs./sq.ft.. 1.000 Ibs./sq.ft, and 2,000 Ibs./sq.ft. with results shown on Plates A and B. 4.7 Consolidation tests (ASTM: D-2435) were performed on undisturbed samples to determine the differential and total settlement which may be anticipated based upon the proposed loads. Water was added to the samples at a surcharge of one KSF and the settlement curves are plotted on Plates C and D. 5.0 Seismicitv Evaluation There are no known active or potentially active faults trending toward or through the site. The proposed development lies outside of any Alquist Priolo Special Studies Zone and the potential for damage due to direct fault rupture is considered very remote. The site is located in an area of high regional seismicity and a peak horizontal ground acceleration of 0.47g may occur from a Magnitude 6.9 earthquake along the Newport- Inglewood fault zone, which is located approximately 4 miles away. NorCal Engineering April 8, 2004 Project Number 11282-04 Page 5 Ground shaking originating from earthquakes along other active faults in the region is expected to induce lower horizontal accelerations due to smaller anticipated earthquakes and/or greater distances to other faults. The following earthquake design parameters are based upon the 1997 Unifomi Building Code (UBC) for a Seismic Zone 4 with a Z factor of 0.40 and a Soil Profile Type of So, a stiff soil profile. 1997 UBC Seismic Design Parameters Distance from Site (Rose Canyon Fault) 7 km Seismic Source Type B Seismic Coefficient = Ca (Table 16-Q) (0.44) Na Seismic Coefficient = Cv (Table 16-R) (0.64) Nv Near-Source Factor Na (Table 16-S) 1.0 Near-Source Factor Nv (Table 16-T) 1.13 6.0 Liquefaction Evaluation The site is expected to experience ground shaking and earthquake activity that is typical of Southern Califomia area. It is during severe ground shaking that loose, granular soils below the groundwater table can liquefy. Our analysis indicates the potential for liquefaction at this site is considered to be very low due to the depth of groundwater in excess of 50 feet within the vicinity area. Thus, the design of the proposed construction in conformance with the latest Building Code provisions for earthquake design is expected to provide mitigation of ground shaking hazards that are typical to Southern California. 7.0 Conclusions and Recommendations Based upon our evaluations, the proposed development is acceptable from a geotechnical engineering standpoint. By following the recommendations and guidelines set forth in our report, the structures and grading will be safe from settlements under the anticipated design loadings and conditions. The proposed development shall meet all requirements of the City Building Ordinance and will not impose any adverse effect on exisfing adjacent stmctures. NorCal Engineering April 8 2004 Proiect Number 11282-04 Page 6 The following recommendations are based upon geotechnical condifions encountered in our field investigation and laboratory data. Therefore, these surface and subsurface conditions could vary across the site. Variafions in these condifions may not become evident unfil the commencement of grading operafions and any unusual conditions which may be encountered in the course of the project development may require the need for additional study and revised recommendations. It is recommended that site inspecfions be performed by a representative of this firm during all grading and constmction of the development to verify the findings and recommendations documented in this report. The following sections present a discussion of geotechnical related requirements for specific design recommendations of different aspects of the project. 7.1 Site Gradinq Recommendations Any demolition debris shall be removed and hauled from proposed grading areas prior to the start of grading operations. Existing vegetation shall not be mixed or disced into the soils. Any removed soils may be reutilized as compacted fill once any deleterious material or oversized materials (in excess of eight inches) is removed. Grading operations shall be performed in accordance with the attached "Specifications for Compacted Fill Operations". All disturiied surface soils (about one foot) shall be removed to competent material {>90% relative compaction), the exposed surface scarified to a depth of 12 inches, brought to within 2% of optimum moisture content and compacted to a minimum of 90% of the laboratory standard (ASTM: D-1557) prior to placement of any additional compacted fill soils, foundations, slabs-on-grade and pavement. Grading shall extend a minimum of five horizontal feet outside the edges of foundations or equidistant to the depth of fill placed, whichever is greater. NorCal Engineering April 8. 