Loading...
HomeMy WebLinkAboutCT 00-06; Bressi Ranch; Geotechnical Completion Letter of Mass Grading; 2005-04-29o: Attention: SuHject: Reference: pril 29, 2005 Lennar Communities 1525 Faraday Avenue, Suite 300 Carlsbad, California 92008 Mr. Rob Demaro \·1 '0,// . \' I 1-·--·-·---,·-··' ; .. i I hf; /i.Y ' t' Ii Project No. 4971009-014 Geotechnical Completion Letter of Mass Grading, Bressi Ranch, Carlsbad, California Project Design Consultants, 2003, Mass Grading and Erosion Control Plans for: Bressi Ranch, Carlsbad, California, Carlsbad Tract No. 00-06, Drawing No. 400- -8A; dated January 7, 2003, revised November 22, 2004 In accordance with the request and authorization of representatives of Lennar Communities, we have performed geotechnical observation and testing services during the mass grading operations for the Bressi Ranch project (Carlsbad Tract No. 00-06), located in Carlsbad, California. As of the date of this letter, the mass grading operations are complete for the project. The geotechnical conditions encountered during the grading operations were generally as anticipated. The mass grading operations included: 1) cuts and fills to achieve the design sheet-graded pads and adjacent slopes and streets; 2) removal of potentially compressible surficial materials (including undocumented fill, topsoil, colluvium, alluvium, landslide deposits, and weathered formational material) to competent formational material; 3) construction of fill slope keys; 4) construction of landslide stabilization buttresses; and 5) installation of canyon subdrains and buttress key and backcut subdrains. After the removals of potentially compressible soils were made in the canyons of the site, subdrains were installed and outletted at the toe-of-slope of the canyon fills. Fill slopes constructed above cut and natural open space areas were constructed with fill slope keys prior to the placement of compacted fill. In accordance with the project geotechnical recommendations and recommendations made during the grading operations, the potentially compressible portions of the on-site landslides were removed to competent material. In addition, buttresses were excavated to 3934 Murphy Canyon Road, Suite 8205 • San Diego, CA 92123-4425 858.292.8030 • Fax 858.292.0771 • www.leightongeo.com 971009-014 stabilize the landslides and areas of potential instability (due to out-of-slope clayseams or other adverse geologic conditions) and buttress key and backcut subdrains installed and outletted. The placement and compaction of the fill soils were geotechnically observed and documented. Field density testing indicated that the fill soils were placed and compacted to at least 90 percent relative compaction (based on American Standard of Testing and Materials [ASTM] Test Method D1557) and near-optimum moisture content in accordance with the recommendations of Leighton and Associates and the requirements of the City of Carlsbad. To mitigate post-construction settlement, deep fills (i.e. areas where the fill soils were generally deeper than approximately 40 feet below the finish grade elevations of the site) were placed at a minimum 95 percent relative compaction. The mass grading operations of the Bressi Ranch project, which occurred prior to the fine or precise grading of the residential portions of the site and resulted in the design of the project as shown on the mass grading plans (Project Design Consultants, 2004), were performed in general accordance with the project geotechnical reports, geotechnical recommendations made during grading, and the City of Carlsbad requirements. It is our professional opinion that the site is suitable for the intended residential and commercial use provided the recommendations included in the project as-graded geotechnical reports of rough and fine grading are incorporated into the design and construction of the proposed development and associated improvements. If you have any questions regarding this letter, please contact this office. We appreciate this opportunity to be of service. Distribution: ( 4) Addresses (2) City of Carlsbad, Attention: Mr. Casey Arndt -2 - Respectfully submitted, LEIGHTON AND ASSOCIATES, INC. William D. Olson, RCE 45283 Senior Project Engineer ~-kW~ Randall K. Wagner, CEG 1612 Senior Associate Leighton