GEOTECHNICAL INVESTIGATION
PROPOSED RESORT VILLAS
LA COSTA RESORT & SPA
COSTA DEL MAR ROAD
CARLSBAD, CALIFORNIA
-Prepared By-
Sladden Engineering
39-725 Garand Lane, Suite G
Palm Desert, Califomia 92211
(760) 772-3893
\
.^laddpn F.nfrinnnrinP
Sladden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
November 11, 2003 Project No. 444-3161
03-10-183
La Costa Resort and Spa
KSL Development Corporation
2100 Costa Del Mar Road
Carlsbad, Califorma, 92009
Attention: Mr. Chevis Hosea
Project: Proposed Resort Villas
La Costa Resort & Spa
2100 Costa Del Mar Road
Carlsbad, California
Subject: Geotechnical Investigation
Presented herewith is the report of our Geotechnical Investigation prepared for the new resort villas
proposed for the La Costa Resort & Spa complex located at 2100 Costa Del Mar Road in the City of
Carlsbad, California. The preliminary plans indicate that the proposed resort viUas will consist of 2
or 3 story structures with subterranean parking levels. This report was prepared in order to provide
recommendations for design and construction ofthe proposed building foundations.
This report presents the results of our field investigation and laboratory testing along with
conclusions and recommendations for design and construction. This report completes our agreed
upon scope of services as described in our proposal dated July 30, 2003.
We appreciate the opportunity to provide service to you on this project. If you have any questions
regarding this report, please contact the undersigned
Respectfiolly submitted,
SLADDEN ENGINEERING
D
Brett L. Anderson* w
Principal Engineer
SER/pc
Copies: 6/La Costa Resort and Spa
Sladden Engineering
GEOTECHNICAL INVESTIGATION
PROPOSED RESORT VILLAS
LA COSTA RESORT & SPA
COSTA DEL MAR ROAD
CARLSBAD, CALIFORNIA
November 11, 2003
TABLE OF CONTENTS
INTRODUCTION 1
SCOPE OF WORK i
PROJECT DESCRIPTION 1
REGIONAL SEISMICITY 2
LIQUEFACTION 2
SUBSURFACE CONDITIONS 2
CONCLUSIONS AND RECOMMENDATIONS 3
Foundation Design 4
Settlements 4
Lateral Design 4
Retaining Walls 4
Expansive SoUs 4
Concrete Slabs-on-Grade 5
Soluble Sulfates 5
Tentative Pavement Design 5
Shrinkage and Subsidence 6
General Site Grading 6
1. Clearing and Demohtion 6
2. Preparation of Building and Foundation Areas 6
3. Placement of Compacted FiU 6
4. Preparation of Slab and Pavement Areas 7
5. Testing and Inspection 7
GENERAL 7
APPENDIX A - Site Plan & Boring Logs
Field Exploration
APPENDIXB- LaboratoryTesting
Laboratory Test Results
APPENDIX C - 1997 UBC Seismic Design Criteria
\
Sladden Engineering
November 11, 2003 -1- Project No. 444-3161
03-10-183
INTRODUCTION
This report presents the results of a Geotechnical Investigation performed in order to provide
recommendations for the design and construction of the proposed resort villas and the various
associated site improvements. The La Costa Resort & Spa is located on the northeast corner of El
Camino Real and Costa Del Mar Road in the City of Carlsbad, Cahfornia. It is proposed to construct
several multi-unit resort/residential buildings within the central portion of the La Costa Resort and
Spa complex. It is our txnderstanding that the proposed resort vUlas wiU consist of 2 or 3 story
structures with subterranean parking levels. The plans indicate that the project wiU include
reconfigured driveways, walkways and parking areas and other related site improvements. A
preliminary site plan provided by the KSL Development Corporation was used dviring our
investigation.
SCOPE OF WORK
The purpose of our investigation was to determine certain engineering characteristics of the near
surface soils on the site in order to develop recommendations for foundation design and site
preparation. Our investigation included field exploration, laboratory testing, Uterature review,
engineering analysis and the preparation of this report. Evaluation of hazardous wastes was not
within the scope of services provided. Our investigation was performed in accordance with
contemporary geotechnical engineering principles and practice. We make no other warranty, either
e.xpress or implied.
PROJECT DESCRIPTION
The La Costa Resort and Spa complex is located on the northeast corner of El Camino Real and
Costa Del Mar Road in the City of Carlsbad, CaUfornia. The proposed project wUl include the
construction of 11 resort/residential buildings along with various associated site improvements. The
associated tmprovements will include reconfigvired walkways, driveways and parking areas,
landscaped areas and underground utiUties.
It is our understanding that the proposed resort/residential bmldings will be of relatively Ughtweight
wood-frame and/or steel frame construction and wiU include subterranean parking levels. The
proposed resort/residential buUdings will be supported by conventional shallow spread footings and
concrete slabs on grade. Based upon preliminary foundation loading information provided by KSL,
we assumed isolated column loads of up to 100 kips and waU loads of up to 5.0 kips per linear foot for
the resort villas buildings. We also assumed isolated column loads of up to 50 kips and waU loads of
up to 3.0 kips per linear foot for the proposed spa buUding. Grading is assumed to include
excavation for the proposed subterranean parking levels along with cutting and filling of the surface
soils to construct level building pads and to provide for proper site drainage.
The proposed resort villas will be constructed within the central portion of the La Costa Resort and
Spa complex in the vicinity of the new spa and ballroom buildings. The majority of the proposed
resort villas locations are concentrated within existing landscape areas but some existing structures
and improvements wUl be removed to accommodate the new buUdings. The proposed buUding sites
and adjacent areas slope gently downward towards the south but some areas include irregular
topography related to previous grading and landscaping. There are several existing buUdings in the
area including the new ballroom and spa buUdings as weU as several older structures. There are
numerous underground utUities servicing the existing buUdings and transecting the new building
areas.
^Irt/i/ian Pttnittoorrttrt
November 11, 2003 "2- Project No. 444-3161
03-10-183
REGIONAL SEISMICITY
A computer program was utUized to compUe data related to earthquake fault zones in the region and
related seismic activity that may affect the site. E.Q. Fault Version 3.00 (Blake 2000) provides a
compUation of data related to earthquake faults in the region. The program searches avaUable
databases and provides both distances to causitive faults and the corresponding accelerations that
may be experienced on the site due to earthquake activity along these faults. The attenuation
relationship utihzed for this project was based upon Boore (1997) attenuation curves. The output
data from this program is included in Appendix C. The mformation generated was utUized in our
liquefaction evaluation
As indicated on the summary page ofthe E.Q. Fault output data, the Rose Canyon fault is the closest
to the site (approximately 8.8 kUometers). The Newport-Inglewood (offshore) faiUt is located
approximately 16.8 kilometers west of the site. The maximum site acceleration is estimated to be
0.332g. This acceleration is based upon a maximum event of magiUtude 6.9.
LIQUEFACTION
Liquefaction occurs with sudden loss of soU strength due to rapid increases in pore press\ires within
cohesionless soUs as a result of repeated cychc loading during seismic events. Several conditions
must be present for Uquefaction to occur including; the presence of relatively shaUow groundwater,
generaUy loose soUs conditions, the susceptibUity of soUs to Uquefaction based upon grain-size
characteristics and the generation of sigiuficant and repeated seismicaUy induced ground
accelerations. Liquefaction affects primarily loose, uiuform grained cohesionless sands with low
relative densities.
As previously indicated the soUs underlying the site consist primarily of a thin layer of sUty clays
and clayey silts overlying dense sUty sands. Groundwater was encountered at varying depths within
several of our borings. The variable groundwater depths suggest that the water encountered
perched may be perched groundwater concentrated within more permeable sUty sand and silt layers
Based upon the prominence of non-Uquefiable sUts and clays and the dense conditions of the sUty
sand layers, it is our opinion that the potential for Uquefaction occurring beneath the site is
neghgible.
SUBSURFACE CONDITIONS
The site soUs consist primarily of a surface layer of silty clays and clay.ey sands overlying native silty
sands, sandy sUts, silty clays and clayey silts. Silty clays and clayey sands were encountered within
the upper 5 to 10 feet within the majority of our borings. The near siirface sUty clay layers were
underlain primarily by dense silty sand, sandy sUt and sUty clay layers. The site soUs appeared
fairly consistent in composition but very inconsistent in stratigraphy due to the varying grades
across the site.
The native soUs underlying the site were found to be firm throughout the depth of each of our
borings. The relatively undisturbed samples obtained indicated dry density varymg from 93 to 123
pcf. Sampler penetration resistance indicates that density within the underlying native soUs
generally increases with depth. The soUs were found to be moist throughout the depth of our borings
but some nearly saturated soils were encountered. Laboratory testing indicates moisture content
varying from 1.0 to 37.0 percent.
.'Hn/idon Rnoinccrino
November 11, 2003 -3- Project No. 444-3161
03-10-183
Laboratory testing indicates that the surface soils consist primarUy of sUty clays that were found to
be moderately expansive. Expansion testing indicates an expansion index of 81 for the sUty clays
that fails within the "medium" expansion category in accordance with the Uniform BuUding Code
classification system. ConsoUdation testing indicates that the majority of the site soUs are
susceptible to only minor consoUdation and/or compression related settlements.
Groundwater was encountered within several of our borings at depths as shaUow as 9 feet below the
existing ground surface. The lack of groundwater within several of our borings suggests that the
groundwater encountered was perched groundwater concentrated within more permeable layers.
The possible presence of groundwater should be considered in foundation design and may impact
construction.
