HomeMy WebLinkAboutCT 02-24; LA COSTA GREENS NEIGHBORHOOD (1.11, 1.13, 1.14); FINAL REPORT OF TESTING AND OBSERVATION; 2006-10-13I ~'- -r 4 9 A'7' - q FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING SITE IMPROVEMENTS VILLAGES OF LA COSTA THE GREENS EL CAMINO REAL WIDENING STATIONS 268+20 TO 270+00 AND 284+77 TO 296+14 CARLSBAD, CALIFORNIA PREPARED FOR REAL ESTATE COLLATERAL MANAGEMENT COMPANY % MORROW DEVELOPMENT INCORPORATED CARLSBAD, CALIFORNIA OCTOBER 13, 2006 PROJECT NO. 06403-52-28 GEOCON INCORPORATED GEOTECHNICAL CONSULTANTS (4 4&>) Project No. 06403-52-28 October 13, 2006 Real Estate Collateral Management Company % Morrow Development Incorporated 1903 Wright Place, Suite 180 Carlsbad, California 92008 Attention: Mr. Tim O'Grady Subject VILLAGES OF LA COSTA - THE GREENS EL CAMINO REAL WIDENING STATIONS 268+20 TO 270+00 AND 284+77 TO 296+14 CARLSBAD, CALIFORNIA FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING SITE IMPROVEMENTS Gentlemen: In accordance with your request and our Proposal No. LG-06175 dated April 27, 2006 we have provided compaction testing and observation services during the construction of site improvements at the subject project. Our services were performed during the period of May 8, 2006 through August 16, 2006. The scope of our services included the following: Performing in-place density tests on a "call out" basis during utility trench backfill operations including storm drain, water, and joint trench backfill. Additionally, in-place density tests were performed during the preparation of sidewalk, curb and gutter and roadway subgrade and the placement of aggregate base and asphalt concrete pavement. Providing geotechnical consultation during improvement operations. Performing laboratory tests to aid in evaluating the compaction characteristics of various soil conditions encountered, including asphalt concrete and base materials. Preparing this final report of improvements. To aid in preparing this report, we have reviewed the following report and plans associated with the project improvements: 1. Final Report of Testing and Observation Services Performed During Site Grading, Villages of La Costa, Neighborhoods 1.02 & 1.03, Carlsbad, California, performed by Geocon Incorporated, dated April 3, 2006 (Project No. 06403-52-22). 6960 Flanders Drive • San Diego, California 92121-2974 • Telephone (858) 558-6900 0 Fax (858) 558-6159 Final Report of Testing and Observation Services Performed During Site Grading, Villages of La Costa, Neighborhood 1.01, Carlsbad, California, performed by Geocon Incorporated, dated March 13, 2006 (Project No. 06403-52-22) Public Street & Utility Plans for La Costa Greens, El Camino Real Widening, Drawing No. 397-2R, prepared by Hunsaker and Associates, City of Carlsbad approval dated April 10, 2006. In-place density tests were performed using a nuclear density gauge in accordance with ASTM Test Procedures D 2922-01 and D 2950-91 for soil and asphalt concrete, respectively. The results of the in-place density tests are summarized in Table I. In general, the results of the in-place density tests indicate that the utility trench backfill and sidewalk subgrade materials possess a dry density of at least 90 percent of the