Loading...
HomeMy WebLinkAboutCE-5662; Nine Lots Seaview Way-MSk Development Group; Nine lots Seaview Way; 1998-10-19NORTH COUNTY COMPACTION ENGINEERING, INC. PRELIMINARY SOILS INVESTIGATION FOR THE PROPOSED NINE LOT RESIDENTIAL SUBDIVISION 3612SEAVIEWWAY CARLSBAD, CALIFORNIA PREPARED FOR: MSK Development Group 5142 Avenida Encinas Carlsbad, CA 92008 October 19, 1998 Project No. CE-5662 P.O. BOX 302002 * ESCONDIDO, CA 92030 (760)480-1116 t'*^urtfr>i$ffrfWt3yyiig^ •:*••••• NORTH COC1MTY COMPACTION ENGINEERING, INC.October 19, 1998 Project No. CE-5662 MSK Development Group 5142 Avenida Encinas Carlsbad, CA 92008 SUBJECT: Proposed Nine Lot Residential Subdivision 3612 Seaview Way Carlsbad, California In response to your request, we have performed a Preliminary Soils Investigation for the subject project. The purpose of our investigation was to evaluate the suitability of the site for the proposed development and make recommendations with regard to site grading and foundation design. Briefly, our investigation revealed the presence of compressible topsoils (old fill/plowed ground) overlying the site from 2 feet to 4 feet in depth. In addition, soils possessing moderate expansion potential were encountered on the western region of the property. However, it is our opinion, the site is suitable for the proposed development, provided recommendations set forth in the attached report are adhered to. If you have any questions, please do not hesitate to contact us. This opportunity to be of service is sincerely appreciated. Respectfully submitted, North County COMPACTION ENGINEERING, INC. Ronald K. Adams A.R. B President Registered Civil Engineer Geotechnical Engineer 0001 RKA:kla cc: (3) submitted (2) filed P.O. BOX 302002 * ESCONDIDO, CA 92030 (760)480-1116 NORTH COUNTY COMPACTION ENGINEERING, INC, TABLE OF CONTENTS 1. Purpose and Scope 2. Location and Description of Site 3. Field Investigation 4. Soil Conditions 5. Laboratory Soil Testing 6. Recommendations and Conclusions A. Grading B. Foundations C. Slopes D. Retaining Walls E. Estimated Paving Section F. Review of Grading Plan 7. Uncertainty and Limitations Page 1 1 1 2 2 3 3 5 6 6 6 7 APPENDIX Appendix A: Exploration Legend & Unified Soil Classification Chart Plate No. One Plate No. Two through Six Plate No. Seven Test Pit Location Plan Exploration Logs Tabulation of Test Results Appendix B: Recommended Grading Specifications S^«««^?*W^^^^^^^W .^-..x;,^.,. ^',n * ,,,7-Vv'.-^ NORTH COUNTY COMPACTION ENGINEERING, INC. 1. PURPOSE AND SCOPE Project No. CE-5662 Page 1 The purpose of the investigation was to determine if the site is suitable for the proposed nine lot residential subdivision. The scope of the investigation was to: A. Determine the physical properties and engineering characteristics of the surface and subsurface soils. *• B. Provide design information with regard to grading, site preparation, and foundation design of the proposed structure(s). 2. LOCATION AND DESCRIPTION OF SITE The site is located at 3612 Seaview Way in the City of Carlsbad, California. The 3.7 acre trapezoidal shaped property is bordered by single family dwellings to the north, west, and south, and Maria Lane to the east. Seaview Drive dead-ends into the approximate center of the south property line. The east portion of the property is occupied by abandoned greenhouse structures and a single family dwelling. The greenhouses and dwelling are supported upon shallow cut/fill building pads that terrace downhill to the west. The depth of fill in the pad varies between 2 to 4 feet. A paved driveway traversing from the end of Seaview Drive to the dwelling parallels the south property line. An existing 2:1 cut slope constructed to an approximate height of 10 feet descends from the east property line to existing grade. The westerly two-thirds of the property is predominately flat and slopes gently downhill to the west and northwest. The total difference in elevation between the southeast property corner and the northwest property corner is approximately 78 feet and varies between 260 feet (MSL) and 338 feet (MSL). Site vegetation on the westerly two-thirds of the property