Loading...
HomeMy WebLinkAboutCDP 13-30; DE ANDA RESIDENCE; SWMP; DWG 482-7, DWG 482-7A; 2014-07-300 0 0 SWMP 14-07 (CDP 13-30/CDP 13-31) CITY OF CARLSBAD ENGINEERING DIVISION PRIORITY DEVELOPMENT PROJECT STORM WATER MANAGEMENT PLAN FOR DE ANDA RESIDENCE ENGINEER OF WORK r!_jd/_ r VINCENT L. SAMPO -RCE 44173 PREPARED FOR: VERONICA DE ANDA 1409 TURQUOISE DR CARLSBAD, CA 92011 PREPARED BY: SAMPO ENGINEERING, INC. 1034 SECOND STREET ENCINITAS, CA 92024 760-436-0660 De Anda Residence Sampo Engineering, Inc. CDP 13-30/13-31 7/30/2014 Priority Development Storm Water Management Plan 1 ~ .. 0 z ~ 0 ~1 :c 0 z <C ...J c.. 0 TABLE OF CONTENTS 1. Project Setting 2. Applicable Storm Water Standards 3. Identify Pollutants of Concern 4. Source Control Measures 5. Low Impact Development (LID) Design Strategies 6. Integrated Management Practices (IMP's) 7. Documentation of Storm Water Design 8. BMP Facility Maintenance Requirements 9. SWMP Certification Statements Attachments: Vicinity Map Hydrology and Hydraulic Calculations Project Threat Assessment Form E-32 Construction Threat Assessment Form E-33 Storm Water Standards Questionnaire (SWSQ) E-34 Post-Construction BMP Exhibit Orthophoto Maps for Hydrology Study Storm Drain Improvement Plan De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 2 0 C 1.0 Project Setting The subject property is located on the westerly side of Jefferson Street, just south of the intersection of Las Flores Drive, in Carlsbad, California and is approximately 0.37 acres in size. The property is legally described as a portion of Tract No. 3 of Laguna Mesa Tracts, according to Map No. 1719 (APN: 155-140-41) and is bounded on the west by the Buena Vista Lagoon, to the east by Jefferson Street, and to the north and south by single family developments. The subject property is currently vacant; however there is evidence that a structure occupied the property in the past, and has been previously graded. From the easterly boundary of the project, also being Jefferson Street, there is a 55-80' wide pad area, and then the property descends at an approximately 3: 1 slope to the westerly property line and the Buena Vista Lagoon. A small easterly portion of the site currently drains to Jefferson Street. No significant vegetation exists on the site that would need to be removed for the proposed development. The project proposes to redevelop the property by constructing a new single-family residence and attached garage, driveway, pool, and planters. The project proposes to maintain the historical drainage patterns. Per the County of San Diego Hydrology Manual's Soil Hydrologic Group Map the project appears to have soil group B present. In preparation of this Storm Water Mitigation Plan for the De Anda Residence, Sampo Engineering, Inc. (SEI) reviewed the previously approved project plans for the property adjacent to the north, project soils report prepared by GeoSoils, Inc., and miscellaneous record drawings adjacent to the subject property. SEI conducted a site visit and field reconnaissance on May 30, 2013 to verify existing drainage patterns and potential sources of pollution. Photos were taken of the undeveloped project area, Jefferson Street, drainage structures, and landscaping that currently exists. SEI prepared a Hydrology Study of the project area to assist with preparation of this SWMP. No evidence of erosion was observed during SEI's site visit of May 30, 2013. Very little trash or debris was found within the project area. All construction related activities for the project to the north appear to be entirely within the project area. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 3 0 1.1 Site Development Opportunities and Constraints Common with any proposed development, the proposed project has its own unique characteristics that present opportunities and constraints for storm water control and treatment. Some constraints that are anticipated for the proposed development of the project are based on the existing topography and underlying soil conditions. The project area lies mostly within a previously graded area that is relatively flat, but a portion lies within the existing slope. Per the project's Geotechnical Report the proposed residence sits atop an existing slope, and therefore infiltration is not recommended for the subject property. In order to prevent infiltration adjacent to building foundations from the proposed bioretention areas and flow through planters impermeable liners will need to be utilized. In addition, an Environmentally Sensitive Area (ESA) is located directly adjacent to the property on the west. The site presents opportunities for storm water control and treatment. Although much of the property consists of a steep slope, a considerable area still remains of relatively flat, usable land. A portion of this area can be used for storm water treatment and control employing Integrated Management Practices (IMP's). An existing curb inlet and public storm drain is located northerly of the site at the intersection of Jefferson Street and Las Flores Drive that will convey the small amount of on-site storm water that is directed to Jefferson Street. The remainder of the on-site developed area will be treated in bio- retention basins and will drain directly to the Buena Vista Lagoon. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 4 0 1.2 Nearby Water Bodies, Existing Storm Drain Systems 0 0 No existing public storm drain systems are located on the subject property. Storm water draining from the westerly portion of the property travels overland westerly to the Buena Vista Lagoon before reaching the Pacific Ocean. The small portion of the property that drains to the east to the curb and gutter in Jefferson Street that drains northerly to an existing curb inlet located in the intersection of Jefferson Street and Las Flores Drive. The curb inlet then drains westerly directly to the shore of the Buena Vista Lagoon via 18" ACP public storm drain. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 5 2.0 Applicable Storm Water Standards The project has been determined to be classified as a Priority Development Project, because the subject property lies within 200 feet of an Environmentally Sensitive Area (ESA). Storm water quality standards will be required per the current City of Carlsbad SUSMP. LID and numerically sized treatment control facilities are designed for the project hereon. The project is exempt from Hydromodification standards. The westerly basin of the subject property drains directly to a tidally-influenced lagoon (node 6). The easterly basin of the subject property drains to a PCC curb and gutter in Jefferson Street, then northerly to a curb inlet at the intersection with Las Flores, and is then piped directly to the lagoon (nodes 6 & 7). See attached Storm Water Standards Questionaire (E-34) De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 6 Q 3.0 Identify Pollutants of Concern 0 The project proposes to redevelop the property by constructing a new single-family residence and attached garage, driveway, pool and spa, and planters. Pollutants anticipated for this type of land use are sediment, nutrients, trash & debris, oxygen demanding substances, oil & grease, bacteria & viruses, and pesticides. The project lies within the Carlsbad Watershed in the Buena Vista Creek Hydrologic Area (904.2). Storm water from the site drains to the Buena Vista Lagoon before reaching the Pacific Ocean. The Buena Vista Creek is listed as an impaired water body per 303d listing for indicator bacteria, nutrients, and sedimentation/siltation. The Buena Vista Lagoon has many beneficial uses including public trails surrounding the lagoon, and fishing. Indicator bacteria, nutrients, and sediment are primary pollutants-of-concern for the proposed project and shall be mitigated with treatment control BMP's. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 7 4.0 Source Control Measures Source Control BMP's consist of scheduling of activities, prohibition of certain practices, maintenance procedures, and education to prevent storm water pollution by reducing the potential for contamination at the source. Proper site planning, land use, and structural or nonstructural measures can achieve this. POTENTIAL PERMANENT SOURCE CONTROL BMP'S SOURCE OF RUNOFF POLLUTANTS A. On-site storm Mark all inlets with the words, "No Dumping! drain inlets Flows to Ocean" .. B. Need for Buildings designed to discourage entry of pests future indoor & structural pest control C. Landscape/ Final Landscape Plans shall: Outdoor • Preserve existing native trees, shrubs, and Pesticide Use ground cover to the maximum extent practical. • Design landscaping to minimize irrigation and runoff, to promote surface infiltration where appropriate, and to minimize the use of fertilizers and pesticides that can contribute to storm water pollution. • Where landscaped areas are used to retain or detain storm water, specify plants that are tolerant of saturated soils conditions. • Consider using pest resistant plants, especially adjacent to hardscape. • To insure successful establishment, select plants appropriate to site soils, slopes, I\ climate, sun, wind, rain, land use, air _. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan OPERATIONAL SOURCE CONTROL BMP'S • Maintain and periodically repaint or replace inlet markings. • Provide storm water pollution prevention information to new site owners, lessees, or operators. • See applicable operational BMP's in Fact Sheet SC-44, "Drainage System Maintenance," in the CASQA Handbook. • Provide Integrated Pest Management information to owners, lessees, and operators. • Maintain landscaping using minimum or no pesticides. • See applicable operational BMP's in Fact Sheet SC-41, "Building and Grounds Maintenance," in the CASQA Stormwater Quality Handbook • Provide IPM information to new owners, lessees, and operators. Sampo Engineering, Inc. 7/30/2014 8 movement, ecological consistency, and plant interactions. POTENTIAL PERMANENT SOURCE CONTROL SOURCE OF BMP'S RUNOFF POLLUTANTS D. Refuse Areas • Site refuse to be handled in covered trash cans in garage. • Signs will be posted on or near dumpsters with the words, "Do not dump hazardous materials here." E. Vehicle and Car wash area not provided on-site. No Equipment facilities will be made available. Cleaning 0 0 De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan OPERATIONAL SOURCE CONTROL BMP'S Adequate number of receptacles to be located on site, inspected for leaks regularly, and covered. Any spills to be cleaned up immediately. Not Applicable Sampo Engineering, Inc. 7/30/2014 9 0 5.0 Low Impact Development {LID) Design Strategies 0 The project proposes to redevelop the property by constructing a new single-family residence and attached garage, driveway, pool, and planters on a property within 200 feet of an Environmentally Sensitive Area (ESA), thereby classifying the project as a "Priority Development Project." The proposed development utilizes Low Impact Development (LID) principles to the Maximum Extent Practical. The project proposes using an undeveloped pad area on-site to construct the residence and improvements. The project proposes to be setback from the lagoon and ESA. Although no natural landforms exist since the site has been previously graded, the project proposes to optimize the site layout by minimizing additional impervious areas by minimizing the size of the single- family residence and driveway. A portion of the driveway is proposed to constructed of permeable pavers. The project also proposes preserving the relatively flat pervious area. Landscaping or ground cover will be used outside of the residence and driveway to prevent erosion of the surface of the soil and slopes, enhance moisture retention, and inhibit the growth of weeds. Although no natural drainage courses exist, the project proposes to maintain draining the site to the lagoon and the existing storm drain located to the north. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 10 0 6.0 Integrated Management Practices (IMP's) 0 To satisfy storm water quality standards for treatment and flow control the project proposes the use oflntegrated Management Practices (IMP's). As a "Priority Development Project," numerically sized IMP's will be incorporated with the design of the project for treatment control. The project will be exempt from hydromodification requirements, however a gravel storage layer will also be implemented for flow control. Multiple Flow Through Planters and Bioretention facilities will be integrated with the landscape design to provide treatment and flow control of runoff from