Subject: Limited Geotechnical Investigation
Proposed Residential Renovation
155 Walnut Avenue
City of Carlsbad, California 92008
Dear Mr. & 1vlrs. Flora:
January 7, 2016
Project No. 15-1106E6
In accordance with your request, we have perfo1med a limited geotechnical investigation at the
subject site to discuss the geotechnical aspects of the project and provide recommendations for the
proposed residential improvement.
Our investigation has found that the areas of the proposed improvement are underlain by topsoil to
a depth of approximately 12 to 18 inches below existing grade. Dense terrace deposits were
underlying the topsoil to the explored depth of 6 feet. It is our opinion that the proposed residential
renovation is geotechnically feasible provided the recommendations herein are implemented in the
design and construction.
Should you have any questions with regard to the contents of this report, please do not hesitate to
contact our office.
Respectfully submitted,
AUG 15 2016
BOB & MONICA FLORAi WALNUT AVENUE PROJECT NO. /5-l /06£6
TABLE OF CONTENTS
IN'fRODUCTION .............................................................................................................................................. 3
SCOPE OF SERVICES ...................................................................................................................................... 3
SITE DESCRIPTION AND PROPOSED CONSTRUCTJON ................................ : ....................................... 3
FIELD INVESTIGiTION AND LABORATORY TESTJNG ....................................................................... .4
GEOLOGY ......................................................................................................................................................... 4
Geologic Setting .................................................................................................................................... 4
Site Stratigraphy .................................................................................................................................... 4
SEISMICITY ...................................................................................................................................................... 5
Regional Se.ismicity ............................................................................................................................... 5
Seisn1ic Analysis ................................................................................................................................... 5
2013 CBC Seis1nic Design Criteria ...................................................................................................... 6
Geologic Hazard Assessment. ............................................................................................................... 6
GEOTECHNJCAL EVALUATION .................................................................................................................. 7
Compressible Soils ................................................................................................................................ 7
Expansive Soils ...................................................................................................................................... 7
Groundwater .......................................................................................................................................... 7
CONCLUSIONS AND RECOMMEND A TIO NS ............................................................................................ 8
CLEARING AND GRUBBING ......................................................................................................................... 8
FOUNDATIONS AND SLABS ........................................................................................................................ 8
sE·rrLEMENT ................................................................................................................................................... 9
PRESATURAT1o·N OF SLAB SUBGRADE ................................................................................................... 9
TEMPORARY SLOPES .................................................................................................................................... 9
TRENCH BACKFILL ........................................................................................................................................ 9
DRAINAGE ...................................................................................................................................................... JO
FOUNDATION PLAN REVlEW .................................................................................................................... 10
LIMITATIONS OF INVESTIGATION .................................................................................................. : ...... 1 O
ADDITIONAL SERVICES ............................................................................................................................ 1 i
PLATES
Plate J. Location of Exploratory Boreholes
Plate 2 -Summary Sheet (Exploratory Borehole Logs)
Plate 3 -USCS Soil Classification Chart
PAGE L-1, LABORATORY TEST RES UL TS .............................................................................................. I 3
REFERENCES ...... , .......................................................................................................................................... 14
2
BOB & MONICA FLORAi WALNUT AVENUE PROJECT NO. l 5-l 106E6
INTRODUCTION
This is to present the findings and conclusions of a limited geotechnical investigation for the
proposed renovation of the existing single-family residence located at 155 Walnut Avenue, in the
City of Carlsbad, California.
The objectives of the investigation were to evaluate the existing soils conditions and provide
recommendations for the proposed improvement.
SCOPE OF SERVICES
The following services were provided during this investigation:
0 Site reconnaissance and review of published geologic, seismological and geotechnical reports
and maps pertinent to the project area
0 Subsurface exploration consisting of three (3) boreholes within the limits of the proposed areas
of improvement. The boreholes were logged by our Staff Geologist.