laboratory maximum dry density at the locations tested. In-place density test results indicate that the curb/gutter and roadway subgrade, as well as aggregate base materials possess a dry density of at least 95 percent of the laboratory maximum dry density at the locations tested. In-place density test results indicate that the asphalt concrete is compacted to at least 95 percent of the Hveem density at the locations tested. Laboratory compaction tests on representative soil samples were performed in accordance with ASTM Test Procedures D 1557-02 (maximum dry density and optimum moisture content), D 422-63 (particle size/sieve), D 2419-02 (sand equivalent value). Laboratory tests on asphalt concrete samples were performed in accordance with ASTM Test Procedures D 2726-04 (Hveem density), D 2041-03a (theoretical maximum density), D 1560-92 (asphalt concrete stability), D 6307-04 (asphalt content), and C 136-05 (sieve analysis for asphalt). The results of laboratory tests are summarized in Tables II through VI. Laboratory tests on base materials and asphalt concrete were performed to check conformance with Standard Specifications for Public Works Construction (Greenbook) and Standard Specifications, Caltrans. The results of the laboratory tests indicate the samples are in general conformance with the exception of those in bold type. These results have been reported to the Morrow Development on-site superintendent and to the City of Carlsbad representative. It should be noted that Section 203-6.3.3 of the City of Carlsbad Asphalt Concrete Special Provisions states, Deviations in gradation may be considered in conformance with the mix design provided the stability of the completed mix complies with the requirements for Stabilometer Value per Table 203-6.3.2 (A) Marshal Stability using Asphalt Institute MS-2. The results of our laboratory asphalt tests are summarized in Table III and indicate that the asphalt concrete samples met or exceeded the required stability values of 33 and 35 for 'i"2- and 3%-inch asphalt, respectively. Adequate drainage provisions are imperative. Under no circumstances should water be allowed to pond adjacent to improvements. Finish grades should be established so that drainage water is directed away from pavements, curb and gutters, and sidewalks to controlled drainage devices. Irrigation of Project No. 06403-52-28 - 2 - October 13, 2006 landscape areas adjacent to pavements should be monitored to provide just enough water to support plant life. Should you have any questions regarding this report, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCON INCORPORATED Michael C. Ertwine varado Senior Staff Geologist RCE 6-lio6915 4ad 8 MCE:EA:AS:dmc (6/del) Addressee OF ESS,0 CD cmv Project No. 06403-52-28 - 3 - October 13, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Test No. Date Location SD 1 05/08/06 Easement 31+24 SD 2 05/08/06 Easement 3 1+10 SD 3 05/09/06 Easement 31+34 SD 4 05/09/06 Easement 31+47 SD 5 05/12/06 Easement 30-i-90 SD 5A ---------------------------------------------------------- 05/12/06 Easement 30+90 SD 6 05/12/06 Easement 30+80 SD 7 05/12/06 Easement 30+72 SD 8 05/12/06 Easement 30+65 SD 9 05/12/06 Easement 30-i-70 SD 10 05/12/06 Easement 