CONCLUSIONS AND RECOMMENDATIONS
Based upon our field investigation and laboratory testing, it is ovir opinion that the proposed resort
residential vUIas are feasible from a soU mechanic's standpoint provided that the recommendations
included in this report are considered in building foundation design and site preparation. Due to the
somewhat inconsistent condition of the near surface soUs and the possibUity of cut/fiU transitions in
some of the proposed buUding areas, remedial grading including overexcavation and recompaction of
the primary foundation bearing soils is recommended. It is our opinion that remedial grading within
the proposed buUding areas should include the removal and recompaction of any compressible
surface soils as weU as the primary foundation bearing soUs. Specific recommendations for site
preparation are presented in the Site Grading section of this report.
Groundwater was encountered within several of our borings at depths as shaUow as 9 feet below the
existing ground surface. Due to the dense condition of the sandy soUs underlying the site, the
potential for liquefaction affecting the site is considered to be neghgible. In our opinion, liquefaction
related mitigation measures in addition to the site grading and foundation design recommendations
included in this report shoiUd not be necessary.
The site is located in a seismically active area as is aU of Southern CaUfornia. Design professionals
should be aware of the site setting and the potential for earthquake activity during the anticipated
life of the structure should be acknowledged. The accelerations that may be experienced on the site
(as previously discussed) should be considered in design. Seismic design parameters as outlined in
the 1997 UBC are summarized in Appendix C.
Caving did not occur within our borings but the potential for caving should be considered within
deeper excavations. All excavations should be constructed in accordance with the normal CalOSHA
excavation criteria. On the basis of our observations of the materials encountered, we anticipate
that the near surface clayey sUts and sUty sands wiU be classified by CalOSHA as Type B and Type
C soUs, respectively. SoU conditions should be verified in the field by a "Competent person"
employed by the Contractor.
The surface soils encountered during our investigation were found to be moderately expansive.
Laboratory testing indicated an Expansion Index of 81 for the near surface silty clays and clayey
silts which corresponds with the "medium" expansion category in accordance with UBC Standard 18-
2. Special expansive soU design criteria as outUned in the Uniform Building Code should not be the
controUing factor in the design of foundations and slabs on grade for this project but should be
considered in design.
nt M a a vi H n
November 11, 2003 -4- ProjectNo. 444-3161
03-10-183
The following recommendations present more detaUed design criteria that have been developed on
the basis of our field and laboratory investigation.
Foimdation Design: The resiUts of our investigation indicate that either conventional
shallow continuous footings or isolated pad footings that are supported upon properiy
recompacted soUs, may be expected to provide satisfactory support for the proposed
residential structmre foundations.
Footings should extend at least 18 inches beneath lowest adjacent grade. Isolated square or
rectangular footings at least 2 feet square may be designed using an aUowable bearing
pressiire of 2500 pounds per square foot. Continuous footings at least 12 inches wide may be
designed using an aUowable bearing value of 2000 pounds per square foot. The aUowable
bearing pressures may be increased by 200 psf for each additional one foot of width and 250
psf for each additional 6 inches of depth, tf desired. The maximum aUowable bearing
pressure should be 3000 psf.
The allowable bearing pressures are for dead and frequently appUed Uve loads and may be
increased by 1/3 to resist wind, seismic or other transient loading. Drainage from the
building area should be rapid and complete.
The recommendations provided in the preceding paragraph are based on the assumption that
all footings will be supported upon properly compacted soU. All grading should be performed
under the testing and inspection of the SoUs Engineer or his representative. Prior to the
placement of concrete, we recommend that the footing excavations be inspected in order to
verify that they extend into compacted soU and are free of loose and disturbed materials.
Settlements: Settlements resiUting from the anticipated foundation loads and fiU placement
are expected to be minimal. We estimate that ultimate settlements should be less than one
inch when using the recommended foundation bearing values. As a practical matter,
differential settlements between footings can be assumed as one-half of the total settlement.
Lateral Design: Resistance to lateral loads can be provided by a combination of friction
acting at the base of the slabs or foundations and passive earth pressure along the sides of
the foundations. A coefficient of friction of 0.40 between soil and concrete may be used with
dead load forces only. A passive earth pressure of 250 pounds per square foot, per foot of
depth, may be used for the sides of footings that are poured against properly compacted
native soils. Passive earth pressure should be ignored within-the upper 1 foot except where
confined (such as beneath a floor slab).
Retaining WaUs: Retaining waUs wiU be necessary to accomplish the proposed construction.
Lateral pressures for use in cantUever retaining waU design may be estimated using an
equivalent flmd weight of 40 pcf for level drained native backfiU conditions. For waUs that
are to be restrained at the top (such as the subterranean parking level walls), the equivalent
fluid weight should be increased to 60 pcf for level drained native backfUI conditions.
Backdrains should be provided for the full height of the walls. The recommended lateral
pressures should also be appUcable for use in the design of temporary shoring systems, tf
required
Expansive SoUs: Due to the presence of "medium" expansion category soUs near the surface
throughout the majority of the site, special expansive soU design criteria shoiUd be
considered in the design of foundations and concrete slabs-on-grade. Due to the somewhat
variable conditions, expansion potential should be reevaluated after grading.
\
Sladden Rnmneerinf
November 11, 2003 -5- Project No. 444-3161
03-10-183
Concrete Slabs-on-Grade: All siirfaces to receive concrete slabs-on-grade should be underlain
by a minimum compacted fill thickness of 12 inches, placed as described tn the Site Grading
Section of this report. Where slabs are to receive moisture sensitive floor coverings or where
dampness of the floor slab is not desired, we recommend the use of an appropriate vapor
barrier or an adequate capiUary break. Vapor barriers should be protected by sand in order
to reduce the possibility of puncture and to aid in obtaining uniform concrete curing.
Reinforcement of slabs-on-grade in order to resist expansive soil pressures wiU Ukely be
necessary. Slab reinforcement wUl also have a beneficial effect in containing cracking due to
concrete shrinkage. Temperature and shrinkage related cracking should be anticipated in
aU concrete slabs-on-grade. Slab reinforcement and the spacing of control joints should be
determined by the Structural Engineer based upon post-grading expansion test results.
Soluble Sulfates: The soluble sulfate concentrations of the smface soUs were determined to
be 774 and 1832 parts per mUlion (ppm) which is considered potentially corrosive with
respect to concrete. The use of Type V cement and speciahzed sulfate resistant concrete mix
designs may be necessary. The soluble siUfate content of the smface soils shoiUd be
reevaluated after grading and appropriate concrete mix designs should be determined based
upon post-grading test results.
Tentative Pavement Design: All paving shoiUd be underlain by a minimum compacted fiU
thickness of 12 inches (excluding aggregate base). This may be performed as described in the
Site Grading Section of this report. Based upon the smface soU conditions observed, an R-
Value of approximately 30 is expected. Based upon a design R-Value of 30, a preUminary
pavement design section of 3.0 inches of asphalt on 6.0 inches of Class 2 base material is
recommended for parking areas and areas Umited to auto and Ught truck traffic (Traffic
Index = 5.0). In driveway areas and areas where heavy truck traffic is expected (Traffic
Index = 6.5), the pavement section should be increased to 4.0 inches of asphalt on 6.0 inches
of base material.
Pavement should be confined by cmbs. Subgrade should be compacted to at least 90 percent
and base material should be compacted to at least 95 percent of maximum density. Final
design for asphalt pavement should be based upon R-Value testing performed after rough
grading.
Aggregate base should conform to the reqiUrements for Class 2 Aggregate Base in Section 26
of CalTrans Standard Specifications, January, 1992. Asphaltic concrete should conform to
Section 39 of the CalTrans Standard Specifications. The recommended sections shoiUd be
provided with a uniformly compacted subgrade and precise control of thickness and
elevations during placement. Drainage from paved areas should be rapid and complete. It
should be noted that the pavement sections recommended above are minimum sections, tf
heavily loaded vehicles are expected to cross automobUe parking and driving areas, thicker
pavement sections should be considered in these locations.
Pavement design sections are tentative and should be confirmed at the completion of site
grading when the subgrade soUs are in-place. This wiU include sampUng and testing of the
actual subgrade soils and an analysis based upon the specific use.
.^Inddet, Pnoineprino
November 11, 2003 -6- Project No. 444-3161
03-10-183
Shrinkage and Subsidence: Volumetric shrinkage of the material that is excavated and
replaced as controUed compacted fiU should be anticipated. We expect that the shrinkage
could vary from 10 to 15 percent. Subsidence of the smfaces that are scarified and
compacted should be between 1 and 2 tenths of a foot. This wUl vary depending upon the
type of eqmpment used, the moistme content of the soU at the time of grading and the actual
degree of compaction attained durtng grading. These values for shrinkage and subsidence
are exclusive of losses that wUl occm due to the site clearing, buUding demoUtion and the
removal of unsuitable materials.
General Site Grading: AU grading should be performed in accordance with the grading
ordinance of the City of Carlsbad, Cahfornia. The foUowing recommendations have been
developed on the basis of our field and laboratory testing:
1. Clearing and DemoUtion: Proper clearing wUl be very Unportant. AU previous
pavements, slabs, foimdations, trees and the associated root systems should be
removed from the buUding areas. Underground utUities should also be removed from
the buUding areas. SoUs that are distmbed during site clearing and demoUtion
operations should be removed and replaced as controUed compacted fUl under the
direction of the SoUs Engineer.
