Loading...
HomeMy WebLinkAboutCDP 06-25; HAGEY RESIDENCE; PARTIAL BUILDING PAD VERIFICATION; 2009-10-22CVFOQ-7--5 Sampo Engineering, Inc. Land Planning, Civil Engineering, Surveying, Mapping -_ Th October 22, 2009 Joe McMahon, Public Works Inspector OCT 26 2009 City of Carlsbad J 5950 El Camino Real Carlsbad, CA 92008-8802 Subject: Partial Building Pad Verification for Hagey Residence Grading Permit No. 458-3A, Jefferson Street, Carlsbad, APN: 155-140-37 & 38 Dear Mr. McMahon, Our office field surveyed the subject property on October 19, 2009 to determine the new building and garage pad elevations. As the Engineer of Work, I hereby state that rough grading for a portion of the new garage pad and building pad have been completed in substantial conformance with the approved plans. The following list provides the partial pad elevations as field verified and as shown on the approved grading plan: Plan Approved Field Measured Pad Elevation Pad Elevation Partial Garage Pad 64.0 64.0 Partial Building Pad at Lower Level 47.3 47.3 Our office will field verify the remaining portion of the garage pad and building pad at the time of building construction. If you have questions please feel free to contact me. Respectfully, NDS ( 7655 Vincent Sampo, PE, PLS No. * IPresident 1034 Second Street • Encinitas, CA 92024 • phone: 760-436-0660 . fax: 760-436-0659 info@sampoengineering.com