30+95 Elev. Plus Field Field Field Reqd. or 3/4 Dry Moist. Rel. Rel. Depth Curve Rock Dens. Cont. Comp. Comp. (ft) No. (%) (pet) (%) (%) (%) 90 0 104.9 16.1 92 90 0 104.7 15.2 92 90 0 105.9 14.4 93 90 0 103.7 14.5 91 90 0 103.2 14.8 91 - 90 0 102.6 15.1 90 90 0 103.9 14.7 91 90 0 105.7 14.3 93 90 0 102.9 14.2 91 90 0 104.5 14.9 92 90 0 103.1 15.2 91 90 0 102.2 14.3 90 -4 -3 -2 -3 -8 -8 -4 -8 -6 -4 -3 90 90 90 90 90 ------------------- 90 90 90 90 90 ------------------- 90 90 October 13, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reqd. or 3/4" Dry Moist. Rel. Re!. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location ('t) No. (%) (pcf) (%) (%) (%) WL 1 06/12/06 El Camino Real 284+89 WL 2 06/12/06 El Camino Real 284+89 WL 3 06/13/06 El Camino Real 284+93 WL 4 06/13/06 El Camino Real 284+89 WL 5 06/16/06 El Camino Real 293+02 WL 6 ---------------------------------------------------------------------- 06/16/06 El Camino Real 293+02 WL 7 06/29/06 El Camino Real 293+02 WL 8 06/29/06 El Camino Real 293+02 WL 9 07/24/06 El Camino Real (S) 269+32 WL 10 07/24/06 El Camino Real 269+32 WL 11 ---------------------------------------------------------------------- 07/24/06 El Camino Real 284+77 WL 12 07/24/06 El Camino Real 284+77 WL 13 07/31/06 El Camino Real 269+32 WL 14 07/31/06 El Camino Real 269+32 WL 15 07/31/06 El Camino Real 269+32 WL 16 ---------------------------------------------------------------------- 08/01/06 El Camino Real 269+32 WL 17 08/11/06 El Camino Real 284+77 WL 18 08/11/06 El Camino Real 284+77 -4 104 0 123.1 10.2 90 90 -2 104 0 122.7 9.9 90 90 -4 104 0 123.0 10.6 90 90 -2 104 0 122.4 10.3 90 90 -3 104 0 125.3 6.9 92 90 -3 104 0 122.6 6.2 90 90 -4 104 0 122.9 7.5 90 90 -2 104 0 124.2 6.9 91 90 -4 104 0 123.0 7.2 90 90 -2 3 0 108.5 12.9 91 90 -4 104 0 ----------------------------------------------------------------------------------------------- 126.7 7.8 93 90 -3 104 0 127.0 8.3 93 90 -4 3 0 111.1 13.3 93 90 -3 3 0 109.5 12.5 92 90 -2 104 0 124.0 6.4 91 90 -2 104 0 ----------------------------------------------------------------------------------------------- 125.3 6.0 92 90 -3 3 0 110.2 14.2 93 90 -2 3 0 112.0 13.2 94 90 Project No. 06403-52-28 - October 13, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Test No. Date Location Elev. or Depth ('t) Cue No. Plus 3/4" Rock (°"°) Field Dry Dens. (P) Field Moist. Cont. (%) Field Rel. Comp. (%) Req'd. Rel. Comp. (%) RW 1 06/21/06 El Camino Real 292+81 -4 104 0 125.6 9.7 92 90 RW 2 06/21/06 El Camino Real 292+81 -2 104 0 123.4 10.1 91 90 RW 3 06/22/06 El Camino Real 292+81 -4 104 0 122.8 8.2 90 90 RW 4 06/22/06 El Camino Real 292+81 -2 104 0 125.7 7.3 92 90 RW 5 06/29/06 El Camino Real 292+81 -4 104 0 123.0 6.8 90 90 RW 6 07/13/06 El Camino Real 284+77 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ -3 3 0 109.1 12.7 92 90 RW 7 07/13/06 El Camino Real 284+77 -1 3 0 109.8 12.9 92 90 RW 8 07/14/06 El Camino Real 284+77 -4 3 0 108.0 12.7 91 90 RW 9 07/28/06 El Camino Real 269+43 -4 3 0 109.9 13.5 92 90 RW 10 -- 07/28/06 E1Carnino Real 269-i-4 -3 3 0 110412.9 93 90 RW ii 07/31/06 El Camino Real 269+43 -4 104 0 122.7 7.1 90 90 RW 12 08/01/06 El Camino Real 269+43 -3 104 0 124.4 6.9 91 90 RW 13 08/01/06 El Camino