Loading...
HomeMy WebLinkAboutCT 00-02; CALAVERA HILLS PHASE 2; DESILTING BASIN CERTIFICATION; 2003-03-03C-roo-o2- C 0 N S U L T A N -r S -- Civil Engineering Surveying April 3, 2003 J.N.: 98-1020-1 Via:'Fax Mr. Joe McMahon City of Carlsbad 5950 El Camino Real Carlsbad, CA 92008 RE: Ca1avera Hills II Desilting Basin Dear Mr. McMahon: Based on a field survey performed by O'Day Consultants on March 31, 2003, I have determined that the existing desilting basin located at the north end of Village W of Calavera Hills is built in accordance with the State Water Resources Control Board's requirements for sediment control as specified in the fact sheet for the Water Quality Order 99-08 DWQ. Very truly yours, ESSIo O'DAY CONSULTANTS, INC. ca C60 23 ca M cc EXP _ Keith Hansen Registered Civil Engineer KIH:eg C')ay :c is tuns Ii;. E-mail: oday@o6ayconsultniis.corii 2710 Loker Avenue West, Suite 100 Website: wvvw,odaycoiisultanls.ccii: Carlsbad. Calitomia. 920066603 • Tel: 760931.7700 Fax: 760931.8680