and around the greenhouses consists of recently mowed native grasses. The dwelling is generally landscaped with lawns, trees, shrubs, walkways, planters, etc. 3. FIELD INVESTIGATION The field investigation was performed on October 1, 1998 and included an inspection of the site and the excavation of five exploratory trenches, with a backhoe to depths of 10 feet. Location of test pits are shown on the attached Plate No. One, entitled "Test Pit Location Plan". NORTH COUNTY COMPACTION ENGINEERING, INC. B nPage 2 As excavation proceeded, representative bulk samples were collected. In place natural densities and moisture contents were determined at different depths in the excavations and are included on Plate No.'s Two through Six. Subsequent to obtaining soil samples, our exploratory excavations were backfilled. 4. SOIL CONDITIONS Loose surficial soils (silty-sands) consisting of old fill and/or plowed ground were found to be 2 feet, 2 feet, 3.5 feet, 2.5 feet, and 4 feet in depth in Test Pit No.'s One through Five, respectively. Underlying native soils to depths explored were comprised of medium dense to dense clayey- sands, sandy-clay, and silty-sands of the Coastal Terrace Deposit. On-site soils encountered in Test Pit No. Five have an expansion index of 79 and are classified as being 'moderate' in expansion potential. This area will receive fill if grading is performed as planned. Therefore, if selective grading is performed to assure these soils remain a minimum of 48 inches below finish grade, we do not anticipate special design considerations with regard to foundations. AH other soils encountered in Test Pit No.'s One through Four were found to have an expansion index varying between 15 and 25 and are classified as being Very low' to 'low' in expansion potential. Groundwater was not encountered at the time of our investigation, nor did caving of exploratory trenches occur. In addition, due to the dense nature of the underlying sandstone formation at the site, it is our opinion, soil liquefaction is unlikely to occur in the event grading is performed in accordance with the recommendations set forth in this report. 5. LABORATORY SOIL TESTING All laboratory test were performed on typical soils in accordance with accepted test methods of the American Society for Testing and Materials (ASTM). Tests conducted include: A). Optimum Moisture & Maximum Density (ASTM D-1557) B). Direct Shear (Remold) (ASTM D-3080) C). Sieve Analysis (ASTM D-421) D). Field Density & Moisture (ASTM D-1556) E). Expansion Potential (FHA Standard) Test results are tabulated on the attached Plate No.'s Two through Seven, entitled "Exploration Log" and "Tabulation of Test Results". NORTH COUNTY COMPACTIOM ENGINEERING, IMC. D ,Page 3 6. RECOMMENDATIONS AND CONCLUSIONS General It is our understanding, the proposed dwellings will consist of wood frame construction utilizing slab on grade foundations. Furthermore, Seaview Way will be extended into the subdivision. In our opinion, the site is suitable for the proposed development. Recommendations presented in this report should be incorporated into the planning, design, and construction phases of the subject project. 6A. Grading General It is our understanding cut/fill earthwork construction will be performed to construct level building pads to accommodate slab on grade construction. In addition, approximately 14,000 cubic yards of imported soils will be required to complete grading as planned. Furthermore, we recommend grading be performed selectively to assure on-site expansive soils encountered in Test Pit No. Five are placed a minimum of 48 inches below finish grade upon completion of grading. In our opinion, due to the amount of imported soil required to complete grading, in conjunction with the present vertical location of expansive soils, selective grading should be nearly automatic. All grading should be performed in accordance with the City of Carlsbad Grading Ordinance and the Recommendations/Specifications presented in this report. Subsequent to site demolition, loose surficial soils (plowed ground/old fill), as indicated on the • attached Plate No's Two through