2004 Project Number 11282-04 F*age 7 It is possible that isolated areas of undiscovered fill, not described in this report are present on site. If found, these areas should be treated as discussed eariier. A diligent search shall also be conducted during grading operations in an effort to uncover any underground structures, irrigation or utility lines. If encountered, these structures and lines shall be either removed or properiy abandoned prior to the proposed construction. Any imported fill material should be preferably soil similar to the upper soils encountered at the subject site. All soils shall be approved by this firm prior to importing at the site and will be subjected to additional laboratory testing to assure concurrence with the recommendations stated in this report. Care should be taken to provide or maintain adequate lateral support for all adjacent improvements and structures at all times during the grading operations and construction phase. Adequate drainage away from the structures, pavement and slopes should be provided at all times. If placement of slabs-on-grade and pavement is not completed immediately upon completion of grading operations, additional testing and grading of the areas may be necessary prior to continuation of construction operations. Ukewise, if adverse weather conditions occur which may damage the subgrade soils, additional assessment by the geotechnical engineer as to the suitability of the supporting soils may be needed. 7.2 Temporai-v Excavations Temporary unsurcharged excavations in the existing site materials less than 4 feet high may be made at a vertical gradient unless cohesionless soils are encountered. Temporary unsurcharged excavations above the vertical from 4 to 8 feet high may be trimmed at a 1 to 1 (horizontal to vertical) gradient. In areas where soils with little or no binder are encountered, where adverse geological conditions are exposed, or where excavations are adjacent to existing structures, shoring, slot-cutting, or flatter excavations may be required. The temporary cut slope gradients given do not preclude local raveling and sloughing. NorCal Engineering April 8, 2004 Project Number 11282-04 Page 8 All excavations shall be made in accordance with the requirements of CAL-OSHA and other public agencies having jurisdiction. Care should be taken to provide or maintain adequate lateral support for all adjacent improvements and structures at all times during the grading operations and constmction phase. 7.3 Foundation Desiqn All foundations may be designed utilizing the following safe bearing capacities for an embedded depth of 18 inches into approved compacted fill materials or competent native soils with the corresponding widths: Allowable Safe Bearing Capacitv fpsfi Continuous Isolated Width (ft) Foundation Foundation 1 -5 2000 2500 2.0 2075 2575 4.0 2375 2875 6.0 2675 3175 The bearing value may be increased by 500 psf for each additional foot of depth in excess of the 18-inch minimum depth, up to a maximum of 4,000 psf. A one third increase may be used when considering short-term loading and seismic forces. A representative of this firm shall inspect all foundation excavations prior to pouring concrete. 7.4 Settlement Analvsis Resultant pressure curves for the consolidation tests are shown on Plate B. Computations utilizing these curves and the recommended safe bearing capacities reveal that the foundations will experience settiements on the order of 3/4 inch and differential settlements of less than 1/4 inch. NorCal Engineering April 8, 2004 Project Number 11282-04 Page 9 7.5 Lateral Resistance The following values may be utilized in resisting lateral loads imposed on the stmcture. Requirements of the Uniform Building Code should be adhered to when the coefficient of friction and passive pressures are combined. Coefficient of Friction - 0.40 Equivalent Passive Fluid Pressure = 250 lbs./cu.ft. Maximum Passive Pressure = 2,500 Ibs./cu.ft. The passive pressure recommendations are valid only for approved compacted fill soils. 