HomeMy WebLinkAboutCT 02-18; BLUFFS; GEOTECHNICAL INVESTIGATION; 2001-07-31,. CT {)J--IB Geotechnical Investigation FOR THE BLUFFS Prepared by: N orCal Engineering Soils and Geotechnical Consultants 10641 Humbolt Street Los Alamitos, California 90720 Tel: (562) 799-9469 Fax: (562) 799-9459 • e -NorCal Engineering Soils and Geotechnical Consultants 10641 Humbolt Street Los Alamitos, CA 90720 (562) 799-9469 Fax (562) 799-9459 July 31,2001 Project Number 9482-01 Anastasi Construction 1200 Aviation Boulevard, Suite 203 Redondo Beach, California 90278 Attn.: Mr. John Simons REL~IVED JUN 0 3 2005 ENG INl:eIZRI NG DEPARTMENT RE: GEOTECHNICAL INVESTIGATION -Proposed Residential Development -Located at South of Chinquapin Avenue, Between Harrison Street and Adams Street, in the City of Carlsbad, California • Dear Mr. Simons: • Pursuant to your request, this firm has performed a Geotechnical Investigation for the above referenced project in accordance with your authorization of our proposal dated July 20, 2001. The purpose of this investigation is to evaluate the ge.otechnical conditions of the subject site and to provide recommendations for the propos~d project. This geotechnical engineering report presents the finding of our study along with conclusions and recommendations for development. We appreciate this opportunity to be of s~rvice to you. If you have any further questions, please do not hesitate to contact the undersigned. Respectfully submitted, NQRCAL ENGINEERING ~l- Keith D. Tucker Project Engineer R.G.E. 841 Troy, D. Norrell President • • • f,.' , . July 31,2001 Page 2 project Description Project Number 9482-Q1 The purpose of the investigation was to explore the subsurface conditions and to provide preliminary geotechnical engineering design parameters for evaluation of the site with respect to the proposed development. It is proposed to construct an eighty unit condominium development on the subject site. Other improvements will comprise of concrete, asphalt pavement and green belt areas. Site Description The subject project is situated within a residential tract south of Chinquapin Avenue between Harrison Street and Adams Street, in the City of Carlsbad. The lot is approximately ±4.8 acres in area and irregular in shape. The site is relatively level with topography descending gradually from west to east of a few feet. The property contains slabs and foundations from previous structures. A single family residence with detached garage and a trailer is located in the southerly portion along with an avocado orchard. The open areas of the site are covered with a moderate growth of vegetation and the south and east property lines contain trees. Small stockpiles of soils ,and debris as well as scattered debris is located throughout the site. A layer of mulch was scattered throughout the northerly section of the parcel. . Field Investigation The investigation consisted of the placement of nine (9) borings to a maxilTium depth of 15 feet placed at accessible areas throughout the site. The explorations were visually classified and logged by a field engineer with locations of the subslJrface explorations shown on the attached Site Plan. The exploratory excavations revealed the existing earth materials to consist of a fill and native soil. A detailed description of the subsurface conditions are listed on the excavation logs in Appendix A. These soils are described as follows: NorCal Engineering • • • • J July 31, 2001 Project Number 9482-01 Page 3 Fill/Disturbed Soils: A fill/disturbed soil to a depth of 1 to 3 feet was encountered consisting predominately of a brown, fine to medium grained, slightly silty SAND which was noted generally to be loose to medium dense and damp. These soils were noted to contain some small gravel, woOd, debris, vegetation and root structures. The heaviest debris was encountered in Test Excavation TE-4 to a depth of 3 feet and contained large roots, palm bushes, concrete and gravel. A leach line with a