Real 269+43 -2 104 0 125.7 6.8 92 90 RW 14 08/02/06 El Camino Real 289+25 -3 105 0 120.1 9.1 95 90 RW 15 08/02/06 El Camino Real 289+25 -2 105 0 119.4 10.2 94 90 RW 16 08/03/06 El Camino Real 289+42 -3 105 0 121.6 9.0 96 90 RW 17 08/03/06 El Camino Real 289+25 -2 105 0 120.1 8.5 95 90 RW 18 08/10/06 El Camino Real 289+42 -2 105 0 118.4 8.0 93 90 Project No. 06403-52-28 October 13, 2006 it TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Test No. Date Location Elev. or Depth t) Curve No. Plus 3/4" Rock (%) Field Dry Dens. (pcf) Field Moist. Cont. (%) Field Rel. Comp. (%) Req'd. Rel. Comp. (%) SW 1 08/09/06 El Camino Real Median 285+75 0 3 0 113.4 12.8 95 90 SW 2 08/09/06 El Camino Real Median 287+00 0 3 0 115.0 13.4 97 90 SW 3 08/09/06 El Camino Real Median 289+00 0 3 0 114.0 11.7 96 90 SW 4 08/09/06 El Camino Real Median 291+00 0 3 0 111.9 12.0 94 90 SW 5 08/09/06 El Camino Real Median 292+90 0 3 0 112.2 11.2 94 90 SW 6 08/09/06 El Camino Real Median 294+00 0 3 0 116.0 12.4 97 90 SW 7 08/09/06 El Camino Real Median 296+00 0 3 0 111.1 13.0 93 90 SW 8 08/16/06 El Camino Real (E) 286+00 0 3 0 111.0 12.2 93 90 SW 9 08/16/06 El Camino Real (E) 287+50 0 3 0 109.1 13.5 92 90 SW 10 08/16/06 El Camino Real (E) 289+00 0 3 0 112.6 12.0 95 90 SW 11 08/16/06 El Camino Real (E) 290+40 0 3 0 113.3 11.8 95 90 SW 12 08/16/06 El Camino Real (E) 291+95 0 3 0 112.0 11.5 94 90 SW 13 08/16/06 El Camino Real (E) 293+40 0 3 0 112.2 12.6 94 90 SW 14 08/16/06 El Camino Real (E) 294+40 0 3 0 111.4 13.7 94 90 SW 15 08/16/06 El Camino Real (E) 296+00 0 3 0 110.0 11.1 92 90 Project No. 06403-52-28 October 13, 2006 11 I-- TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4' Dry Moist. Rel. Rel. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location (ft) No. (°"°) (pcO (%) (%) (%) CO 1 07/05/05 El Camino Real 295+80 0 3 0 116.8 12.9 98 95 CO 2 07/05/05 El Camino Real 294+15 0 3 0 114.1 13.0 96 95 CO 3 07/06/05 El Camino Real 292+50 0 3 0 113.8 13.3 96 95 CO 4 07/06/05 El Camino Real 290+95 0 3 0 115.4 12.9 97 95 CO 5 07/06/05 El Camino Real 289+10 0 3 0 112.9 12.7 95 95 CO 6 07/07/09 El Camino Real 287+40 0 3 0 117.0 13.2 98 95 CO 7 07/07/09 El Camino Real 285+95 0 3 0 113.4 13.6 95 95 CO 8 07/11/06 El Camino Real 245+82 0 105 0 119.2 9.2 94 95 CO 8 A 07/11/06 El Camino Real 245+82 0 105 0 123.5 8.9 97 95 CO 9 07/11/06 El Camino Real 293+75 0 105 - 0 118.4 10.1 --95 CO 9 A 07/11/06 El Camino Real 293+75 0 105 0 121.6 8.0 96 95 CO 10 07/11/06 El Camino Real 292+30 0 105 0 119.5 9.0 94 95 CO IOA 07/11/06 El Camino Real 292+30 0 105 0 123.1 8.6 97 95 CO 11 07/11/06 El Camino Real 290+60 0 105 0 117.3 8.8 92 95 CO 11 A 07/11/06 El Camino Real 290+60 0 105 0 120.9 8.4 - 95 - 95 - CO 12 07/11/06 El Camino Real 288+65 0 105 0 118.3 8.6 93 95 CO 12A 07/11/06 El Camino Real 288+65 0 105 0 122.0 8.7 96 95 CO 13 07/11/06 El Camino Real 286+95 0 105 0 117.6 9.2 93 95 CO 13 A 07/11/06 El Camino Real 286+95 0 105 0 122.0 9.2 96 95 CO 14 07/31/06 El Camino Real 285+50 0 107 0 138.4 5.6 95 95 CO 15 07/31/06 El Camino Real Median 286+50 0 107 0 141.4 5.5 97 95 CO 16 07/31/06 El Camino Real 287+40 0 107 0 139.2 5.6 96 95 CO 17 07/31/06 El Camino Real 288+75 0 107 0 140.1 5.0 96 95 CO 18 07/31/06 El Camino Real 289+60 