Loading...
HomeMy WebLinkAboutCDP 05-46; MOSS RESIDENCE; STORM WATER QUALITY MANAGEMENT PLAN; 2018-02-12CITY OF CARLSBAD PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) Moss Residence 5015 Tierra Del Oro Carlsbad CA 92008 APN: 210-020-15 CDP05-46 / DWG 508-1 A I GR2017-0061 ENGIN EER OF WORK: Michael Kinnear, RCE 76785 [IN SERT CIVIL ENGINEER'S NAME AND PE NUMBER HERE, PROVIDE WET SIGNATURE AND STAMP ABOVE LINE] PREPARED FOR: Steve and Janet Moss Moss Livi ng Trust 25408 Colette Way Calabasas, CA 91302 PREPARED BY: Coffey Engineering 9666 Businesspark Avenue, Suite 210 San Diego, CA 92131 (858) 831-01 11 michael@cofFeyengineering.com DATE: 2/12/2018 ___ ___, RECORD COPY Initial Date ECEIV 1 D FEB 1-3 lUlB LAND DEVELOf--JMENT ENGINEERING ' '··. ·- CV, • 0 :z: ~ (.) w :c (..) :z <( ___J a.. TABLE OF CONTENTS Certification Page Project Vicinity Map FORM E-34 Storm Water Standard Questionnaire Site Information FORM E-36 Standard Project Requirement Checklist Summary of PDP Structural BMPs Attachment 1: Backup for PDP Pollutant Control BMPs Attachment 1 a: OMA Exhibit Attachment 1 b: Tabular Summary of DMAs and Design Capture Volume Calculations Attachment 1 c: Harvest and Use Feasibility Screening (when applicable) Attachment 1 d: Categorization of Infiltration Feasibility Condition (when applicable) Attachment 1 e: Pollutant Control BMP Design Worksheets/ Calculations Attachment 2: Backup for PDP Hydromodification Control Measures Attachment 2a: Hydromodification Management Exhibit Attachment 2b: Management of Critical Coarse Sediment Yield Areas Attachment 2c: Geomorphic Assessment of Receiving Channels Attachment 2d: Flow Control Facility Design Attachment 3: Structural BMP Maintenance Thresholds and Actions Attachment 4: Single Sheet BMP (SSBMP) Exhibit 12/18/2017 Project Name: Moss Residence Project ID: CERTIFICATION PAGE I hereby declare that I am the Engineer in Responsible Charge of design of storm water BMPs for this project, and that I have exercised responsible charge over the design of the proj ect as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the requirements of the BMP Design Manual, which is based on the requirements of SDRWQCB Order No. R9-2013-0001 (MS4 Permit) or the current Order. I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land 'development activities, as described in the BMP Design Manual. I certify that this SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this SWQMP by the City Engineer is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design. Engineer of Work's Signature, PE Number & Expiration Date Michael Kinnear Print Name Coffey Engineering, Inc Company 2/12/18 Date 2/12/2018 \ PROJECT VICINITY MAP 12/18/2017 ____, SITE VICINITY MAP NO SCALE THOMAS BROS. 1126, F2 N I Ccityof Carlsbad STORM WATER STANDARDS QUESTIONNAIRE Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov E-34 I INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view th e BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of subm itting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: MOSS RESIDENCE PROJECT ID: CDP05-4 6 ADDRESS: 5015 Tierra Del Oro Street APN:210-020-15 The project is (check one): D New Development Ill Redevelopment The total proposed disturbed area is: 4421 ft2 ( 0.101 ) acres The total proposed newly created and/or replaced impervious area is: 3,81 3 ft2 ( 0.088 ) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP#: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with yo ur application to the city. E-34 Page 1 of 4 REV 02/16 To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? □ [ll If you answered "yes" to the above question, provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; D b) Designed and constructed to be hydraulically disconnected from paved streets or roads; c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets uidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in D accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? D If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If ou answered "no" to the above uestions, our ro·ect is not exem E-34 Page 2 of 4 REV 02/16 To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): 1. Is your project a reWAliy~Jppr.iJ~N)h~l::.ff~~te~Jo;opp?$qua'r'~J§~LPnm_qre/ptjrnpe._ryipµ§(§L\ifaefes) collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and ublic develo ment ro ·ects on ub/ic or rivate land. 2 · ,:_~~~~q~~~~z~~~e,f~~~~c1:~~-~~~~~mi~~~;f1~~1:~J~~!&1!t~8~:Q:~~~l;'.bJt~,f~~:;1~1aJ~\~◊-~~-~~i~~:tf~~) idji;@)gfjifip~fyi9@/~Y.TTa§&?) This includes commerdal, industrial, residential, mixed-use, and public develo ment pro ·ects on ublic or rivate land. 3. Is rour p~oject a new or red~velopment proje?t that _creat~s andl,?~ . .[~pl~~~f. 2.!(),99,~9~are feet or mo~e of 1mperv1ous surface collectively over the entire project site and §Y.PP9f:l.~}.i;l}~ft§4f9..QJ? A restaurant 1s a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification SIC code 5812 . 4. Is your project a new or redevelopment project that createsfi,000 squareJ~etc>r .m.preof impervious surface collectively over the entire project site and supports '~)ii/)§iqg/i:1~11~Jiipiii,@fpf,6j~_ct,? A hillside develo ment ro·ect includes develo ment on an natural slo e that is !went -five ercent or reater. 5. Is your project a new or redevelopment project that creates and/Off~Pl,~W(j!.~ ~,9Q.9,.~gtJare feet or more of impervious surface collectively over the entire project site and s@i:>?>.rt~'-~ip~rk)ijgJi?l7 A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 s'.guare feet9r more of l!JlP~Q'.!9!-!§, ,~Nrf~,c:~ collectively over _the entire project sit~ and s_upports\jiii,\~Jf~~t;)fo~dt;;hi~~fdiy} JrE:JE:JWqYiJ>J9fllJE:l),'{.i=IY?J A street, road, highway, freeway or dnveway Is any paved Imperv10us surface used for the trans ortation of automobiles, trucks, motorc cles and other vehicles. 7. Is your project a new or redevelopment project that creates ~n9/9!S~RJp.C:§~ ?,§QQ.~.g~,~rE:J f~~t9L!)}9rn <>f.i[ripeiry(CllJ.~-~Urf?c:,~ collectively over the entire site, and tjisqti_arge§_):l@¢tlyA9/~tUE[ivir§ni'ijl'l'nt.ally} §illsHiVif)A.'c~~·x1;:;;A)7i "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the ro·ect to the ESA i.e. not commin led with flows from ad·acent lands.* 8. Is your project a new development or redevelopment Pf.9i~9.tJb?J c:r,~,§1Je,§.l:!f\9/.9r replaces 5,000 square feet or more of impervious surface that supports an ;~1,1tQri:)9ti'1$i't@:Pf:iif.}$.h\:iri,;? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopmeo! p(9je~tth?l c:r;~,§lt.~§ ?}J9/<?r replaces 5,000 square feet or more of impervious area that supports '~i§tail .g~s'91ib$~9@~.L(RGQ)?) This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic ADT of 100 or more vehicles er da . 10. Is your project a new or redevelopment project that results in thedi~Jqrpa!1¢~of 'qn'¢)9(ffiW~~cre~·otl~tiqJ and are expected to generate pollutants post construction? 11. Is your project)Qqat~g,W)H:iifl\~OQJ~iat)::iHh~i fijc;ifi6Qt9-an',and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC 21.203,040 YES NO □ 121 □ 121 □ 121 □ □ 121 □ lZI lZI □ □ lZI □ 121 □ lZI □ lZI If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the second box statin "M ro·ect is a 'STANDARD PROJECT' ... " and com lete a licant information. E-34 Page 3 of 4 REV 02/16 Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = _3_,5_3_8 _________ sq. ft. Total proposed newly created or replaced impervious area (8) = _3_•8_1_3 _________ sq. ft. Percent impervious area created or replaced (B/A)*100 = 107·7 % YES NO Ill □ If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. lZI My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. 0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. D My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: _M_i_c_ha_e_l_R_e_in ___________ _ Applicant Title: Engineering Designer Applicant Signature: ,zJ ~,f" ~ Date: _ _..£_,._1/!_~....,.../.__l . ...,_"7---______ _ • Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego: Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been Identified by the City. r, c· u This Box or 1/y se Only YES NO City Concurrence: □ □ By: Date: Project ID: E-34 Page 4 of 4 REV 02/16 SITE INFORMATION CHECKLIST Project Summary Information Project Name Moss Residence Project ID Project Address 5015 Tierra Del Oro Carlsbad CA 92008 Assessor's Parcel Number(s) (APN(s)) APN: 210-020-15 Project Watershed (Hydrologic Unit) Carlsbad 904 .31 Parcel Area 0.312 13,600 Acres ( Square Feet) Existing Impervious Area 0.081 Acres ( 3,542 Square Feet) (subset of Parcel Area) Area to be disturbed by th e project 0.101 Acres ( 4,421 Square Feet) (Project Area) Project Proposed Impervious Area 0.088 Acres ( 3,813 Square Feet) (subset of Project Area) Project Proposed Pervious Area 0.014 Acres ( 608 Square Feet) (subset of Project Area) Note: Proposed Impervious Area+ Proposed Pervious Area= Area to be Disturbed by the Project. ' This may be less than the Pa rcel Area. 12/18/2017 Description of Existing Site Condition and Drainaae Patterns Current Status of the Site (select all that apply): ¢ Existing development □ Previously graded but not built out □ Agricultural or other non-impervious use □ Vacant, undeveloped/natural Description/ Additional Information: Existing is a 2,560 sqft single-family residence, with brick walkway, rear yard wood deck, and concrete driveway. Existing Land Cover Includes (select all that apply): 0"Vegetative Cover ~Non-Vegetated Pervious Areas ~Impervious Areas Description/ Additional Information: Existing residence surrounded by hardscape, vegetation, and pervious wood deck. Underlying Soil belongs to Hydrologic Soi l Group (select all that apply): ¢NRCS Type A D NRCS Type B D NRCS Type C D NRCS Type D Approximate Depth to Groundwater (GW): D GW Depth < 5 feet □ 5 feet < GW Depth < 10 feet □ 10 feet < GW Depth < 20 feet ~GW Depth> 20 feet Existing Natural Hydrologic Features (select all that apply): D Watercourses D Seeps □ Springs □Wetlands ~None Description/ Additional Information: 12/18/2017 Description of Existing Site Topography and Drainage [How is storm water runoff conveyed from the site? At a minimum, this description should answer (1) whether existing drainage conveyance is natural or urban; (2) describe existing constructed storm water conveyance systems, if applicable; and (3) is runoff from offsite conveyed through the site? if so, describe]: 1. Existing storm water conveyance is urban. 