clay pipe was encountered in the west end of the trench. Approximately one foot of mulch was encountered in TE-9. Natural: An undisturbed native material was encountered directly beneath the upper fill soils consisting predominately of a brown to red brown, fine to medium grained, slightly silty SAND which were noted to be dense to very dense and dry to damp to moist. The overall engineering characteristics of the earth material were relatively uniform with each boring. Groundwater was not encountered and no caving occurred to the depths of our excavations. Laboratory Tests Relatively undisturbed samples of the subsurface soils were obtained to perform· laboratory testing and analysis for direct shear, consolidation tests, and to determine in- place moisture/densities. These undisturbed samples consisted of one-inch rings with inside diameter of 2.5 inches. Bulk bag samples were obtained in the upper soils for expansion index tests, maximum density tests, atterberg limits and sulfate tests. All test results are included in Appendix B, unless noted otherwise. A. The field moisture content (ASTM:D 2216) and the dry density of the ring samples were determined in the laboratory. This data is listed on the log of excavations. B. Maximum density tests (ASTM: D-1557-00) were performed on typical samples of the upper soils. Results of these tests are shown on Table I. NorCaI Engineering • •• • July 31, 2001 Page 4 Project Number 9482-01 C. Expansion index tests in accordance with the Uniform Building Code Standard No. 29-2 were performed on remolded samples of the upper soils to determine the expansive characteristics. Results of these tests are provided on Table II. D. Determination of Atterberg limits (ASTM: D 4318-84) consisting of liquid limit, plastic limit and plasticity index of soils were performed on representative samples. Results are shown on Table '" E. Soluble sulfate tests in accordance with EPA Method 9038 were performed on representative soils samples. Results are provided in Table IV. F. Direct shear tests (ASTM: D-3080) were performed on ·undisturbed and disturbed samples of the subsurface soils. The test is performed under saturated conditions at loads of 500 Ibs.lsq.ft., 1,000 Ibs.lsq.ft., and 2,000 Ibs.lsq.ft. with results shown on Plate A. G. Consolidation tests (ASTM: D-2435) were performed on undisturbed samples to determine the differential and total settlement which may be anticipated based upon the proposed loads. Water was added to the samples at a surcharge of one KSF and the settlement curves are plotted on Plate B. Conclusions and Recommendations Based upon our evaluations, the proposed development is acceptable from 'a geotechnical engineering standpoint. By following the recommendations and guidelines set forth in our report, the structures will be safe from excessive settlements under the anticipated design loadings and conditions. The proposed development snail meet all requirements of the City Building Ordinance and will· not impose any adverse effect on existing adjacent structures. It is recommended that site inspections be performed by a representative of this firm during all grading and construction of the· development to verify the findings and recommendations documented in this report.. rhe foJ/owing sections present a discussion of geotechnical related requirements for specific design recommendations of different aspects of the project. NorCaI Engineering ---------------------------------------- • • • July 31,2001 Page 5 Seismicity Evaluation Project Number 9482-01 There are no known active or potentially active faults trending toward or through the site. The proposed development lies outside of any Alquist Priolo Special Studies Zone , and the potential for damage due to direct fault rupture is considered very remote. The site is located in an area of high regional seismicity and a peak horizontal ground 'acceleration of 0.47g may occur from a Magnitude 6.9 earthquake along the Newport- Inglewood fault zone, which is located approximately 7.5 kilometers away. Ground shaking originating from earthquakes along other active faults in the region is expected to induce lower horizontal accelerations due to smaller anticipated earthquakes and/or greater distances to other faults. The following earthquake design parameters are based upon the 1997 Uniform Building Code (USC) for a Seismic Zone 4 with a Z factor of 0.40 and a Soil Profile Type of SO, based on a stiff soil profile. 