0 107 0 137.9 4.7 95 95 CO 19 07/31/06 El Camino Real 290+50 0 107 0 138.7 5.1 95 95 CO 20 07/31/06 El Camino Real 291+55 0 107 0 139.8 5.2 96 95 CO 21 07/31/06 El Camino Real 292+70 0 107 0 139.0 6.0 96 95 CO 22 07/31/06 El Camino Real 293+80 0 107 0 140.5 6.1 97 95 CO 23 07/31/06 El Camino Real 294+95 0 107 0 141.3 4.9 97 95 CO 24 07/31/06 El Camino Real 296+00 0 107 0 138.0 5.7 95 95 CO 25 08/03/06 El Camino Real 268+25 0 3 0 115.4 12.9 97 95 CO 26 08/03/06 El Camino Real Xgutter269+00 0 3 0 115.0 13.3 97 95 CO 27 08/03/06 El Camino Real 269+80 0 3 0 114.1 12.2 96 95 CO 28 08/08/06 El Camino Real 268+35 0 107 0 140.0 5.3 96 95 CO 29 08/08/06 El Camino Real Xgutter 269+05 0 107 0 139.0 6.3 96 95 CO 30 08/08/06 El Camino Real 269+75 0 107 0 142.5 4.9 98 95 Project No. 06403-52-28 October 13, 2006 O TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Test No. Date Location Elev. or Depth ('t) Curve No. Plus 3/4" Rock (°"°) Field Dry Dens. (P) Field Moist Cont. (%) Field Rel. Comp. (%) Reqd. Re!. Comp. (%) SO 1 05/19/06 El Camino Real 290+00 0 90 0 108.7 15.6 96 95 SO 2 06/13/06 El Camino Real 284+89 0 104 0 129.5 10.1 95 95 SO 3 06/16/06 El Camino Real 293+02 0 104 0 129.2 6.9 95 95 SG 4 06/16/06 El Camino Real 293+02 0 104 0 128.8 6.6 95 95 SO 5 06/22/06 El Camino Real 292+81 0 104 0 129.0 7.3 95 95 SG 6 06/30/06 El Camino Real 292+81 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 0 104 0 129.8 7.8 95 95 SO 7 06/30/06 El Camino Real 284+89 0 104 0 130.7 6.9 96 95 SO 8 07/05/06 El Camino Real 295+95 0 3 0 116.7 12.9 98 95 50 9 07/05/06 El Camino Real 295+35 0 3 0 114.2 12.5 96 95 SG io 07/06/06 El Camino Real 295+00 0 3 0 115.7 12.9 97 95 50 11 07/06/06 El Camino Real 294+68 0 3 0 113.4 13.0 95 95 50 12 07/06/06 El Camino Real 293+65 0 3 0 113.1 13.3 95 95 SO 13 07/06/06 El Camino Real 293+00 0 3 0 116.2 12.7 98 95 SO 14 07/06/06 E1Camino Real 291+80 0 3 0 115.3 12.9 97 95 SO 15 07/06/06 El Camino Real 290+55 0 3 0 113.0 13.1 95 95 50 16 07/07/06 El Camino Real 289+25 0 3 0 115.7 12.9 97 95 SO 17 07/07/06 El Camino Real 287+95 0 3 0 116.2 13.0 98 95 SO 18 07/07/06 El Camino Real 286+50 0 3 0 114.4 12.6 96 95 50 19 07/14/06 El Camino Real 284+77 0 3 0 113.4 13.4 95 95 SG 20 07/14/06 El Camino Real 284+77 0 3 0 114.7 12.9 96 95 50 21 07/17/06 El Camino Real 284+78 0 3 0 117.0 11.9 98 95 SG 22 07/17/06 El Camino Real 284+78 0 3 0 115.2 12.9 97 95 SG 23 07/31/06 El Camino Real 269+32 0 105 0 123.3 7.2 97 95 50 24 08/01/06 El Camino Real 269+43 0 105 0 124.5 8.5 98 95 50 25 08/01/06 El Camino Real 269+32 0 105 0 125.4 7.6 99 95 50 26 08/03/06 El Camino Real 289+42 0 105 0 126.0 7.5 99 95 SO 27 08/03/06 El Camino Real 289+50 0 3 0 116.0 12.0 97 95 SO 28 08/10/06 El Camino Real 289+32 0 105 0 124.1 8.0 98 95 SO 29 08/10/06 El Camino Real 289+42 0 105 0 122.8 7.9 97 95 50 30 08/11/06 El Camino Real 284+77 0 105 0 123.7 8.9 97 95 I Project No. 06403-52-28 October 13, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Test No. Date Location B 1 05/19/06 El Camino Real 290+00 B 2 05/19/06 El Camino Real 290+00 B 3 06/13/06 El Camino Real 284+89 B 4 06/16/06 El Camino Real 293+02 B 5 06/16/06 El Camino Real 293+02 B 6 06/22/06 El Camino Real 292+81 B 7 06/30/06 El Camino Real 293+02 B 8 