Loading...
HomeMy WebLinkAboutCT 01-03; CALAVERA HILLS VILLAGE E-1; GEOTECHNICAL UPDATE; 2004-08-17COIb Geotechnical • Geologic. Environmental 5741 Palmer Way • Carlsbad California 92008 • (760) 438-3155 • FAX (760) 931-0915 August 17, 2004 Revised December 23, 2004 W.O. 3902-C-SC Brookfield Homes * . 12865 Pointe Del Mar, Suite 200 • Del Mar, California 92014 -. Attention Ms Teri McHugh Subjeët: Geotechnical Update for Phase 5 of Village E-1 (Mystic Point), (Buildings 1. 2, 15, and 16, Calavera Hills II, Carlsbad, San Diego County, California Dear Ms McHugh In accordance with your request, GeoSoils, Inc. (GSI) has reviewed the referenced reports - (see the Appendix) with respect to as-graded building lot conditions and has prepared this update report. Grading and processing of original ground within the subject building lots was observed and selectively tested by a representative of GSI during the earthwork phase of development for the subject building lots. Based on our observations and testing, the building lots are considered suitable for their intended use. Geotechnical observations and testing completed during site grading, and completed by this office, is summarized in GSI (2003b). The building lots have not changed significantly since the issuance of GSI (2003b); thus, the findings, conclusions, and recommendations presented in our referenced reports (see the Appendix), including GSI (2003b), are considered valid and applicable with respect to the construction and development of the subject building lots:' Our study is based upon our review, engineering analyses; and .laboratory data, these conclusions and recommendations are professional opinions. These opinions have been derived in accordance with current standards of practice, and no warranty is express or implied. Standards of practice are subject to change with time. GSI assumes no responsibility or liability for work or testing performed by others, or their inaction, or work performed when GSI is not requested to be onsite to evaluate if our recommendations • ' - have been properly implemented:. Use of this report constitutes an agreement and consent by the user to all the limitations outlined above, notwithstanding any other • agreements that may be in place In addition, this report may be subject to review by the controlling authorities •- • • 4. • - (.5 c The opportunity to be of service is greatly appreciated. If you have any questions, please do riot hesitate to call our office. • 1 : Respectfully submi zo GeoSoils Inc Z1.1 A Nx.. 934 GE 4707 Ski Robert G. Crism *i '/ ' David W. Skelly Engineering Geoloist'424 Civil Engineer, RCE 47S 9' RGC/DWS/JPF/jk/jh • Attachment: Appendix - References Distribution: (4) Addressee Brookfield Homes W.O. 3902-C-SC Village E-1 (Mystic Point), Phase 5 Revised December 23, 2004 File:e:\wp9\3900\3902c.rguf5 Page 2 GeoSoils, Inc. APPENDIX REFERENCES Davidson Reinforcing Company, 2002, Post tension slab foundation plans for: Calavera Hills E-1, Carlsbad, California,, Job No; 1391, dated May 29 (last revision November 23, 2003) Esgil Corporation, 2003a, Plan check comments, Mystic Point sixplex & triplex models (foundation revision), Carlsbad, PC03-16 (PCR03-270), dated December 30. 2003b, Plan check comments, Mystic Point sixplex & triplex models (foundation revision), Carlsbad, PC03-16 (PCR03-270), dated December 15. GèoSoils, Inc., 2004, Second geotechnical review of mat foundation plans, Village [-1, Calavera Hills II, Carlsbad, San Diego County, California, W.O. 3902-C-SC, dated January 5. 2003a, Geotechnical review of mat foundation plans, Village E-1, Calavera Hills II, Carlsbad, San Diego County, California, W.O. 3902-C-SC, dated December 16. 2003b, Report of rough grading, Calavera Hills, Village E-1, pads 1 through 28, Carlsbad tract 01-03, City of Carlsbad, San Diego County, California, W.O. 3459-B-SC, dated June 9. - ' 2003c, Revised geOtechnicai' update, Village E-1 of Calavera Hills II, Carlsbad, San Diego County, California, W.O. 3459-B-SC, dated May 12.. GeoSoils, Inc.