2. Roof runoff discharges via downspouts and rooftop sheet flow to the surrounding hardscape and landscape areas. 3. Runoff from offsite is not conveyed through the site. Any storm water from the street is co llected by the rolled curb. 12/18/2017 Description of Proposed Site Development and Drainaae Patterns Project Description / Proposed Land Use and/or Activities: Proposed is the demolition of the existing single family residence. The new construction will also include a 2,575 sqft single family residence, hardscape walkways, and rea r yard deck/patio. List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): The proposed impervious features of the site will include a 2,575 sqft single family residence, and 1,238 sqft of impervious surfaces for a total of 3,813 sqft. List/describe proposed pervious features of the project (e.g., landscape areas): Disturbed surfaces that are intended to remain or be replaced by landscaping areas will total approximately 583 sqft. These areas will be located around the perimeter of the site. There is a 118 sqft bioretention basin proposed on the southeasterly corner of the site for pollutant control. Does the project include grading and changes to site topography? 0Yes □No Description/ Additional Information: 450 cu yd. of cut, proposed retaining wall along rear yard patio. Does the project include changes to site drainage (e.g ., installation of new storm water conveyance systems)? $Yes □No Description/ Additional Information: The majority of storm water runoff draining from rooftop downspouts will be collected by landscape drains and directed to a proposed dual sump pump system, after which it wi ll be pumped to a proposed 118 sqft bioretention basin. Surface flows on the upper portion of the site adjacent to the easterly property line will be collected by landscape drains and pumped to the bioretention basin as well, where combined flows will discharge to Tierra Del Oro Street through a D-25 curb outlet. 12/18/2017 Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply): □ On-site storm drain inlets □ Interior floor drains and elevator shaft sump pumps □ Interior parking garages □ Need for future indoor & structural pest control ¢Landscape/Outdoor Pesticide Use □ Pools, spas, ponds, decorative fountains, and other water features □ Food service □ Ref use areas □ Industrial processes □ Outdoor storage of equipment or materials □ Vehicle and Equipment Cleaning □ Vehicle/Equipment Repair and Maintenance □ Fuel Dispensing Areas □ Loading Docks ¢Fire Sprinkler Test Water ¢Miscellaneous Drain or Wash Water □ Plazas, sidewalks, and parking lots 12/18/2017 Identification of Receiving Water Pollutants of Concern Describe path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable): Runoff from the site enters the public storm drain system at a storm water inlet 250 feet southeast of the site, where storm water discharges to the Pacific Ocean apprx. 200 feet west of the in let. There are no impaired water bodies downstream between the site and the Pacific Ocean. List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)/stressor(s) causing impairment, and identify any TMDLs for the impaired water bodies: N / A . 303(d) Impaired Water Body Poll utant(s )/Stressor(s) TMDLs ---~-·- - Identification of Project Site Pollutants Identify pollutants anticipated from the project site based on all proposed use(s) of the site (see BMP Desiqn Manual Appendix B.6): Also a Receiving Not Applicable to Anticipated from the Water Pollutant of Pollutant the Project Site Project Site Concern Sediment X Nutrients X Heavv Metals X Oraanic Comoounds X Trash & Debris X Oxygen Demanding X Substances Oil & Grease X Bacteria & Viruses X Pesticides X 12/18/2017 Hvdromodification Management Requirements Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? o Yes, hydromodification management flow control structural BMPs required. D No, the project will discharge runoff directly to existing underground storm drains discharg ing directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. ~No, the project will discharge 'runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. o No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides. Description/ Additional Information (to be provided if a 'No' answer has been selected above): Site flows will be discharged to the concrete-lined curb and gutter, where it will enter a storm drain inlet and discharge to the Pacifi c Ocean. Critical Coarse Sediment Yield Areas* *This Section onlv reauired if hydromodification management reauirements aooly Based on the maps provided within the W MAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries? □Yes ~No, No critical coarse sediment yield areas to be protected based on WMAA maps If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed? o 6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite o 6.2.2 Downstream Systems Sensitivity to Coarse Sediment o 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite □ No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps If optional analyses were performed, what is the final result? □ No critica l coarse sediment yield areas to be protected based on verification of GLUs onsite □ Critical coarse sediment yield areas exist but additional analysis has determin ed that protection is not required. Documentation attached in Attachment 8 of the SWQMP. □ Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit. Discussion/ Additional Information: 12/18/2017 Flow Control for Post-Project Runoff"' *This Section only required if hydromodification management reauirements annly_ List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1 ). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit. N/A Has a geomorphic assessment been performed for the receiving channel(s)? D No, the low flow threshold is 0.102 (default low flow threshold) D Yes, the result is the low flow threshold is O. 102 D Yes, the result is the low flow threshold is 0.302 D Yes, the result is the low flow threshold is 0.502 If a geomorph ic assessment has been performed, provide title, date, and preparer: Discussion / Add itional Information: (optional) Other Site Requirements and Constraints When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or City codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements. The only constraint to the bioretention basin design is the difference in elevation from the bioretention outlet pipe to the street. A raised biofiltration basin will be implemented in order to allow for the required fall from the outlet to the street. Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed. [Insert City's Standard Project Requirement Checklist Form E-36 (here)] SUMMARYOFPDPSTRUCTURALBMPS C City of Carlsbad Project Name: Moss Residence Project ID: DWG No. or Building Permit No.: STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information Source Control BMPs Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required. • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided . Please add attachments if more space is needed . • "NIA" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided . Source Control Requirement Applied? SC-1 Prevention of Illicit Discharges into the MS4 Ill Yes □ No □ NIA Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage □ Yes Ill No □ NIA Discussion/justification if SC-2 not implemented: Only small on-site landscape drains will be implemented. SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind □ Yes Ill No □ NIA Dispersal Discussion/justification if SC-3 not implemented: There will be no permanent outdoor material storage areas (project is a single family residence). E-36 Page 1 of 4 Revised 03/16 Source Control Reauirement (continued) Annlied? SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and D Yes Ill No D N/A Wind Dispersal Discussion/justification if SC-4 not implemented: There will be no permanent outdoor work areas where materials would be stored (project is a single family residence). SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Ill Yes D No D N/A Discussion/justification if SC-5 not implemented: Trash bins shall have lids that will be kept closed or are stored in garage. SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for quidance). A □ On-site storm drain inlets