Six, should be undercut or removed to firm native ground and recompacted in accordance with the attached Appendix *B* entitled "Recommended Grading Specifications". Firm native ground may be determined as undisturbed soil having an insitu density of greater than ninety percent (90%) of maximum, dry density. We should be contacted to document firm native ground is exposed and properly prepared prior to filling. Prior to constructing fill slopes, shear keys should be excavated a minimum of 2 feet into firm native ground, inclined back into slope, and have a minimum width of 15 feet. We should be contacted to document keyways were properly constructed prior to placing fill. Natural terrain steeper than an inclination of 5:1 (horizontal to vertical units), should be benched (stair-stepped) to provide a stable bedding for subsequent fill. Sizing of benches should be determined by the Soils Engineer or his representative during grading. NORTH COC1MTY COMPACTION ENGINEERING, INC.Page 4 All fill soils generated from earthwork construction should be placed in conformance with the attached Appendix 'B' entitled, "Recommended Grading Specifications". Soils to be imported should be non-expansive (less than 2% swell) and granular by nature, having strength parameters equal to or greater than the prevailing on-site soils. We should be contacted to inspect an/or test imported soils prior to hauling then on-site to assure they will be suitable for the proposed construction.»• Particles of asphalt and concrete debris, having a diameter of greater than 6 inches, will not be suitable fill material and should be separated from fines during grading and hauled off-site. If encountered, leach lines and/or pipes should be removed. Concrete pipes may be crushed in place. Trench lines should be recompacted in accordance with Appendix 'B*. Proposed slopes to be retained have been tested for temporary stability in accordance with guidelines presented by CAL-OSHA. Direct shear tests have been conducted and their results are presented on attached Plate No. Seven. The results indicate a temporary slope constructed to a height of 10 feet having a minimum slope ratio of 1:1 should be stable with relation to deep seated failure for a period of 60 days. Should construction of walls lapse beyond the indicted time, we should be contacted to update the site conditions. Furthermore, we should be contacted to supervise backfill operations. Backfill materials should consist of non-expansive soils (having a swell of less than 2%) placed at a width behind the wall equivalent to two-thirds of the retained height. Crushed rock (1 inch minus), approved by this firm, may be an alternate method. All walls should be provided with drains. Drains should consist of 4 inch perforated pipe surrounded with crushed rock placed at a minimum of 1 cubic foot per lineal foot, and have a minimum fall of one percent (1%). A Structural Engineer should be contacted for the design of a retaining device. It is highly probable the proposed structures will be traversed by a transition from cut to fill. Therefore, to reduce structural damage occurring from foundations bearing on two different soil types, the following measure should be employed: It is recommended the cut side of the transitional areas be removed to a depth of 1 foot below the bottom of the deepest proposed footing and brought back to grade with properly compacted fill. This will allow the proposed structures to bear entirely on a compacted fill mat, thus reducing the probability of differential settlement. The removal areas should extend under and a minimum of 5 feet beyond the proposed dwellings. sw^? NORTH COCINTY COMPACTION ENGINEERING, INC. D ePage 5 6B. Foundations General The following foundation recommendations are based on the assumption that soils possessing 'very low' to 'low' expansion potential will exist within 48 inches of finish grade upon completion of grading. Therefore, conventional foundations may be utilized, provided the aforementioned Grading Recommendations are adhered to. For One-Story Construction: Continuous footing having a minimum width of 12 inches and