1997 USC Seismic Design Parameters Distance from Site (Rose Canyon Fault) Seismic Source Type Seismic Coefficient = Ca (Table 16-0) Seismic Coefficient = Cv (Table 16-R) Near-Source Factor Na (Table 16-S) Near-Source Factor Nv (Table 16-T) Site Grading Recommendations 7.5 km B (0.44) Na (0.64) Nv 1.0 1.14 Any vegetation or demolition debris shall be removed and hauled from proposed grading areas prior to the start of grading operations. Any removed soils may be reutilized as -.... ,,, .. ~-... ~ compacted fill once any deleterious material or oversized materials (in excess of eight .~ ...----~-~---~--. .. .......-__ ,_ '" W9. "u . .(,.--.... "!Ic~~.~ __ ... _ ..... "" ... .Jo ____ ~""~~~_ inches) is removed. All grading operations shall be performed in accordance with the ~ ... ~""'" attaChec:J7.sp~cjfications for Placement of Compacted Fill". NorCaI Engineering • • • July 31,2001 Page 6 • Project Number 9482-01 The upper disturbedlfill soils (upper 1 to 3 feet) shall be removed to expose native $oils, the exposed surface shall be scarified to a depth of 12 inches, brought to the proper .. moisture content and compacted to a minimum of 90% of the laboratory standard prior to placement of any additional compacted fill soils, foundations and concrete slabs. This fill shall extend a minimum of five horizontal feet or to the depth of vertical overexcavation, whichever is greater, beyond the outside edge of the perimeter foundation. It is highly probable that cesspools and leach lines will be encountered which also shall be removed to competent native soils. Temporary Excavations Temporary unsurcharged excavations in the existing site materials Jf!SS' than: 4: feet,higli may' be' m8(fe:-a1'" a, vertical" gradient~ unless cohesionless soils are encountered. Temporary. unsurcharged excavations· from 4to 8 feet. high may 'be trimmed ,'at a 1. tot . (horizontal to vertical) gradient. In areas where soils with little Qr no binder are encountered, where adverse geological conditions are exposed,qr. wher.e· "exc;:~vatiohs! are adj~~ent to existing structures, shoring, slot-cutting, or flatter !q~ca'(ati.ons may be "', required~· The temporary cut slope gradients given do not preclude local raveling and sloughing. All excavations shall be made in accordance with the requirements of CAL-OSHA and other public agencies having jurisdiction. Care should be taken to provide or maintain adequate lateral support for all adjacent improvements and structures at all times during the grading operations and construction phase. Foundation Design All foundations may be designed utilizing a safe bearing capacity of 2;200 psf foran', embedded depth of 18 inches into approved compacted fill soils or competent native soils. The bearing value may be increased by 500 psf for each additional foot of d.epth in excess of the 18 inch minimum depth, up to a maximum of 3,000' psf. A one third increase may be used when considering short term loading and seismic forces. NorCaI Engineering • • • July 31,2001 Page 7 Lateral Resistance Project Number 9482-01 The following values may be utilized in resisting lateral loads imposed on the structure. Requirements of the current Uniform Building Code should be adhered to when the coefficient of friction and passive pressures are combined: Coefficient of Friction -0.40 Equivalent Passive Fluid Pressure = 250 Ib./cu.ft. Maximum Passive Pressure = 2,500 Ibs./sq'.ft. The passive pressure recommendations are valid only for compacted fill soils