0 Collection of representative soil samples at se]ected depths. The obtained samples were sealed
in moisture-resistant containers and transported to the laboratory for subsequent analysis.
0 Laboratory testing of samples representative of the types of soils encountered during the field
investigation
0 Geologic and engineering analysis of the field and laboratory data, which provided the basis
for our conclusions and recommendations
0 Production of this report, which summarizes the results of the above analysis and presents our
findings and recommendations for the proposed improvement
SITE DESCRIPTION AND PROPOSED CONSTRUCTION
The suqject site is a rectangular-shaped residential lot located on the south side of Walnut Avenue,
in the City of Carlsbad, California. The property which encompasses an area of 4,375 square feet
(87.5' X 50') includes a one-story residence with a detached parking canopy and a storage room.
The building pad is relatively level with general drainage to the west. Vegetation consisted of
grass, shrnb and a few trees. Site boundaries include Walnut Avenue to the north and similar
residential developments to the remaining directions.
The preliminary plans prepared_ by Wright Design of Carlsbad, California indicate that the
proposed renovation will include a second-story and deck addition to the existing, one-story single-
family residence and a detached garage with a living unit above, following demolition of the
existing parking canopy and storage room. It is our understanding that the structures will be wood-
framed and founded on continuous and/ or spread footings with a slab-on-grade floor.
3
BOB& l110NICA fl~ORAI WALNUT AVENUE PROJECT NO. 15-1106£6
FIELD INVESTIGATION AND LABORATORY TESTING
On December 10, 2015, three (3) boreholes were excavated to a maximum depth of approximately
6 feet below existing grade with a hand auger. The approximate locations of the .boreholes are
shown on the attached Plate No. 1, entitled "Location of Exploratory Boreholes". A continuous log
of the soils encountered was recorded at the time of excavation and is shown on Plate No. 2 entitled
"Summary Sheet". The soils were visually and texturally classified according to the filed
identification procedures set forth on Plate No. 3 entitled "USCS Soil Classification".
Following the field exploration, laboratory testing was perfonned to evaluate the pertinent
engineering properties of the foundation materials. The laboratory-testing program included
moisture and density, particle size analysis and expansion index tests. These tests were performed
in general accordance with ASTM standards and other accepted methods. Page L-1 and Plate No. 2
provide a summary of the laboratory test results.
GEOLOGY
Geologic Setting
The subject site is located within the southern portion of what is known as the Peninsular Ranges
Geomorphic Province of California. The geologic map pertaining to the area (Reference No. 7)
indicates that the site is underlain by Pleistocene terrace deposits (Qt).
Site Stratigraphy
The subsurface descriptions provided are interpreted from conditions exposed during the field
investigation and/or inferred from the geologic literature. Detailed descriptions of the subsurface
materials encountered during the field investigation are presented on the exploration logs provided on
Plate No. 2. The following par<1graphs provide general descriptions of the encountered soil types.
Topsoil
Topsoil is the surficial soil material that mantles the ground, usually containing roots and other organic
materials, which supports vegetation. Topsoil was observed in the boreholes with a thickness of
approximately 12 to 18 inches. It consisted of dark brown, silty sand that was moist, loose and porous
in consistency with some organics (roots and rootlets).
Terrace Deposits (Qt)
Terrace deposits were encountered below the topsoil layer. They generally consisted of reddish
brown, silty sand that was moist and medium dense to dense in consistency.
4
BOB & MONICA FLORAi WALNUT A VENUE PROJECT NO. 15-1 l 06£6
SEISMICITY
Regional Seismicity
Generally, Seismicity within California can be attributed to the regional tectonic movement taking
place along the San Andreas Fault Zone, which includes the San Andreas Fault and most parallel
and subparallel faults within the state. The portion of southern California where the subject site is
located is considered seismically active. Seismic hazards are attributed to groundshaking from
earthquake events along nearby or more distant Quaternai-y faults. The primary factors in
evaluating the effect an earthquake has on a site are the magnitude of the event, the distance from
the epicenter to the site and the near surface soil profile.