2. Preparation of BuUding and Foundation Areas: The remedial grading recommended
should include the overexcavation and recompaction of any compressible smface soUs
as weU as the primary foundation bearing soils tn order to provide uniform
foundation support. Removals within the buUding areas should extend to a
minimum depth of 3 feet below existing grade or 3 feet below the bottom of the
footings, whichever is deeper.
Subsequent to excavation, the exposed soUs should be scarified to a depth of 1-foot,
moistme conditioned and recompacted to at least 90 percent relative compaction.
Once cleaned of unsmtable material, the excavated soUs may then be replaced as
controUed compacted fiU.
3. Placement of Compacted FiU: FUl materials consisting of on-site soUs or approved
import soUs should be spread in shallow Ufts at near optunum moisture content and
compacted to a minimum of 90 percent relative compaction. Imported fiU material
shaU be of equal or greater quaUty than the native surface soUs. The contractor shaU
notify the SoUs Engineer at least 48 hours in advance of importing soUs in order to
provide sufficient time for the evaluation of proposed import materials. The
contractor shaU be responsible for deUverUig material to the site that complies with
the project specifications. Approval by the SoUs Engineer wUl be based upon
material delivered to the site and not the preUminary evaluation of import sources.
Our observations of the material encountered dming om investigation indicate that
compaction wUl be most readUy obtained by means of heavy rubber tired grading
equipment and sheepsfoot compactors. A untform and near optimum moisture
content should be maintained during fiU placement and compaction.
C1..JJ.
November 11, 2003 -7- Project No. 444-3161
03-10-183
4. Preparation of Slab and Paving Areas: AU surfaces to receive asphalt or concrete
paving and exterior concrete slabs-on-grade should be underlain by a minimum
compacted fiU thickness of 12 Uiches. This may be accomplished by a combination of
overexcavation, scarification and recompaction of the smface soUs, and the
placement of the excavated material as compacted engineered fiU. Compaction of the
concrete slab sureas should be to a mimmum of 90 percent relative compaction.
Compaction within the proposed pavement areas should be to a minimum of 95
percent relative compaction.
5. Testing and Inspection: DmUig grading tests and observations should be performed
by the SoUs Engineer or his representative in order to verify that the grading is being
performed in accordance with the project specifications. Field density testing shaU
be performed in accordance with applicable ASTM test standards. The minimum
acceptable degree of compaction shaU be 90 percent of the maximum dry density as
obtained by the ASTM D1557-91 test method. Where testing indicates insufficient
density, additional compactive effort shall be appUed untU retesting indicates
satisfactory compaction.
GENERAL
The findings and recommendations presented in this report are based upon an interpolation of the
soU conditions between boring locations and extrapolation of these conditions throughout the
proposed buUding area. Should conditions encountered during grading appear different than those
indicated tn this report, this office should be nottfied.
This report is considered to be appUcable for use by La Costa Resort and Spa for the specific site and
project described herein. The use of this report by other parties or for other projects is not
authorized. The recommendations of this report are contingent upon monitoring of the grading
operations by a representative of Sladden Engineering. AU recommendations are considered to be
tentative pending our review of the grading operations and additional testing, if indicated. If others
are employed to perform any soU testing, this office should be notified prior to such testing in order
to coordinate any required site visits by om representative and to assure indemnification of Sladden
Engineering.
We recommend that a pre-job conference be held on the site prior to the initiation of site grading.
The purpose of this meeting wiU be to assure a complete understanding of the recommendations
presented in this report as they apply to the actual grading performed.
APPENDIX A
Site Plan
Borings Logs
\
Sladden Engineering
APPENDIX A
FIELD EXPLORATION
For om field investigation, 11 exploratory borings were excavated on September 3 and 4, 2003, using
a truck mounted hoUow stem auger rig (Mobile B61). The approximate boring locations are
indicated on the site plan included in this appendix. Continuous logs of the materials encountered
were prepared dming drUling by a representative of Sladden Engineering. Boring logs are included
in this appendix.
Representative undisturbed samples were obtained within om borings by driving a thin-waUed steel
penetration sampler (CaUfornia spUt spoon sampler) or a Standard Penetration Test (SPT) sampler
with a 140-pound hammer dropping approximately 30 inches (ASTM D1586). The number of blows
requtred to drive the samplers 18 inches was recorded in 6-inch increments and blowcounts are
indicated on the boring logs.
The Cahfornia samplers are 3.0 inches in diameter, carrying brass sample rings having inner
diameters of 2.5 inches. The standard penetration samplers are 2.0 inches in diameter with an inner
diameter of 1.5 inches. Undistmbed samples were removed fi:om the sampler and placed in moistme
sealed containers in order to preserve the natmal soil moistme content. Bulk samples were obtained
frnm the excavatton spoUs and samples were then transported to om laboratory for further
observations and testing. Samples were then transported to om laboratory for fmther observations
and testing.
\
Sladden Engineering
.i:.-
• ^ i-l ;
r-
>
O O 05
H
>
5 m
> ,
i< im
H
>
O H
> TJ
Approximate Boring Locations
Boring Location Map
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road
Carlsbad, California
Sladden Engineering
Project Number: 544-3161 Date: 11-10-03
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-3-03 Boring No. 1 - Lot 10 •Iob No.: 444-3161
a*-
c
o
m
DESCRIPTION a.
'3
tZ)
Q
D 3
e
.>-2
Pi B
^6
REMARKS
Silty Clay: Brown,
slightly sandy
CL
i
10
15
20
25
30
35
40
45
50
55
i-
10/13/19
18/26/37
15/16/21
118
Silty Clay; Brown with
interbedded silty clayey sand layers
CL 118
Silty Clay: Brown,
slightly sandy
CL 116
21/35/38
I
I
I
I
I
Silty Clay: Brown with
interbedded silty clayey sand layers
CL 105
1/22/25
0/14/20
6/9/13
9/11/16
12/14/15
Clayey Sand: Brown,
slightly silty, fine grained
SC
Silty Clay: Brown with
very silty sand layer 4" thick
Silty Clay: Brown
Silty Clay: Brown,
slightly sandy
Silty Clay: Brown
11/13/21
CL
CL
CL
CL
82% passing #200
82% passing #200
14 86% passing #200
85% passing #200
23
25
28
21
30
39% passing #200
91% passing #200
3% passing #200
87% passing #200
89% passing #200
95% passing #200
im Recovered Sample
I [ I Standard Penetration
Sample
Note: The stratification lines
.represent the approximate
bi^undaries between the soil types:
the transitions may be gradual.
Total Depth = 51.5'
No Bedrock
No Groundwater
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-3-03 Boring No. 2 - Lot ll Job No.: 444-3161
&
o
JS E >>
c/3
VO
O
DESCRIPTION a
H •
'o
Cfl
Q
3 3
9J
S Si .2
a> CL. REMARKS
Clayey Sand: Brown,
slightly silty, fine grained
SC
Z
10
15
20
25
30
35
40
45
50
55
i-
12/17/20
3/40/45
123
Silty Clay: Brown, sandy CL 121
r 21/33/30 Clayey Sand: Brown,
slightly silty
SC
I
I
7/20/36
15/27/36
15/22/35
115
103
Sand: Grey brown, fine grained
trace silt, trace clay
SP
44% passing #200
79% passing #200
38% passing #200
26% passing #200
14% passing #200
16%) passing #200
Recovered Sample
I J |.Standard Penetration
Sample
\
Total Depth = 31.5'
No Bedrock
No Groundwater
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
Date: 9-3-03
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Boring No. 3 - Lot 15 Job No.: 444-3161
— 4)
c
vo
Cfl
o
DESCRIPTION
<u
'o
>1
Q
D 3
3
O a REMARKS
Silty Clay: Brown,
slightly sandy
CL
Scattered tree roots
10
15
20
25
30
35
40
45
50
55
n
12/13/17
14/20/27
23/33/37
112 83% passing #200
Silty Clay; Brown, sandy CL
I
17/23/24
11/19/26
16/50-5"
Clayey Sand: Brown, very clayey,
silty, fine grained
SC
Silty Sand; Grey brown,
fine grained
SM
Sand: Grey brown,
fine grained
SP
120 86% passing #200
115 46% passing #200
21% passing #200
6% passing #200
[B
Recovered Sample
Unrecovered Sample
Standard Penetration
Sample
Total Depth = 31.5'
No Bedrock
No Groundwater
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-3-03 Boring No. 4 - Lot 14 Job No.: 444-3161
o ja
E
Cfl
s
vo
Cfl
o
s
DESCRIPTION a
H
'o
Ofl
a;
3
O
B
_« S3
S
REMARKS
Silty Clay; Brown with
interbedded silty clayey sand layers
CL
5/10/16 112 19
10
15
20
25
30
35
40
45
50
55
9/13/18 Silty Clay; Brown,
slightly sandy
CL 107
14/20/27
14/24/30
Clayey Silt; Brown, sandy
I
I
Silty Sand; Grey brown,
fine grained
15/26/26
7/15/16
Sand; Grey brown,
fine grained
Silty Sand; Grey brown,
fine grained
ML 115 15
SM 94
SP
SM 12
73% passing #200
84%) passing-#200
78% passing #200
19%) passing #200
6%) passing #200
26% passing #200
m Recovered Sample
I Standard Penetration
Sample
\
Total Depth = 31.5'
No Bedrock
No Groundwater
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-3-03 Boring i\o. 5 - Lot 8 Job No.: 444-3] 61
~ O)
a. •"
Qo Cfl
e
vo
CA
o
5
DESCRIPTION
1) a
'3
Cfl
Q
J3 3
4;
« E
REMARKS
Clayey Sand: Brown,
slightly silty, fine grained
SC
10
15
20
25
30
35
40
45
50
Clayey Sand: Brown, fine to
coarse grained, silty
SC 102 23% passing #200
z
26/50-5"
19/30/37
15/15/15
7/10/13
Sand: Brown, slightly silty,
slightly clayey, fine grained
SP/SM 102
Sand: Grey brown,
fine grained
SP IOO
I
Silty Sand: Grey brown,
fine grained
SM 102
Silty Clay: Brown CL
E
I
7/9/9
8/9/8
8/17/19
8/7/17
7/14/19
Silty Clay; Brown with
very silty fine grained sand
layer 2" thick
CL
Silty Clay: Brown, stiff CL
Silty Clay; Brown with
very silty fine grained sand
layer 2" thick
CL
Silty Clay: Brown, stiff CL
11% passing #200
3% passing #200
22 26% passing #200
37
37
91% passing #200
92% passing #200
\7 Groundwater (§ 33'
22
17
22
78% passing #200
93% passing #200
71% passing #200
21 92% passing #200
55
^1 Recovered Sample
[ [ I Standard Penetration
Sample
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
Total Depth = 51.5'
No Bedrock
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-3-03 Boring No. 6 - Lot 12 Job No.: 444-3161
JS «
~ ,0)
QO
o
C >>
Cfl
vo
Cfl
o
5
DESCRIPTION
0)
a.