and/or competent native soils. Settlement Analysis Resultant pressure curves for the consolidation tests are shown on Plate B. Computations utilizing these curves and the recommended safe bearing capacities reveal that the foundations will experience settlements on the order of ~ inch and differential settlements of less than ~ inch. Retaining Wall DeSign Parameters Active earth pressures against retaining walls will be equal to the pressures developed by the following fluid densities. These values are for granular free draining backfill , material placed adjacent to the walls at various ground slopes above the walls. ' Surface Slope of Retained Materials (Horizontal to Vertical) Level 5 to 1 4 to 1 3 to 1 2 to 1 Equivalent Fluid Density (Ib./cu.ft.) 30 35 38 40 45 Any applicable short-term construction surcharges and seismic forces should be added to the above lateral pressure values. A backfill zone of non-expansive material shall consist of a wedge beginning a minimum of one horizontal foot from the base of the wall extending upward at an inclination no less than 1/4 to 1 (horizontal to vertical) .. All wall~ shall be waterproofed as needed and protected from hydrostatic pressure by a reliable permanent subdrain system. NorCal Engineering • • • July 31,2001 Page 8 Slab Recommendations • Project Number 9482.-01 All concrete slabs shall be a minimum of.· four inches· in: thickness' and placed on approved subgrade soils. ~>.¥ap'Q,(};:.I;>~rr.i~r _~9Qgw.ich~,d,betwee.r::l, fQur:;:inql1~$:,.o.f sete~t ,· .... ' .... .I-"' ..... ,,,f •• k ...... ·.';.r sa-nd'shall' be· utilized beneath floor slabs whi.GtJ wO!JI~J~.~;§~n~itiye tQ: tlle.Jnmtration· off , '-',' '. «.-.. .'. -. . moistur;e'f, All. concrete slab areas to. receive floor coverings should be moistUre tested to meet a I/. manufacturer requirements prior to placemen.t. Corrosion Design Criteria Representative samples of the surficial soils, typical of the subgrade soil$ expected to be encountered within foundation excavations were tested for sulfate concentration. According to the '1994 Uniform Building Code (UBC) Table 19-A-3 -ReqUirements for Concrete Exposed to Sulfate-Containing Solutions', these contents revealed negligible levels of sulfate exposure. Therefore, a Type 1/ cement according to latest UBC speCifications may be utilized for building foundations at this time. Additional sulfate tests shall be performed at the completion of rough grading to assure that these soils are consistent with the recommendations stated in this design. Sulfate test results may be found on. the attached Table IV. Limitations The recommendations and conclusions contained in this report are based upon the soil conditions uncovered in our test excavations. No warranty of the soil condition between' our excavations is implied. NorCal Engineering should be notified for possible further recommendations if unexpected to unfavorable conditions are encountered during construction phase. NorCal Engineering • July 31, 2001 Page 9 • Project Number 9482-01 Any unusual conditions which may be encountered in the course of the project development may require the need for additional study and revised recommendations. It is the responsibility of the owner to ensure that all information within this report is submitted to the Architect and appropriate Engineers for the project. Ihisfirm should have the opportunity to review the final plans to verify that all our recommendations are incorporated. This report and all conclusions are subject to the review of the controlling authorities for the project. A;pteconstruction conference should be held between the developer, general contractor, grading contractor, city inspector, architect, and geotechnical engineer to clarify any questions relating to the grading operations and subsequent construction. Our representative should be present during the grading operations and construction phase to certify that such recommendations are complied within the field. This