founded a minimum depth of 12 inches below lowest adjacent grade will have an allowable soil bearing pressure of 1500 pounds per square foot. For Two-Story Construction: Continuous footings should have a minimum width of 15 inches and be founded a minimum depth of 18 inches below lowest adjacent grade. Isolated square footings having a diameter of 18 inches and founded a minimum depth of 18 inches below lowest adjacent grade will have an allowable soil bearing pressure of 1500 pounds per square foot. All continuous footings are to be reinforced with one #4 bar top and bottom. Steel should be positioned 3 inches above bottom of footing and 3 inches below top of footing. Slabs should be a minimum of 4 inches thick and reinforced with 6 X 6, w 1.4 X w 1.4 welded wire mesh or #3 bars on 18 inch centers, both ways. Reinforcement should be placed near the center of the slab and extended through joints to provide a tension tie with perimeter footings. Welded wire mesh is a UBC approved method when properly placed. However, it is the past experience of this firm , wire mesh usually ends up in or below the.bottom of the slab. Therefore, it is our opinion. #3 bars placed on 18 inch centers is a more effective method with regard to concrete slab reinforcement. Slab underlayment should consist of 4 inches of washed concrete sand with a visqueen moisture barrier installed at mid-point of sand (2 inches sand, visqueen, 2 inches sand). Sand should be tested in accordance with ASTM D-2419 to insure a minimum sand equivalent of 3.0. Foundation set-backs from top of slopes should be a minimum of 8 feet. If this cannot be achieved, footings.near or on adjacent slopes should be founded at a depth such that the horizontal distance from the bottom outside edge of footing to the face of the slope is a minimum of 8 feet. NORTH COCINTY COMPACTION ENGINEERING, INC. 6C. Slopes Page 6 Cut and compacted fill slopes constructed to maximum heights of 25 feet with maximum slope ratios of 2:1 (horizontal to vertical units) will be stable with relation to deep seated failure, provided they are properly maintained. During grading, positive drainage away from top of slopes should be provided. Subsequent to completion of grading, slopes should be planted as soon as possible with light groundcover indigenous to the area, A slope stability analysis was performed utilizing 'Taylor's Charts' for cut and compacted fill slopes and a safety factor of 1.5. 6D. Retaining Walls For static conditions, the prevailing soils will have an allowable equivalent passive fluid pressure of 288 psf, increasing 288 psf per foot in depth. Allowable pressures assume walls are backfilled with a non-expansive sand a distance behind the wall equivalent to two-thirds the retained height. Allowable active pressures may be assumed to be equivalent to the pressure of a fluid weighing 47 pcf for unrestrained walls. These values assume a vertical, smooth wall, and a level, drained backfill. Should these conditions not be met, we should be contacted for new values. Allowable active pressures for restrained walls may be assumed to be equivalent to the pressure of a fluid weighing 47 pcf, plus an additional uniform lateral pressure of 8H. H=height of retained soils above top of wall footing in vertical feet. Allowable active pressures for retaining walls with 2:1 inclinations of sloping surcharge may be assumed to be equivalent to a pressure of fluid weighing 67 pcf. The coefficient of friction of concrete to soil may be assumed to be .31 for resistance to horizontal movement. 