According to the Fault-Rupture Hazard Zones Act of 1994 (revised Alquist-Priolo Special Studies
Zones Act), quaternary faults have been classified as "active" faults, which show apparent surface
rupture during the last 1 I ,000 years (i.e., Holocene time). "Potentially-active" faults are those faults
with evidence of displacing Quaternary sediments between 11,000 to 16,000 years old.
Seismic Analysis
Based on our evaluation, the closest kno\\-11 '"active" fault is the Newport-Inglewood Fault located
approximately 7.4 kilometers (4.6 miles) to the west. The Newport-Inglewood Fault is the design fault
of the project due to the predicted credible fault magnitude and ground acceleration.
The Seismicity of the site was evaluated utilizing the 2008 National Hazard Maps from the USGS
website and Seed and Idriss methods for active Quaternary faults within the regional vicinity. The
site may be subjected to a Maximum Probable Earthquake of 7.2 Magnitude along the Newport-
Inglewood Fault, with a corresponding Peak Ground Acceleration of 0.45g. 111e maximum
Probable Earthquake is defined as the maximum earthquake that is considered likely to occur
within a 100-year time period.
The effective ground acceleration at the site is associated with the part of significant ground
motion, which contains repetitive strong-energy shaking, and which may produce structural
deformation. As such, the effective or '·free field" ground acceleration is referred to as the
Repeatable High Ground Acceleration (RHGA). It has been determined by Ploessel and Slosson
(1974) that the 'RHGA is approximately equal to 65 percent of the Peak Ground Acceleration for
earthquakes occurring within 20 miles of a site. Based on the above, the calculated Credible
RHGA at the site is 0.29g.
5
BOB & i\40NICA FLORAi WALNUT AVENUE PROJECT NO. I 5-1106£6
2013 CBC Seismic Design Criteria
A review of the active fault maps pertaining to the site indicates the location of the Newport-
Inglewood Fault Zone approximately 7.4 km to the west. Ground shaking from this fault or one of
the m~ior active faults in the region is the most likely happening to affect the site. With respect to
this hazard, the site is comparable to others in the general area. The proposed residential
renovation should be designed in accordance with seismic design requirements of the 2013
California Building Code or the Structural Engineers Association of California using the following
seismic design parameters:
. r~i\tE,)iJJti:' < --··--.·--•((/ ... __ ·-': _., --,·:· ·-·-y_ J· ";'.! JV$$,: fi11l,~J~1~;t~Qt:i;1U1gllQC12-s ·---•-.
Site Class D Table 20.3-1/ ASCE 7, Chapter 20
Mapped Spectral Acceleration For Short Periods, 1.161g Figure 1613.3.1(1)
Ss ,__...._..
Mapped Spectral Acceleration For a 1-Second 0.445g Figure 1613.3.1(2)
Period, S1 -Site Coefficient, Fa 1.035 Table 1613.3.3(1)
Site Coefficient, Fv l.555 Table 1613.3.3(2)
Adjusted Max. Considered Earthquake Spectral I 1.203g Equation ]6-37
Response Acce.leration for Short Periods, SMs
J I
Adjust.ed Max. Considered Earth uake s ectral I 0.6920-E uation 16-38 I I q p ::, I q I
I Response Acceleration for I-Second Period, SM1 -j
5 Percent Damped Design Spectral Response 0.802g Equation 16-39 -----1
~IA~cc_·e_le __ ra_t_io_n_f._or_S_'h_o_n_P_e_ri_o_ds~,_S=os"'---~~~~-+-~~~+-~~~~~~-~~--~
5 Percent Damped Design Spectral Response 0.461g Equation 16-40
Acceleration for 1-Second Period, Sm
Geologic Hazard Assessment
Ground Rupture
Ground rupture due to active faulting is not considered likely due to the absence of known fault traces
within the vicinity of the project; however, this possibility cannot be completely ruled out. The
tmlikely hazard of !:,)found rupture should not preclude consideration of "flexible" design for on-site
utility lines and connections.