06/30/06 El Camino Real 284+89 B 9 07/06/06 El Camino Real 295+95 B 10 07/06/06 El Camino Real 295+50 B 11 07/07/06 El Camino Real 294+65 B 12 07/07/06 El Camino Real 294+00 B 13 07/07/06 El Camino Real 292+90 B 14 07/07/06 El Camino Real 291+40 B 15 07/10/06 El Camino Real 290+12 B 16 07/10/06 El Camino Real 288+50 B 17 07/10/06 El Camino Real 287+10 B 18 07/10/06 El Camino Real 286+20 B 19 07/14/06 El Camino Real 284+77 B 20 07/14/06 El Camino Real 284+77 B 21 07/17/06 El Camino Real 286+32 B 22 07/17/06 El Camino Real 287+50 B 23 07/17/06 El Camino Real 288+20 B 24 07/17/06 El Camino Real 289+00 B 25 07/17/06 El Camino Real 289+90 B 26 07/17/06 El Camino Real 284+78 B 27 07/17/06 El Camino Real 284+78 B 28 07/17/06 El Camino Real 290+76 B 29 07/17/06 El Camino Real 291+75 B 30 07/17/06 El Camino Real 292+78 B 31 07/17/06 El Camino Real 293+60 B 32 07/17/06 El Camino Real 294+62 B 33 07/17/06 El Camino Real 295+70 B 34 07/31/06 El Camino Real 269+32 B 35 08/01/06 El Camino Real 269+43 B 36 08/01/06 El Camino Real 269+43 B 37 08/10/06 El Camino Real 269+32 B 38 08/10/06 El Camino Real 289+25 B 39 08/11/06 El Camino Real 289+42 .. B 40 ------------------------------------------------------------------------------- 08/11/06 El Camino Real 284+77 B 41 08/15/06 El Camino Real 286+00 B 42 08/15/06 El Camino Real 287+00 • B 43 08/15/06 El Camino Real 288+00 B 44 08/15/06 El Camino Real 268+60 B 45 08/15/06 El Camino Real 269+60 Elev. or Depth (ft) Cue No. Plus 3/4 Rock (%) Field Dry Dens. (pcf) Field Moist. Cont. (%) Field Rel. Comp. (%) Req'd. Rel. Comp. (%) 99 0 139.7 6.7 95 95 99 0 140.2 6.5 96 95 99 0 139.0 5.6 95 95 99 0 140.3 5.9 96 95 99 0 139.3 5.6 95 95 99 0 143.8 5.5 98 95 99 0 140.2 6.0 96 95 99 0 139.4 5.8 95 95 105 0 122.3 10.2 96 95 105 0 120.5 9.3 95 95 105 0 124.2 9.0 98 95 105 0 121.5 9.8 96 95 105 0 122.0 10.2 96 95 105 0 121.0 9.7 95 95 105 0 120.9 9.2 95 95 105 0 123.3 8.3 97 95 105 0 122.1 8.9 96 95 105 0 120.3 8.0 95 95 99 0 141.8 5.9 97 95 99 0 139.1 6.3 95 95 105 0 122.0 7.2 96 95 105 0 123.6 9.2 97 95 105 0 121.4 7.6 96 95 105 0 121.7 9.2 96 95 105 0 123.2 9.6 97 95 105 0 122.6 8.0 97 95 105 0 122.0 9.1 96 95 105 0 124.0 8.4 98 95 105 0 121.9 7.3 96 95 105 0 121.2 8.4 95 95 105 0 122.6 9.2 97 95 105 0 121.3 9.4 96 95 105 0 123.2 9.8 97 95 105 0 122.6 8.4 97 95 105 0 125.4. 9.2 99 95 105 0 125.4 9.2 99 95 105 0 120.9 8.3 95 95 105 0 121.4 8.5 96 95 105 0 122.2 9.1 96 95 105 0 123.0 8.8 97 95 107 0 138.9 6.7 96 95 107 0 140.1 6.0 96 95 107 0 139.6 5.9 96 95 107 0 139.5 5.5 96 95 107 0 141.2 6.4 97 95 Project No. 06403-52-28 October 13, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Test No. Date Location Sample No. Field Dens. (pct) Field Rel. Comp. (%) Reqd. Rel. Comp. (%) AC 1 05/19/06 El Camino Real 290+00 AC1 146.3 97 95 AC 2 05/19/06 El Camino Real 290+00 AC1 145.0 96 95 AC 3 06/23/06 El Camino Real 292+81 AC2 145.1 98 95 AC 4 06/23/06 El Camino Real 293+02 AC2 144.9 97 95 AC 5 06/23/06 El Camino Real 292+81 AC2 146.2 98 95 AC 6 06/23/06 El Camino Real 293+02 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ AC2 145.5 98 95 AC 7 06/30/06 El Camino Real 293+02 AC2 146.1 98 95 AC 8 06/30/06 El Camino Real 292+81 AC2 145.9 98 95 AC 9 06/30/06 El Camino Real 