D Yes D No 0 N/A B □ Interior floor drains and elevator shaft sump pumps D Yes D No 0 NIA C □ Interior parking garages D Yes D No 0 N/A D1 0 Need for future indoor & structural pest control 0 Yes D No D NIA D2 0 Landscape/Outdoor Pesticide Use 121 Yes D No D N/A E □ Pools, spas, ponds, decorative fountains, and other water features D Yes D No 0 N/A F D Food service D Yes D No 0 N/A G □ Refuse areas D Yes D No Ill N/A H D Industrial processes D Yes D No 0 N/A I □ Outdoor storage of equipment or materials D Yes D No Ill N/A J □ Vehicle and Equipment Cleaning D Yes D No 0 N/A K □ Vehicle/Equipment Repair and Maintenance D Yes D No 0 N/A L □ Fuel Dispensing Areas D Yes D No 0 N/A M □ Loading Docks D Yes D No 0 N/A N 0 Fire Sprinkler Test Water Ill Yes D No D N/A 0 0 Miscellaneous Drain or Wash Water laZI Yes D No D N/A p D Plazas, sidewalks, and oarkino lots D Yes □No Ill N/A For "Yes" answers, identify the additional BMP per Appendix E.1. Provide justification for "No" answers. Project is a single family residence. E-36 Page 2 of 4 Revised 03/16 Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion / justification is not required. • "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. • "NIA" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Source Control Requirement I Applied? SD-1 Maintain Natural Drainaae Pathwavs and HydroloQic Features I □ Yes I '21 No ID NIA Discussion/justification if SD-1 not implemented: Sump pump will be installed to divert storm water from bluff. SD-2 Conserve Natural Areas, Soils, and Vegetation 1 '2J Yes I □ No I □ N/A Discussion/justification if SD-2 not implemented: SD-3 Minimize Impervious Area I l2l Yes I □ No I □ N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction I '21 Yes I □No I □ NIA Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion I '2J Yes 1 □ No I □ N/A Discussion/justification if SD-5 not implemented: E-36 Page 3 of 4 Revised 03/16 Source Control Reauirement (continued) I APPiied? SD-6 Runoff Collection I Ill Yes I □ No I □ N/A Discussion/justification if SD-6 not implemented: SD-7 Landscapinq with Native or Drought Tolerant Species I Ill Yes l □ No I □ N/A Discussion/justification if SD-7 not implemented: SD-8 Harvestina and Usinq Precipitation I □ Yes I (l] No I □ NIA Discussion/justification if SD-8 not implemented: Minimal amount of landscaping with native, drought tolerant species. Not sufficient demand for harvest & re-use. E-36 Page 4 of 4 Revised 03/16 PDP Structural BMPs All PDPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s). PDP structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owner's representative to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). PDP structural BMPs must be maintained into perpetuity, and the City must confirm the maintenance (see Section 7 of the BMP Design Manual). Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below. Then complete the PDP structural BMP summary information sheet for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP). Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated together or separate. To address the primary and secondary pollutants of concern, structural BMP treatment control options were evaluated for required pollutant removal efficiency. A bioretention facility was selected which meets the required removal efficiency for all anticipated pollutants from the project. Runoff from the flat graded area which will contain the house and majority of the landscaping & hardscape will be collected by area drains and will be directed to the dual sump pump located at the rear yard patio. Runoff will be pumped to a raised bioretention basin, will it will filter through an 18" eng ineered soil binder layer before infiltrating into the native soils. If ponding occurs greater than the 12" allowed, storm water will discharge from the bioretention area through an outlet in the overflow control catch basin to a small landscaped area, where it flows to a D-25 curb outlet discharging from the site (see plan sheet C.1 -Drainage & Grading Plan reproduced in Appendix A). [Continued from previous page -This page is reserved for continuation of description of general strategy for structural BMP implementation at the site.] Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. IMP A DWG Sheet No. C.1 Type of structural BMP: □ Retention by harvest and use (HU-1) □ Retention by infiltration basin (INF-1) ¢Retention by bioretention (INF-2) □ Retention by permeable pavement (INF-3) □ Partial retention by biofiltration with partial retention (PR-1) □ Biofiltration (BF-1) □ Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) □ Detention pond or vault for hydromodification management □ Other (describe in discussion section below) Purpose: ~ Pollutant control only □ Hydromodification control only □ Combined pollutant control and hydromodification control □ Pre-treatment/forebay for another structural BMP □ Other (describe in discussion secti on below) Discussion (as needed): 12/18/2017 ATTACHMENT 1 BACKUP FOR PDP POLLUTANT CONTROL BMPS This is the cover sheet for Attachment 1. Check which Items are Included behind this cover sheet: Attachment Contents Checklist Sequence Attachment 1 a DMA Exhibit (Required) Attachment 1 b Attachment 1 c Attachment 1 d See DMA Exhibit Checklist on the back of this Attachment cover sheet. (24"x36" Exhibit typically required) Tabular Summary of DMAs Showing OMA ID matching OMA Exhibit, DMA Area, and DMA Type (Required)* *Provide table in this Attachment OR on DMA Exhibit in Attachment 1 a Form 1-7, Harvest and Use Feasibility Screening Checklist (Required unless the entire project will use infiltration BMPs) Refer to Appendix B.3-1 of the BMP Design Manual to complete Form 1-7. Form 1-8, Categorization of Infiltration Feasibility Condition (Required unless the project will use harvest and use BMPs) Refer to Appendices C and D of the BMP Design Manual to complete Form 1-8. 0Included ¢Included on DMA Exh ibit in Attachment 1 a □ Included as Attachment 1 b, separate from OMA Exhibit ~Included □ Not included because the entire project will use infiltration BMPs ¢Included □ Not included because the entire project will use harvest and use BMPs Attachment 1e Pollutant Control BMP Design ~Included Worksheets / Calculations (Required) Refer to Appendices B and E of the BMP Design Manual for structural pollutant control BMP design guidelines Use this checklist to ensure the required information has been included on the OMA The DMA Exhibit must identify: ¢Underlying hydrologic soil group ¢ Approximate depth to groundwater Exhibit: ¢Existing natural hydrologic features (watercourses, seeps, springs, wetlands) ¢ Critical coarse sediment yield areas to be protected (if present) v'f Existing topography and impervious areas ~Existing and proposed site drainage network and connections to drainage offsite ¢Proposed grading ¢Proposed impervious features ¢Proposed design features and surface treatments used to minimize imperviousness ¢Drainage management area (DMA) boundaries, DMA ID numbers, and OMA areas (square footage or acreage), and OMA type (i.e., drains to BMP, self-retaining, or self-mitigating) ¢Structural BMPs (identify location and type of BMP) I I I I I I I I I > ....... ~ Ill) ) Pre -- DMA X (Sheet flow to Street) Y (Sheet flow to Bluff) Z(Ocean) Total 'fl@ I Impervious Area I 1,712.00 1,830.00 3,542.00 ii COFFEY ENGINEERING, INC. Pervious Area I Total (SF) 546.00 2,258.00 4,663.00 6,493.00 4,849.00 5,209.00 13,600.00 I BASIN YI I Total (AC) I C-Value I Q(CFS) I % Imp. 0.0521 0.711 0.251 75.821 0.1491 0.331 0.331 28.181 0.111 0.312 0.58 I BASINX ··~ LEGEND DESCRIPTION PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR DIRECTION OF FLOW PVC PIPE OMA LIMIT IMPERVIOUS AREAS PERVIOUS AREAS PACIFIC OCEAN SYMBOL ---90--- ---90--- I I Eid SITE CHARACTERISTICS • HYDROLOGIC SOIL GROUP ........... A • APPROXIMATE DEPTH TO GROUND WATER ......... >24' • CRITICAL COARSE SEDIMENT YIELD AREAS ........... NONE PRESENT ON SITE SCALE: 1 n=20' OMA MAP ~':EXISTING CONDITIONS MOSS RESIDENCE 5015 TIERRA DEL ORO ST CARLSBAD CA 92008-4351 I I I I I I I I I > --..., '(, ~ll :..) :) Post OMA A (Biofiltration) B (Sheet flow to Bluff) C (Ocean) D (Sheet Flow to Street) Total '{}@ \ Impervious Area 3,607.00 0.00 206.00 3,813.00 !§ COFFEY ENGINEERING, INC. Pervious Area Total (SF) Total (AC) C-Value Q(CFS) 608.00 4,215.00 0.097 0.78 0.52 4,330.00 4,330.00 0.099 0.10 0.07 4,849.00 0.111 0.00 206.00 0.005 0.90 0.03 4,938.00 13,600.00 0.312 0.62 -,. %Imp. 85.58 0.00 100.00 LEGEND DESCRIPTION SYMBOL ! PROPERTY LINE EXISTING CONTOUR 90 PROPOSED CONTOUR 90 DIRECTION OF FLOW PVC PIPE OMA LIMIT IMPERVIOUS AREAS I I PERVIOUS AREAS I I BASINDh I I PACIFIC OCEAN EiBd I BAS/NA I SCALE: 1 "=20' SITE CHARACTERISTICS • HYDROLOGIC SOIL GROUP ........... A .. ,· • APPROXIMATE DEPTH TO GROUND WATER ......... >24' • CRITICAL COARSE SEDIMENT .. YIELD AREAS ........... NONE PRESENT ON SITE ~ .. OMA MAP 'B ': PROPOSED CONDITIONS MOSS RESIDENCE 5015 TIERRA DEL ORO ST CARLSBAD CA 92008-4351 Appendix I: Forms and Checklists IE"~ ,,.:-,' .,7;..,-,·~~.....,.~f ~ ~,r-;-;-·~":"' ,r,,·:;~-,;!'t:;r::•";;!;'.~:-,;.-~·.,,,.•,"""'.,_;.-1 ,~ ,., • V ' / ,"" ,-....,.,.,," ,~-r~·~ ~,.,.-r"". ~l ::~.· .. Ha~est apd U~e Fe~~i6ili_ty Chec~sf : , Forni 1-7 J ~. •"r :1' .-i.::~_ ..... ,,~ ... ~~, t~""~ __ ,..,.. ,.;...i.•~-:& ·,..., "'· ~ ~ ~J:...