Liguefaction
Liquefaction involves the substantial loss of shear strength in saturated soils, usually sandy soils with a
loose consistency when subjected to earthquake shaking. Based on the absence of shallow
groundwater and consistency of the underlying terrace deposits, it is our opinion that the potential for
liquefaction is very low. '
Landsliding
There is no indication that landslides or unstable slope conditions exist on or adjacent to the project
site. There are no obvious geologic hazards related to landsliding to the proposed improvement or
adjacent properties.
6
BOB & MONICA FLORAi WALNUT AVENUE PROJECT NO. 15-1106£6
Tsunamis and Seiches
The site is not subject to inundation by tsunamis due to its elevation. The site is also not subject to
seiches {waves in confined bodies of water).
GEOTECHNICAL EVALUATION
Based on our investigation and evaluation of the collected i.nfonnation, we conclude that the
construction of the proposed additions is feasible from a geotechnical standpoint provided the
recommendations herein will be properly implemented during construction.
In order to provide a unifonn support for the proposed additions, footings should be embedded into the
dense terrace deposits. However, for slab support for the proposed detached garage/ living unit,
overexcavation and recompaction of the upper 18 inches of subgrade will be required. The
foundations may consist of reinforced continuous or spread footings with reinforced slabs.
Recommendations and criteria for foundation design are provided in the Foundation and Slab
recommendations section of this report.
Compressible Soils
Our field observations and testing indicate low compressibility within the terrace deposits, which
underlie the areas of the proposed additions. However, loose topsoil was encmmtered to a maximum
depth of approximately 18 inches below surface grades. These soils are compressible, therefore not
adequate for the support of the proposed additions. As a result, footings for the proposed additions
should be extended to the dense terrace deposits.
Following implementation of the recommendations presented herein, the potential for soil
compression resulting from the new development has been estimated to be low. The low-settlement
assessment assumes a well-planned and maintained site drainage system.
Expansive Soils
An expansion index test was performed on a representative sample of the terrace deposits to
detennine volumetric change characteristics with change in moisture content. An expansion index
of O was obtained which indicates a very low expansion potential for the foundation soils.
Groundwater
Static groundwater was not encountered to the depths of the boreholes. TI1e building pad is located
at an elevation of approximately 50 feet above Mean Sea Level. We do not expect groundwater to
affect the proposed construction. Recommendations to prevent or mitigate the effects of poor
surface drainage are presented in the Drainage section of this report.
7
BOB & MONJCA FLORAi WALNUT AVENUE PROJECT NO. 15-J 106E6
CONCLUSIONS AND RECOMMENDATIONS
The following conclusions and recommendations are based upon the analysis of the data and
infonnation obtained from our soil investigation. This includes site reconnaissance; field
investigation; laboratory testing and our general knowledge of the soils native to the site. The site
is suitable for the proposed residential additions provided the recommendations set forth are
implemented during construction.
CLEARING AND GRUBBING
The area of the proposed garage should be cleared of vegetation. Vegetation and debris from the
clearing operation should be properly disposed of off-site. The area should be thoroughly
inspected for any possible buried objects, which need to be rerouted or removed prior to
construction. All holes, trenches, or pockets left by the removal of these objects should be properly
backfilled with compacted fill materials.
FOUNDATIONS AND SLABS
a. Continuous and spread footings are suitable for use and should extend to a minimum depth of 18
inches for the proposed two-story structures into the dense terrace deposits. Continuous footings
should be at least 15 inches in width and reinforced with a minimum of four #4 steel bars; two bars
placed near the top of the footings and the other two bars placed near the bottom of the footings.