6E. Estimated Paving Section Structural section for asphaltic paving for the proposed extension of Seaview Way and driveways are based on an estimated R-Value of 30. The following section is provided for bid purposes only. Actual sections should be determined subsequent to completion of grading operations. Assumed Traffic Index = 4.5 (Residential Cul De Sac) (Extension of Seaview Way) 3 inches of asphaltic paving on 4 inches of select base coarse on 6 inches of recompacted native subgrade. NORTH COCJNTY COMPACTION ENGINEERING, INC. D nPage 7 All materials and construction for asphaltic paving and base should conform to the Standard Specifications of the State of California Business and Transportation Agency, Department of Transportation, Sections 39 and 26, respectively. Class II base material should have a minimum R-Value of 78 and a sand equivalent of 30. All materials should be compacted to a minimum of ninety-five percent (95%). Rigid Concrete Paving: (private driveways)»• 5 inches of concrete reinforced with #3 bars on 18 inch center, both ways, on 4 inches of Class II base material on 6 inches of recompacted native subgrade soil. NOTE: All concrete should have a minimum compressive strength of 3250 psi. All subgrade and base materials should be compacted to a minimum of ninety-five percent (95%). 6F. Review of Grading Plan Approved site and grading plans were not available at the time of our investigation. Therefore, upon their completion, we should review them to assure compliance with the recommendations presented in this report. Preliminary Plans used during our investigation were prepared by Buccola Engineering, Inc. and were not dated. 7. UNCERTAINTY AND LIMITATIONS Surface and subsurface soils are assumed to be uniform. Therefore, should soils encountered during construction differ from those presented in this report, we should be contacted to provide their engineering properties. It is the responsibility of the owner and contractor to carry out recommendations set forth in this report. During our investigation of the subject site, evidence of faulting was not encountered. Subsequent to review of available geologic literature, we feel any faulting in the vicinity of the site may be classified as inactive. However, it should be noted that San Diego County is located in a high seismic area with regard to earthquake. Earthquake proof projects are economically unfeasible. Therefore, damage as a result of earthquake is probable and we assume no liability. NORTH COCJNTY COMPACTION ENGINEERING, INC. PageS We assume the on-site safety of our personnel only. We cannot assume liability of personnel other than our own. It is the responsibility of the owner and contractor to insure construction operations are conducted in a safe manner and in conformance with regulations governed by CAL-OSHA and/or local agencies. Should you have any questions, please do not hesitate to contact us. This opportunity to be of service is sincerely appreciated. Respectfully submitted, North County COMPACTION ENGINEERING, INC. Ronald K. Adams President A.R. Barry Registered Civil Engineer Geotechnical Engineer 0001 RKA:kla cc: (3) submitted (2) filed NORTH COUNTY COMPACTION ENGINEERING, INC. EXPLORATION LEGEND UNIFIED SOIL CLASSIFICATION CHART SOIL DESCRIPTION I. COARSE GRAINED: More than half of material is larger than No. 200 sieve size. GRAVELS CLEAN GRAVELS More than half of coarse fraction is larger than No. 4 sieve size, but smaller than 3". GRAVELS WITH FINES (Appreciable amount of fines) SANDS CLEAN SANDS More than half of coarse fraction is smaller than No. 4 sieve size. - SANDS WITH FINES (appreciable amount of fines) II. FINE GRAINED: More than half of material is smaller than No.200 sieve size. SILTS AND CLAYS Liquid Limit less than 50 SILTS AND CLAYS Liquid Limit greater than 50 HIGHLY ORGANIC SOILS GROUP SYMBOL GW GP GM GC SW SP SM SC TYPICAL NAMES ML CL OL MH CH OH PT Well graded gravels, gravel-sand mixtures, little or no fines Poorly graded gravels, gravel sand mixtures, little or no fines. Silty gravels, poorly graded gravel- sand-silt mixtures. Clayey gravels, poorly graded gravel-sand, clay mixtures Well graded sand, gravely sands, little or no fines. Poorly graded sands, gravely sands, little or no fines. Silty sands, poorly graded sand and silt mixtures. Clayey sands, poorly graded sand and clay mixtures. Inorganic silts and very fine sands, rock flour, sandy silt or clayey- silt-sand mixtures with slight plasticity. Inorganic clays of low to medium plasticity, gravely clays, lean clays, Organic silts and organic silty clays of low plasticity. Inorganic silts, micaceous or diatomaceous find sandy or silty soils, elastic silts. Inorganic clays of high plasticity, fat