~ ~''!!,~(L~.a ~ .,:, .... "' . 1. ,.:..,..,,:...1.,.J.,..~ .. ..,, -.1.. ~ .lJ 1. Is there a demand for harvested water ( check all that apply) at the project site that is reliably present during the wet season? lilf Toilet and urinal flushing !iZ1' Landscape irrigation D Other: ______ _ 2. If there is a demand; estimate the anticipated average wet season demand over a period of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] 4 residents/residence x 9.3 gallons/resident/day/ 7.48 gallons/cubic foot x 36 hours / 24hours/day = 7.45 cubic feet/residence 1 Residence x 7.45 cubic feet/residence= 7.45 cubic feet 3. Calculate the DCV using worksheet B-2.1. DCV = 158.906 ( cubic feet) 3a. Is the 36 hour demand greater than or equal to the DCV? D Yes / £No ~ -0, Harvest and use appears to be feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 36. Is the 36 hour demand greater than 0.25DCV but less than the full DCV? □ Yes / t1' No ~ .0, Harvest and use may be feasible. Conduct more detailed evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture targets while draining in longer than 36 hours. Is harvest and use feasible based on further evaluation? □ Yes, refer to Appendix E to select and size harvest and use BMPs. i No, select alternate BMPs. BMP Design Manual-Appendices December 2015 I-3 3c. Is the 36 hour demand less than 0.25DCV? r£ Yes JJ. Harvest and use is considered to be infeasible. CITYOF CHULA VISTA Moss 07-9342 Appendix I: Forms and Checklists Part t -Full Infiltration Feasibility Screening Criteria Would infiltration of the full design volume be feaaible from a physical perspective without any undesirable consequences that cannot be reasonably mitigated? Criteria Screening Quesuon Is the estimated reliable infiltration rate below proposed facility locations greater than 0.5 inches pet how? The response to this Screening Question shaU be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D. Provide basis: Yes No X The infillration test results below the proposed facility location were 3.522 and 3.428 inches per hour with a minimum factor of safety of 2 applied. Simple open pit testing was performed at 2 locations on the site within or adjacent to the proposed Infiltration basin in accordance with Appendix D of the City of Carlsbad BMP design manual. In addition, a comprehensive evaluation of the site was conducted in accordance with Appendix C.2. Please refer to our "Report of Limited Geotechnical Investigation Proposed Storm Water Infiltration BMPs· for details of the comprehensive evaluation and investigation conducted, simple open pit test rates and simple open pit rate to infiltration rate calculations and maps representative of the study. Summarize findings of studies; provide reference to studies, calculations, maps, dara sources, etc. Provide narrative discussion of study/ data source applicability. 2 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of gcotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? 'The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: X The infiltration test results below the proposed facility locations ranged from 3.522 to 3.428 inches per hour with a minimum factor of safety of 2 applied. In our opinion, any long term full infillration at the site will not result in geotechnical hazards which cannot be reasonable mitigated to an acceptable level. Please refer to our "Report of Limited Geotechnical Investigation Proposed Storm Water lnfillration BMPs" for details of the comprehensive evaluatioo and investigation conducted. simple open pit test rates and simple open pit rate to infiltralton rate calculations and maps representative of the study. Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability. 1-3 February 2016 Moss 07-9342 Appendix I: Fonns and Checklists Ctitcri a 3 Screening Question Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of groundwater contamination (shallow water table, storm water pollutants O< other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Yes No X TM infiltration test results below the proposed facilily locations ranged from 3.522 to 3.428 inches per hour with a minimum factor of safety of 2 applied. In our opinion, any long term full infiltration at the site will not result in a significant risk for groundwater related concerns. Please refer to our "Report of Limited Geotechnlcal Investigation Proposed Storm Water Infiltration BMPs-for details of the comprehensive evaluation and investigation conducted, simple open pit test rales and simple open pit rate to infiltraUon rate calculations and maps representaUvc of the study. Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability. 4 Can infiltration greatec th:,n 0.5 inches per hour be allowed without causing potential water balance issues such as ch:a.nge of seasonality of ephemeral str<..-ams or increased disch:,cge of contaminated gtoundwater to surface waters? The cesponse to this Screening Question shall be based on a comprehensive evaluation of the factocs presented in Appendix C.3. Provide basis: Question to be answered by the design engineer. X Coffey Engineering: The site does not have ephemeral str eams or existing areas where stormwater concentrates prior to leaving the site . Summarize findings of studies; provide reference to studies, calculations, maps, data soucces, etc. Provide narrative discussion of study/ data source appucability. Part 1 Result "' If all ans-..\'CtS to rows 1 -4 arc "Yes" a full infiltration design is porentially feasible. The feasibility screening category is Full Infiltr,ition If any answer from row 1-4 is "No", jnfiltmtion may be possible to some extent but would not generally be feasible or desirable to achieve• "fuU infiltration" design. Proceed to Part 2 Full Inf . •To be completed using gathered site information and best professional judgment considering the definition of MEP in the MS4 Pennit. Additional testing and/or studies may be required by the City to subscantiate findings. 1-4 February 2016 Moss 07 -9342 Appendix I: Forms and Checklists .,, --'" . ,_ s· -'"".':,.--nJ!' i,,-.'ot,i:~{~~!~~'.; "·' >-,::~ .. . I. ,, , i:C01,111i e:111 ---- Part 2 -Partial Infiltration vs. No Infiltration Feasibility Screening Criteria Would infiltration of water in any appreciable amount be physically feasible without any negative consequences that cannot be reasonably mitigated? Criteria Screening Question Yes No Do soil and geologic conditions allow for infiltration in any 5 appreciable rate or volume? The response to this Screening X Question shall be based on • comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D. Provide basis: The infillration test results below the proposed facility location were 3.522 and 3.428 inches per hour with a minimum factor of safety of 2 applied. Based on our infiltration rate findings end our geotechncial investigalion conducted on the site, ii is our opinion that the geologic conditions aHow for appreciable Infiltration. Please refer lo our "Report of Limited Geolechnical Investigation Proposed Storm Water Infiltration BMPs· for details of the comprehensive evaluation and investigation conducted, simple open pit test rates and simple open pit rate to infiltration rate calculations and maps representative of the study. Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion nfstudy/data source applicability and why it was not feasible to mitigate low infiltration rates. Can Infiltration in any appreciable quantity be allowed without increasing risk of gcotcchnical hazards (slope 6 stability, groundwater mounding, utilities, or other factors) X that cannot be mitigated to an acceptable level? The response to this Screening Question shaU be based on a comprehensive evaluation of the factors presented in Appendix C.2, Provide basis: In our opinion, any long lemn partial infillration al the site will not result in geolechnical hazards whlctl cannot be reasonable mitigated 10 an acceptable level. Please refer to our "Report of Limited Geotechnical Investigation Proposed Storm Water Infiltration BMPs· for details of the comprohonsive evaluation arid investigation conducted, slmple open pit tesl rates and simple open pit rate to infiltration rate calculations and maps representative of the study. Summarize lin,ling, of studies; pnwide reference to studies, calculations, maps, data sources, ere. Provide narrative discussion of srudr/dara source applicabilit)' and whr it was not fca~ible to mitigate low infiltration tares. 1-5 February 2016 Moss 07-9342 Appendix I: Forms and Checklists ,,...1.. . 'r ... ~C\ ... , .,.:.J .. , , .,. ~,:'·, .:.: · .. ·•~~~·~ ••• 's :t.r;=-,11'8:ll~r.,ir,•~!'°'·'·;i Criteria Screening Question Yes No Can Infiltration in any appreciable quantity be allowed without posing significant risk for groundwater related 7 concerns (shallow water table, storm water pollutants or other factors)? The response to this Screcniog Question shall be based X on a comprehensive evaluation of the factors presented in AppendLx C.3. Provide basis: In our opinion, any long term partial infiltration at the site will not result in a significant risk for groundwater related concerns. Please refer to our "Report of Limited Geotechnlcal Investigation Proposed Storm Water Infiltration BMPs· for details of the comprehensive evaluation and lnvesUgalion conducted, simple open pit test rates and simple open pit rate lo infiltration rote calculations and maps representative of the study. Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. Can infiltration be allowed without violating downstream 8 wate.r rights? The response to this Screening Question shall be X based on a comprehensive evaluation of the fuctors presented in Appendix C.3. Provide basis: Question to be answered by the design engineer. Coffey Engineering: Site discharges nearby to public storm drain, which outlets to Ocean. Water rights will not be violated. Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of studr/ data source applicability and why it was not feasible to mitii,,ate low infiltration rates. If aU answers from row 5-8 are yes then partial infiltration design is potentially feasible. Part 2 1be feasibility screening category is Partial Infiltration. Result* If any answer from row 5-8 is no, then infiltration of any volume is considered to be infeasible within the drainage area. The feasibility screening category is No Infiltration. .. •To be completed usrng gathered Slte mformauon and best profess10n•I 1udgmenr cons1dermg the defimt1on of MEP 1n the MS4 Pennit. Additional testing and/or studies may be required br the City to substantiate findings. 1-6 February 2016 If These Sources Will Be on the Project Site ... 1 Potential Sources of Runoff Pollutants 0 A. Onsite storm drain inlets D Not Applicable Appendix E: BMP Design Fact Sheets liiiii . .. Then Your SWQMP Must Consider These Source Control BMPs 2 Permanent Controls-Show on Drawings -1 Locations of inlets. -3 Permanent Controls-List in Table and Narrative ~ Mark all inlets with the words "No Dumping! Flows to Bay" or similar. See stencil template provided in Appendix I-4 E-4 4 Operational BMPs-lnclude in Table and Narrative □ Maintain and periodically repaint or replace inlet markings. □ Provide storm water pollution prevention information to new site owners, lessees, or operators. □ See applicable operational BMPs in Fact Sheet SC-44, "Drainage System Maintenance," in the CASQA Storm Water Quality Handbooks at www.casqa.org/resources/bmp- handbooks /municipal-bmp- handbook. □ Include the following in lease agreements: "Tenant shall not allow anyone to discharge anything to storm drains or to store or deposit materials so as to create a potential discharge to storm drains." February 26, 2016 If These Sources Will Be on the Project Site ... □ ~ □ ~ 1 Potential Sources of Runoff Pollutants B. Interior floor drains and elevator shaft sump pumps Not Aeelicable C. Interior parking garages Not Applicable □ D1. Need for future indoor & structural pest control ~ Not Applicable Appendix E: BMP Design Fact Sheets . .. ThenYour SWQMP must considerThese Source Control BMPs 2 Permanent Controls-Show on Drawings 3 Permanent Controls-List in Table and Narrative □ State that interior floor drains and elevator shaft sump pumps will be plumbed to sanitary sewer. □ State that parking garage floor drains will be plumbed to the sanitary sewer. □ Note building design features that discourage entry of pests. E-5 4 Operational BMPs-lnclude in Table and Narrative □ Inspect and maintain drains to prevent blockages and overflow. □ Inspect and maintain drains to prevent blockages and overflow. □ Provide Integrated Pest Management information to owners, lessees, and operators. February 26, 2016 If These Sources Will Be on the Project Site ... 1 Potential Sources of Runoff Pollutants li1' DZ. Landscape/ Outdoor Pesticide Use D Not Applicable Appendix E: BMP Design Fact Sheets Iii . .. Then Your SWQMP must consider These Source Control BMP 2 Permanent Controls-Show on Drawings ii1 □ ~ Show locations of existing trees or areas of shrubs and ground cover to be undisturbed and retained. Show self-retaining landscape areas, if any. Show storm water treatment facilities. 3 Permanent Controls-List in Table and Narrative State that final landscape plans will accomplish all of the following. 51 Preserve existing drought tolerant trees, shrubs, and ground cover to the maximwn extent possible. I 51 Design landscaping to nuru.rruze irrigation and runoff, to promote surface infiltration where appropriate, and to minimize the use of fertilizers and pesticides that can contribute to storm water pollution. 51 Where landscaped areas are used to retain or detain storm water, specify plants that are tolerant of periodic saturated soil conditions. li1' Consider using pest-resistant plants, especially adjacent to hardscape. ~ To ensure successful establishment, select plants appropriate to site soils, slopes, climate, sun, wind, rain, land use, air movement, ecological consistency, and plant interactions. E-6 4 Operational BMPs-Include in Table and Narrative lit Maintain landscaping using minimwn or no pesticides. □ See applicable operational BMPs in Fact Sheet SC-41, "Building and Grounds Maintenance," in the CASQA Storm Water Quality Handbooks at www.casqa.org/resources/bmp -handbooks/municipal-bmp- handbook. □ Provide IPM information to new owners, lessees and operators. February 26, 2016 If These Sources Will Be on the Project Site ... 1 Potential Sources of Runoff Pollutants □ E. Pools, spas, ponds, decorative fountains, and other water features. !;a' Not Applicable □ F. Food service !;a' Not Applicable Appendix E: BMP Design Fact Sheets . .. Then Your SWQMP must consider These Source Control BMPs □ 2 Permanent Controls-Show on Drawings Show location of water feature and a sanitary sewer cleanout in an accessible area within 10 feet. 3 Permanent Controls-List in Table and Narrative □ If the local municipality requires pools to be plumbed to the sanitary sewer, place a note on the plans and state in the narrative that this connection will be made according to local requirements. □ For restaurants, grocery stores, I □ Describe the location and features of the designated cleaning area. and other food service operations, show location I 0 (indoors or in a covered area outdoors) of a floor sink or other area for cleaning floor mats, containers, and equipment. □ On the drawing, show a note that this drain will be connected to a grease interceptor before discharging to the sanitary sewer. Describe the items to be cleaned in this facility and how it has been sized to ensure that the largest items can b e accommodated. E-7 4 Operational BMPs-lnclude ill Table and Narrative □ See applicable operational BMPs in Fact Sheet SC-72, "Fountain and Pool Maintenance," in the CASQA Storm Water Quality Handbooks at www.casqa.org/resources/bm p-handbooks/municipal- bmp-handbook. February 26, 2016 IfThesc Sources Will Be on the Project Site 1 Potential Sources of □ G. Refuse areas Gif Not Applicable Appendix E: BMP Design Fact Sheets ... Then Your SWQMP must consider These Source Control BMPs 2 Permanent Controls-Show on Drawings □ Show where site refuse and recycled materials will be handled and stored for pickup. See local municipal requirements for sizes and other details of refuse areas. □ If dumpsters or other receptacles are outdoors, show how the designated area will be covered, graded, and paved to prevent run- on and show locations of berms to prevent runoff from the area. Also show how the designated area will be protected from wind dispersal. □ Any drains from dumpsters, compactors, and tallow bin areas must be connected to a grease removal device before discharge to sanitary sewer. 3 Permanent Controls-List in Table and Narrative □ State how site refuse will be handled and provide supporting detail to what is shown on plans. □ State that signs will be posted on or near dumpsters with the words "Do not dump hazardous materials here" or similar. E-8 4 Operational BMPs-Include in Table and Narrative □ State how the following will be implemented: Provide adequate number of receptacles. Inspect receptacles regularly; repair or replace leaky receptacles. Keep receptacles covered. Prohibit/prevent dumping of liquid or hazardous wastes. Post "no hazardous materials" signs. Inspect and pick up litter daily and clean up spills immediately. Keep spill control materials available on-site. See Fact Sheet SC-34, ''Waste Handling and Disposal" in the CASQA Stom1 Water Quality Handbooks at www.casqa.org/resources/bmp- handbooks /municipal-bmp-handbook. February 26, 2016 1 Potential Sources of Runoff Pollutants □ H. Industrial processes. lid Not Applicable □ I. Outdoor storage of equipment or materials. (See rows J and K for source control measures for vehicle cleaning, repair, and maintenance.) ~ Not Applicable 2 Permanent Controls-Show on Drawings □ □ □ Show process area. Show any outdoor storage areas, including how materials will be covered. Show how areas will be graded and bermed to prevent run-on or runoff from area and protected from wind dispersal. Storage of non-hazardous liquids must be covered by a roof and/ or drain to the sanitary sewer system, and be contained by berms, dikes, liners, or vaults. □ Storage of hazardous materials and wastes must be in compliance with the local hazardous materials ordinance and a Hazardous Materials Management Plan for the site. Appendix E: BMP Design Fact Sheets 3 Permanent Controls-List in Table and Narrative □ If industrial processes are to be located onsite, state: "All process activities to be performed indoors. No processes to drain to exterior or to storm drain system." □ Include a detailed description of materials to be stored, storage