Loading...
HomeMy WebLinkAboutCT 00-06; BRESSI RANCH; ADDENDUM TO THE AS-GRADED REPORTS OF MASS GRADING CONCERNING THE COMPLETION OF SETTLEMENT MONITORING, PLANNING AREAS PA-1 THROUGH PA-5; 2004-10-11Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY To: Attention: Subject: October 11, 2004 Lennar Communities 1525 Faraday A venue, Suite 300 Carlsbad, California 92008 Mr. John Slatton Project No. 971009-014 Addendum to the As-Graded Reports of Mass Grading Concerning the Completion of Settlement Monitoring, Planning Areas PA-I through PA-5, Bressi Ranch, Carls bad, California In accordance with the project geotechnical recommendations, settlement monuments were installed within the deep fill areas upon the completion of the fine grading operations for Planning Areas PA-1 through PA-5 of the Bressi Ranch project, located in Carlsbad, California. It should be noted that although this letter is applicable to Planning Areas PA-1 through PA-5, there are no deep fill areas within Planning Areas PA-I and P A-4. A total of seven settlement monuments were installed within the deep fill areas (i.e. fills generally greater than 40 feet in depth) within Planning Areas P A-1 through P A-5 and one additional monument (Monument 2-1) was placed in a cut area to provide a benchmark. The settlement monuments were surveyed generally on a twice monthly to monthly basis for a minimum period of five to six months. The settlement monitoring data for each of the monuments is attached. Based on our evaluation of the survey data obtained from the settlement monuments placed in Planning Areas PA-1 through PA-5 of the Bressi Ranch project, it is our professional opinion that the primary settlement of the fill soils is essentially complete. Therefore, from a geotechnical standpoint, construction of the improvements within Planning Areas PA-1 through PA-5 may begin. Consequently, survey readings of the monuments can be discontinued and the monuments may be removed. The settlement of the deep fill areas within Planning Area P A-3 was previously evaluated and determined to be essentially complete (Leighton, 2004d). fo) [E CG lE ~ \VJ [E m1 llllj MAR -4 2005 ll!:V J. T. KRUER 8, COMPAN~ I 3934 Murphy Canyon Road, Suite 8205 • San Diego, CA92123-4425 858.292.8030 • Fax 858.292.0771 • www.leightongeo.com 971009-014 Secondary consolidation settlement of the fill soil may continue; however, future settlements are expected to be less than 1 to 3 inches depending upon the location within Planning Areas PA-1 through PA-5. Based on the recommendations provided in the two as-graded reports for Planning Areas PA-1 through PA-5, total future settlement is expected to be order of 1 to 3 inches and differential settlement is estimated to be on the order of 1/2 inch in 25 feet (Leighton, 2004a and 2004b ). Long-term settlement values and the affects on site development should be evaluated after the site is fine graded and the actual location of the proposed structures and site improvements are known and the fill thicknesses determined. Attachments: Appendix A-References Settlement Monitoring Data Results Distribution: (2) Addressee Respectfully submitted, LEIGHTON AND ASSOCIATES, INC. je/d{__{) ~J_ __ _ William D. Olson, RCE 