geotechnical investigation has been conducted in a manner consistent with the • level of care and skill exercised by member~ of our profession currently practicing under similar conditions in the Southern California area. No other warranty, expressed or implied is made. • NorCaI Engineering • • • July 31,2001 Page 10 Project Number 9482-01 SPECIFICATIONS FOR PLACEMENT OF COMPACTED fill Preparation Any existing low density soils and/or saturated soils shall be removed to competent natural soil under the inspection of the Soils Engineering Firm. After the exposed surface has been cleansed of debris and/or vegetation, it shall be scarifi'ed until it is uniform in consistency, brought to the proper moisture content and compacted to a minimum of 90% relative compaction (in accordance with ASTM: D-1557-00). Material For Fill The on-site soils or approved import soils may be utilized for the compacted fill provided they are free of any deleterious materials and shall not Gontain any rocks, 'brick, asphaltic concrete, concrete or other hard materials greater than eight inches in maximum dimensions. Any import soil must be approved by the Soils Engineering firm a minimum of 24 hours prior to importation of site. Placement of Compacted Fill Soils . The approved fill soils shall be placed in layers not in excess of six inches in thickneSs. Each lift shall be uniform in thickness and thoroughly blended. Th$ fill soils shall .be brought to within 15% of the optimum moisture content, unless otherwise speCified by the Soils Engineering firm. Each lift shall be compacted to a minimum of 90% relative compaction (in accordance with ASTM: 0-1557-00) and approved prior to the placement of the next layer of soil. Compaction tests shall be obtained at the discretion of the Soils, Engineering firm but at a minimum of one test for every 500 cubic yards placed and/or for every two vertical feet of compacted fill placed. NorCal Engineering ,.....---------------------------------~-~-->------ • • • July 31,2001 Page 11 • Project Number 9482-01 The minimum relative compaction shall be obtained in accordance with accepted methods in the construction industry. The final grade of the structural areas shall be in a dense and smooth condition prior to placement of slabs-on-grade or pavement. No fill soils shall be placed, spread or compacted during unfavorable weather conditions. When the grading is interrupted by heavy rains, compaction operations shall not be resumed until approved by the Soils Engineering firm. Grading Observations The controlling governmental agencies should be notified prior to commencement of any grading operations. This firm recommends that the grading operations be conducted under the observation of a Soils Engineering firm as deemed necessary. A 24 hour notice must be provided to this firm prior to the time of our initial inspection. Observation shall include the clearing and grubbing operations to assure that all unsuitable materials have been properly removed; approval of the exposed subgrade in areas to receive fill and in areas where excavation has resulted in the desired finished grade and deSignate areas of overexcavation; and performance of field compaction tests to determine relative compaction achieved during fill placement. In additic:>n, all foundation excavations shall be observed by the Soils Engineering firm to confirm that appropriate bearing materials are present at the design grades and recommend any> modifications to construct footings. NorCal Engineering 1"=100' J I --. l ADAMS STREET ·1· .~ w ::> z ~rr;::.~-.-< r-- -__ I • II· ~- I ANI.'