areas, and strnctural features to prevent pollutants from entering storm drains. Where appropriate, reference documentation of compliance with the requirements of local Hazardous Materials Programs for: • Hazardous Waste Generation • Hazardous Materials Release Response and Inventory • California Accidental Release Prevention Program • Aboveground Storage Tank • Uniform Fire Code Article 80 Section 103(b) & ( c) 1991 • U nderground Storage Tank E-9 4 Operational BMPs-lnclude in Table and N arrative Table and Narrative □ See Fact Sheet SC-10, "Non- Storm Water Discharges" in the CASQA Storm Water Quality Handbooks at https: //www.casqa.org/resou rces/bmo-handbooks. □ See the Fact Sheets SC-31, "Outdoor Liquid Container Storage" and SC-33, "Outdoor Storage of Raw Materials" in the CASQA Storm Water Quality Handbooks at www.casqa.org/resources/bm p-handbooks/municipal-bmp- handboo k. February 26, 2016 1 Potential Sources of Runoff Pollutants D J. Vehicle and Equipment Cleaning [iii' Not Applicable 2 Permanent Controls-Show on Drawings D Show on drawings as appropriate: (1) Commercial/industrial facilities having vehicle / equipment cleaning needs must either provide a covered, berm~d area for washing acttvittes or discourage vehicle/ equipment washing by removing hose bibs and installing signs prohibiting such uses. (2) Multi-dwelling complexes must have a paved, bermed, and covered car wash area (unless car washing is prohibited onsite and hoses are provided with an automatic shut- off to discourage such use). (3) Washing areas for cars, vehicles, and equipment must be paved, designed to prevent run-on to or runoff from the area, and plumbed to drain to the sanitary sewer. ( 4) Commercial car wash facilities must be designed such that no runoff from the facility is discharged to the storm drain system. Wastewater from the facility must discharge to the sanitary sewer, or a wastewater reclamation system must be installed. E-10 3 Permanent Controls-List in Table and Narrative D If a car wash area is not provided, describe measures taken to discourage onsite car washing and explain how these will be enforced. Appendix E: BMP Design Fact Sheets 4 Operational BMPs-Include in Table and Narrative Describe operational measures to implement the following (if applicable): D Washwater from vehicle and equipment washing operations must not be discharged to the storm drain system. D Car dealerships and similar may rinse cars with water only. D See Fact Sheet SC-21, ''Vehicle and E quipment Cleaning," in the CASQA Storm Water Quality Handbooks at www.casqa. erg/resources /bm p-handbooks /municipal-bmp- handbook. February 26, 2016 If These Sources Will Be on the Project Site ... 1 Potential Sources of Runoff Pollutants □ K. Vehicle/Equipment Repair and Maintenance liZI: Not Applicable □ □ □ Appendix E: BMP Design Fact Sheets . .. Then Your SWQMP must consider These Source Control BMPs Permanent Controls-Show on Drawings Accommodate all vehicle equipment repair and maintenance indoors. Or designate an outdoor work area and design the area to protect from rainfall, run-on runoff, and wind dispersal. Show secondary containment for exterior work areas where motor oil, brake fluid, gasoline, diesel fuel, radiator fluid, acid- containing batteries or other hazardous materials or hazardous wastes are used or stored. Drains must not be installed within the secondary containment areas. Add a note on the plans that states either (1) there are no floor drains, or (2) floor drains are connected to wastewater pretreatment systems prior to discharge to the sanitary sewer and an industrial waste discharge permit will be obtained. Permanent Controls-List in Table and Narrative □ □ □ State that no vehicle repair or maintenance will be done outdoors, or else describe the required features of the outdoor work area. State that there are no floor drains or if there are floor drains, note the agency from which an industrial waste discharge permit will be obtained and that the design meets that agency's requirements. State that there are no tanks, containers or sinks to be used for parts cleaning or rinsing or, if there are, n ote the agency from which an industrial waste discharge permit will be obtained and that the design meets that agency's requirements. E-11 Operational BMPs-Include in Table and Narrative In the report, note that all of the following restrictions apply to use the site: □ No person must dispose of, nor permit the disposal, directly or indirectly of vehicle fluids, hazardous materials, or rinsewater from parts cleaning into storm drains. II □ No vehicle fluid removal must be performed outside a building, nor on asphalt or ground surfaces, whether inside or outside a building, except in such a manner as to ensure that any spilled fluid will be in an area of secondary containment. Leaking vehicle fluids must be contained or drained from the vehicle immediately. □ No person must leave unattended drip parts or other open containers containing vehicle fluid, unless such containers are in use or in an area of secondary containment. February 26, 2016 0 ~ 1 Potential Sources of Runoff Pollutants 2 Permanent Controls-Show on Drawings L. Fuel Dispensing I 0 Fueling areas 16 must have impermeable floors (i.e., portland cement concrete or equivalent smooth impervious surface) that are (1) graded Areas Not Applicable at the minimum slope necessary to prevent ponding; and (2) separated from the rest of the site by a grade break that prevents run-on of storm water to the MEP. 0 Fueling areas must be covered by a canopy that extends a minimum of ten feet in each direction from each pump. [Alternative: The fueling area must be covered and the cover's minimum dimensions must be equal to or greater than the area within the grade break or fuel dispensing areal.] The canopy [or cover] must not drain onto the fueling area. 3 Permanent Controls-List in Table and Narrative Appendix E: BMP Design Fact Sheets 4 Operational BMPs-lnclude in Table and Narrative 0 The property owner must dry sweep the fueling area routinely. 0 See the Business Guide Sheet, "Automotive Service-Service Stations" in the CASQA Storm Water Quality Handbooks at https: / /www .casqa.org/resources /6 mp-handbooks. 16 The fueling area must be defined as the area extending a minimum of 6.5 feet from the comer of each fuel dispenser or the length at which the hose and nozzle assembly may be operated plus a minimum of one foot, whichever is greater. E-12 February 26, 2016 1 Potential Sources of Runoff Pollutants M. Loading Docks ~ Not Applicable 2 Permanent Controls-Show on Drawings □ Show a preliminary design for the loading dock area, including roofing and drainage. Loading docks must be covered and/ or graded to minimize run-on to and runoff from the loading area. Roof downspouts must be positioned to direct storm water away from the loading area. Water from loading dock areas should be drained to the sanitary sewer where feasible. Direct connections to storm drains from depressed loading docks are prohibited. □ Loading dock areas draining directly to the sanitary sewer must be equipped with a spill control valve or equivalent device, which must be kept closed during periods of operation. □ Provide a roof overhang over the loading area or install door skirts ( cowling) at each bay that enclose the end of the trailer. 3 Permanent Controls-List in E-13 Appendix E: BMP Design Fact Sheets 4 Operational BMPs-lnclude in Table and Narrativ e □ Move loaded and unloaded items indoors as soon as possible. □ See Fact Sheet SC-30, "Outdoor Loading and Unloading," in the CASQA Storm Water Quality Handbooks at www.casqa.org/resources /bmp- handbooks /municipal-bmp-handbook. ·February 26, 2016 1 Potential Sources of Runoff Pollutants □ N. Fire Sprinkler Test Water 0 Not Applicable 0. Miscellaneous Drain or Wash \Vater □ Boiler drain lines □ Condensate drain lines □ Rooftop equipment □ Drainage sumps □ Roofing, gutters, and trim □ Not Applicable Appendix E: BMP Design Fact Sheets 2 3 Permanent Controls-Permanent Controls-List in Table and Show on Drawings Narrative ~ Provide a means to drain fire sprinkler test water to the sanitary sewer. □ Boiler drain lines must be directly or indirectly connected to the sanitary sewer system and may not discharge to the storm drain system. □ Condensate drain lines may discharge to landscaped areas if the flow is small enough that runoff will not occur. Condensate drain lines may not discharge to the storm drain system. □ Rooftop mounted equipment with potential to produce pollutants must be roofed and/ or have secondary containment. □ Any drainage sumps onsite must feature a sediment sump to reduce the quantity of sediment in pumped water. □ Avoid roofing, gutters, and trim made of copper or other unprotected metals that may leach into runoff E-14 4 Operational BMPs-lnclude in Table and Narrative l!i' See the note in Fact Sheet SC- 41, "Building and Grounds Maintenance," in the CASQA Storm Water Quality Handbooks at www.casqa.org/resources/bm p-handbooks/municipal-bmp- bandbook February 26, 2016 1 Potential Sources of Runoff Pollutants 6Z{ P. sidewalks, parking lots. 0 Not Applicable Plazas, and 2 Permanent Controls-Show on Drawings 3 Permanent Controls-List in Table and Narrative E-15 Appendix E: BMP De sign Fact Sheets 4 Operational BMPs-Include in Table and Narrative li2f Plazas, sidewalks, and parking lots must be swept regularly to prevent the accumulation of litter and debris. Debris from pressure washing must be collected to prevent entry into the storm drain system. Washwater containing any cleaning agent or degreaser must be collected and discharged to the sanitary sewer and not discharged to a storm drain. February 26, 2016 I I I I Storm Water Standards San Diego County 85 th Percentile lsopluvials Legend --SStn PERCENTILE ISOPLIJVIAL CJ INCORPORATED CITY NOTE: The 85th percentile IS a 24 hOIX ranfall total It represetns a vaue such that 85% of the observed 24 houf raintan totals win be less than that value. N + ~ .... 