clays. Organic days of medium to high plasticity. Peat and other highly organic soils. US - Undisturbed, driven ring sample or tube sample CK - Undisturbed chunk sample BG - Bulk sample V - Water level at time of excavation or as indicated APPENDIX 'A' NORTH C'' MNTY COMPACTION ENGINEERING, INC. SOiL TESTING & INSPECTION SERVICES TEST PIT LOCATION PLAN PROPOSED NINE LOT SUBDIVISION SEAVIEW WAY CARLSBAD, CALIFORNIA Approx. Scale 1" - 75' PROJECT NO. CE-5662 PLATE NO.ONE NORTH COUNTY COMPACTION ENGINEERING, INC. EXPLORATION LOG PROJECT NAME: SEA VIEW WY. CARLSBAD DATE LOGGED: 10/01/98 ELEVATION:290 MSL TEST PIT NO. ONE Depth (Feet) 1- 2- 3- 4- 5- 6- 7- 8- 9- Sample Type CK BG Dry Density (pcf) 118.4 Moisture Content (%) 10.0 Passing #200 Sieve 21.4 Sample Depth 4' Soil Class SM SM sc Description & Remarks BROWN, DRY LOOSE SILTY-SAND. (PLOWED GROUND) (REMOVE & RECOMPACT) fVERY LOW EXPANSION BROWN RED, HUMID, MEDIUM DENSE SILTY-SAND. (FIRM NATIVE) (VERY LOW EXPANSION) ORANGE BROWN, MOIST, MEDIUM DENSE SLIGHTLY CLAYEY-SAND. (LOW EXPANSION) (BECOMES MORE SANDY W/DEPTH) BOTTOM OF TEST PIT. PROJECT NO.CE-5662 PLATE NO..TWO NORTH COUNTY COMPACTION ENGINEERING, INC. EXPLORATION LOG PROJECT NAME: SKA VIEW WY. CARLSBAD DATE LOGGED: 10/01/98 ELEVATION:312MSL TEST PIT NO. TWO Depth (Feet) 1- 2- 3- 4- 5- 6- 7- 8- 9- 10- Sampie Type BG CK Dry Density (pcf) 117.0 Moisture Content (%) 10.1 Passing #200 Sieve 29.9 Sample Depth 51 Soil Class SM SM Description & Remarks BROWN, DRY LOOSE S1LTY-SAND. (PLOWED GROUND) (REMOVE & RECOMPACT) (VERY LOW EXPANSION ORANGE BROWN, MOIST, DENSE SILTY-SAND. (FIRM NATIVE) (CLAY TINT) (VERY LOW EXPANSION) BOTTOM OF TEST PIT. PROJECT NO.CE-5662 PLATE NO.THREE NORTH COCINTY COMPACTION ENGINEERING, INC. EXPLORATION LOG PROJECT NAME: SEAVIEW WY. CARLSBAD DATE LOGGED: 10/01/98 ELEVATION:308 MSL TEST PIT NO. THREE Depth (Feet) 1- 2- 3- 4- 5- 6- 7- S ample Type Dry Density (pcO Moisture Content (%) Passing #200 Sieve Sample Depth Soil Class SM SM Description & Remarks BROWN, DRY LOOSE SILTY-SAND. (PLOWED GROUND) (REMOVE & RECOMPACT) (VERY LOW EXPANSION) ORANGE BROWN, HUMID, DENSE SILTY-SAND. (FIRM NATIVE) (VERY LOW EXPANSION) BOTTOM OF TEST PIT. PROJECT NO.CE-5662 PLATE NO.FOUR NORTH COUNTY COMPACTION ENGINEERING, INC. EXPLORATION LOG PROJECT NAME: SEAVIEW WY. CARLSBAD DATE LOGGED: 10/01/98 ELEVATION:286 MSL TEST PIT NO. FOUR Depth (Feet) 1- 2- 3- 4- 5- 6- 7- 8- Sample Type CK Dry Density (pcO 120.6 Moisture Content (%) 10.9 Passing #200 Sieve Sample Depth 5' Soil Class SM SC Description & Remarks BROWN, HUMID, LOOSE SILTY-SAND (PLOWED GROUND) (REMOVE & RECOMPACT) (VERY LOW EXPANSION) ORANGE BROWN, MEDIUM DENSE HUMID TO MOIST, SLIGHTLY CLAYEY-SAND. (FIRM NATIVE) (VERY LOW EXPANSION) BOTTOM OF TEST PIT. PROJECT NO.CE-5662 PLATE NO.FIVE V^^tf^l^s^^^-\'^^^ • MORTH COUNTY COMPACTION ENGINEERING, INC. EXPLORATION LOG PROJECT NAME: SEAVIEW WY. CARLSBAD DATE LOGGED: 10/01/98 ELEVATION:274 MSL TEST PIT NO. FIVE Depth (Feet) 1- 2- 3- 4- 5- 6- 7- 8- S ample Type BG Dry Density (pcf) Moisture Content (%) Passing #200 Sieve 53.1 Sample Depth 6' Soil Class SM SM CL Description & Remarks BROWN, DRY, LOOSE SILTY-SAND. (OLD FILL/ PLOWED GROUND) (VERY LOW EXPANSION) BROWN RED, HUMID, SILTY-SAND. (FIRM NATIVE) ORANGE BROWN, MOIST, MEDIUM DENSE SANDY-CLAY. (MODERATE EXPANSION) (NOT TO BE PLACED WITHIN 48 INCHES OF FINISH GRADE) BOTTOM OF TEST PIT. PROJECT NO.CE-5662 PLATE NO.SIX NORTH COUNTY COMPACTION ENGINEERING, INC. TABULATION OF TEST RESULTS OPTIMUM MOISTURE/MAXIMUM DENSITY SOIL DESCRIPTION TYPE Orange Brown Clayey-Sand PI @4' Orange Brown Silty-Sand (Clay Tint) P2@5' Orange Brown Silty-Sandy- Clay P5@6' MAX. DRY DENSITY (LB. CU. 131.0 129.7 111.5 OPT. MOISTURE (% DRY WT1 11.2 10.3 16.2 EXPANSION POTENTIAL SAMPLE NO. CONDITION INITIAL MOISTURE (%) AIR DRY MOISTURE (%) FINAL MOISTURE (%) DRY DENSITY (PCF) LOAD (PSF) SWELL (%) EXPANSION INDEX Pl@4' Remold 90% 10.6 05.1 17.3 117.9 150 ' 2.5 25 P2@5T Remold 90% 10.8 07.1 16.1 116.7 150 1.5 15 P5@6' Remold 90% 16.1 10.9 30.2 100.4 150 7.9 79 DIRECT SHEAR SAMPLE NO. PI @4' P2 @ 5' CONDITION Remold 90% Remold 90% ANGLE INTERNAL FRICTION 28 25 COHESION