the proposed residence, driveway, and hardscape areas to target the pollutants of concern. Bioretention detains runoff in a surface reservoir, filters it through plant roots and a biologically active soil mix, stores runoff in a subsurface aggregate storage layer, and then infiltrates it into the ground. Per the project's soils engineer's recommendations the bioretention facilities shall be underlain with an impermeable liner and sub drain system for slope stability where infiltration cannot be allowed, sizing factors and criteria for the flow through planter is utilized. Sizing of the bioretention basins and flow through planters uses "water quality only" sizing factors from the County of San Diego Final Hydromodification Plan. See attached BMP Site Plan for IMP locations and the following tabulation for calculations of the sizing for the treatment and flow control facilities. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 11 0 0 7 .0 Documentation of Storm Water Design To satisfy storm water quality standards for treatment and flow control the project proposes the use oflntegrated Management Practices (IMP's). The project site has been divided into five Drainage Management Areas (DMA's) and each DMA drains to one IMP area for storm water treatment and flow control (see attached BMP Site Plan). The following tables show the calculations and sizing factors used to calculate the IMP's. DMACode: DMA Description: Post Project Surface Tvpe Roof /Hardscaoe Permeable Pavers LandscapinQ IMP area DMACode: DMA Description: Post Project Surface Type Roof/Hardscaoe Permeable Pavers LandscapinQ IMP area De Anda Residence CDP 13-30/13-31 1 Total Basin Area: 11,106 sf Northeast portion of property tributary to Jefferson Street Soil Type: IMP type DMA DMAarea Area Runoff x runoff (sf} factor factor B bioretention basin 843 1.0 843 0 0.6 0 157 0.1 16 106 0 0 IMP Sizing factor (WQ Minimum Proposed only) Area Area Total 859 0.04 34 I 50 2 Total Basin Area: 2,006 sf Southeast portion of property tributary to Jefferson Street Soil Type: IMP type DMA DMAarea Area Runoff x runoff (sf} factor factor B bioretention basin 1713 1.0 1713 0 0.6 0 144 0.1 14 149 0 0 IMP Sizing factor(WQ Minimum Proposed only) Area Area Total 1727 0.04 69 I 84 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 12 C 0 0 DMACode: DMA Description: Post Project Surface Type Roof /Hard scape Permeable Pavers Landscaping IMP area DMACode: DMA Description: Post Project Surface Type Roof/Hard scape Permeable Pavers Landscaping IMP area DMACode: DMA Description: Post Project Surface Type Roof/Hardscape Permeable Pavers Landscaping IMP area De Anda Residence CDP 13-30/13-31 3 Total Basin Area: Southerly portion of property tributary to west Soil Type: DMA DMAarea Area Runoff x runoff (sf) factor factor B 736 1.0 736 0 0.6 0 128 0.1 13 73 0 0 IMP Sizing factor (WQ only) Total 749 0.04 4 Total Basin Area: Northerly portion of property tributary to West Soil Type: DMA DMAarea Area Runoff x runoff (sf) factor factor B 1515 1.0 1515 0 0.6 0 86 0.1 9 69 0 0 IMP Sizing factor (WQ only) Total 1524 0.04 5 Total Basin Area: Westerly portion of property tribtary to west Soil Type: DMA DMAarea Area Runoff x runoff (sf) factor factor B 157 1.0 157 0 0.6 0 0 0.1 0 37 0 0 IMP Sizing factor(WQ onlv) Total 157 0.04 937 sf IMP type flow through planter Minimum Proposed Area Area 30 I 41 1,669 sf IMP type flow through planter Minimum Proposed Area Area 61 I 69 194 sf IMP type flow through planter Minimum Proposed Area Area 61 37 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 13 0 8.0 BMP Facility Maintenance Requirements 0 The City Engineer will not consider structural Treatment Control BMPs and LID IMPs as meeting the maximum extent practicable standard (MEP), unless the applicant identifies a specific maintenance mechanism and implements a storm water operation and maintenance plan (O&M Plan) to ensure ongoing long-term inspection and maintenance of all structural Treatment Control BMPs and IMPs. This mechanism shall be proposed by the applicant as part of the SWMP. Processing an O&M Plan is among the requirements to obtain a grading permit during the final engineering phase of a Priority Development Project. The SWMP identifies one of the following Priority Development Project maintenance mechanisms to ensure long-term facility maintenance. A supporting O&M Plan has been developed and is located in the attachments section of this report. MaintenanceiMechanism . ·-· ..