Loading...
HomeMy WebLinkAboutCDP 16-29; LINCOLN RESIDENCE; TEMPORARY BASEMENT EXCAVATION PROPOSED; 2019-08-01HETHERINGTON ENGINEERING, INC. SOIL & FOUNDATION ENGINEERING • ENGINEERING GEOLOGY• HYDROGEOLOGY August 1, 2019 Project No. 8081.2 Log No. 20606 Robert Hall Constmction 34145 Pacific Coast Highway, #332 Dana Point, California 92629 Attention: Mr. Robert A. Hall Subject: TEMPORARY BASEMENT EXCAVATION (Southeast Side) Proposed Single-Family Residence 5198 Shore Drive Carlsbad, California References: 1. "Geo technical Investigation, Proposed Single-Family Residence, 5198 Shore Drive, Carlsbad, California", by Hetherington Engineering, Inc., dated November 14, 2016. Dear Mr. Hall: 2. "Temporary Basement Excavations, Proposed Single-Family Residence, 5198 Shore Drive, Carlsbad, California", by Hetherington Engineering, Inc., dated July 23, 2019 3. "Grading Plan For: Lincoln Residence (5198 Shore Drive)", prepared by Duca-McCoy, Inc., undated (Sheets 1 through 6). In response to the request ofBabaq Taj, Engineering Manager, Construction Management and Inspection, City of Carlsbad, we are providing this letter addressing the temporary basement excavation along the southeast side of the site. The basement excavation for the proposed single-family residence consists entirely of cut to finish grade. Cw.Tent conditions on the southeast side of the basement excavation consist of a temporary 5-feet high vertical cut with an approximately 3-feet high, 0.7: 1 (horizontal to vertical) to 1: 1 (horizontal to vertical) temporary slope above. The temporary basement excavation along the southeast side of the site is considered stable for the period of time necessary to constrnct and backfill the proposed basement retaining wall from a geotechnical standpoint. Construction of the basement retaining wall and backfill should proceed as rapidly as possible. The Geotechnical Consultant should observe the temporary basement excavation on a daily basis. 5365 Avenida Encinas, Suite A • Carlsbad, CA 92008-4369 • (760) 931 -1917 • Fax (760) 931 -0545 333 Third Street, Suite 2 • Laguna Beach, CA 92651-2306 • (949) 715-5440 • Fax (760) 931-0545 www.hetheringtonengineering.com TEMPORARY BASEMENT EXCAVATION (Southeast Side) Project No. 8081.2 Log No. 20606 August 1, 2019 Page2 This oppo11unity to be of service is appreciated. If you have any questions, please contact our office. Sincerely, HETHERINGTON ENGINEERING, INC. au A. Bogseth ·ofessional Geologist 3772 ~ C~g=-h-am--n11. Civil Engineer ( expires 3/31/20) Distribution: 2-Addressee 1-via e-mail Robe11 Hall (RHC493@cox.net) 1-via e-mail Bruce Lincoln (mvznl@aol.com) }-via e-mail Jason Gelde11 Gason.geldert@carlsbadca.gov) 1-via e-mail Dave Rick (David.rick@carlsbadca.gov) 1-via e-mail Babaq Taj (babaq.taj@carlsbadca.gov) 1-via e-mail Ali Luedtke (Alison.luedtke@carlsbadca.gov) HETHERINGTON ENGINEERING, INC.