Isolated or spread footings should have a minimum width of24 inches. Their reinforcement should
consist of a minimum of #4 bars spaced 12 inches on center (each way) and placed horizontally
near the bottom. New footings should be dowelled to existing footings in accordance with the
structural engineer requirements. The minimum reinforcement recommended is based on soil
characteristics and is not intended to supersede the structural engineer requirements.
b. Interior concrete floor slabs should be a minimum 4 inches thick. Reinforcement should consist
of #3 bars placed at 18 inches on center each way within the middle third of the slabs by supporting
the steel on chairs or concrete blocks "dobies". The slabs should be underlain by 2 inches of clean
sand over a 10-mil visqueen moisture ,barrier. The effect of concrete shrinkage will result in cracks
in virtually all-concrete slabs. To reduce the extent of shrinkage, the concrete should be placed at a
maximum of 4-foch slump. The minimum steel recommended is not intended to prevent shrinkage
cracks.
c. Where moisture sensitive floor coverings are anticipated over the slabs, the 10-mil plastic
moisture barrier should be underlain by a capillary break at least 2 inches thick, consisting of
coarse sand, gravel or crushed rock not exceeding 3/4 inch in size with no more than 5 percent
passing the #200 sieve.
8
BOB & MONICA FLORAi WALNUT AVENUE PROJECT NO. 15-1106£6
d. An allowable soil bearing value of 2,000 pounds per square foot may be used for the design of
continuous and spread footings at least 12 inches wide and founded a minimum of 12 inches into
the dense terrace deposits as set forth in the 2013 California Building Code, Table 1804.2. This
value may be increased by 400 psf for each additional foot of depth or width to a maximum value
of 4,000 lb/ft2.
e. Lateral resistance to horizontal movement may be provided by the soil passive pressure and the
friction of concrete to soil. An allowable passive pressure of 300 pounds per square foot per foot
of depth may be used. A coefficient of friction of 0.35 is recommended. The soils passive pressure
as well as the bearing value may be increased by 1/3 for wind and seismic loading.
SETTLEMENT
Since the proposed footings are anticipated to be supported by the dense terrace deposits, the total and
differential settlement should be within tolerable limits.
PRESATURA TION OF SLAB SUBGRADE
Because of the granular characteristics of on-site soils, presoaking of subgrade prior to concrete
pour is not required. However, subgrade soils in areas receiving concrete should be watered prior
to concrete placement to mitigate any drying shrinkage, which may occur following foundation
excavation. ·
TEMPORARY SLOPES
For the excavation of foundations and utility trenches, temporary vertical cuts to a maximum height of
4 feet may be constructed in fiH or natural soil. Any temporary cuts beyond the above height
constraints should be shored or further laid back following a 1: 1 (horizontal to vertical) slope ratio.
OSHA guidelines for trench excavation safety should be implemented during construction.
TRENCH BACKFILL
Excavations for utiJity lines, which extend under structural areas should be properly backfilled and
compacted. Utilities should be bedded and backfilled with clean sand or approved granular soil to
a depth of at least one foot over the pipe. This backfill should be uniformly watered and
compacted to a finn condition for pipe support. The remainder of the backfill should be on-site
soils or non-expansive imported soils, which should be placed in thin lifts, moisture-conditioned
and compacted to at least 90% relative compaction.
9
BOB & MONICA FLORAi lt'ALNUT AVENUE PROJECT NO. 15-/ 106£6
DRAINAGE
Adequate measures should be undertaken after the additions and other improvements are in place,
such that the drainage water within the site and adjacent properties is directed away from the
foundations, footings, floor slabs and the tops of slopes via rain gutters, downspouts, surface swales
and subsurface drains towards the natural drainage for this area. A minimum gradient of 2 percent
is recommended in hardscape areas; In earth areas, a minimum gradient of 5 percent away from the
structures for a distance of at least 10 feet should be provided. Earth swales should have a
minimum gradient of 2 percent. Drainage should be directed to approved drainage facilities.
