Loading...
HomeMy WebLinkAboutCE 83-21; CALAVERA HILLS SUBDIVISION; SEWER LIFT STATION STUDY; 1984-04-20(' 0' CALAVERA HILLS -VILLAGE 0 & P-l, UNIT 12 Sewer Lift Station Study Prepared For: Pacific Scene Inc. 3900 Harney Street San Diego, California 92110 Prepared By: . Rick Engineering Company 5620 Friars Road San Diego, California 92110 Job No. 9114 February 17, 1984 Revised April 20, 1984 APPROVED ',' • -The purpose of this study is to determine the average d~ily discharge and the peak discharge which should be used for the design of the sewer lift station. This study will a1&0 be used to proportion the costs associated with the sewer lift station between the property owners whose property is served by the lift station. The area that will be served by the lift station is presently owned by two property owners. They are: Pacific Scene Inc. 3900 Harney Street San Diego, CA 92110 CESCO Development Corp. 110 West "C" St. Suite 1220 San Diego, CA 92101 , , ,,~, . '. ,- • SUMMARY Below are the total design flows as well as the flows contributed by each property owner. Pacific Scene Inc. -Contributive Discharge Average Daily Discharge ------~---------------0.l4 MGD Peak Discharge -------------------------------0.34 MGD CESCO Development Corp. -Contributive Discharge Average Daily Discharge ----------------------0.08 MGD Peak Discharge -------------------------------0.21.AGD TOTAL DISCHARGE Average Daily Discharge ---------------------~ 0.22 MGD Peak Discharge -------------------------------0.55 MGD 2 ;,., CALCULATIONS Pacific Scene Inc. Village o & P-l N L-1 TOTAL D.U. Dwelling Unit 406 25 120 551 • Average Daily Flow = 551 x 247 = 0.14 MGD Peak Flow = 2.5 x 0.14 = 0.34 MGD Cesco Development Corp. Village M Q L-2 TOTAL D.U. Dwelling Unit 40 204 90 334 Average Daily Flow 334 x 247 = 0.08 MGD Peak Flow = 0.08 x 2.5 = 0.21,MGD TOTAL FLOW Average Daily Flow = 0.14 + 0.08 = 0.22 MGD Peak Flow = 0.34 + 0.21 = 0.55'MGD 3 NOTES 1. Demand and peak ing factors used are per City o·f Carlsbad Standards. 2. Dwelling Unit count for Village 0 and P-l are per approved Tentative Map of Carlsbad Tract 83-21. 3. Dwelling Unit count for Village Nand M are maximum al~owed per the Calavera Hills Master Plan. 4. Dwelling Unit count for L-l are calculated using 15 PU/Ac. This is used in lieu of 20 DU/Ac. per the CalaveraHills Master Plan because of rough terrain. 5. Dwelling Unit count for Villages Q and L-2 are per infor- mation received from C.W. Christensen and Associates. (Se.e attached letter). 4 p. CHARLES W. CHRISTENSEN & ASSOCIATES CIVIL ENGINEERS 444 WEST C STREET SUITE 400 SAN DIEGO CALIfORNIA 92101 (6I9123l· 7191 April 13, 1984 Mr. Cal Frey CESCO DEVELOPMENT COMPANY 110 west "C" Street, Suite 1220 San Diego, California 92101 Subject: Sewage Flow to Proposed pump Station in Village 0 and P-l Dear Cal, The 204 units of Village Q added to the 90 units possible in Village L-2 will sewer to the pro- posed pump station in Villages 0 and P-l. The 204 living units of Village Q will be single family detached on small lots. The 90 possible units in village L-2 are multi-family with pro~ bably 4 to 8 living units per building. If I can be of further assistance please do not hesitate to contact me. very truly yours, ; , --I , ./ I. . ' ... ;: i...{' Mario Alcantar Assistant Vice President for CHARLES W. CHRISTENSEN & ASSOCIATES MA/jk A-7ll2 11'-'" ,.. 1::.?0'1