~~obv ~ I tIrMIhauI. "'dlcfiId .......... , NorCal E.ngineering '3.:'.4G,12~ 10 __ .' ..... _ ...... SOILS AND GEOTECHNICAL.CONSULTANTS LOCATION OF ("'PACTI·ON TESTS - _1 • • • APPENDICES (In order of appearance) Appendix A -Log of Borings *Logs of Test Borings B1 to B9 Appendix B -Laboratory Analysis *Table I -Maximum Density Tests *Table 11-Expansion Index Tests *Table III -Atterberg Limits *Table IV -Sulfate Tests *Plate A -Direct Shear Test *Plate 8 -Consolidation Test N orCal Engineering • • Appendix A • • NorCal Engineering • • • COARSE GRAINED SOILS MORE THAN 50% OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE FINE GRAINED SOILS MORE THAN 50% OF MATERIAL IS SMALLER THAN NO. 200 SIEVE SIZE MAJOR DIVISION GRAVEL AND GRAVELLY SOILS MORE THAN 50% OF COARSE FRACTION RETAINED ON NO. 4 SIEVE SAND AND SANDY SOILS MORE THAN 50% OF COARSE FRACTION PASSING ON NO. 4 SIEVE SILTS AND CLAYS SILTS AND CLAYS CLEAN GRAVELS (LITTLE OR NO FINES) GRAVELS WITH FINES (APPRECIABLE AMOUNT OF FINES) CLEAN SAND (LITTLE OR NO FINES) SANDS WITH FINE (APPRECIABLE AMOUNT OF FINES) LIQUID LIMIT I FS.~ THAN !';() LIQUID LIMIT GREATER THAN 50 HIGHLY ORGANIC SOILS GRAPHIC LETTER ~VMRnI ~VMROI GW GP GM GC SW SP SM SC OL MH CH OH PT TYPICAL DESCRIPTIONS WELL-GRADED GRAVELS, GRAVEL. SAND MIXTURES, LlTILE OR NO FINES POORLY-GRADED GRAVELS, GRAVEL-SAND MIXTURES, LlTILE ORNOFINES SILTY GRAVELS, GRAVEL-SAND- SILT MIXTURES CLAYEY GRAVELS, GRAVEL-SAND- CLAY MIXTURES WELL-GRADED SANDS, GRAVELLY SANDS, LlTILE OR NO FINES POORLY-GRADED SANDS, GRAVEL- L Y SANDS, LITTLE OR NO FINES SILTY SANDS, SAND-SILT MIXTURES CLAYEY SANDS, SAND-CLAY MIXTURES INORGANIC SILTS AND VERY FINE SANDS, ROCK FLOUR, SIL TV OR CLAYEY FINE SANDS OR CLAYEY ORGANIC SILTS AND ORGANIC SILTY CLAYS OF LOW PLASTICITY INORGANIC SILTS, MIC.ACEOUS OR DIATOMACEOUS FINE SAND OR SILTY SOILS INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS . ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, ORGANIC SILTS PEAT, HUMUS, SWAMP SOILS WITH HIGH ORGANIC CONTENTS NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS UNIFIED SOIL CLASSIFICATION SYSTEM NorCal Engineering • KEY: • Indicates 2.5-inch Inside Diame,ter. Ring Sample. 181 Indicates 2-inch 00 Split Spoon Sample (SPT). rsJ Indicates Shelby Tube Sample. OJ Indicates No Recovery. IJ Indicates SPT with 140# Hammer 30 in. Drop. E] Indicates Bulk Sample. ~ Indicates Small Bag Sample. [J Indicates Non-Standard Indicates Core Run. COMPONENT DEFINITIONS COMPONENT Boulders Cobbles Gravel Coarse gravel Fine gravel Sand Coarse sand Medium sand Fine sand Silt and Clav SIZE RANGE Larger than 12 in 3 in to 12 in 3 in to No 4 (4.5mm ) 3 in to 3/4 in 3/4 in to No 4 ( 4.5mm ) No.4 ( 4.5mm ) to No. 200 ( 0.074mm ) No.4 (4.5 mm ) to No. 10 (2.0 mm ) No. 10 (2.0 mm ) to No. 40 (0.42 mm) No. 40 ( 0.42 mm ) to No. 200 ( 0.074 mm ) Smaller than No. 200 ( 0.074 mm ) COMPONENT PROPORTIONS DESCRIPTIVE TERMS RANGE OF PROPORTION Trace Few Little Some And 1 -5% 5 -10% 10 -20% 20 -35% 35 -50% MOistURE CONTENT DRY DAMP MOIST WET Absence of moisture. dusty. dry to the touch. Some perceptible moisture; belqwoptimum No visible water; near optimum moisture content Visible free water, usually soil is below water table. RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N .. VALUE COHESIONLESS SOILS COHESIVE SOIL$ Density N ( blowslft ) Consistency N (blowslft ) Approximate Undrained Shfi!ar Strength (psf) Very Loose Ot04 Very Soft o t02 < 250 Loose 4 to 10 Soft 2 t04 250-500 Medium Dense 10 to 30 Medium Stiff 4 to 8 500 -1000 . Dense 30 to 50 Stiff 8 to 15 1000 -2000 Very Dense over 50 Very Stiff 15 to 30 2000 -4000 Hard over 30 > 4000 NorCal Engineering E 0 u .c u ~ :a i ! -j 0 til ,c u -~ "> -U N ~ ~ I " :II Log of Boring B-1 Groundwater Depth: None Encountered WAI"ht· 140 Ibs. 30" (feet) Geotechnical Description Lith. ~ __ ~ __________________________________________________ ~ ology o 5 10 20 25 30 Slightly silty fine to medium grained SAND Reddish brown, dense to very dense Slight decrease in density and silt content @ 5' Boring completed at depth of NorCal Engineering of wood ' Project No. 9482-01 • ~~ o ;, -0 CO u 3,0 117,6 6,7 115.8 1 UI QI-.5~ LL E 0 u '" u i I! 1 3, oJ: ~ "> -. (j '" N > Log of Boring 8-2 Groundwater None Encountered WAinht'140 Ibs. 30" (feet) Geotechnical Description ,Lith-! 