Proper surface and subsurface drainage wiil be required to minimize the potential of water seeking
the level of the bearing soils under the foundations, footings and floor slabs, which may otherwise
result in undermining and differential settlement of the structures and other improvements.
FOUNDATION PLAN REVIEW
Our firm should review the foundation plans during the design phase to assure confqrmance with the
intent of this report. During construction, foundation excavations should be observed by our
representative prior to the placement of forms, reinforcement or concrete for conformance with the
plans and specifications.
LJMJTAT10NS0F INVESTIGATION
Our investigation was performed using the skill and degree of care ordinarily exercised, under similar
circumstances, by reputable soils engineers and geologists practicing in this or similar localities. No
other wruTanty, expressed or implied, is made as to the conclusions and professional advice included in
this report. This report is prepared for the sole use of our client and may not be assigned to others
without the written consent of the client and ECSC&E, Inc.
The samples collected and used for testing, and the observations made, are believed representative of
site conditions; however, soil and geologic conditions can vary significantly between exploration
trenches, boreholes and surface exposures. As in most major projects, conditions revealed by
construction excavations may vary with preliminary findings. If this occurs, the changed conditions
must be evaluated by a representative of ECSC&E and designs adjusted as required or alternate
designs recommended.
This report is issued with the understanding that it is the responsibility of the O\.\'Uer, or of his
representative to ensure that the information and recommendations contained herein are brought to the
attention of the project architect and engineer. Appropriate recommendations should be incorporated
into the structural plans. The necessary steps should be taken to see that the contractor and
subcontractors carry out such recommendations in the field.
10
BOB & MONICA FLORA/ WALNUT AVENUE PROJECT NO. 15-1106£6
The findings of this report are valid as of this present date. However, changes in the conditions of a
property can occur with the passage of time, whether they are due to natural processes or the works of
man on this or adjacent properties. In addition, changes in applicable or appropriate standards may
occur from legislation or the broadening of knowledge. Accordingly, the findings of this report may
be invalidated wholly or partially by changes outside of our control. Therefore, this report is subject to
review and should be updated after a period of two years.
ADDITIONAL SERVICES
The review of plans and specifications, field observations and testing under our direction are integral
parts of the recommendations made in this report. If East County Soil Consultation and Engineering,
Inc. is not retained for these services, the client agrees to assume our responsibility for any potential
claims that may arise during construction. Observation and testing are additional services, which are
provided by our finn, and should be budgeted within the cost of development.
Plates No. 1 through 3, Page L-1 and References are parts of this report.
11
--....... -------~ .---~\:--------------'''--'_.,,:./." ----·----------,'\cc._ __ , ..... /
I
EAST COUNTY SOIL CONSULTATION
& ENGINEERING, INC.
10925 HARTLEY RD .. SUITE I. SANTEE. CA 92071
(619) 258· 7901 Fax (619) 251! · 7902
DEPTH
Surface
l.O'
3.0'
4.0'
6.0'
DEPTH
Surface
l.5'
3.0'
5.0'
DEPTH
Surface
1.0'
3.0'
4.0'
BOB& MONICA FLORAi WALNUTAVENUE PROJECT NO.15-1106£6
PLATEN0.2
SUMMARY SHEET
BOREHOLE NO. I
SOIL DESCRIPTION
TOPSOIL
dark brown, moist, loose, porous, silty sand with rootlets
TERRACE DEPOSITS (Qt) .
