Loading...
HomeMy WebLinkAboutCDP 13-30; DE ANDA RESIDENCE; PAD VERIFICATION; 2015-03-02)I(SAMPD ENGINEERING. INC. March 2, 2015 City of Carlsbad Engineering Department 1635 Faraday Avenue Carlsbad, CA 92008 Page 1 of 1 Subject: Pad Verification for Grading Plan No. 482-7A, Dc Anda Residence, Project No. CDP 13-30, APN: 155-140-41, Jefferson Street, Carlsbad, CA To Whom It May Concern, On February 25, 2015, our office performed a field survey at the referenced project to determine the average elevations of the building and garage pads that have been created. The results of our survey are as follows: Garage Pad Approved Grading Plan Pad Elevation = 64.6 Field Measured Pad Elevation = 64.6 Main Residence Pad Approved Grading Plan Elevation=62 .3 Field Measured Pad Elevation--62.4 Upper Level Residence Pad Approved Grading Plan Elevation=63.8 Field Measured Pad Elevation=63.8 Please feel free to contact me if y Sincerely, Vince Sampo, PE, PLS President 171 Saxony Road, Suite 213 • Encinitas, CA 92024 • phone: 760-436-0660 • fax: 760-436-0659 info@sampoengineering.com ix 7-/ / .: I . , I. . . ... .. . . -. . . 2043.-.' - X 655 6j. 260!~-9 ONAD n r, n' / WRRAC / / I I y X64,480 2POOLiZI__t 1/ p PAD GARAGE I:ff 6550 •0 X 64.18"X 2057 PAD 646 PAD /156,6 IJ/5 I624 20 5 —8- 4-i X65.3 57.8 / X62.265 X6 •57 CONCRETE-' / 6226 PA D 3 / IX 2 WA7 : fF r LANTER 2OFYS PA W j-- 17. / 20 62. / CONCRETE ) I0 2055 2056 ( / / ' X62.1 2 X6Ev/N PAD 20 )45 / V:° 6142X63 46 PAD 4 204 . r, F~A N TER X2A 8O 3 2040PAD X 65.8 / I r.(I/ IF 64.5 .360 GARAGE /950 64,749 1.3% I I I PAD 63.8 I PAD 64.6 PAD PAD /207 1.42-s--- 17. ) PO708 ~m j 11 6jo 205 ]PLANTER 1 3..! , L a), - '.'a7 5 6_4_53a___ I L. \ O PAD 4PVC ,/ X \ A. APING_ 1% CONc. PLANTER