•. ,_.,..; ... ,. .. Conditional use permits -For discretionary projects only, the City may assure D maintenance of storm water BMPs through the inclusion of maintenance conditions in the conditional use permit. A non-refundable security may be required. D D D Project proponent agreement to maintain storm water BMPs -The City may enter into a contract with the project proponent obliging the project proponent to maintain, repair and replace the storm water BMP as necessary into perpetuity. A non-refundable security may be required. Conditional use permits -For discretionary projects only, the City may assure maintenance of storm water BMPs through the inclusion of maintenance conditions in the conditional use permit. A non-refundable security may be required. Lease provisions -In those cases where the City holds title to the land in question and the land is being leased to another party for private or public use, the City may assure storm water BMP maintenance, repair and replacement through conditions in the lease. Assessment districts -The City may approve an Assessment District or other funding mechanism created by the project proponent to provide funds for storm water BMP maintenance, repair and replacement on an ongoing basis. Any agreement with such a District shall be subject to the Public Entity Maintenance Provisions below. Public entity maintenance -The City may approve a public or acceptable quasi-public entity ( e.g., the County Flood Control District, or annex to an existing assessment district, an existing utility district, a state or federal resource agency, or a conservation conservancy) to assume responsibility for maintenance, repair and replacement of the BMP. Public entity maintenance agreements shall ensure estimated costs and front-funded D or reliably guaranteed, ( e.g., through a trust fund, assessment district, fees, bond, letter of credit or similar means). In addition, the City may seek protection from liability by appropriate releases and indemnities. The City Engineer shall have the authority to approve storm water BMPs proposed for transfer to any other public entity within its jurisdiction before installation. The City shall be involved in the negotiation of maintenance requirements with any other public entities accenting maintenance De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 14 0 I l I I responsibilities within their respective jurisdictions; and in negotiations with the resource agencies responsible for issuing permits for the construction and/or maintenance of the facilities. The City must be identified as a third party beneficiary empowered to enforce any such maintenance a~eement within their respective jurisdictions. Alternative mechanisms -The City may accept alternative maintenance mechanisms if D such mechanisms are as protective as those listed above. Alternative mechanisms must be aooroved by the City Attorney and the City Engineer. Comment: The Applicant will enter maintenance agreement with the City to satisfy storm water maintenance requirements. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 15 0 9.0 SWMP Certification Statement 0 The selection, sizing, and preliminary design of storm water treatment and other control measures in this plan meet the requirements of Regional Water Quality Control Board Order R9-2007-0001 and subsequent amendments. I understand and acknowledge that the plan check review of the Storm Water Mitigation Plan by the City of Carlsbad is a review for the limited purpose of ensuring the Plan and design complies with requirements of the City, Regional Water Quality Control Board, San Diego Region, and other applicable policies and ordinances. The review of this plan by City Staff is not a determination of the technical adequacy of the design of Storm Water Mitigation Plan. Such review of the Plan does not relieve me of my responsibility for the design and content of the Storm Water Mitigation Plan. De Anda Residence (CDP 13-30/13-31) r/~£.1.en 44113 Vincent L. Sampo PE No. Engineer-of-Work Sampo Engineering, Inc. 171 Saxony Road Suite 213 Encinitas, CA 92024 De Anda Residence CDP 13-30/13-31 6ate Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 16 «~ ~ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.gov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. STEP1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a priority development project, please answer the following questions: YES NO 1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or X other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are X designed and constructed in accordance with the USEPA Green Streets guidance? If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet PDP requirements" and complete applicant information. If you answered "no· to both questions, then go to Step 2. E-34 Page 1 of 3 Effective 6/27/13 «~ ~ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STEP2 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a priority development project, please answer the following questions: YES 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire X project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial residential mixed-use and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption. 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the temporary parkina or storaae of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles and other vehicles. 7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive X Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingles with flows from adjacent lands).• 8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 1 O. ls your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11 . ls your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? NO X X X X X X X X X If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step 4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant information. e-34 Page 2 of 3 Effective 6/27/13 «~ ~ CI T Y OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 STEP3 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPEMENT PROJECTS ONLY Complete the questions below reqardinq your redevelooment oroiect: YES Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than I I 50% of the surface area of the oreviouslv existina develooment? If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. NO If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the "my project meets PDP reauirements" box and comolete aoolicant information. STEP4 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION iJ My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. D My project does not meet PDP requirements and must only comply with ST ANDA RD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Accessor's Parcel Number(s): 155-140-41 Applicant Tiijff Cl.. <.v "l'«C Date: 7/3t/;j This Box for City Use Only City Concurrence: By: Date: Project ID: I YES I NO I I • Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27 /13 C 0 De Anda Residence CDP 13-30/13-31 ATTACHMENTS Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 17 Vicinity Map 1n.,,,-11r,_1tl I ,,.t .. C'Ul10ttrch f#I fxti:.f'~1:1, :a1 a"ld Will 'Suit .. , r.,r,'"n~ StM:do "" De Anda Residence CDP 13 -30/13 -31 li ~ )1·,.:1,,rtl":J, Priority Development Storm Water Management Plan L•';tuO h tcT1dl:dS1ay At1"1t1•.;••loltl"i1n ~f(l(ke1J A,t Ii' Q .. fHt> .. ~Vuta u~n,,1,41,:y S,.;.hoc;I ~ Lnrtl)tu '· C'h.~ch-NH.NC:1)(! Sampo Engineering, Inc. 7/30/2014 18 0 0 Hydrology Calculations Pre-Development Rational Methocl'Hydrology:Calctilations. (Basiri~West) .. .. . .. . . . .. ' ,... · .. · Storm p6 C I Area Tc Q Velocity Volume (fl3) Frequency (adjusted) (acres) (cfs) (fps) 100-year 2.5 0.38 3.85 0.351 11.5 0.5 Pre-Development Rational· Method!Hydrology Calculations (Basin-East) , . . ... . Storm p6 C I Area Tc Q Velocity Volume (ft3) Frequency (adjusted) (acres) (cfs) (fps) 100-year 2.5 0.35 6.59 0.023 5.0 0.1 Post-Development. Rational. Method• Hydrology .Cal~ulations:(easin-West) . ' . · .. ,. .. . . . . Storm p6 C I Area Tc Q Velocity Volume (ft3) Frequency (adjusted) (acres) (cfs) (fps) 100-year 2.5 0.49 4.32 0.297 9.6 0.6 Post-Development Rational Method