1---'------------------------------4 ology ~ 5 10 20 25 30 Silty fine to medium grained SAND Dark brown, loose to medium dense, dry with small roots, pieces of wood NATURAL SOILS Slightly silty fine to medium grained SAND Reddish brown, dense to very dense Slight decrease in density and silt content @ 6' completed at depth NorCal Engineering Project-No. 9482-01 • • 2.7 114.9 3.4: 116.1 2 II) , ClJ7 Cd' u:- E 0 u ..: u ~ ~ i ! .. ! '0 - 1/1 .&: U -• !: "> c:i N N > Log of Boring B-3 Groundwater None Encountered 30" Geotechnical Description Lith. . GI 1---"-----------------------------; ology ~ I-o 5 10 20 25 30 FI Silty fine to medium grained SAND Dark brown, loose to medium dense NATURAL SOILS Slightly silty fine to medium grained SAND Reddish brown, dense to very dense Slight decrease in density and silt content @ 6' Change to light brown @ 9' Boring completed at depth of 8' NorCal Engineering Project No. 9482·01 • 2.1 113.8 5.9 116.8. 3 Log of Boring 8-4 ". UJ"'''; Anastasi/Carlsbad l Groundwater Depth: None Encountered a;;: of Drilling: 7/25/01 Drilling Method: Hollow Stem Auger Hammer ~·:VI~:;!. 140 Ibs. 1 Drop: 3~'' Depth (feet) . Samples Geotechnical Description Lith· ~ ~---L------------------------------------------------------4 ology ~ Surface :: ........ w Not ;,~"","",,,'; 1-0 l- I- I- 1-5 I- - 1-10 - l- I- I- I- I-- '-25 E o "! J: u ~I­;; U 11-30 ! -; o rn J: u ~ ;; -iJ FILL SOILS Silty fine to medium grained SAND Dark brown, loose to medium dense, dry with heavy debris, large'roots, palm tree and concrete NATURAL SOILS Slightly silty fine to medium grained SAND Reddish brown, dense to very dense Slight decrease in density and silt content @ 6' Change to light brown @ 12' fine to medium grained SAND Tan to dark brown, dense, moist, slight caving Boring completed at depth of 16' 1". • • 1·- • • • I" ~~ o ::s mO o LaboratolY 3.5 100.7 4.2 111.4 5.6 113.8 6.0 116.1 6.7 119.8 ~I.L---____ .,------l-~----l--..;L..~ o J NorCal Engineering Project No. 9482·01 4 E 0 ~ .I:! U ~ , ! -• ! ,g .I:! ¥ -!: ~ U N N > Log of Boring B-5 Anastasi/Carlsbad "-""--: 7/25/01 Groundwater None Encountered Hammer WAinht~ 140 Ibs. 30" Depth (feet) Geotechnical Description Lith-~ __ ~ ____________________________________________________ ~ ology o 5 10 20 25 30 Silty fine to medium grained SAND Dark brown, loose to medium dense, dry with gravel and small pieces of wood NATURAL SOILS Slightly silty fine to medium grained SAND Reddish brown, dense to very dense Slight decrease in density and silt content @ 6' Change to light brown @ 9' fine to medium grained SAND Tan to dark brown, dense, moist, slight caving Boring completed at depth of 15' NorCaI Engineering Project No. 9482-01 • ~.2 115.0 • 4.1 113.8 • 3.6 115.2 5 ! • ! 0 rn J:: u ~ ~ u N ~ 8' I 1 ~ Log of Boring B·6 PrOJUC1; Anastasi/Carlsbad ~ ot Drilling: 1125/01 ! Groundwater Depth: None Encountered Drilling Method: Ho"ow Stem Auger Hammer ";"'=f:-':' 140 Ibs. ![)!5'J): 30" Geotechnical Description Lith· ! ~ __ ~ __________________________________________________ ~ ology ~ 1-0 1--5 1--10 l- I- I- I- -25 - - - Surface ~:;. ...... y, Not Measured FILL/DISTURBED TOP SOILS Silty fine to medium grained SAND Dark brown, loose to medium dense, dry NATURAL SOILS Slightly silty fine to medium grained SAND Reddish brown, dense to very dense Slight decrease in density and silt content @ 6' Change to light brown @ 8' I fine to medium grained SAND i Tan to dark brown, dense, slight caving ! J i Boring completed at depth of 15' NorCal Engineering ~/ t"-I~ I;: t"-I:: 1-- [- 1"-I:: Project No. 9482-01 • • • en ~c o :::I' -0 al u I "'h, 11.7 103.2 5.3 112.6 6.4 109.1 6 E 0 u ..c u 4! :! i .. ! ; ~ - J:: U ~ :! - Col N N > Log of Boring B-7 Groundwater : None Encountered W9'IOn1:: 140 Ibs. 30" (feet) Lith· ~ I----I.....