reddish brown, moist, medium dense, silty sand
" " " "
becomes dense
bottom of borehole, no caving, no groundwater
borehole backfilled 12/l 0/l 5
BOREHOLE NO. 2
SOIL DESCRIPTION
TOPSOIL
dark brown, moist, loose, porous, silty sand with rootlets
TERRACE DEPOSITS (Qt)
reddish brown, moist, medium dense, silty sand
becomes dense
bottom of borehole, no caving, no groundwater
borehole backfilled J2/l0115
BOREHOLE NO. 3
SOIL DESCRIPTION
TOPSOIL
dark brown, moist, loose, porous, silty sand with rootlets
TERRACE DEPOSITS (Qt)
reddish brown, moist, medium dense, silty sand
becomes dense
bottom of borehole, no caving, no groundwater
borehole backfilled 12/10/15
y
1 I 1.7
109.4
y
y
Y = DRY DENSJTY IN PCF M == MOISTURE CONTENT IN%
12
M
7.3
7.9
7.5
6.7
M
8.3
M
I
l I
l\tAJOR DIVISIONS SYMBOL DESCRIPTION
GW WELL GRADED OR.A VELS OR GR.A VEL· SAND
MIXTURES, Lrrn..E OR NO FINES
GRAVELS GP POORLY GRADED ORA VELS OR GRAVEL-SAND (MORETHAN~
OF COARSE MIXTURES, LITTLE OR NO FfNES
FRACTION GM SIL TY GR.A VELS, GR.A VEL-SAND-SILT MIXTURES >N0.4SIEVE
SIZE) COARSE GC
GRAINED SOILS CLAYEY GRAVELS, GR.A VEL-SAND-CLA Y MIXTURES
(MORE THAN ~ OF SOIL SW > NO. 200 SIEVE SIZE) WELL GRADED SANDS OR GRAVELLY SANDS,
Ll'ITLE OR NO FINES
SANDS SP I (MORETHAN\'2 POORLY GRADED SANDS OR ORA VELL Y SANDS,
OF COARSE UTILE OR. NO FINES
FRACTION SM SILTY SANDS, SILT-SAND MIXTURES <N0.4SJEVE
SIZE)
SC CLAYEY SANDS, SAND-CLAY MIXTURES ·
J\IIL INORGANIC SILTS AND VERY FINE SANDS, ROCK
SILTS & FLOUR, SILTY OR CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
CLAYS CL INORGAl"ilC CI.A YS OF LOW TO MEDIUM
LIQUID LIMIT PLASTICITY, GR.A VELL Y CLAYS, SANDY CLAYS,
SILTY CLAYS, LEAN CLA VS < 50 FINE GRAINED OL I SOILS ORGANIC SILTS AND ORGANIC SILTY CLAYS Of
LOW PLASTICITY (MORE THAN l4 OF SOIL MH < NO. 200 SIEVE SIZE) INORGANIC SILTS, MICACEOUS OR DIA.TOMACEOUS SILTS& FINE SANDY OR SILTY SOILS ELASTIC SILTS
CLAYS CH INORGANIC CLAYS OF HIGH PLASTICITY, FAT LIQUID LIMIT
> 50 I CLAYS
OH ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY,
ORGANfC SILTY CLAYS, ORGANIC SILTS
HIGHL y ORGANIC son..s Pt PEAT AND OTHER HIGHLY ORGANIC SOILS
CLASSIFICATION CHART (UNIFIED SOIL CLASSIFICATION SYSTEM)
CLASSIFICATION RANGE OF GRAIN SIZES
U.S. STANDARD GRAIN SIZE IN
SIEVE SIZE MILLIMETERS
BOULDERS Above 12 lnches Above 305
COBBLES 12 lnches To 3 Inches 30S To 76.2
GRAVEL 3 Inches to No. 4 76.2 to 4.76
Coarse 3 Inches to :Y. Inch 76.2 to 19.l
Fine % Inch to No. 4 19.l to 4.76
SAND No. 4 to No. 200 4.76 to 0.074
Coarse No. 4 to No. JO 4.76 to 2.00
Medium No. 10 to No. 40 2.00 to 0.420
Fine No. 40 to No. 200 0.420 to 0.074
SILT AND CLAY Below No. 200 Below0.074
GRAIN SIZE CHART
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE 4'1"
SANTEE, CALIFORNIA 92071
U.S.C.S. SOIL· CLASSIFICATION
.. ..
l. 1~UU:I \, U,H T 11,,\,.J
N\.f~O.-.