Hydrology Calculations (Basin-East) Storm p6 C I Area Tc Q Velocity Volume (ft3) Frequency (adjusted) (acres) (cfs) (fps) 100-year 2.5 0.79 6.59 0.078 5.0 0.4 De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 19 0 0 0 OPERATION AND MAINTENANCE PLANS The City Municipal Code requires a description of the long-term maintenance requirements of proposed BMPs and a description of the mechanism that will ensure ongoing long-term maintenance. Responsible Party The responsible party for long term maintenance of permanent treatment control BMPs outside of public right-of-ways will ,be the property owner. Site Design, Source Control, and Detention Basin Maintenance Permanent storm water BMPs for this project consist of site design, source control, and treatment control BMPs. The following text describes the designated responsible party that will be responsible for ensuring the ongoing effectiveness and maintenance of each permanent storm water BMP. General indications for effectiveness and required maintenance of each permanent storm water BMP are discussed, however, it is important for the owner or responsible party to contact the manufacturer of each structural BMP for additional information and guidance. The designated responsible party shall maintain record of inspections, maintenance cleanings, and servicing of all permanent storm water BMPs for at least 5 years. Site Design • Maintain vegetation throughout vegetated areas and slopes. • To be maintained by the property owner. Source Control . Educational material will be distributed to the owner to ensure their understanding of the importance of source control for pollution prevention. This material shall include, but not be limited to: • Integrated pest management principles (i.e. minimizing the use of pesticides) o To be maintained by an the property owner. • Efficient irrigation systems (i.e. preventing irrigation runoff and/or over- irrigation) o To be maintained by the individual property owner. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 20 0 0 0 • Pollution prevention "stenciling and signage" (i.e. inlet stenciling and "no dumping" signs) o To be maintained by the Citymaintenance Treatment Control BMP Maintenance There are two types of structural treatment control BMPs proposed for the De Anda Residence project, private Bio-Retention basins and flow through planters. Bio-Retention Basins The basins will be maintained by the property owner. Periodic inspections of the basins will be conducted at regular intervals throughout the rainy season (October 1 through April 30). The inlets and outlets for each detention basin will be inspected for trash, litter, debris, or other solid materials that may hinder the intended functioning of the basins. Any eroded areas will be restored andre-vegetated, while invasive species will be removed as needed. The maintenance procedure for servicing the detention basins consists mostly of sediment, trash, and debris removal. In addition, vegetation management will have to be taken into consideration. Typical activities and frequencies include: 1. Schedule semiannual inspection at the beginning and end of the wet season for standing water, slope stability, sediment accumulation, trash and debris, and the presence of burrows. 2. Remove accumulated trash and debris in the basin and around the riser or pipe/outlet during the semiannual inspections. The frequency of the activity may be altered to meet specific site conditions. 3. Trim vegetation at the beginning and end of the wet season and inspect monthly to prevent the establishment of woody vegetation and for aesthetic and vector reasons. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 21 0 0 4. Remove accumulated sediment and re-grade about every 10-years, or when the accumulated sediment volume exceeds 10 percent of the basin volume. Inspect the basin each year for accumulated sediment volume. The basins may require maintenance attention two times a year, but clearing frequencies are highly dependent upon many factors and are difficult to predict. Flow Through Planters See Bio-Retention basin maintenance plan. De Anda Residence CDP 13-30/13-31 Priority Development Storm Water Management Plan Sampo Engineering, Inc. 7/30/2014 22 \ i _)--~~~~~~~~~~~~~~~~-,-~~ . ) r n Ojego Counry Hydro.logy Maou.il . te: June 2003 Table3-1 Section: Page: . RUNOFF COEFFICIBNTS-FOR VRBAN .AREAS ~C$ EJctnems s~N:wralTmaia~) Density. ltesideo.tial (I.DR} [)enS11y~{LDR) ~Residen~WQR) .. . . m;t Density ~~l,(MPIQ ~,~tylt~~~) DJ Density~(MDR) 1DrDcnsity-J.tesidemial=(MDR) lemity Residential ~R) easity Residential (HOR) ma.fl.