0 1 2 4 I I ,...-,. .. ~NIH01.:'"~(>.-.,.,.,o,c.._,1...:,i (ID""llflaCR-IEOIICl.lO<QaJINOflrVl'COT0,1-.1:M'UD -.,...,oo,:~~•NCff"HEl;IIIFOll:•_..0.I.AII' ~ ... 1,.--,...., __ ...,,.. __ s,..~ ""'°"""'-~---~------M>OG"'---"__, ____ ..,, _.,_.., _ _.,ao.,.·..,..•S.OS ........ ==--=-=-·~.:..·::=:::=i;.~-__ .,,. .......,,~ c.rc,w:is-c-.~, ¥---f'I.IIMl._,_ ___ Do --------~--.,., """'"' ,.,._c., __ • .,,.,_~-.:0_;,,t1s, fJC~Cl9"..>.r,.. • Part 1: BMP Design Manual January 2016 Edition WEG =<ifs 1--'I.-~~°"""' .................. Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods / .:.J Figure B.1-1: 85th Percentile 24-hour lsopluvial Map B-7 City of San Diego ~ Tf ~SPORTATION ORM WATER Drainage Management Area Surface Type Runoff Factor Area (Ft ) Concrete or Ashphalt 0.9 3607 Natural (A Soil) 0.1 608 Total 4215 Weighted Runoff Factor 0.78 Tin l{j, J,l.L!, \l nt• ljffi1 \} :ilj l 'L'Im/Jill:O 1 85th Percentile 24-hr storm depth from Figure b.1-1 d = 0.580 inches 2 Area tributary to BMP (s) A = 0.10 acres 3 Area weighted runoff factor (estimate using Appendix B.1.1 and B.2.1 C= 0.78 unitless 4 Street trees volume reduction TCV= 0.000 cubic-feet 5 Rain barrels volume reduction RCV = 0.000 cubic-feet 6 Calculated DCV = (3630 x C x d x A) -TCV · RCV DCV= 158.906 cubic-feet Appendix B: Stormwatcr Pollutant Control Hydrologic Calculations and Sizing Methods B.4.1 Simple Method Stepw ise Instructions: 1 2 3 4 5 6 l . Compute DCV using Workshecl B.4-1 2. Estimate design infdtraLion rate using \Vorksheet D.5-1 3. Design BlVlP(s) to ensure that the DCV is fully retained (i.e., no surface discharge <luring the design event) and the store<l effect.ive depth draws clown in no longer than 36 hours. Worksheet B.4-1: Simple Sizing Method for Infiltration BMPs Simple Sizing Method for Infiltration BMPs Worksheet B.4-1 DCV (\Xlorkshee1 B 2.1) DCV= 158.91 cubic-feet Estimated design infilLration rate (Worksheet 0.5-1) l(,ks,,.,= 1.74 in/hr Available BMP surface area All,11'= 81.81 sq-ft - Average effective depth in the BMP footprint (DCV / 1\1~n,) D,11,= 1.94 feet Drawdown time, T (0,,., *12/K""""') T= 13.38 hours Provide alternat.ive calculation of drawdown time, if nee<led. Notes: • Drawdown time must be less than 36 hours. This criterion was set to achieve average annual capture o[ 80% to account for back to back storms (Sec rationale in Section B.4.3). T n order to use a different drawdown time, J3MPs should be sized using the percent capture melho<l (Seel ion B.4.2). • The average effective depth calculat.ion should account for any aggregate/ media in the Bl\1P. For example, 4 feel of stone at a porosity of 0.4 would equate to 1.6 feet of effective depth. • This method may overestimate drawdown Lime for BMPs that drain through both the bottom and walls of the system. BMP specific calcula1jons of drawdown time may be provided that account for BMV-specific geometry. B-19 February 2016 Moss 07-9342 Appendix I: Forms and Checklists ...• ,' -------· .,._ ·--.~ l~• f . ... , . , ,,,ae~,_. .. n • • -. ~-.... ..., ..,,;:.. •t ~-""--'-\' ·,.r;n 17:'1 :TL"!n 1:.11i11Jl~ . ..'JI -··•. r •. Facmr C,itcgory Factor Descnpoon Assigned Factor Product (p) \'\ic,ght (w) Value (v) p==wx\" Soil assessment methods 0.25 2 0.5 Predominant soil texture 0.25 2 0.5 Suitability Site soil variability 0.25 2 0.5 A Assessment Depth to groundwater / impervious 0.25 ' 0.25 layer Suitability Assessment Safety !'actor, SA = rp 1.75 J .evd of pretreatment/ expected 0.5 2 1 sediment loads B Design Redundancy/ resiliency 0.25 3 0.75 Compaction during construction 0.25 2 0.5 Design Safety !'actor, S11 = Lp 2 .25 Combined Safety Factor, s, .... ,= s,, X Ss 4. 0 Observed Infiltration Rate, inch/hr, Ko,,""'"" (corrected for test-spcc,fic bias) 6 . 95 Design Infiltration Rate, in/hr, K.J,,.,n = l<oo.m,J / S,,,,., 1 .74 Supporting Data ,_ ___ -·-... ·-··-· -- Briefly describe infiltration test and provide reference to test forms: Simple open pit testing was performed at 2 locations within er adjacent to the proposed facih1y per tile requirements of the Cily or Cartsbad SI01rn Water Standards, BMP Desrgn Manual, in accordance with Appendix D. Please refer to our "Report of Limited Geolechnical Investigation Proposed Storm Waler Infiltration BMPs" for details of the compretrnnsive evaluation and investigation conducted. simple open pit test rates and simple open pit rale 10 inflltratfon rate calculations and maps representative of the study. I-7 February 2016 ATT AC HM ENT 2 BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES [This is the cover sheet for Attachment 2.] Indicate which Items are Included behind this cover sheet: Attachment Contents Checklist SeQuence Attachment 2a Hydromodification Management LJ Included Exhibit (Required) See Hydromodification Management Exhibit Checklist on the back of this Attachment cover sheet. Attachment 2b Management of Critical Coarse I I Exhibit showing project drainage Sediment Yield Areas (WMAA Exhibit boundaries marked on WMAA is required, additional analyses are Critical Coarse Sediment Yield optional) Area Map (Required) See Section 6.2 of the BMP Design Optional analyses for Critical Coarse Manual. Sediment Yield Area Determination D 6.2.1 Verification of Geomorphic Landscape Units Onsite L 6.2.2 Downstream Systems Sensitivity to Coarse Sediment LJ 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite Attachment 2c Geomorphic Assessment of Receiving l l Not performed Channels (Optional) LJ Included See Section 6.3.4 of the BMP Design Manual. Attachment 2d Flow Control Facility Design and rJ Included Structural BMP Drawdown Calculations (Required) See Chapter 6 and Appendix G of the BMP Desiqn Manual Use this checklist to ensure the required information has been included on the Hydromodification Management Exhibit: The Hydromodification Management Exhibit must identify: lJ Underlying hydrologic soil group [J Approximate depth to groundwater r Existing natural hydrologic features ( watercourses, seeps, springs, wetlands) r-1 Critical coarse sediment yield areas to be protected (if present) lJ Existing topography Existing and proposed site drainage network and connections to drainage offsite lJ Proposed grading n Proposed impervious features □ Proposed design features and surface treatments used to minimize imperviousness Point(s) of Compliance (POC) for Hydromodification Management D Existing and proposed drainage boundary and drainage area to each POC (when necessary, create separate exhibits for pre-development and post-project conditions) n Structural BMPs for hydromodification management (identify location, type of BMP, and size/detail) IHYDROMODIFICATION EXEMPT EXHIBIT -MOSS RESIDENCE I Site runoff discharges to concrete-lined curb & gutter, where it enters the storm drain inlet south of the site. This drainage line will discharge to the Pacific Ocean. See photos attached. ATTACHMENT 3 Structural BMP Maintenance Information Use this checklist to ensure the required information has been included in the Structural BMP Maintenance Information Attachment: Preliminary Design/Planning/CEQA level submittal: Attachment 3 must identify: □ Typical maintenance indicators and actions for proposed structural BMP(s) based on Section 7. 7 of the BMP Design Manual Final Design level submittal: Attachment 3 must identify: v'l" Specific maintenance indicators and actions for proposed structural BMP(s). This shall be based on Section 7. 