7.6 Retaining Wall Design Parameters Active earth pressures against retaining walls will be equal to the pressures developed by the following fluid densifies. These values are for granular backfill material placed behind the walls at various ground slopes above the walls. Surface Slope of Retained Materials Equivalent Fluid (Horizontal to Vertical) Densitv fib./cu.ft.) Level 30 5 to 1 35 4 to 1 38 3 to 1 40 2 to 1 45 Any applicable short-term construction surcharges and seismic forces should be added to the above lateral pressure values. A backfill zone of non-expansive material shall consist of a wedge beginning a minimum of one horizontal foot from the base of the wall extending upward at an inclination no less than 1/4 to 1 (horizontal to vertical). All walls shall be waterproofed as needed and protected from hydrostatic pressure by a reliable permanent subdrain system. NorCal Engineering April 8, 2004 Project Number 11282-04 Page 10 7.7 Slab Design All concrete slabs shall be at least five inches in thickness in service bay areas and four inches in office and sidewalk areas and placed on approved subgrade soils. Reinforcement requirements and an increase in thickness of the slabs may be necessary based upon proposed loading conditions in the structures. All subgrade soils shall be moistened to over optimum moisture content immediately prior to pouring of concrete. All concrete slab areas to receive floor coverings should be moisture tested to meet all manufacturer requirements prior to placement. 7.8 Pavement Section Design The table below provides a preliminary pavement design based upon an estimated R- Value of 40 for the proposed pavement areas. Final pavement design may need to be based on R-Value testing of the subgrade soils near the conclusion of rough grading to assure that these soils are consistent with those assumed in this preliminary design. Traffic Asphaltic Base Type of Traffic Index Concrete fin) Material (in) Parking Stalls 4.0 3.0 3.0 Light Vehicle 5.0 3.0 4.0 Circulation Areas Medium Tmck Access Areas 6.0 3.5 5 5 (GVW < 42,000 lbs.; 3 axle) All concrete slabs to be utilized for pavement shall be a minimum of six inches in thickness and placed on approved subgrade soils. In addition, the above recommendations are based upon estimated traffic loads. Client should submit anticipated traffic loadings, when available, so that pavement sections may be reviewed to determine adequacy to support these loads. NorCal Engineering Apr\\ 8. 2004 Project Number 11282-04 Page 11 Any approved base material shall consist of a Class II aggregate or equivalent and should be compacted to a minimum of 95% relative compaction. All pavement materials shall conform to the requirements set forth by the City of Carlsbad. The base material and asphaltic concrete should be tested prior to delivery to the site and during placement to determine conformance with the project specifications. A pavement engineer shall designate the specific asphalt mix design to meet the required project specificafions. 7.9 Utiiitv Trench and Excavation Baclrfill Trenches from installation of utility lines and other excavations may be backfilled with on-site soils or approved imported soils compacted to a minimum of 90% relative compaction. All utility lines shall be properly bedded with clean sand having a sand equivalency rating of 30 or more. This bedding material shall be thoroughly water jetted around the pipe structure prior to placement of compacted backfill soils. 7.10 Corrosion Design Criteria Representative samples of the surficial soils, typical of the subgrade soils expected to be encountered within foundation excavations and underground utilities were tested for corrosion potential. The minimum resistivity value obtained for the samples tested is representative of an environment that may be severely corrosive to metals. The soil pH value was considered mildly alkaline and may have a significant effect on soil corrosivity. Consideration should be given to corrosion protection systems for buried metal such as protective coatings, wrappings or the use of PVC where permitted by local buiiding codes. According to the latest 'Unifomi Building Code (UBC) Table 19A-A-4 - Requirements for Concrete Exposed to Sulfate-Containing Solutions', these contents revealed negligible levels of sulfate