March 2, 2015
City of Carlsbad
Engineering Department
1635 Faraday Avenue
Carlsbad, CA 92008
Page 1 of 1
Subject: Pad Verification for Grading Plan No. 482-7A, Dc Anda Residence, Project No. CDP
13-30, APN: 155-140-41, Jefferson Street, Carlsbad, CA
To Whom It May Concern,
On February 25, 2015, our office performed a field survey at the referenced project to determine
the average elevations of the building and garage pads that have been created.
The results of our survey are as follows:
Garage Pad
Approved Grading Plan Pad Elevation = 64.6
Field Measured Pad Elevation = 64.6
Main Residence Pad
Approved Grading Plan Elevation=62 .3
Field Measured Pad Elevation--62.4
Upper Level Residence Pad
Approved Grading Plan Elevation=63.8
Field Measured Pad Elevation=63.8
Please feel free to contact me if y
Sincerely,
Vince Sampo, PE, PLS
President
171 Saxony Road, Suite 213 • Encinitas, CA 92024 • phone: 760-436-0660 • fax: 760-436-0659
info@sampoengineering.com
ix 7-/ / .: I . , I. . . ... .. . . -. . .
2043.-.' - X 655
6j. 260!~-9 ONAD n r, n'
/ WRRAC / / I I
y
X64,480
2POOLiZI__t 1/ p
PAD
GARAGE
I:ff 6550 •0
X 64.18"X
2057 PAD 646
PAD
/156,6 IJ/5 I624 20 5 —8- 4-i X65.3 57.8 / X62.265 X6 •57 CONCRETE-'
/ 6226 PA D 3 /
IX 2 WA7
:
fF r LANTER 2OFYS
PA W
j--
17.
/ 20
62.
/ CONCRETE ) I0
2055 2056 (
/ / ' X62.1 2 X6Ev/N
PAD 20 )45
/ V:°
6142X63 46 PAD 4 204 . r, F~A N TER
X2A 8O 3
2040PAD
X 65.8
/ I r.(I/
IF 64.5
.360 GARAGE
/950 64,749 1.3%
I I I PAD 63.8 I PAD 64.6 PAD PAD /207
1.42-s--- 17.
)
PO708
~m j 11 6jo 205 ]PLANTER 1 3..! , L a),
- '.'a7 5 6_4_53a___ I
L.
\
O PAD 4PVC
,/ X \ A. APING_ 1% CONc. PLANTER