7 of the BMP Design Manual and enhanced to reflect actual proposed components of the structural BMP(s) □ How to access the structural BMP(s) to inspect and perform maintenance □ Features that are provided to facilitate inspection (e.g., observation ports, cleanouts, silt posts, or other features that allow the inspector to view necessary components of the structural BMP and compare to maintenance thresholds) □ Manufacturer and part number for proprietary parts of structural BMP(s) when applicable □ Maintenance thresholds for BMPs subject to siltation or heavy trash(e.g., silt level posts or other markings shall be included in all BMP components that will trap and store sediment, trash, and/or debris, so that the inspector may determine how full the BMP is, and the maintenance personnel may determine where the bottom of the BMP is . If required, posts or other markings shall be indicated and described on structural BMP plans.) □ Recommended equipment to perform maintenance D When applicable, necessary special training or certification requirements for inspection and maintenance personnel such as confined space entry or hazardous waste management ATTACHMENT 3A Maintenance Plan Moss Residence Treatment BMP Maintenance Plan for Vegetated BMPs Typical Maintenance lndicator(s) for Vegetated BMPs Maintenance Activities Accumulation of sediment, litter, or debris Remove and properly dispose of accumulated materials, without damage to the vegetation. Poor vegetation establishment Re-seed, re-plant, or re-establish vegetation per original plans. Mow or trim as appropriate, but not less than the design height of 411 • Overgrown vegetation Eros ion due to concentrated irrigation flow Repair/re-seed/re-plant eroded areas and adjust the irrigation system. Repair/re-seed/re-plant eroded areas, and make appropriate corrective measures such as adding erosion control blankets, Erosion due to concentrated storm water runoff flow adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade, the Engineer shall be contacted prior to any additional repairs or reconstruction. Make appropriate corrective measures such as adjusting Standing water in bioretention area for longer than 96 irrigation system, removing obstructions of debris or invasive hours following a storm event* vegetation, clearing underdrains, or repairing/replacing clogged or co mpacted soils. Obstructed inlet or outlet structure Clear obstructions. Damage to structural components such as weirs, inlet Repair or replace as applicable. or outlet structures *These BMPs typically include a surface ponding layer as part of their function which may take 96 hours to drain following a storm event. Moss Residence Treatment BMP Maintenance Plan Maintenance Indicators and Actions for Detention BMPs Typical Maintenance lndicator(s) for Detention Basins Maintenance Activities Poor vegetation establish ment Re-seed, re-establish vegetation. Erosion due to concent rated irrigation Repair/re-seed/re-plant eroded areas and adjust the irrigation flow system. Erosion due to concentrated storm Mow or trim as appropriate, but not less than the design height wat er runoff flow of 4". Repair/re-seed/re-plant eroded areas and make appropriate Erosion due to concent rated irrigation flow corrective measures such as adding erosion control blanket s, add ing stone at flow entry points, or re-grading where necessary. Accumulation of sediment, litter, or Remove and properly dispose of accumulated materials. debris Make appropriate corrective measures such as adjusting Standing water irrigation system, removing obstructions of debris or invasive vegetation, or minor re-grading for proper drainage. Obstructed inlet or outlet structure Clear obstructions. Damage to structural components such as weirs, inlet Repair or replace as applicable. or outlet structures 2 Moss Residence Treatment BMP Maintenance Plan Maintenance of Bioretention BMPs • Access of Structural BMPs for Insp ection and Mainten ance o The Bioretention BMP consists of one (1) vegetated areas: • IMP A -118 ft:2 o A 1'x1' concrete inlet will be installed within the BMP with its rim elevated 12" above the surface. The total depth of the inlet will be approximately 1.67'. o The inlet will be visible from the surface and can be accessed through the grate. • The depth will not require a ladder to access the full extent of the inlet. o The bioretention basin is accessible from the front yard of the private residence. • Maintenan ce T hresholds o Any grasses within the bioretention areas shall be cut when in excess of 4" tall. o Debris & sediment shall be cleared from the basin when 2" have accumulated. o Any amount sediment or debris accumulation observed within the overflow inlet shall be removed when seen. o During routine landscape maintenance activities, if bare areas or erosion are observed they shall be re-seeded. o If standing water is observed for longer than 24-hours the soil media shall be inspected for clogging and cleaned. • Bioretention Soil Media Replacem ent o Soil media within the bioretention area shall be replaced when the filtration rate drops below S" /hour if regular maintenance cannot restore this rate. • Recommended Maintenance E quipment o E quipmen t needed for maintenance will typically include those needed for routine landscape maintenance: ■ H and Shovels ■ Wheel barrows ■ Lawn mower ■ Hedge clippers ■ Other • Special T raining o Maintenance and inspection activities required are typical for routine landscape maintenance. No special training required. 3 ATTACHMENT 4 City standard Single Sheet BMP (SSBMP) Exhibit [Use the City's standard Single Sheet BMP Plan.] Use this checklist to ensure the required information has been included on the plans: The plans must identify: Q1' Structural BMP(s) with ID numbers matching Form 1-6 Summary of PDP Structural BMPs iiZI' The grading and drainage design shown on the plans must be consistent with the delineation of DMAs shown on the OMA exhibit 1;21' Details and specifications for construction of structural BMP(s) iiZI' Signage indicating the location and boundary of structural BMP(s) as required by the [City Engineer] iiZI' How to access the structural BMP(s) to inspect and perform maintenance Gt Features that are provided to facilitate inspection (e.g., observation ports, cleanouts, silt posts, or other features that allow the inspector to view necessary components of the structural BM P and compare to maintenance thresholds) Gt Manufacturer and part number for proprietary parts of structural BMP(s) when applicable Gt Maintenance thresholds specific to the structural BM P(s), with a location-specific frame of reference (e.g., level of accumulated materials that triggers removal of the materials, to be identified based on viewing marks on silt posts or measured with a survey rod with respect to a fixed benchmark within the BMP) Gt Recommended equipment to perform maintenance Cit when applicable, necessary special training or certification requirements for inspection and maintenance personnel such as confined space entry or hazardous waste management D Include landscaping plan sheets showing vegetation requirements for vegetated structural BMP(s) Cit All BM Ps must be fully dimensioned on the plans l:t When proprietary BMPs are used, site-specific cross section with outflow, inflow, and model number shall be provided. Photocopies of general brochures are not acceptable. Page Insert Page# of Insert Total# of Pages PDP SWQMP Date: Click here to enter a date. PDP SWQMP Template Date: January 2016 I I I I I I ;~ t2 I ~, ., ,,_ 1;:1' VJ I I I I I I I f- IQ 0 ,._----1 nl re -~ Ice:, ~, ~. 'fi ~. fl//,! /J \,DI '9/()1'_/.f 02" '/' v;, , I I,--' _._, ,1 U -/'/ LUUL,,~u C::/\.'.:::,,-'C:-'../.c...._.__, c1 r::: f ' '-'"' I u t.1/ PER BEACH ACCESS EASEMENT f" 10 20 30 i I SCALE: I"= 1 O' I .flr,/ JJ!Lii u'7J BMP TABLE I ! --• I I ! I I I I I I I I I I I I I i -r / / / I i I I I I ,I I I I I I sl / I A I BMP ID# BMPTYPE SYMBOL CASQA NO. QUANTITY DRAWING NO. SHEET NO.(S) INSPECTION MAINTENANCE FREQUENCY FREQUENCY TREATMENT CONTROL & HYDROMODIFICATION BIORETENTION G) f:-:-:-:-1 TC-32 118 S.F. 503-9A 2 * ANNUALLY AREA (SEE BELOW) LOW IMPACT DESIGN (L.I.D.) @ ROOF DRAIN TO @~ 503-9A 2 QUARTERLY ANNUALLY LANDSCAPING SD-11 9 EA. SOURCE CONTROL ® DRAINAGE SYS. ii 503-9A 2 * ANNUALLY MAINTENANCE SC-44 10 EA. (SEE BELOW) * WEEKLY DURING RAINY SEASON/ QUARTERLY DURING DRY SEASON CONSTRUCTION SIGN OFF I I 1W 31.04 TRW 30.7 BW 29.5 GR NO. 2017-0061 I I * SD-6 SD-1 MAINTENANCE AGREEMENT DOCUMENT: YES _X__ NO RECORDATION NO. _____ _ PARTY RESPONSIBLE FOR MAINTENANCE: NAME STEVE MOSS ---------- ADDRESS 25408 COLETTE WAY CALPSASAS,CA 91302 PHONE NO. (818)996·2000 PLAN PREPARED BY: _ NAME JOHN COFFEY CONTACT STEVE MOSS COMPANY COFFEY ENGINEERING, INC. ADDRESS 9666 BUSINESSPARKAVE. SUITE 210 SAN DIEGO, CA 92131 PHONE NO. (858) 831-0111 CERTIFICATION _6_27~1~6 __ _ BMP NOTES: 1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS OR THESE PLANS. 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. 3. NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. 4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFF HAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTION AND INSTALLATION. SD-1 ~-(P) BUILDING FOOTPRINT (P)DS SD-4 y SD-3 19 SD-7 ·<J.!). ✓'? "1"1 ! i .c;'__,l --' I j "" ~ I I i.fl f ; ; i I I,• t++ ~ I i I ,I :.,"':;. & ,- 1 r;;'7 I I u -----30'--- PERMANENT BMP LEGEND SITE DESIGN BMPS MAINTAIN NATURAL DRAINAGE PATHWAYS & HYDROLOGIC FEATURES CONSERVE NATURAL AREAS, SOIL, VEGETATION MINIMIZE IMPERVIOUS AREA MINIMIZE SOIL COMPACTION IMPERVIOUS AREA DISPERSION RUNOFF COLLECTION LANDSCAPING W/NATIVE OR DROUGHT TOLERANT SPECIES SOURCECONTROLBMPS PREVENT ILLICIT DISCHARGES STORM DRAIN STENCILING OR SIGNAGE PROTECT REFUSE/TRASH AREAS FROM RAINFALL, RUN-ON, RUN-OFF, WIND DESPERSION ADDITIONAL BMPs BASED ON POTENTIAL SOURCES OF RUNOFF POLLUTION: ON SITE STORM DRAIN INLETS LANDSCAPE/OUTDOOR PESTICIDE USE POOLS, SPAS & OTHER WATER FEATURES FIRE SPRINKLER TEST WATER ~ 1so-21 ISO-JI ISD-41 ISD-51 ISD-61 ISD-71 ~ 1sc-21 ISC-51 ISC-6.1I ISC-6.51 ISC-6.61 ISC-6.151 ------------------~---------.. ·----------+----I -----+--------+---------,--·----- .r D-.TE Ii !!Tl~:_ :-,--TE i I: '·-L [.:.._T:_ i[IITI.-L I --~-'EET GRADTl-l"._~ k::::~-----t::: ,,; ... ----- :~:::: l[ :D 3' I -ISPE:: TCR ( :1·r,; -:i-._., l, El 1,~-[ER:: G DEP>Rfr'E <T ' ·1 -,-" ·c_ :1r,, .-~, I[·,-E' l\J ,:_-, -::--._ /:·_.!j_'-~)i_·, ') ---·--.Llk_) ' . '----·'---' ·1r 1ERR.'-.\ ['1EL i'"'"R,~-. _1_ , t_-~r_,_ , ., _ _.: \'~/ ,_.1/i.s-::, < . _____ ,,_, -, "-~ ::IT'' Fi•Ji H:P ~~ D'-i'-:r·-: E:··1·: ,::.,-He-, E.:,,· __ _ f;,';,[ ~ ( ---- j,::, ::HEEE :,E