H
'3
Cfl
Q
D 3
3
REMARKS
Silty Clay: Brown, sandy CL
r
9/13/23 108
10
15
20
25
30
35
40
45
50
55
9/12/16 Clayey Silt; Brown with
thin interbedded silty fine
to coarse grained sand layers
ML 99 20
6/35/43 Silty Clay; Brown, sandy CL 114 16
i-20/34/50
I
I
Silty Clay; Brown, stiff CL 115 17
8/13/17
9/16/17
Clayey Silt: Brown with
clayey, silty fine grained sand
layer 6" thick
ML 14
Silty Sand; Grey brown,
fine grained
SM
82% passing #200
67%) passing #200
85% passing #200
91%) passing #200
51% passing #200
19% passing #200
Recovered Sample
I Standard Penetration
Sample
TotalDepth = 31.5'
No Bedrock
No Groundwater
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-4-03 Boring No. 7 - Lot 16 Job No.: 444-3161
- 4)
a""
QO
o
J2
E
Cfl
vo
Cfl
o
5
DESCRIPTION a
H
'o
Cfl
>1 u
Q
D3
OJ
3
'3
« E
REMARKS
Clayey Sand: Brown,
slightly silty, fine grained
SC
10
15
20
25
30
35
40
45
SO
9/10/12
0/15/19
108 10
Clayey Sand; Brown, fine to
coarse grained, silty
SC
31/50-5'
118
121
10
10
I
I
15/18/18
19/25/25
50-4"
Sand; Brown, slightly silty,
slightly clayey, fine grained
SP/SM 107 16
Sand: Brown, slightly silty,
slightly clayey, fine to
coarse grained with gravel
SP/SM 13
22% passing #200
24% passing #200
Groundwater @ 14' \/
14% passing #200
19%) passing #200
13%) passing #200
Unrecovered sample
IIH Recovered Sample
UJ Standard Penetration
Sample
55
Total Depth = 31.5'
No Bedrock
Note: The stratification lines
represent the approximate
boundaries berween the soil types;
the transitions may be gradual.
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-4-03 Boring No. 8 - Lot 17 Job No.: 444-3161
JS
a
4) q
QO
o .a
£
cn
vo
Cfl
o
B
DESCRIPTION
O)
a
>> H
'3
Cfl
.ti a-
D 3
3
'4J O.
cs! E
REMARKS
Clayey Silt; Brown ML
16/17/8 100 21
10
15
20
25
30
35
40
45
50
55
11 9/9/12
^•6/10/11
^•5/7/8
I
I
I
I
6/11/13
4/6/6
6/10/10
7/8/10
5/6/6
50-2"
85% passing #200
'\7 Groundwater @ 9'
Silty Clay; Brown with
slightly silty, slightly clayey
sand layer layer 6" thick
CL 108 71%) passing #200
Silty Clay; Brown,
slightly sandy
CL 114 16 87% passing #200
Silty Clay; Brown CL 111
17
19
16
21
93%) passing #200
94%) passing #200
91% passing #200
89%) passing #200
94%) passing #200
87% passing #200
Silty Clay: Brown, sandy CL 23 83% passing #200
m Recovered Sample
I ^ I Standard Penetration
Sample
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
Total Depth = 51.5'
No Bedrock
Date: 9-4-03
a
4) C
Q O
o
X)
E
Cfl
La Costa Resort
N.E.C. EI Camino Real & Costa Del Mar Road / Carlsbad, California
Boring No. 9 - Lot ll
vo
O 5
DESCRIPTION
01
o.
H
'3
Cfl
Q
fi a 13 3
3
es
41 O.
cs! E
S5c3
Job No.: 444-3161
REMARKS
Silty Clay: Brown, sandy CL
6/9/1:
10
15
20
25
30
35
40
45
50
11 8/12/12
11!
Ill 12
r 10/13/15
i
Silty Clay: Brown with
interbedded silty clayey sand layers
20/50-5"
2
I
Clayey Sand; Brown,
slightly silty, fine grained
19/24/24
25/50-5"
Sand; Grey brown,
slightly silty, fine grained
CL 105
SC 98
SP/SM
Asphalt 3" thick
82% passing #200
80% passing #200
68% passing #200
32%) passing #200
10% passing #200
11% passing #200
55
Recovered Sample
[JU Standard Penetration
Sample
Total Depth = 31.5'
No Bedrock
No Groundwater
Note: The stratification lines
represent the approximate
boundaries between the soi! types;
the transitions may be gradual.
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-4-03 Boring No. 10 - Lot 7 Job No.: 444-3161
JS 4) ^ .4)
a
Q=§ Cfl
vo
Cfl
o
5
DESCRIPTION a
H
'3
Cfl
Q
fi 5i D3
9i U
3
O
.51
JS 53
Pi E
REMARKS
Silty Clay; Dark grey CL
^•6/9/13 115 15
10
15
20
25
30
35
40
45
50
55
r
10/17/26
16/19/29
Silty Clay; Brown, sandy CL 116
Silty Clay; Brown CL 96 25
20/17/21
I
I
Silty Clay: Dark grey CL 94 26
5/6/8
5/8/8
-Silty Clay: Brown CL 29
29
86% passing #200
75% passing #200
93% passing #200
97% passing #200
95% passing #200
Groundwater @ 27' \7
88% passing #200
^1 Recovered Sample
[JU Standard Penetration
Sample
\
Total Depth = 31.5'
No Bedrock
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Costa Resort
N.E.C. El Camino Real & Costa Del Mar Road / Carlsbad, California
Date: 9-4-03 Boring No. 11 - Lot 5 Job No.: 444-3161
O) C
Qo
o
J2
E
Cfl
z
G
VO
Cfl DESCRIPTION
4)
a. >> H
'3
Cfl
Q
.1= o
fi y
:33
4)
— cs
'4J Q,
C2! E
REMARKS
Silty Clay: Brown CL
r 8/11/15 108 17
10
15
20
25
30
35
40
45
50
55
10/35/30
17/24/30
121/24/30
Sand; Brown, slightly silty,
slightly clayey, fine grained
SP/SM 119
Sand; Grey brown,
slightly silty, fine grained
SP/SM 93
1
Sand; Grey brown,
fine grained
SP 97
7/9/22
7/9/9
Silty Clay; Brown, stiff CL
Silty Clay; Brown, sandy CL
29
87%. passing #200
15% passing #200
1% passing #200
4%) passing #200
91% passing #200
Groundwater @ IT
82% passing #200
m Recovered Sample
I ^ I Standard Penetration
Sample
Total Depth = 31.5'
No Bedrock
Note: The stratification lines
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
APPENDIX B
Laboratory Testing
Laboratory Test Results
\
Sladden Engineering
APPENDIX B
LABORATORY TESTING
Representative bulk and relatively undistmbed soU samples were obtained in the field and retmned
to om laboratory for additional observations and testing. Laboratory testing was generaUy
performed in two phases. The first phase consisted of testing in order to determine the compaction of
the existing natmal soU and the general engineering classifications of the soUs underlying the site.
This testing was performed in order to estunate the engineering characteristics of the soU and to
serve as a basis for selecting samples for the second phase of testing. The second phase consisted of
soU mechanics testing. This testing including consoUdation, shear strength and expansion testing
was performed in order to provide a means of developing specific design recommendations based on
the mechanical properties of the soU.
CLASSIFICATION AND COMPACTIONTESTING
Unit Weight and Moistme Content Determinations: Each undistmbed sample was weighed and
measured in order to determine its unit weight. A small portion of each sample was then subjected
to testing in order to determine its moisture content. This was used in order to determine the dry
density of the soU in its natural condition. The results of this testUig are shown on the Boring Logs.
Maximum Density-Optimum Moistme Detenrunations: Representative soU types .were selected for
maximum density determinations. This testUig was performed in accordance with the ASTM
Standard D1557-91, Test Method A. The results of this testing are presented graphicaUy in this
appendbc. The maximum densities are compared to the field densities of the soU in order to
determine the existUig relative compaction to the soU. This is shown on the Boring Logs, and is
useful in estimating'the strength and compressibihty ofthe soU.
Classification Testing: SoU samples were selected for classification testing. This testing consists of
mechanical grain size analyses and Atterberg Limits determinations. These provide information for
developing classifications for the soU in accordance with the Unified Classification System. This
classification system categorizes the soU into groups having similar engineering characteristics. The
results of this testing are very useful Ui detecting variations in the soUs and in selecting samples for
fmther testing.