INTERCEPT (PCF) 130 210 PROJECT NO. CE-5662 PLATE NO. SEVEN NORTH COUNTY COMPACTION ENGINEERING, INC RECOMMENDED GRADING SPECIFICATIONS (General Provisions) 1. INTENT The intent of these specifications is to provide procedures in accordance with current standard practices regarding clearing, compacting natural ground, preparing areas to receive fill, and placing and compacting of fill soil to the lines , grades, and slopes delineated on the project plans. Recommendations set forth in the attached "Preliminary Soils Investigation" report or special provisions are a part of the "Recommended Grading Specifications" and shall supercede the provisions contained hereinafter in case of conflict. 2. INSPECTION & TESTING A qualified Soils Engineer shall be employed to inspect and test the earthwork in accordance with these specification and the accepted plans. It will be necessary that the Soils Engineer or his representative be allowed to provide adequate inspection so that he may certify that the work was or was not accomplished as specified or indicated. It shall be the responsibility of the contractor to assist the Soils Engineer and to keep him appraised of work schedules, changes, new information and dates, and new unforeseen soils conditions so that he may make these certifications. If substandard conditions (questionable soils, adverse weather, poor moisture control, inadequate compaction, etc.) Are encountered, the Soils Engineer will be empowered to either stop construction until conditions are remedied or recommend rejection of the work. Soil tests used to determine the degree of compaction will be performed in accordance with the following American Society for Testing and Materials (ASTM) test methods: *Maximum Density & Optimum Moisture Content (ASTM D-1557-78) * Density of Soil In-Place (ASTM D-1556 or ASTM D-2922 & 3017) 3. MATERIALS Those soils used as fill will have a minimum of forty percent (40%) passing a #4 sieve. They will be free of vegetable matter or other deleterious substances and contain no rock over 6 inches in size. Should unsuitable material be encountered, the Soils Engineer will be contacted to provide recommendations. APPENDIX 'B' > i.i&&i$ia4f#4<'JfWB?*t<tf ^i!***-? *t •• NORTH COtiriTY COMPACTION ENGINEERING, INC. 4. PLACING AND SPREADING OF FILL The selected fill material shall be placed in layers which when compacted will not exceed 6 inches in thickness. Each layer shall be spread evenly and shall be thoroughly blade mixed during the spreading to insure uniformity of material in each layer. When moisture content of the fill material is below that recommended by the Soils Engineer, water shall then be added until the moisture content is as specified to assure thorough bonding during the compacting process. When the moisture content of the fill materials is above that recommended by the Soils Engineer, the fill material shall be aerated by blading or other satisfactory methods until the moisture content is as specified. 5. COMPACTION After each layer has been placed, mixed, and spread evenly, it shall be thoroughly compacted to not less than ninety percent (90%) relative compaction. Compaction shall be by sheepsfoot rollers multiple-wheel pneumatic tired rollers or other types of rollers. Rolling shall be accomplished while the fill material is at the specified moisture content. Rolling each layer shall be continuous over it's entire area and the roller shall make sufficient trips to insure that the desired density has been obtained. The fill operation shall be continued in 6 inch compacted layers, or as specified above, until the fill has been brought to the finished slopes and grades shown on the project plans. 6. WALL BACKFILL Backfill soils should consist of non-expansive sand, Compaction should be achieved with light hand-held pneumatic tampers to avoid over compaction and hence cause structural damage. Wall backfill should be compacted to a minimum of ninety percent (90%) of maximum density. 7. TRENCH BACKFILL All trench backfill located within structural areas should be compacted to a minimum of ninety percent (90%) of maximum density. APPENDIX *