Loading...
HomeMy WebLinkAboutCDP 12-04; ARMY & NAVY ACADEMY ATHLETIC FIELD; STRUCTURAL SLAB FLOW; 2014-07-31JONES, CAHL & ASSOCIATES, INC. CONSULTING ENGINEERS City of Carlsbad July 31, 2014 Department of Transportation 5950 El Camino Real Carlsbad, CA 92008 Attn: Jay Jordan, Public Works Inspector Re: Hoehn Buick-Cadillac - 5334 Paseo Del Norte SDP 12-04 Dwg. No. 482-2A Dear Mr. Jordan, It is acceptable to have the wall of the flow thru planter as part of the structural slab as the structural plans depict and waterproofed aè shOwn on the civil drawings. SINCERELY, C 60934 in '/31/ft DANIEL RUBIO,R.C.E. 60934 18090 Beach Boulevard, Suite 12 • Huntington Beach, California 92648 • Phone: (714) 848-0566 • Fax: (714) 848-6322