SOIL MECHANIC'S TESTING
Dkect Shear Testing: Three bulk samples were selected for Direct Shear Testmg. This testing
measmes the shear strength of the soU under various normal pressures and is used in developing
parameters for foundation design and lateral design. Testing was performed using recompacted test
specimens, which were saturated prior to testing. Testing was performed using a strain controUed
test apparatus with normal pressmes ranging from 800 to 2300 pounds per square foot.
Expansion Testing: Three bulk samples were selected for E.xpansion testing. Expansion testing was
performed in accordance with the UBC Standard 18-2. This testing consists of remolding 4-inch
diameter by l-inch thick test specimens to a moistme content and dry density corresponding to
approximately 50 percent satmation. The samples are subjected to a smcharge of 144 pounds per
square foot and allowed to reach equUibrium. At that point the specimens are inundated with
distiUed water. The linear expansion is then measmed untU complete.
ConsoUdation Testing: Eight relatively undistmbed samples were selected for consoUdation testing.
For this testing one-inch thick test specimens are subjected to vertical loads varying from 575 psf to
11520 psf appUed progressively. The consoUdation at each load increment was recorded prior to
placement of each subsequent load. The specimens were satmated at the 575 psf or 720 psf load
increment.
h
\
Sladden Ensineerim
Max imum Density/Optimum Moisture
ASTM D698/D1557
Project Number: 444-3161
Project Name:
Lab ID Number:
Sample Location:
Description:
Maximum Density:
Optiraum Moisture
La Costa Villas
Bulk 1 @ 15-20'
Sandy Silt with Traces of Clay
123 pcf
9%
October 3, 2003
ASTMD-1557 A
Rammer Type: Machine
Sieve Size % Retained
3/4"
3/8"
#4
Moisture Content, %o
c ' LJ C-
Project Number:
Project Name:
Lab ID Number:
Sample Location: Bulk 3 @, 25-30'
Description: Sand
Maximum Density: 107 pcf
Optimum Moisture 8%
Maximum Density/Optimum Moisture
ASTM D698/DI557
444-3161
La Costa Villas
October 3, 2003
ASTMD-1557 A
Rammer Type: Machine
Sieve Size % Retained
3/4"
3/8"
#4
Maximum Density/Optimum Moisture
ASTM D698/D1557
Project Number: 444-3161
Project Name:
Lab ID Number:
Sample Location:
Descnption:
Maximum Density:
Optimum Moisture
La Costa Villas
Bulk 7 1-5'
Silty Sand with Traces of Clay
116 pcf
12%
October 3, 2003
ASTMD-1557 A
Rammer Type; Machine
Sieve Size % Retained
3/4"
3/8"
#4
\
Direct Sliear ASTM D 3080-90
(modified for unconsolidated, undrained conditions)
Job Number 444-3161 October 3, 2003
Job Name La Costa Villas
Lab ID No.
Sample ID Bulk 1 @ 0-5'
Classification Sandy Silt with Traces of Clay
Sample Type Remolded @ 90% of Maximum Density
Initial Dry Density: 112.0 pcf
Initial Mosture Content: 9.0 %
Peak Friction Angle (0): 34°
Cohesion (c): 90 psf
Test Results 1 2 3 4 Average
Moisture Content, % 16.5 16.5 16.5 16.5 16.5
Saturation, % 88.5 88.5 88.5 88.5 88.5 Nonnal Stress, kips 0.151 0.301 0.603 1.206
Peak Stress, kips 0.135 0.351 0.504 0.891
• Peak Stress Linear (Peak Stress)
1.2 •
1.0 -
1.2 •
1.0 -
4
1.2 •
1.0 -
4
0.8 -
4
0.8 -
4 • Stress o bv 4 • Stress o bv ^— !
4
CS
.c
Cfl
0.4 -
1 ]
4
CS
.c
Cfl
0.4 -1
4
0.2 -
0.0 -
< i
!
4
0.2 -
0.0 -
1
4
0.2 -
0.0 -
i
• 1
4
0.2 -
0.0 -
4 0.0 0.2 0.4 0.
r
6 0.
'^ormaI Stress
8 1. 0 1. 2 1. 4
Direct Shear ASTM D 3080-90
(modified for unconsolidated, undrained conditions)
Job Number 444-3161 October 3, 2003
Job Name La Costa Villas
Lab ID No.
Sample ID Bulk 3 (§25-30
Classification Sand
Sample Type Remolded @ 90% of Ma.ximum Density
Initial Dry Density: 95.1 pcf
Initial Mosture Content: 8.0 %
Peak Friction Angle (0): 37°
Cohesion (c): 130 psf
Test Results 1 2 3 4 Average
Moisture Content, % 26.6 26.6 26.6 26.6 26.6
Saturation, % 93.1 93.1 93.1 93.1 93.1
Normal Stress, kips 0.151 0.301 0.603 1.206
Peak Stress, kips 0.099 0.405 0.765 0.954
• Peak Stress Linear (Peak Stress)
1.2 -
1.0 -
4
1.0 -
4
0 8-
1
4
0 8-
4 Stress 3 < 4 Stress 3 < ,
4 Shear 4 Shear 1 --^
4
0.2 -
4
0.2 -
4
0 0 -
—m—
4
0 0 -
4 0.0 0. 2 0. 4 0.
r
6 0.
*(ormal Stress
8 1. 0 1. 2 1. 4
\
Direct Shear ASTM D 3080-90
(modified for unconsolidated, undrained conditions)
Job Number 444-3161 October 3, 2003
Job Name La Costa Villas
Lab ID No.
Sample ID Bulk 7 @ 0-5'
Classification Silty Sand with Traces of Clay
Sample Type Remolded @ 90% of Maximum Density
Initial Dry Density: 102.3 pcf
Liitial Mosture Content: 12.0 %
Peak Friction Angle (0): 26°
Cohesion (c): 80 psf
Test Results 1 2 3 4 Average
Moisture Content, % 24.4 24.4 24.4 24.4 24.4
Saturation, % 101.5 101.5 101.5 101.5 101.5
Normal Stress, kips 0.151 0.301 0.603 1.206
Peak Stress, kips 0.162 0.207 0.396 0.675
• Peak Stress Linear (Peak Stress)
1.2 -
1.0 -
0.8 -
1
4
1.0 -
0.8 -
4
1.0 -
0.8 -
4
1.0 -
0.8 -
4 • Stress o bv 4 • Stress o bv 4
cs u
J= Cfl
0.4 -
4
cs u
J= Cfl
0.4 -
4
0.2 -
4
0.2 -
4
0.0 -
4
0.0 -1
4 0.0 0.2 0. 4 0.
r
6 0.
'formal Stress
8 1. 0 1-2 1. 4
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 1 15'
Soil Description: Sandy Silt
October 3, 2003
Initial Dry Density, pcf: 114.5
Initial Moisture, %: 14
Initial Void Ratio: 0.456
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
-2
-3
-9
•10
0.0
• Before Saturation
• Rebound
1.0 2.0
•After Saturation
•Hydro Consolidation
3.0
—1—
4.0 5.0 6.0 7.0
\
One Dimensional Consolidation
ASTM D2435 &. D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 1 @ 20'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf 105.1
Initial Moisture, %: 9
Initial Void Ratio: 0.587
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
• Before Saturation
• Rebound
•After Saturation
•Hydro Consolidation
i 1 i 1
1
1 j
i—: 1
1 ....
i .. i 1
-
-
_
-—i
-9
-10 H
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0
\
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161 October 3, 2003
Job Name: La Costa Villas
Sample ID:' Boring 2 5'
Soil Description: Silty Sand
Initial Dry Density, pcf 122.8
Initial Moisture, %: 9
Initial Void Ratio: 0.357
Specific Gravity: 2.67
%> Change in Height vs Normal Presssure Diagram
•Before Saturation
• Rebound
• Affer Saturation
• Hydro Consolidation
: : i i ! 1
• 1 i i
i 1 1
•A 1 1 !
n 1 I 1
1
1 i
-f3 -J_. 1 i 1 ^ 1
1 [ 1 1 —
!
1
1
1
-3
-9
•10
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
\
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 2 (§10'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf 116.8
Initial Moisture, %: 11
Initial Void Ratio: 0.427
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
-4
-5
-6
-7
-9
-10 4
— Before Samration
-9— Rebound
•After Saturation
• Hydro Consolidation
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 3 (§15'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf 120.3
Initial Moisture, %: 12
Initial Void Ratio: 0.386
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
0
-I.
-2
-3
-4
-5
-6
-7
• Before Saturation
•Rebound
-TA:— After Saturation
-•—Hydro Consolidation
• 10 —I—
2.0 3.0
h
0.0 1.0 4.0 5.0 6.0 7.0
\
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 3 @ 20'
Soil Description: Sandy Silt
October 3, 2003
Initial Dry Density, pcf 113.5
Initial Moisture, %: 15
Initial Void Ratio: 0.469
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
Before Saturation
-Q— Rebound
• After Saturation
• Hydro Consolidation i
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 8 @ 15'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf 108.2
Initial Moisture, %: 16
Initial Void Ratio: 0.541
Specific Gravity; 2.67
Vo Change in Height vs Normal Presssure Diagram
-1
-3
-6
-7
-9
-10
• Before Saturation.