exposure. Therefore, a Type II cement according to latest UBC specificafions may be utilized for building foundations at this time. Additional sulfate tests shall be performed at the completion of site grading to assure that these soils are consistent with the recommendations stated in this design. Con-osion test results may be found on the attached Table IV. NorCal Engineering April 8, 2004 Page 12 Project Number 11282-04 8.0 Closure The recommendations and conclusions contained in this report are based upon the soil conditions uncovered in our test excavations. No warranty of the soil condition between our excavations is implied. NorCal Engineering should be notified for possible further recommendations if unexpected to unfavorable conditions are encountered during construction phase. It is the responsibility of the owner to ensure that all information within this report is submitted to the Architect and appropriate Engineers for the project. This firm should have the opportunity to review the final plans to verify that all our recommendations are incorporated. This report and all conclusions are subject to the review of the controlling authorities for the project. A preconstmction conference should be held between the developer, general contractor, grading contractor, city inspector, architect, and soil engineer to clarify any questions relating to the grading operations and subsequent construction. Our representative should be present during the grading operations and construction phase to certify that such recommendations are complied within the field. This geotechnical investigation has been conducted in a manner consistent with the level of care and skill exercised by members of our profession currentiy practicing under similar conditions in the Southern California area. No other warranty, expressed or implied is made. We appreciate this opportunity to be of service to you. If you have any further questions, please do not hesitate to contact the undersigned. Respectfully submitted, NORCAL ENGINEERING Keith D. Tucker Project Engineer R.G.E. 841 Scott D. Spensiero Project Manager NorCal Engineering April 8 2004 Project Number 11282-04 rage 13 SPECIFICATIONS FOR PLACEMENT OF COMPACTED FILL Excavation Any existing low density soils and/or saturated soils shall be removed to competent natural soil under the inspection of the Soils Engineering Firm. After the exposed surface has been cleansed of debris and/or vegetation, it shall be scarified until it is uniform in consistency, brought to the proper moisture content and compacted to a minimum of 90% relative compaction (in accordance with ASTM: D-1557). In any area where a transition between fill and native soil or between bedrock and soil are encountered, additional excavation beneath foundations and slabs will be necessary in order to provide uniform support and avoid differential settlement of the structure. Material For Fill The on-site soils or approved import soils may be utilized for the compacted fill provided they are free of any deleterious materials and shall not contain any rocks, brick, asphalfic concrete, concrete or other hard materials greater than eight inches in maximum dimensions. Any import soil must be approved by the Soils Engineering firm a minimum of 24 hours prior to importation of site. Placement of Compacted FIII Soils The approved fill soils shall be placed in layers not excess of six inches in thickness. Each lift shall be uniform in thickness and thoroughly blended. The fill soils shall be brought to within 2% of the optimum moisture content, unless othen/vise specified by the Soils Engineering firm. Each lift shall be compacted to a minimum of 90% relative compaction (in accordance with ASTM: D-1557) and approved prior to the placement of the next layer of soil. Compaction tests shall be obtained at the discretion of the Soils Engineering firm but to a minimum of one test for every 500 cubic yards placed and/or for every 2 feet of compacted fill placed. NorCal Engineering ^Pge'l4°°' Project Number 11282-04 The minimum relative compaction shall be obtained in accordance with accepted methods in the constmction industry. The final grade of the stmctural areas shall be in a dense and smooth condition prior to placement of slabs-on-grade or pavement areas. No fill soils shall be placed, spread or compacted during unfavorable