[ndu~. (N. Com) icial/Indus1r¥ (G. Com) rda.llindus~.(O.P. ~) :ciaJ/Industrial (Limited I) ~{&en~I.) Laud Use -CQuaty_Elem~ts Residemial l.O DU/A or les.s ~tial. 2.0 DU/A or la$ ~~ia,1,.2:.9 ~~ leas ~~-~4p.u/"'-~~ ~.l 1~W./Aor#SS ~ 10.9DU/A.ot.Jess . . . . Residential i4.S DU/A or iess ~rial. .2'4.0 DU/~ or.Jess Resideiitial 43.0 PU}A or less Neipbo,rhood Commercial Gener.al Commeicial Office PmfcssionaJ/Co.mmercial Limited Industrial Gcaeta1 Industriai %,~ 0- 10 20 25 ~ 40 45 so 65 80 80 85 . 90 90 95 A 0..20 0?7 034 038 0.41 O~-f~ 0.52 0.55 0.66 0.76 0.76 0.80 0.83 0.83 0.87 Ruoa!reodiicieot·-c- Soil Type i3 C .0.25 -0.30 032 0.36 . ().,38 Q.42 0.41 0.45· 0.4S. 0.48 <Ul -0;54- 0$,if 0.57 0;58 0.60 0.67 o~cw ~n 0.78 0.17 0.18 0.80 0.81 0~84 0.84 0.84 0.34. 0.87 0.!7 ·, I ' l ,J, 3 6of26 D ~35 0..4.t ~-46 0.49 O.S2 .0.5,1 0.60 0.63 0.11 0.79 0.79 0.82 0.85 0.85 O.S7 lucs. associated with 0% impcnious .may be used for. di:f;e;ct _c.alcubtjo.o ·Of the rono.ff codl:i:cient 3$ described in Sedi~ 3.1.2 (rq>~g the pemoU$ rutJDff' 11t. Cp, for 1k soil type). ot ~ areas that will remain ~disturbe4 in PefPC'huo/-Justification must be given that the aiea will remain~ f«eVcr (e.g., the asea . l in Clevekmd Naiimµi Forest). twelliag • per acre N"atio.nal Resources Conservati~ SetVice 3-6 0 0 0 ..... , -\ •• ·.J \.· ...... --~-----;___ _______ ··.:·1 1 W1 I 2f.g% slope7T///. 100 1.5 I . .. ~ L f :/'-I Y4 130 fjj w lL ~ UJ 0 ! Cl) c 1.11 ~ ::) 0 0 a: . ~ :: "ffJ I!! ::, z --I • I -""' ~ ff-· _.., "1 -~ I · ~ f· I ~ 120 :,: . ~~~~ ~ :a,... _a.II ~-0 EXAMPLE: Given: Watercourse Distance {O) = 70 Feet Slope (s) = 1.3% Runoff Coefficient (CJ= 0.41 Overland Row Time (T} = 9.5 Mint$:?S T= 1.8 (1.1-C) Vo . 3Vs ~ SOURCE: Airport Dra~flage, Federal Aviation Administration, 1965 FIGURE RafionaJ Formula -Overland Time of Flow Nomograpta 3.3 0 0 0 "j -:. ---· ·~4c -• / ' ' • • c,;, ' :.-~--,--':·,. . >•' . . )-. .'///·--· ! --.. ••• • • ' .; ::: : ;:-·.::::: . ,. -7.f)-.••. ~-. • s: : t .. t·k ',;,~-~ • .-.: •• ' ~~ ·i:;2' . / ':'fl :,1. >/ ,-• --•. • ~ ·-• "• • v· ' . •• •.... :·~,. .,:,:: ' t 'E!:) •.• •• a .. :.:;;:r:;::f:J~:.i ;:.-.~~;:t),~:~< i . ·····"-'-···· ........ --------~----------=---=---------------·~-"'-a< . .,,.._,-.~,~~~=--~-•-·n~----"•--.._.,--..,~..._,,_,,~-M'"-~' --~-~-~-,,-·~•--··-••••"- ... l·····-.!·-···+······L ........ . ,,;<:[: ;-~~~ ;:' ~r I , I I ,,. ... -,._~ ..... 1 ..... \•I ' " . County of San Diego Hydrology Manual Rainfall Jsopluvials 100 Year Rainfall Event-24 Hours lsopluvial (inches) PW ~GIS Depa,tmamof Pubtic Worlcl: We Hav.:: San Diego Covered! G~~lt»'tlm-ilf.'Qr.S;v,r,:(:lff" N ~-·+ s 3 0 3 ~ I -- THIS MAP IS PROVIDED WITHOIIT WARRANTY OF NN KIND, EITHER EXPRESS OR IMPLIED, INCi.UC iNG, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND RTNESS FOR A PARTICULAR PURPOSE. Copyright SanGIS. All RlghlB -· This produc1I rnoycon181n lnbmallon ll'am the SANDAG Regional lnlormlltion Syllem which cannot be n,poduced without the -.., perml11lon cl SANDAG. Thil pmduct rnoy conllin lnlcrmotlon -hll beln repn,duced with pennlllion granf8d by Thomas lln>thelo Maps. Miles ~~~~~~~~~~~~·~~~~~~~~~~~~~ County of San Diego Hydrology Manual Rainfall /sopluvials 100 Year Rainfall Event - 6 Hours lsopluvial (inches) PW ~GIS Depa,tmanr -af A.dffic Worlcl: \);,'e H,1~;.: San Diego Cnvcf(:J.! Gt~~l.rffu.rrr.~5~ N ~E s 3 0 3 I--, ~ THIS MAP IS PROVIDED WITHOl/T WARRANTY OF N« KIND, EITHER EXPRESS OR IM'LIED, INCLUDING. Bl/T NOT LIMITED TO, THE IM'LIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Copyright SanGIS. All Rlghlll -. This pnxlucls moycantoln lnloonatlon from the BANDAG Reglonal lnloonatlon 8-"'11ch cannot be 19P'od..-wl1hcxJI the wrl1l8n permlalon af BANDAG. This product moy conlaln lnloonatlon which hu _, rapn>d..--permlalon granted byThonlM Brolher8 Mopo. Miles