• Rebound
•Tir- After Saturation
-•—Hydro Consolidation
0.0 0.5 1.0 1.5 2.0 2.5 3.0 5.5 4.0 4.5 5.0
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa VUlas
Sample ID: Boring 8 @ 20'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf 110.6
Initial Moisture, %: 18
Initial Void Ratio: 0.507
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
j —0—Before Saturation
i O Rebound
• After Saturation
• Hydro Consolidation
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 10 @ 15'
Soil Description: Silty Clay
October 3, 2003
Initial Dry Density, pcf 94.3
Initial Moisture, %: 25
Initial Void Ratio: 0.767
Specific Gravity: 2.67
1 T
-3
-4
-5
-6
-9 --
•10 -I-
0.0
%> Change in Height vs Normal Presssure Diagram
• Before Saturation
• Rebound
1.0 2.0
•After Saturation
•Hydro Consolidation
3.0 4.0 5.0 6.0 7.0
One Dimensional Consolidation
ASTMD2435 &D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring \0@20'
Soil Description: Silty Clay
October 3,2003
Initial Dry Density, pcf 92.2
Initial Moisture, %: 26
Initial Void Ratio: 0.807
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
-2
-5
-6
-10
0.0
-^Before Saturation
Rebound
•After Saturation
• Hydro Consolidation
1.0 2.0 3.0 4.0 5.0 6.0 7.0
\
O I _ J J T-'..
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 11 (§ 5'
Soil Description: Sandy Silt
October 3, 2003
Initial Dry Density, pcf 105.1
Initial Moisture, %: 17
Initial Void Ratio: 0.586
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
• Before Saturadon
•Rebound
•After Saturation
•Hydro Consolidation
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
One Dimensional Consolidation
ASTM D2435 & D5333
Job Number: 444-3161
Job Name: La Costa Villas
Sample ID: Boring 11 @ 10'
Soil Description: Silty Sand
October 3, 2003
Initial Dry Density, pcf 118.0
Initial Moisture, %: 7
Initial Void Ratio: 0.412
Specific Gravity: 2.67
% Change in Height vs Normal Presssure Diagram
•Before Saturation
•Rebound
• After Saturation
• Hydro Consolidation
-10 1 ' r
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
\
Gradation
ASTM Cl 17 & C136
Project Number:
Project Name:
444-3161
La Costa Villas
Sample ID: Bulk 1 @ 15-20'
Sieve Sieve Percent
Size, in Size, mm Passing
1" 25.4 100
3/4" 19.1 100
1/2" 12.7 100
3/8" . 9.53 100
#4 4.75 100
#8 2.36 100
#16 1.18 100
#30 0.60 100
#50 0.30 97
#100 0.15 84
#200 0.074 58
Gradation
ASTMC117&C136
Project Number:
Project Name:
Sample ID:
444-3161
La Costa VUlas
Bulk 3 @ 25-30'
Sieve Sieve Percent
Size, in Size, mm Passing
1" 25.4 100
3/4" 19.1 100
1/2" 12.7 100
3/8" 9.53 100
#4 4.75 100
#8 2.36 100
#16 1.18 100
#30 0.60 100
#50 0.30 100
#100 0.15 48
#200 0.074 9
100
90
80
70
CJO 60
_c Cfl cfl CCj 50
40
30
20
10
0
• » »
100.0 10.0 i.o 0.1
Sieve Size, mm
0.0 0.0
\
Gradation
ASTMC117&C136
Project Number:
Project Name:
444-3161
La Costa Villas
Sample ID: Bulkl @ 1-5'
Sieve Sieve Percent
Size, in Size, mm Passing
1" 25.4 100
3/4" 19.1 100
1/2" 12.7 100
3/8" 9.53 100
#4 4.75 97
#8 2.36 96
#16 1.18 . 93
#30 0.60 88
#50 0.30 78
#100 0.15 63
#200 0.074 48
\
Project Number:
Project Name:
Sample ID:
444-3161
La Costa Villas
Boring 1 @5'
Gradation
ASTM Cl 17 (fe C136
Sieve Sieve Percent
Size, in Size, mm Passing
1" 25.4 100
3/4" 19.1 100
1/2" 12.7 100
3/8" 9.53 100
#4 4.75 98
#8 2.36 93
#16 1.18 86
#30 0.60 75
#50 0.30 54
#100 0.15 31
#200 0.074 22
100.0
100 -| r4-> • < 1-
90 -
80 -OV/
70 -
OO Uv
c Cfl
^2 ^0 -
DH
NP
40 -
30 -
90 -
10 -1 \J
0 -1
10.0 1.0 0.1
Sieve Size, mm
0.0 0.0
\
Expansion Index
ASTM D 4829/UBC 29-2
Job Number:
Job Name:
Lab ID:
Sample ID:
Soil Description:
444-3161
La Costa Villas
Date:
Tech:
10/3/03
Jake
Bulk 1 (§ 0-5'
Sandy Silt with Traces of Clay
Wt of SoU-ming: 595.0
Weight of Ring: 179.0
Wt of Wet SoU: 416.0
Percent Moisture: 8%
Wet Density, pcf: 126.0
Dry Denstiy, pcf 116.7
% Saturation: 48.7
Expansion Rack #
Date/Time 10/7/03 11:50 a.m.
Initial Reading 0.500
Final Reading 0.581
Expansion Index
(Final - Initial) X 1000
81
El
\
Sladden Engineering Revised 12/10/02
Expansion Index
ASTM D 4829/UBC 29-2
Job Number:
Job Name:
Lab ID:
Sample ID:
Soil Description:
444-3161
La Costa Villas
Bulk 3 @ 25-30'
Sand
Date:
Tech:
10/3/03
Jake
Wt ofSoil + Ring: 620.0
Weight of Ring: 179.0
Wt of Wet SoU: 441.0
Percent Moisture: 6%
Wet Density, pcf 133.6
Dry Denstiy, pcf 126.1
% Saturation: 48.1
Expansion Rack #
Date/Time 10/6/03 8:00 a.m.
Initial Reading 0.500
Final Reading 0.501
Expansion Index
(Final - Initial) X 1000
EI
\
Sladden Engineerin? Revised 12/10/02
Job Number:
Job Name:
Lab ID:
Sample ID:
Soil Descripfion:
Expansion Index
ASTM D 4829/LJBC 29-2
444-3161
La Costa Villas
Date: 10/3/03
Tech: Jake
Bulk 7 (al 0-5'
Silty Sand with Traces of Clay
WtofSoil + Ring: 565.0
Weight of Ring: 179.0
Wt of Wet SoU: 386.0
Percent Moisture: 11%
Wet Density, pcf 117.0
Dry Denstiy, pcf 105.4
% Saturation: 49.6
Expansion Rack #
Date/Time 10/9/03 7:30 a.m.
Initial Reading 0.500
Final Reading 0.542
Expansion Index
(Final - Initial) X 1000
42
E!
\
Sladden Engineering Revised 12/10/02
ANAHEIM TEST LABORATORY
3008 S. ORANGE AVENUE
SANTA ANA. CALIFORNIA 92707
PHONE (714) 549-7267
Ta SLADDEN ENGINEERING:
6 78 2 STANTON AVE, SUITE A
BUENA PARK, CA. 90621
ATTN; BRETT/DAVE
PROJECT: #444-3161
ANALYTICAL REPORT
CORROSION SETIIES
SUMMARY OF DATA
DATt: 9/22/03
P.O. No. Chain of Custody
Shipper No.
Loo. No. A-38 IS 1-2
Speciflcation:
MotsriQl: SOIL
pH SOLUBLE SULFATES SOLUBLE CHLORIDES MIN. RESISTIVITY
per CA, 417 per CA. 422 per CA. 643
ppm ppm ohm-cm
#1 B-7 § 1'-5' 6.5 774
#2 B-1 @ 15'-20' 6.6 1,832
304
364
600 max
600 max
\
APPENDIX C
1997 UBC Seismic Design Criteria
\
1997 UNIFORM BUILDING CODE SEISMIC DESIGN INFORMATION
The Intemational Conference of Building Officials 1997 Uniform Building Code contains
substantial revisions and additions to the earthquake engineering section in Chapter 16. Concepts
contained in the 1997 code that will be relevant to construction of the proposed structures are
summarized below.
Ground shaking is expected to be the primary hazard most likely to affect the site, based upon
proximity to significant faults capable of generating large earthquakes. Major fault zones
considered to be most likely to create strong ground shaking at the site are listed below.
Fault Zone
Approximate Distance
From Site
Fault Type
(1997 UBC)
Newport - Inglewood 16.8 km B
Rose Canyon Fault 8.8 km B
Based on our field observations and understanding of local geologic conditions, the soil proflle
type judged applicable to this site is SD, generally described as stiff or dense soil. The site is
located within UBC Seismic Zone 4. The following table presents additional coefficients and
factors relevant to seismic mitigation for design is accordance with the 1997 code.
Near-Source Near-Source Seismic Seismic
Seismic Acceleration Velocity Coefficient Coefficient
Source Factor, N^ Factor, Ny Ca Cv
Newport 1.0 1.0 0.44 Na 0.64 Nv
Inglewood
Rose Canyon Fault 1.0 1.05 0.44 Na 0.64 Nv
- *
EQFAULT
•* y
Version 3 . CG * *•
DETERMINISTIC ESTIMATION OF
PEAK ACCELERATION FROM DIGITIZED FAULTS
JOB NUMBER: 544-2063
DATE: 06-23-2002
JOB NAME: Costa Del Mar Road / Carlsbad
CALCULATION N-AME: Test Run Analysis
FAULT-DATA-FILE NAME: CDMGFLTE.DAT
SITE COORDINATES:
SITE LATITUDE: 33.0889
SITE LONGITUDE: 117.2678
SEARCH RADIUS: 100 mi
ATTENUATION RELATION: 5) Boore et al. (1997) Horiz. - SOIL (310)
UNCERTAINTY (M=Median, S=Sigma): M Number of Sigmas: 0.0
DISTANCE MEASURE: cd_2drp
SCOND: 0
Basement Depth: 5.00 km Campbell SSR: Campbell SHR:
COMPUTE PEAK HORIZONTAL ACCELERATION
FAULT-DATA FILE USED: CDMGFLTE.DAT
MINIMUM DEPTH VALUE (km): 0.0 , .
