Loading...
HomeMy WebLinkAboutCT 01-11; OCEAN BREEZE CONDOMINIUMS; FINAL GRADING REPORT; 2002-12-09Geotechnical • Geologic • Environmental 5741 Palmer Way • Carlsbad California 92008 • (760) 438-31 55 • FAX (760) 931-0915 December 9 2002 ' W.O.3471-B-SC Karnak Architecture/Planning, Inc 2802 State Street, Suite C Carlsbad, California 92008 '. .. Attention Mr. Robert Richardson ,•. Subject : Final Grading Report, Proposed Ocean Breeze Condominiums, 3416 Garfield Street, Carlsbad, San Diego County, California References 1 "Preliminary. Geotechnical investigation Proposed Condominium Development 3416 Garfield Street, Carlsbad, California," P.N. 21137-01, dated March 19, 2001, by Earth Technics. 2. "Change of Geotechnicál Consultant of Record, Proposed Ocean Breeze Condomihiurns, 3416 Garfield Street,. Carlsbad, California 92008," W.O. 3471 -B-SC, . dated . . November 21, 2002, by GeoSoils, inc. Dear Mr. Richardson:, . . .. . •'. ' .' . . In accordance with your request, GeoSoils, Inc. (GSI), is providing this summary report for grading performed at the subject site. Our scope of work included observations during site excavation (on a part-time basis), analysis of data, and preparation of this summary report. ' • Unless superseded by recommendations presented herein, the' conclusions and recommendations contained in the referenced reports remain pertinent and applicable, and should be appropriately implemented. ' • ' ' ' ' ' ' Grading Of original ground within the building pad, and 5 feet out from the building footprint at the subject site, was observed by a representative of GSI, during the earthwork phase of development for the, subject property. Grading consisted of excavation and export of' ..material from the site. Excavation was performed to competent bearing strata according to : recommendations in the referenced reports and .our site observations and recommendations No fill was placed onsite The work performed is in general conformance with the recommendations contained in the referenced report, and with the grading ordinance of the County of San Diego, California Earthwork operations' started on November 25, 2002 and were completed on , December, .2, 2002.. Earthwork was.: performed in . general accordance 'with ,the . recommendations "presented in the referenced report and our field recommendations. Based on the observations and testing (probing) performed by GSI, it is our opinion that the