293+02 AC2 146.3 98 95 AC 10 06/30/06 El Camino Real 292+81 ----146.0 98 95 AC 11 06/30/06 El Camino Real 284+83 AC2 146.7 99 -- 95 AC 12 06/30/06 El Camino Real 284+83 AC2 146.3 98 95 AC 13 07/19/06 El Camino Real 285+85 AC3 138.7 96 95 AC 14 07/19/06 El Camino Real 287+65 AC3 139.0 96 95 AC 15 07/19/06 El Camino Real 289+40 AC3 135.7 94 95 AC 15 A 07/19/06 El Camino Real 289+40 AC3 98 95 AC 16 07/19/06 El Camino Real 291+00 AC3 139.0 96 95 AC 17 07/19/06 El Camino Real 292+38 AC3 138.2 96 95 AC 18 07/19/06 El Camino Real 294+78 AC3 139.9 97 95 AC 19 07/19/06 El Camino Real 295+06 AC3 138.4 96 95 AC 20 07/19/06 El Camino Real 286+68 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ AC3 141.8 98 95 , AC 21 07/19/06 El Camino Real 288+55 AC3 143.6 99 95 AC 22 07/19/06 El Camino Real 290+22 AC3 143.3 99 95 AC 23 07/19/06 El Camino Real 291+85 AC3 142.1 98 95 . AC 24 07/19/06 El Camino Real 293+25 AC3 142.3 98 95 AC 25 07/19/06 E1 Camino Real 295+64 AC3 141.7 98 95 AC 26 07/31/06 El Camino Real 269+32 AC4 144.3 96 95 AC 27 08/11/06 El Camino Real 269+32 AC5 143.9 97 95 AC 28 08/11/06 El Camino Real 269+43 ACS 145.6 98 95 AC 29 08/14/06 El Camino Real 284+77 AC -6 143.4 97 95 AC 30 08/14/06 El Camino Real 284+77 AC6 142.1 96 95 AC 31 08/15/06 El Camino Real 268+75 AC8 143.0 97 95 . AC 32 08/15/06 El Camino Real 269+40 AC8 141.9 96 95 AC 33 08/15/06 El Camino Real 286+50 AC8 142.7 97 95 AC 34 08/15/06 El Camino Real 287+60 AC8 143.5 97 95 . AC 35 08/15/06 El Camino Real 268+60 AC7 145.6 97 95 AC 36 08/15/06 El Camino Real 269+50 AC7 147.2 98 95 AC 37 08/15/06 El Camino Real 286+25 AC7 146.4 97 95 AC 38 08/15/06 El Camino Real 287+40 AC7 145.9 97 95 AC 39 08/15/06 El Camino Real 289+25 AC8 143.0 97 95 AC 40 08/15/06 El Camino Real 289+42 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ AC8 142.1 96 95 11 Project No. 06403-52-28 October 13, 2006 TABLE I EXPLANATION OF CODED TERMS - TEST SUFFIX A, B, C,... : Retest of previous density test failure, following moisture conditioning and/or recompaction. Fill in area of density test failure was removed and replaced with properly compacted fill soil. - PREFIX CODE DESIGNATION FOR TEST NUMBERS AC - ASPHALT CONCRETE B - BASE CG -CURB AND GUTTER RW - RECLAIMED WATER SD - STORM DRAIN SO - SUB GRADE SW - SIDEWALK WL - WATER LATERAL CURVE NO. Corresponds to curve numbers listed in the summary of laboratory maximum dry density and optimum moisture content test results table for selected fill soil samples encountered during testing and observation. - ROCK CORRECTION For density tests with rock percentage greater than zero, laboratory maximum dry density and optimum moisture content were adjusted for rock content. For tests with rock content equal to zero, laboratory maximum dry density and optimum moisture content values are unadjusted. SC: Sand Cone Test (ASTM D1556) NU: Nuclear Density Test (ASTM D2922) OT: Other - ELEVATION/DEPTH Test elevations/depths have been rounded to the nearest whole foot. Project No. 06403-52-28 October 13, 2006 TABLE II SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS ASTM D 1557-02 OptimumSample Maximum No. Description Dry Density Moisture Content (pci) (% dry weight) 3 Yellowish brown, Silty, fine to medium 119.0 