\
EQF.^.ULT SUMMARY
DETERMINISTIC SITE PARAMETERS
Page 1
ESTIMATED MAX. EARTHQUAKE EVENT
APPROXIMATE
ABBREVIATED DISTANCE MAXIMUM 1 PEAK EST. SITE
FAULT NAME mi (km) EARTHQUAKE ! SITE INTENSITY
MAG . (Mw) 1 ACCEL, g MOD.MERC.
================================ ===== === ==== == ===== ===== 1 ===== ===== =========
ROSE CANYON 5. 5 ( 8. 8) 6. 9 1 0 • 332 IX
NEWPORT-INGLEWOOD (Offshore) 10. 4 ( 16. 8) 6. 9 1 0. 220 IX
CORONADO BANK 20 . 6 ( 33. 2) 7 1 0. 173 VIII
ELSINORE-TEMECULA 24 . 8 ( 39. 9) 6 . 1 0. 110 VII
ELSINORE-JULIAN 24 . 8 ( 39. 9) 7 . 1 1 0. 129 VIII
ELSINORE-GLEN IVY 38 . 5 ( 62. 1) 6. 8 1 0. 078 VII
EARTHQUAKE VALLEY 40 . 3 { 64 . 8) 6 . 5 1 0. 065 VI
PALOS VERDES 41 . 1 ( 65. 1) 7 1 1 0. 087 VII
SAN JACINTO-ANZA 47 . 7 ( 76. 7) 7 . 2 1 0. 082 VII
SAN JACINTO-SAN JACINTO VALLEY 49. 3 ( 79. 4) 6. 9 1 0. 068 VI
SAN JACINTO-COYOTE CREEK 50 . 8 ( 81. 3) 6. 8 1 0. 063 VI
NEWPORT-INGLEWOOD (L.A.Basin) 52 . 2 ( 84 . 0) 6. 9 1 0. 065 VI
CHINO-CENTRAL AVE. (Elsinore) 52. 8 ( 84 . 9) 6. 7 1 0. 071 VI .
ELSINORE-COYOTE MOUNTAIN 53. 1 ( 85. 5) 6 . o 1 0. 061 VI
WHITTIER 57 . 0 ( 91. 8) 6 . 8 1 0. 058 VI
COMPTON THRUST 61. 8 ( 99. 5 ) 6. 8 1 0. 066 VI
SAN JACINTO - BORREGO 62 . 6 ( 100. 8) 6. 6 1 0. 048 1 VI
SAN JACINTO-SAN BERNARDINO 64 . 1 ( 103. 2) 6. 7 1 0. 050 1 VI
ELYSIAN . PARK THRUST 64 . 5 ( 103. 8) 6. 7 1 0. 061 1 VI
SAN ANDREAS - San Bernardino 67 . 4 ( 108 . 4) 7 . 3 1 0. 066 1 VI
SAN ANDREAS - Southern 67 . 4 ( 108 . 4) 7 . 4 1 0 070 1 VI
SAN JOSE 73. 8 ( 118 . 8) 6. 5 1 0 049 1 VI
SAN ANDREAS - Coachella 73. 8 ( 118 . 8) 7 1 . 1 • 0 055 1 VI
PINTO MOUNTAIN 74 . 0 ( 119. 1) 7 0 1 0 052 1 VI
CUCAMONGA 76. 2 ( 122 . 7) 7 0 1 0 062 1 VI
SIERRA MADRE 76. 5 ( 123 . 1) 7 0 1 0 062 1 VI
SUPERSTITION MTN. (San Jacinto) 78 . 2 ( 125. 8) 6 6 1 0 041 ! V
BURNT MTN. 78 . 5 ( 126. 3) 1 6 4 1 0 037 1 V
NORTH FRONTAL FAULT ZONE (West) 79, 5 ( 128 . 0) 1 7 0 1 0 060 1 VI
EUREKA PEAK 81. 2 ( 130. 7) 1 6 4 1 0 036 1 V
ELMORE RANCH 81. 9 ( 131. 8) 1 6 6 1 0 039 1 V
CLEGHORN 81. 9 ( 131. 8) 1 6 5 1 0 037 1 V
NORTH FRONTAL FAULT ZONE (East) 82 7 ; 133. i) 1 6 7 1 0 050 1 VI
SUPERSTITION HILLS (San Jacinto) 83 0 ( 133 5) 1 6 6 1 0 039 1 V
LAGUNA SALADA 84 1 ( 135 3) 1 7 0 1 0 048 1 VI
SAN ANDREAS - 1857 Rupture 85 7 ( 138 0) 1 7 8 1 0 071 1 VI
SAN ANDREAS - Mojave 1 85 7 { 138 0) 1 7 1 1 0 049 1 VI
RAYMOND 1 85 9 { 13S 2) i 5 5 1 0 044 1 VI
CLAMSHELL-S.AWPIT 1., 8 5 1 ( 138 5) 1 6 5 1 0 04 4 1 VI
VERDUGO 1* 8 8 4 { 142 \ i 5 7 1 0 .047 1 VI
\
DETERMINISTIC S PA.RAMETERS
Page 2
1 1 ESTIMATED MAX. EARTHQUAKE EVENT
1 APPROX I l-'ATE
ABBREVIATED | DISTANCE 1 MAJ<IMUM 1 PEAK 1 EST . SITE
FAULT NAME | mi (km) 1 EARTHQUAKE 1 SITE 1 INTENSITY
1 1 MAG.(Mw) 1 ACCEL. g 1 MOD .MERC.
LANDERS 1 89 . 1( 143. 4) 1 7.3 1 0.053 VI
HOLLYWOOD 1 90.4 ( 1 45. 5) 1 6.4 1 0.040 V
HELENDALE - S. LOCKHARDT - 1 91.5 { 147 . 3) 1 7.1 1 0.047 VI
BRAWLEY SEISMIC ZONE | 92.1( 148. 2) 1 6.4 1 0.032 V
LENWOOD-LOCKHART-OLD WOMAN SPRGS! 94.8 ( 152 . 5) 1 7.3 1 0.051 VI
SANTA MONICA 1 95.2( 153. 2) 1 6.6 1 0.043 VI
EMERSON So. - COPPER MTN. | 96.8( 155. 8) 1 6.9 1 0,040 V
JOHNSON VALLEY (Northern) 1 97.3( 156. 6) 1 6.7 1 0.036 V
MALIBU COAST 1 97.9( 157. 6) 1 6.7 1 0.044 VI
IMPERIAL 1 99.2( 159. 6) 1 7.0 1 0.042 1 VI
* * * + + *
-END OF SEARCH- 50 FAULTS FOUND WITHIN THE SPECIFIED SEA RCH RADIUS.
THE ROSE CANYON FAULT IS CLOSEST TO THE'SITE.
IT IS ABOUT .5.5 MILES (8.8 km) AWAY.
LARGEST MAXIMUM-EARTHQUAKE SITE ACCELERATION: 0.3317 g
1100
1000
CALIFORNIA FAULT MAP
Costa Del Mar Road / Carlsbad
400 -300 -200 -100 0 100 200 300 400 500 600
\
STRIKE-SLIP FAULTS
5) Boore et al. (1997) Horiz. - SOIL (310)
c q
'+->
03
0)
CD O
O
<
M=5 M=6 M=7 M=8
1 -=
01 -=
,001
10 100
Distance \a6\s\] (km)
DIP-SLIP FAULTS
5) Boore et al. (1997) Horiz. - SOIL (310)
M=5 M=6 M=7 M=8
c q
'4—' 03 L_
0)
CD O O
<
.1 -=
,01
,001
10 100
Distance \a6\si] (km)
BLEND-THRUST FAULTS
5) Boore et al. (1997) Horiz. - SOIL (310)
c _o
"-t-J
03
Q)
(D O O
<
M=5 M=6 M=7 M=8
1 -i:'
01 -=
001
10 100
Distance \a6\si] (km)
MAXIMUM EARTHQUAKES
Costa Del Mar Road / Carlsbad
c o
03 s_
0)
CD
O O
<
1 --
1 -=
01
,001
1 10
Distance (mi)
100
EARTHQUAKE MAGNITUDES & DISTANCES
Costa Del Mar Road / Carlsbad
1 10
Distance (mi)
100
HUNSAKER
^ASSOCIATES
SAN DIECO, INC.
PLANNING
ENGINEERINC
SURVEYING
IRVINE
LOS ANGELES
RIVERSIDE
SAN DIECO
STORM WATER
MANAGEMENT PLAN
for
LA COSTA RESORT &
SPA PHASE II
City of Carlsbad, California
Prepared for:
KSL Development Corporation
2100 Costa Del Mar Road
Carlsbad, CA 92009
w.o. 2503-1
July 19, 2005
DAVE HAMMAR
LEX WILLIMAN
ALISA VIALPANDO
RAN SMITM
RAY MARTIN
10179 Huennekens St.
San Diego, CA 92121
(858) 558-4500 PH
(858)558-1414 FX
www.HunsakerSD.com
lnfo@HunsakerSD.com
Hunsaker & Associates
San Diego, Inc.