weather conditions. When the grading is intermpted by heavy rains, compaction operations shall not be resumed until approved by the Soils Engineering firm. Grading Observations The controlling govemmental agencies should be notified prior to commencement of any grading operations. This firm recommends that the grading operations be conducted under the observation of a Soils Engineering firm as deemed necessary. A 24 hour notice must be provided to this firm prior to the time of our initial inspection. Observation shall include the clearing and gmbbing operafions to assure that all unsuitable materials have been properiy removed; approve the exposed subgrade in areas to receive fill and in areas where excavation has resulted in the desired finished grade and designate areas of overexcavation; and perform field compaction tests to determine relative compaction achieved during fill placement. In addition, all foundation excavations shall be observed by the Soils Engineering firm to confirm that appropriate bearing materials are present at the design grades and recommend any modificafions to construct footings. NorCal Engineering PASEO DEL NORTE 9 1 INCH ' 80 FEET NorCal Engineering SOILS AND GEOTECHNICAL CONSULTANTS PROJECT 11282-04 WTE APRIL 2004 SITE PLAN APPROXIMATE LOCATION OF FILED EXPLORATIONS April 8, 2004 Project Number 11282-04 Page 15 List of Appendices (in order of appearance) Appendix A - Log of Excavations • Log of Borings B-1 to B-4 • Appendix B - Laboratorv Tests • Table I - Maximum Dry Density • Table II - Expansion • Table III - Atterberg • Table IV - Corrosion • Plate A - Direct Shear • Plate B - Consolidation NorCal Engineering April 8, 2004 Project Number 11282-04 Appendix A NorCal Engineering MAJOR DIVISION GRAPHIC .<$YMRni LETTER .SYMROI TYPICAL DESCRIPTIONS COARSE GRAINED SOILS MORE THAN 50% OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE GRAVEL AND GRAVELLY SOILS MORE THAN 50% OF COARSE FRACTION RETAINED QN NO. 4 SIEVE SAND AND SANDY SOILS MORE THAN 50% OF COARSE FRACTION PASSING ON NO. 4 SIEVE CLEAN GRAVELS (LITTLE OR NO FINES) o Oo GW WELL-GF5ADED GRAVELS, GRAVEL. SANO MIXTURES, LITTLE OR NO FINES GP POORLY-GRADED GRAVELS, GRAVEL-SAND MIXTURES, LITTLE OR NO FINES GRAVELS WITH FINES (APPRECIABLE AMOUNT OF FINESl GM SILTY GRAVELS, GRAVEL-SAND- SILT MIXTURES GC CLAYEY GRAVELS, GRAVEL-SAND- CLAY MIXTURES CLEAN SAND (LITTLE OR NO FINES) 1 m^ m^m SW WELL-GRADED SANDS. GRAVELLY SANDS. LITTLE OR NO FINES SP POORLY-GRADED SANDS. GRAVEL- LY SANDS, LITTLE OR NO FINES SANDS WITH FINE (APPRECIABLE AMOUNT OF FINES) SM SILTY SANDS, SAND-SILT MIXTURES SC CLAYEY SANDS, SAND-CLAY MIXTURES FINE GRAINED SOILS MORE THAN 50% OF MATERIAL ISSfi^EB THAN NO. 200 SIEVE SIZE SILTS ANO CLAYS LIQUID LIMIT I P.'5.'5 THAN SILTS AND CLAYS LIQUID LIMIT GREATER THAN 50 ML INORGANIC SILTS AND VERY FINE SANDS, ROCK FLOUR, SILTY OR CLAYEY FINE SANDS OR CLAYEY SILTS WITH SLIGHT PLASTICITY CL INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS. LEAN CLAYS OL ORGANIC SILTS AND ORGANIC SILTY CLAYS OF LOW PLASTICITY MH INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS FINE SAND OR SILTY SOILS CH INORGANIC CLAYS OF HIGH PLASTICITY. FAT CLAYS OH ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, ORGANIC SILTS HIGHLY ORGANIC SOILS PT PEAT. HUMUS, SWAMP SOILS WITH HIGH ORGANIC CONTENTS NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS UNIFIED SOIL CLASSIFICATION SYSTEM NorCal Engineering KEY: CD C • B •I QCI Indicates 2.5-inch Inside Diameter. Ring Sample. Indicates 2-inch OD Split Spoon Sample (SPT). Indicates Shelby Tube Sample. Indicates No Recovery. Indicates SPT with 140# Hammer 30 in. Drop. Indicates Bulk Sample. Indicates Small Bag Sample. Indicates Non-Standard Indicates Core Run. COIVIPONENT PROPORTIONS COMPONENT DEFINITIONS COMPONENT SIZE RANGE Boulders Cobbles Gravel Coarse gravel Fine gravel Sand Coarse sand Medium sand Fine sand Silt and Clav Larger lhan 12 in 3 in lo 12 in 3 in lo No 4 (4.5mm ) 3 in to 3/4 in 3/4 in lo No 4 ( 4.5mm ) No. 4 ( 4.5mm ) to No. 200 ( 0.074mm ) No. 4 (4.5 mm ) to No. 10 (2.0 mm) No. 10 ( 2.0 mm ) to No. 40 ( 0.42 mm ) No. 40 ( 0.42 mm ) to No. 200 ( 0.074 mm ) Smaller than No. 200 { 0.074 mm ) DESCRIPTIVE TERMS RANGE OF PROPORTION Trace 1 - 5% Few 5 - 10% Little 10-20% Some 20 - 35% And 35 - 50% MOISTURE CONTENT DRY Absence of moisture, dusty, dry to the