13.2 SAND 90 Light yellow brown, fine, Sandy SILT 113.7 14.2 99 Dark olive brown, fine to coarse, Sandy 146.5 6.4 GRAVEL (Class 2 Base) 104 Dark olive brown, fine to coarse, Sandy 136.1 6.6 GRAVEL (Class 2 Base) 105 Olive brown, fine to coarse, Sandy GRAVEL 127.0 8.6 (Class 2 Base) 107 Dark olive brown, fine to coarse, Sandy 145.3 6.4 GRAVEL (Class 2 Aggregate Base) TABLE III SUMMARY OF LABORATORY TEST RESULTS FOR ASPHALT CONCRETE Sample No. Test Green Book Specifications Stability Aggregate Size (inch) Theoretical Maximum Density (pci) Hveem Maximum Density (pci) Percent Air Voids Stability AC-1 3/4 157.7 150.3 5 36 ~35 AC-2 3/4 156.1 148.7 5 47 ~35 AC-3 3/4 151.4 144.6 5 38 ~35 AC-4 3/4 157.5 149.6 5 50 >-35 AC-5 3/4 155.3 149.1 4 37 >-35 AC-6 ½ 157.1 147.5 6 37 ~33 AC-7 ~ 155.7 150.7 3 36 ~35 AC-8 ½ 154.7 147.8 4 35 ~33 Project No. 06403-52-28 October 13, 2006 Test Type Base Material Base Material Base Material Caltrans Specifications Sample No. 99 Sample No. 105 Sample No. 107 Class 2 Aggregate Base Sieve Analysis ASTM D 422 (% Passing) (% Passing) (% Passing) (% Passing) (Sieve Size) 1 inch 100 100 100 100 1/4 inch 100 93 98 90-100 No.4 60 40 58 35-60 No. 30 30 21 20 10-30 No. 200 9 7 9 2-9 Sand Equivalent 41 56 48 25 ASTM D 2419-02 I 4) I. S TABLE IV SUMMARY OF LABORATORY GRAIN SIZE ANALYSIS AND SAND EQUIVALENT TEST RESULTS TABLE V SUMMARY OF LABORATORY ASPHALT CONCRETE GRADATION AND ASPHALT CONTENT TEST RESULTS ASTM C 136-05 AND D 6307-04 3/4-Inch Aggregate Greenbook Test Type Section 203-6.3.2 Specifications Sample No. Sample No. Sample No. Sample No. AC-1 AC-2 AC-3 AC-4 Type II Class B2 Sieve Analysis ASTM C 136-01 (% passing) (% passing) (% passing) (% passing) (% passing) (Sieve Size) 1 inch 100 100 100 100 100 3/4 inch 98 98 94 99 87-100 ½ inch 88 86 75 86 70-87 % inch 73 70 59 70 55-76 No. 4 53 52 36 52 35-52 No. 8 39 37 25 38 22-40 No. 30 17 16 14 19 8-24 No. 50 11 10 9 12 5-18 No. 200 4 4 3 4 0-7 Oil Content (%)* ASTM D 6307-04 5.4 4.7 4.8 4.8 4.6-6.0 *Green Book refers to as "Asphalt %." Project No. 06403-52-28 October 13, 2006 là 0 '/z-Inch Aggregate Test Type Greenbook Section 203-6.3.2 Sample No. Sample No. Specifications Type II Class Cl AC-6 AC-8 Sieve Analysis ASTM C 136-05 (Sieve Size) (% passing) (% passing) (%passing) 3/4 inch 100 100 100 ½ inch 87 98 89-100 %inch 74 82 74-100 No.4 56 50 50-78 No. 8 37 36 32-60 No. 30 16 19 14-38 No. 200 4 6 2-10 Oil Content (%)* ASTM D 6307-04 5.0 5.1 4.6-7.0 *Green Book refers to as "Asphalt %." TABLE V (Continued) SUMMARY OF LABORATORY ASPHALT CONCRETE GRADATION AND ASPHALT CONTENT TEST RESULTS ASTM C 136-05 AND D 6307-04 3/4-Inch Aggregate Greenbook Test Type Section 203-6.3.2 Specifications Sample No. AC-5 Sample No. AC-7 Type H Class B2 Sieve Analysis ASTM C 136-01 (% passing) (% passing) (% passing) (Sieve Size) 1 inch 100 100 100 3/4 inch 95 92 87-100 ½ inch 86 74 70-87 % inch 74 60 55-76 No. 4 57 42 35-52 No. 8 42 32 22-40 No. 30 19 15 8-24 No. 50 12 10 5-18 No. 200 5 4 0-7 Oil Content (%)* ASTM D 6307-04 5 . . 5.1 4.6-6.0 *Green Book refers to as "Asphalt %." TABLE VI SUMMARY OF LABORATORY ASPHALT CONCRETE GRADATION AND ASPHALT CONTENT TEST RESULTS ASTM C 136-05 AND D 6307-04 Project No. 06403-52-28 October 13, 2006