Loading...
HomeMy WebLinkAboutCT 00-06; BRESSI RANCH; ADDENDUM TO THE AS-GRADED REPORT OF MASS GRADING CONCERNING THE COMPLETION OF SETTLEMENT MONITORING, PLANNING AREA PA-3; 2004-08-26Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY To: Attention: Subject: August 26, 2004 Lennar Communities 1525 Faraday Avenue, Suite 300 Carlsbad, California 92008 Mr. John Slatton Project No. 971009-014 Addendum to the As-Graded Report of Mass Grading Concerning the Completion of Settlement Monitoring, Planning Area PA-3, Bressi Ranch, Carlsbad, California References: Leighton and Associates, 2004a, As-Graded Report of Mass Grading, Planning Areas PA-1, PA-2, and PA-3, Metropolitan Street, and a Portion of Town Garden Road, Gateway Road, and Alicante Road, Carlsbad Tract No. 00-06J Bressi Ranch, Carlsbad, California, Project No. 971009-014, dated April 15, 2004 ----, 2004b, Status of Deep Fill Settlement Monitoring, Planning Areas PA-1 through PA-5, Bressi Ranch, Carlsbad, California, Project No. 971009-014, dated August 24, 2004 In accordance with the project geotechnical recommendations, settlement monuments were installed upon the completion of the fine grading operations for Planning Area P A-3 of the Bressi Ranch project, located in Carlsbad, California. A total of two settlement monuments were placed within the deep fill areas (i.e. fills greater than 40 feet in depth) of Planning Area PA-3. The settlement monuments were surveyed generally on a twice monthly to monthly basis for a minimum period of five months. Based on our evaluation of the survey data obtained from the settlement monuments placed in Planning Area P A-3 of the Bressi Ranch project, it is our professional opinion that. the primary settlement of the fill soils is essentially complete. Therefore, from a geotechnical standpoint, construction of the improvements within Planning Area P A-3 may begin. Consequently, survey readings of the monuments within Planning Area PA-3 can be discontinued and the monuments may be removed. Secondary consolidation settlement of t · · future settlements are expected to be less than 1 inch. MAR -4 2005 J. T. l{RUER & COMPANY 3934 Murphy Canyon Road, Suite B205 • San Diego, CA 92123-4425 858.292.8030 • Fax 858.292.0771 • www.leightongeo.com 971009-014 If you have any questions regarding this letter, please contact this office. We appreciate this opportunity to be of service. Distribution: (2) (2) (1) Addressee Respectfully submitted, LEIGHTON AND ASSOCIATES, INC. William D. Olson, RCE 45283 Senior Project Engineer ~~12 Director of Geology Sares Regis Group, Attention: Mr. Patrick Russell Lennar Communities, Attention: Mr. Jim Urbina - 2 - Leighton