touch. DAMP Some perceptible moisiure; below optimum MOIST No visible water near optimum moisture content WET Visible fi^e water, usually soil is below water table. RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N -VALUE COHESIONLESS SOILS COHESIVE SOILS Density N (blows/ft) Consistency N (blows/ft) Approximate Undrained Shear Strength (psO Very Loose Olo 4 Very Sofl Oto 2 <250 Loose 4 to 10 Soft 2to4 250 - 500 Medium Dense 10 to 30 Medium Stiff 4to8 500 -1000 Dense 30 to 50 Stiff 8 to 15 1000-2000 Very Dense over 50 Very Stiff 15 to 30 2000 - 4000 Hard over 30 >4000 NorCal Engineering Log of Boring B-1 Project: The Automotive Group/Carisbad Date of Drilling: 3/30/04 Groundwater Deptii: None Encountered Drilling Method: Hand Auger Hammer Weiglit: Drop: 15 20 -25 30 - 35 Geotechnical Description Surface Elevation: Not Measured FILL Silty SAND Dark brown to grey-brown, dense, damp to moist NATURAL Silty SAND Brown to grey-brown, dense to very dense, moist 10 ! Boring completed at depth of 15' NorCal Engineering Litli-ology Project No. 11282-04 a 9.2 8.1 10.9 8.9 115.4 113.6 112.7 115.0 Log of Boring B-2 j Project: The Automotive Group/Carlsbad Date of Drilling: 3/30/04 Groundwater Oepth: None Encountered Drilling Metiiod: Hand Auger Hammer Weiglit: Drop: Geotechnical Description Surface Elevation: Not Measured TILL ~ Silty SAND Brown to light brown, medium dense, moist Lith-ology 1 = O 3 = 5 I? o' Q S3 o I? 10 15 20 25 30 35 I-I NATURAL I Silty SAND ! Reddish-brown, dense, moist Boring completed at depth of 10" 8.9 11.0 112.2 116.3 NorCal Engineering Project No. 11282-04 11.7 113.7 Log of Boring B-3 1 Project: The Automotive Group/Carisbad Samoies Laboratorv 1 Date of Drilling: 3/30/04 Groundwater Depth: None Encountered Samoies Laboratorv 1 Drilling Method: Hand Auger Samoies Laboratorv 1 Hammer Weight: Deoth Drop: Samoies Laboratorv 1 (feet) -5 10 15 20 25 30 35 Geotechnical Description Surface Elevation: Not Measured FILL Silty SAND Brown, dense, damp to moist NATURAL Silty SAND Reddish-brown, dense, moist Boring completed at depth of 10' NorCal Engineering Lith ology |l o a ~ o m Project No. 11282-04 I-o 7.6 7.6 9.4 11.3 Q 112.9 111.7 116.5 113.0 M Log of Boring B-4 Project: The Automotive Group/Carlsbad Date of Drilling: 3/30/04 Drilling Method: Hand Auger Groundwater Depth: None Encountered Hammer Weight: Depth (feet) 10 15 20 25 6 rt 30 35 Drop: Geotechnical Description Surface Elevation: Not Measured [^Asphalt Pavement (2.5' thickness) j FILL ! Silty SAND i Brown, dense, moist NATURAL Silty SAND Orange-brown, dense, damp to moist Lith ology Boring completed at depth of 12' NorCal Engineering Samples w 11 ffl Project No. 11282-04 1 I? Laboratory 8.7 6.5 Q S tt Q 117.8 115.9 7.2 110.9 M April 8. 2004 Project Number 11282-04 Appendix B NorCal Engineering April 8. 2004 Project Number 11282-04 Sample B-1 @ 2-3' Classification Silty SAND TABLE I MAXIMUM DENSITY TESTS (ASTM: D.1557> Optimum Moisture 10.5 Maximum Dry Densitv flbs./cu.ft.) 124.0 Soil Type B-1 @ 2-3' TABLE II EXPANSION INDEX TESTS (U.B.C. STD. 18-2^ Classification Silty SAND Expansion Index 04 Sample B-1 @ 0-4' B-1 @ 9-12' TABLE III ATTERBERG LIMITS Liquid Limit Plastic Limit 22 17 24 18 Plasticity Index 5 6 Sample pH B-1 @ 2-3' 7.4 TABLE IV CORROSION TESTS Electrical Resistivitv fohm-cm) 1,360 Sulfate (%) Chloride (ppm) 0.023 85 ND denotes not detected % by weight ppm - mg/kg NorCal Engineering 2500 500 1000 1500 2000 NORMAL STRESS (PSF) 2500 3000 SYMBOL B0RIN6 NUMBER DEPTH (FEET) fi (DEGREES) C (PSF) ORY DENSITY (PCF) MOISTURE CONTENT {%) X 1 2 34 100 115.4 9.2 O 3 2 31 100 112.9 7.6 A 4 2 30 125 117.8 * * ^ 8.7 • NOTE: TESTS PERFORMED ON SATURATED SAMPLES UNLESS SHOWN BELOW (FM) FIELD MOISTURE TESTS PERFORMED ON UNDISTURBED SAMPLES UNLESS SHOWN BELOM. (R) SAMPLES REMOLDED AT 90% OF MAXIMUM DRY DENSITY NorCal Engineering SOILS AND GEOTECHNICAL CONSULTANTS DIRECT SHEAR TEST RESULTS Plate A DIRECT SHEAR TEST RESULTS Plate A PROJECT 11282-04 OATE DIRECT SHEAR TEST RESULTS Plate A 1.0 5 NORMAL PRESSURE (KSF) SVMBOL BORING NUHBER DEPTH (FEET) DRY DENSITY (PCF) MOISTURE CONTENT (I) LIQUID LIMIT (X) PLASTICITY INDEX («) X 1 5 113.fi R-1 O 1 10 112.7 10.9 A 4 10 110.9 ^ 7.2 • REBOUND (R) SAMPLE REMOLDED AT 90X OF MAXIMUM DRY DENSITY NorCal Engineering SOILS AND GEOTECHMCAL CONSULTANTS PROJECT 11282-04 DATE CONSOLIDATION TEST RESULTS Plate B