----------------------------i ology ~ Surface Elevation: Not 1lII ..... ,.U" .. U Geotechnical Description o 5 10 20 25 30 FI Silty fine to medium grained SAND Dark loose to medium dense, RAL Slightly silty fine to medium grained SAND Reddish brown, dense to very dense Slight decrease in density and silt content @ 6.5' Change to light brown @ 10' Boring completed at depth of 13' NorCal Engineering of wood Project No. 9482-01 • • 4.1 117.6 5.3 116.1 7 ! l o ." 'fi -~ "> -13 Log of Boring B-8 astasi/Carlsbad 7/25/01 Hammer \Na,l,.,h,t· 140 Ibs. Depth (feet) Groundwater 30" Geotechnical Description Lith· !. ~ __ ~ ____________________________________________________ ~ ology ~ o 5 10 20 25 FILUDISTURBED Silty fine to medium grained SAND Dark brown, loose to medium dense NATURAL SOILS Slightly silty fine to medium grained SAND Reddish brown, dense to very dense Slight decrease in density and silt content @ 6' completed at depth of 8' N orCal Engineering Project No. 9482.;01 3.4 113.6 8 e 0 u ..: u .! ~ i ! 1 0 1/1 .c " -~ '> v N ~ Log of Boring B-9 Anastasi/Carlsbad 7/25/01 Groundwater None Encountered 1401bs. : 30" (feet) Geotechnical Description Lith· ! ~ __ ~ ____________________________________________________ ~ ology ~ o 5 10 20 25 30 i I , I I I I I i Slightly silty fine to medium grained SAND Reddish brown, dense to very dense Slight decrease in density and silt content @ 7' Change to light brown @ 10' fine to medium grained SAND Tan to dark brown, dense, moist, slight caving Boring completed at NorCal Engineering to wood Project No. 9482·01 • • • I/) ~c o = -0 ca u 2.7 114.9 4.8 115.6 5.3 115.1 7.1 115.2 9 . " '" • • • Appendix B NorCal Engineering j. July 31, 2001 .' Page 12 • Sample 81 @ 0-3' 89 @ 3-4' Soil Type 81 @ 0-3' • 89@3-4' Sample 86@2-4' Sample Composite • % by weight TABLE I MAXIMUM DENSITY TESTS (ASTM: P-1557-00) Optimum Classification Moisture SAND, fine to medium grained, 10.0 slightly silty SAND, fine to medium grained, 9.0 slightly silty TABLE II EXPANSION INDEX TESTS (U.B.C. STD. 29-2) Classification SAND, fine to medium grained, slightly silty SAND, fine to medium grained, slightly silty TABLE III A TTERBERG LIMITS Liquid Limit 17 Plastic Limit 13 TABLE IV SULFATE TESTS NorCal Engineering Project Number 9482-01 . Maximum Dry Density (lbs.lcuJt.) 120.0 125.5 Expansion Index 05 02 Plasticity Index 4 Sulfate (%) 0.025 " 'I • • ~~~------~------~------~~--------~--------r-------~ P:-:-:.:-~ :,:- ~--.... , .. ~-.,., ...... . f---. --.. --f----.... ' 1----... -. f---.... . • , ......... - -....... _~I ... , '. .. ... _--.. _A ... ___ ._. ___ -~ ..... _. ~ ......... . •.• ' l. •.•. I ', • 1------._--. ~~--------+-------~~-------+------~~--------+-------~ 1---+,--,---r--' '-' _.. i---, .• -.... ~-_.-----. r-' ---" .--.--_. -.. -_. ~---.-+------.----:..----.... ---. --. -~ -.. -. ,-" . -.. --...... -_. -_._-;-- ::-1500 lit Go - o 500 1000 1500 2000 ~l STRESS (PSF) BORING DEPTH • C DRY *lISTURE SYJIIJOI. DENSITY CCJITEKT NtlEER (FEET) ,DEGREES) (PSF) (PCF) (I) X 1 2,5 34 200 117.6 3.0 0 8 3.0 31 125 113.6 3.4 A 9 2.0 36 175 114.9 2.7 C NOTE: TESTS PERFORMED ON SATURATED SAMPLES UNLESS SHOWN BELOW" (FM) FIELD MOISTURE 2500 TESTS PERFORMED ON UNDISTURBED SAMPLES UNLESS SHOWN' BELOW. (R) SAMPLES REMOLDED AT 90S OF MAXIMUM DRY DENSITY 3000 • NorCal Engineerliig-: PLATE A SOILS AND GEOTECHNICAL CONSULTANTS DIRECT SHEAR TEST RESULTS • • -.. - -2 < 0 2 4 6 8 10 0.1 I I ! , , I I I -r--:: r-i f-~ ~ .... ~~ "-.... ~ ~ l'... I I '~ '" I'k I r-.... --r"' ....... ~~-=" __ I -"_ ... --.. "" 1'-'" ""'" t'-.. I I , ! I i ! , i ! I I , I I ; I I J " i ! I I I i , I f , I I I 0.5 1.0 5 JIOIIW. PRESSURE (KSF) BORIJIG DEPTH DRY MOISTURE LIQUID SYMBOL IllBEI (FEET) DEJlSITY cOO'EIrt LIMIT (PCF) (I) (I) I 2 4 114.9 2 7 0 4 8 116. 1 6.0 A 9 12 115.2 7.1 0 ctJIPAESSI(II (AI) FInD .Isr. -•• m MEt 1 1 1 Til NOTE: I!IATER ADDED AT NOAML PRESSURE AT 1.0 KSF I ~~ ~ " ,~ ~ ...... " -.- I ! "I i i , I i 10 20 PlASTICITY INDEX (I) ---REBCUI) (I) SMIIl.£ ...... AT '" (If Mil .... DIY OEISITY NorCal Engineering SOll..s AND GEOTECHNICAL CONSULTANTS PIATE B CONSOlIDATION TEST RESULTS 40 ~-~------~----------------~------------------------------------------------~