PLASTICITY CHART
INITIAL
MOISTURE
CONTENT(%)
9.1
1"
112"
3/8"
#4
#8
#16
#30
#50
#100
#200
uses
BOB& MONICA FLORAi WALNU7'AVENUE PROJECT NO. 15-1106£6
PAGE L-1
LABORATORY TEST RESULTS
EXPANSION INDEX TEST (ASTM D4829)
SATURATED
MOISTURE
CONTENT(%)
17.8
INITIAL DRY
DENSITY EXPANSION
(PCF) INDEX
109.6 0
PARTICLE SIZE ANALYSIS (ASTM D422)
JO
99
98
96 JOO iOO
82 87 88
42 45 43
21 25 21
16 21 16
SM SM SM
13
LOCATION
BH-2@ 1.5'
JOO
90
40
18
12
SM
,~
f
BOB & MONICA FLORAi WALNUT AVENUE PROJECT NO. 15-1106£6
REF.ERENCES
I. "2013 California Building Code, California Code of Regulations, Title 24, Part 2, Volume 2 of 2",
Published by International Code Council.
2. "Geologic Map of the San Diego 30' x 60' Quadrangle, California", by Michael P. Kennedy and
Siang S. Tan, 2008.
3. ';EqfaultiEqsearch, Version 3.0", by Blake, T.f., 1995, Updated 2008.
4. "Geotechnical and Foundation Engineering: Design and Construction", by Robert W. Day, 1999.
5. "1997 Unifonn Building Code_, VoJume 2, Structural Engineering Design Provisions", Published by
lntemational Conference of Building Officials.
6. "Maps of Known Active Fault Near-Source Zones in California and Adjacent Portions of Nevada to
be used with 1997 Uniform Building Code", Published by International Conference of Building
Officials.
7. "Geologic Maps of the Northwestern Part of San Diego County, California", Department of
Conservation, Division of Mines and Geology, by Siang S. Tan and Michael P. Kennedy, 1996.
8. "Bearing Capacity of Soils, Technical Engineering and Design Guides as Adapted from the US
Army Corps of Engineers, No. 7", Published by ASCE Press, 1994.
9. ''Foundations and Earth Structures, Design Manual 7.2", by Department of Navy Naval Facilities
Engineering Command, May 1982, Revaiidated by Change I September 1986.
10. "Ground Motions and Soil Liquefaction during Earthquakes", by H.B. Seed and J.M. Idriss, 1982.
14
EAST COUNTY SOIL CONSULTATION
AND ENGINEERINGr INC.
Bob & Monica Flora.
2208 Eastbrook Road
Fallbrook, California 92081
10925 HARTLEY ROAD, SUITE "':P'
S-4N'IEE, CALIFORNIA 92071
(619) 258-7901
Fax (619) 258-7902
Subject: Addendum to Limited Geotechnical Investigation
Proposed Residential Renovation
15 5 Walnut Avenue
City of Carlsbad, California 92008
October 14, 2016
Project No. 15-1106E6
Reference: · "'Limited Geotecbnical Investigation Proposed Residential Renovation, 155 Walnut
Avenue, City of Carlsbad, California 92008, Project No. 15-1106E6, Prepared by
East County Soil Consultation.and Engineering, Inc .• Dated January 7) 2016.
Dear 'Nir. & :Mrs. Flora:-
1n accordance 'With your request, we have reviewed the grading plans. prepared by Bob Sukop of
Carlsbad, California to address the proposed su..-rface drainage adjacent to the east and south
properi"f lines.at the subject site.
A minimum gradient of l percent in hardscape areas around the proposed foundation for at least 3
feet and a minimum of 1 percent i11 the drainage swales may be used provided the swales are lined
with gu.,tiite or ooncrete.
If we can be of any further assistance, please do not hesitate to contact our office.
Respectfully submitted,