45283 Senior Project Engineer ~K-~ti,~ Senior Associate (6) Sares Regis Group, Attention: Mr. Patrick Russell -2 - Leighton 971009-014 Appendix A References Leighton and Associates, 2004a, As-Graded Report of Mass Grading, Planning Areas P A-1, PA- 2, and PA-3, Metropolitan Street, and a Portion of Town Garden Road, Gateway Road, and Alicante Road, Carlsbad Tract No. 00-06, Bressi Ranch, Carlsbad, California, Project No. 971009-014, dated April 15, 2004 , 2004b, As-Graded Report of Mass Grading, Planning Areas PA-4 and PA-5, Innovation Way and a Portion of Gateway Road, Carlsbad Tract No. 00-06, Bressi Ranch, Carlsbad, California, Project No. 971009-014, dated May 25, 2004 , 2004c, Status of Deep Fill Settlement Monitoring, Planning Areas P A-1 through PA-5, Bressi Ranch, Carlsbad, California, Project No. 971009-014, dated August 24,2004 , 2004d, Addendum to the As-Graded Report of Mass Grading Concerning the Completion of Settlement Monitoring, Planning Area PA-3, Bressi Ranch, Carlsbad, California, dated August 26, 2004 A-1 6.00 5.00 4.00 3.00 -2.00 en Q) .c 1.00 CJ C: --0.00 C: Q) E ~ -1.00 :::: Q) en -2.00 -3.00 -4.00 -5.00 -6.00 1 Monument placed on Cut Settlement Monitoring Data Settlement Monument 2-1 T T I I I I T ..... --l /~ I I I I J ~ 10 100 Time (days) I-SM2-1 I 1000 10/11/2004 6.00 5.00 4.00 3.00 -2.00 ti) Q) .c 1.00 0 C: -.... 0.00 C: Q) E .S! -1.00 ;:: Q) tn -2.00 -3.00 -4.00 -5.00 -6.00 1 Settlement Monitoring Data Settlement Monument 2-3 "T T T T ~ ...--l .I' ,, T ..L .L ..L 1.-+ __. ~ ~ 10 100 Time (days) I-SM2-3I 1000 10/11/2004 6.00 5.00 4.00 3.00 -2.00 t/J Cl) .c 1.00 (.) C: --0.00 C: Cl) E ~ -1.00 ~ Cl) en -2.00 -3.00 -4.00 -5.00 -6.00 Settlement Monitoring Data Settlement Monument 2-4 t 1 1 1 1i1111 I ~I ~Iff¥f~ 1 1 111 m-SM 2-41 1 10 100 1000 Time (days) 10/11/2004 6.00 5.00 4.00 3.00 -2.00 en Cl) .c: 1.00 (J C: -~ 0.00 C: Cl) E ~ -1.00 t:: Cl) en -2.00 -3.00 -4.00 -5.00 -6.00 Settlement Monitoring Data Settlement Monument 2-5 ~I I Ii 11 lb+(I_ bl j bl IJ lvi==~ I I I\ I I li-SM2-5I ~l'"J ~ .L T1±f1' J. 1 10 100 1000 Time (days) 10/11/2004 6.00 5.00 4.00 3.00 -2.00 en C1) .s:::: 1.00 0 C: :.:.. -0.00 C: C1) E: ~ -1.00 ~ C1) Cl) -2.00 -3.00 -4.00 -5.00 -6.00 1 Monument destroyed as of 08/06/04 Settlement Monitoring Data Settlement Monument 3-1 J" J: ---..L --T T .L -.............. ~ .L ' ~ V ..L ~ ~ 10 100 Time (days) I-SM3-1 I 1000 10/11/2004 6.00 4.50 3.00 -u, 1.50 a, .s::: (..) C -.. 0.00 C a, E a, ';::; a, -1.50 en -3.00 -4.50 -6.00 1 Settlement Monitoring Data Settlement Monument 3-2 T I ~ Jt -.1. " "f+/ 'i / ~ 10 100 Time (days) T I l. I-SM3-21 1000 10/11/2004 6.00 5.00 4.00 3.00 -2.00 ti) Cl) .s:::: 1.00 (.) C: --0.00 C: Cl) E ~ -1.00 --Cl) en -2.00 -3.00 -4.00 -5.00 -6.00 Settlement Monitoring Data Settlement Monument 5-2 t I I I I + ~ I I I 1111 I I I I I 11111-sMs-2] .1 I 1. i--t--U_ I I I ~ I N-Yl.'\a .LI.! 1 10 100 1000 Time (days} 10/11/2004 6.00 5.00 4.00 3.00 -2.00 U) Cl) .c 1.00 (.) C: -.... 0.00 C: Cl) E ~ -1.00 ;: Cl) u, -2.00 -3.00 -4.00 -5.00 -6.00 1 Settlement Monitoring Data Settlement Monument 5-3 T IT I -l.l .l I T l. 10 100 Time (days) Monument destroyed as of 03/31/04 and re-installed on 05/13/04 [-SM5-3 [ 1000 10/11/2004