R^yfnond L. Martin, R.C.E.
Vice President
1/ 71
DE:kc H:«EPORTS\2503\01\SWMP03.doc
w.o. 2503-1 7/19/2005 2;49PM
La Costa Resort & Spa Phase il
Storm Water Management Plan
TABLE OF CONTENTS
CHAPTER 1 - Executive Summary
1.1 Introduction
1.2 Summary of Pre-Developed Conditions
1.3 Summary of Proposed Development
1.4 Results and Recommendations
1.5 Conclusion
CHAPTER 2 - storm Water Criteria
2.1 Regional Water Quality Control Board Criteria
2.2 City of Carlsbad SUSMP Criteria
CHAPTER 3 - Identification of Typical Pollutants
3.1 Anticipated Pollutants from Project Site
3.2 Sediment
3.3 Nutrients
3.4 Trash & Debris
3.5 Oxygen-Demanding Substances
3.6 Oil & Grease
3.7 Metals
3.8 Bacteria & Viruses
3.9 Pesticides
CHAPTER 4 - Conditions of Concern
4.1 Receiving Watershed Descriptions
4.2 Pollutants of Concern in Receiving Watersheds
CHAPTER 5 - Flow-Based BMPs
5.1 Design Criteria
5.2 Grass-Lined Swales
5.3 Pollutant Removal Efficiency Table
5.4 Maintenance Requirements
5.5 Annual Operations and Maintenance Plan & Costs
KT: HAREPORTa2503«)1\SWMP02.doc
W.0.2352-107 5/ia/200S9:S5AM
La Costa Resort & Spa Phase II
Storm Water Management Plan
CHAPTER 6 - Source Control BMPs
6.1 Landscaping
6.2 Urban Housekeeping
6.3 Automobile Use
6.4 Site Design BMPs
CHAPTER 7 - Treatment Control BMP Design (Grassy Swale)
7.1 BMP Location
7.2 Determination of Treatment Flows
7.3 Grassy Swale Sizing
CHAPTER 8 - References
List of Tables and Figures
Chapter 1 - Watershed Map
Chapter 2 - Storm Water Requirements Applicability Checklist
Chapter 2 - Site Design and Source Control Storm Water BMP Selection Matrix
Chapter 3 - Pollutant Category Table
Chapter 4 - San Diego Region Hydrologic Divisions
Chapter 4 - Combined 1998 and Draft 2002 Section 303(d) Update
Chapter 4 - Beneficial Uses of Inland Surface Waters
Chapter 4 - Water Quality Objectives
Chapter 5 - Pollutant Removal Efficiency Table (Flow-Based BMPs)
Chapter 7 - BMP Location Map
Chapter 7 - Design Runoff Determination Summary Table
Chapter 7 - Swale Design Spreadsheet
Attachments
BMP Location Map
DE:de H:\REPORTS\2503«l1\SWMP02.doc
w.a.2S03-1 S/18/2005 9:55 AM
La Costa Resort & Spa Phase II
Storm Water Management Plan
CHAPTER 1 - EXECUTIVE SUMMARY
1.1 - Introduction
The La Costa Resort & Spa Phase II site is located north ofthe intersection of El
Camino Real and Costa Del Mar Road in the City of Carlsbad, California (see
Vicinity Map on this page). The 3.2-acre site is located within the greater La Costa
Resort and Spa development.
CITY OF OCEANSIDE
CITY OF ENCINITAS
ViCINITY MAP
NOT TO SCALE
J
,-PRCpECT QsL^gATION
All runoff from the project site will drain south to the existing 36-inch RCP storm
drain within El Camino Real, ultimately draining to San Marcos Creek. Runoff from
San Marcos Creek eventually discharges into Batiquitos Lagoon.
Perthe City of Carlsbad SUSMP, the La Costa Resort & Spa Phase II project is
classified as a Priority Project and subject to the City's Permanent Storm Water BMP
Requirements.
This Storm Water Management Plan (SWMP) has been prepared pursuant to
requirements set forth in the City of Carlsbad's "Standard Urban Storm Water
Mitigation Plan (SUSMP)." All calculations are consistent with criteria set forth by
the Regional Water Quality Control Board's Order No. 2001-01, and the City of
Carlsbad SUSMP.
This SWMP recommends the location and sizing of site Best Management Practices
(BMPs) which include a grass lined swale. See BMP Location Map in this chapter.
DE:de H:\REPORT5\2503\01\SWMP02.doc
w.a.2S03-1 5/180005 9:55 AM
La Costa Resort & Spa Phase II
Storm Water Management Plan
Furthermore, this report determines anticipated project pollutants, pollutants of
concern in the receiving watershed, peak flow mitigation, recommended source
control BMPs, and methodology used forthe design of flow-based BMPs.
1.2 - Summarv of Pre-Developed Conditions
Currently a mass graded lot, the project is located within the existing La Costa
Resort and Spa development, which is being constructed in multiple phases. Site
runoff currently flows overland to the receiving curb and gutter located to the west of
the proposed site.
A 24-inch storm drain, located to the west ofthe site (adjacent to El Camino Real)
discharges mnoff from the Phase 1 portion ofthe La Costa Resort and Spa
development to a large, natural open space. Flow is then conveyed south via this
grassed natural area to the receiving 36-inch RCP located within the proximity ofthe
intersection of El Camino Real and Costa Del Mar Road.
Per the "Drainage Study for La Costa Resort and Spa Phases I & II" dated May,
2005 by Hunsaker & Associates, peak flow data from the adjacent Phase 1 ofthe La
Costa Resort development attributes 63.4 cfs from a developed area of 21.8 acres to
this existing 30-inch storm drain.
Priorto exiting the existing 30-inch storm drain, runoff from Phase I ofthe La Costa
Resort and Spa development is treated via a CDS unit. However, runoff from the
proposed La Costa Resort and Spa Phase II site is not treated within this existing
unit
The Regional Water Quality Control Board has identified San Marcos Creek as part
ofthe Carlsbad Hydrologic Unit, San Marcos Hydrologic Area, and the Batiquitos
Hydrologic Subarea (basin number 904.51).
1.3 - Summarv of Proposed Development
Development ofthe 3.2-acre area will consist of 38 multi-family residences, foot
paths, communal open space, onsite parking and underground utilities with a single
entrance from the adjacent Estrella Del Mar Road.
Peak flow generated by the proposed La Costa Resort & Spa Phase II development
will be conveyed to two (2) points of discharge. The western portion of the
development will drain via curb and gutter, entering the proposed extension to the
existing 30-inch storm drain located to the west of the project site. The eastern
portion of the developed site will drain to the receiving curb and gutter within Costa
Del Mar Road. It should be noted that all low flows, inclusive of the 85*^^ percentile
treatment flow, is contained within the area drain system for the La Costa Resort &
Spa Phase II site and is conveyed to the western storm drain system.
DE:de H:\REPORTSV2503W1\SVVMP02.doc
W.0.2503-1 5/18/2005 10:31 AM
CARLSBAD
ENQNITAS WATERSHED MAP FOR
LA COSTA RESORT
& SPA PHASE 2
CITY OF CARLSBAD. CALIFORNIA
La Costa Resort & Spa Phase II
Storm Water Management Plan
85**^ percentile mnoff from the proposed La Costa Resort & Spa Phase II and the
existing Phase 1 portion of the La Costa Resort and Spa via a grass lined BMP prior
to discharge to the existing storm drain system within El Camino Real.
Based on County of San Diego criteria, runoff coefficient of 0.82 was assumed for
the proposed multi-family residential development.
1.4 - Results and Recommendations
Table 1 below summarizes rational method 85*^ percentile calculations for the
proposed water quality treatment swale for the La Costa Resort & Spa Phase I
the attributing La Costa Resort and Spa Phase I development.
Table 1 - Developed Conditions 85*^ Percentile Calculations
and
BMP
Drainage
Area
(acres)
Rainfall
Intensity
(inches/hour)
Runoff
Coefficient
85'" Pct.
Design Flow
(cfs)
Grassy Swale 23.3* 0.2 0.82 3.8
'Note: Inclusive of the adjoining La Costa Resort and Spa Phase I
Rational Method calculations predicted an 85*^ percentile runoff flow of roughly 3.8
cfs for the area discharging to the existing vegetated open space area adjacent to El
Camino Real. Calculations show that this existing natural open space has sufficient
treatment capacity in order to treat this developed flow (refer to Chapter 7).
It should be noted that this natural swale area is a temporary BMP treatment area.
Future phases ofthe La Costa Resort and Spa propose to construct a parking lot
where this current natural area exists, continuing the storm drain system within this
future development and connecting directly to the existing 36-inch storm drain within
El Camino Real. This future development will incorporate a proposed flow based
treatment unit (CDS or similar approved, flow based treatment unit) prior to entering
the existing 36-inch storm drain.
The existing CDS treatment unit currently servicing flow from Phase 1 ofthe La
Costa Resort and Spa development will remain, providing additional treatment.
1.5 - Conclusion
The combination of proposed construction and permanent BMP's will reduce, to the
maximum extent practicable, the expected project pollutants and will not adversely
impact the beneficial uses ofthe receiving waters.
DE:de H:\REPORTS\2503\01\SWMP02.doc
w.0. 2503-1 5/18/2005 9:55 AM
HUNSAKER & ASSOCIATES
lAH micft INC
BO0MC SMDki^aim
BMP LOCATION EXHIBIT FOR
LA COSTA RESORT & SPA
PHASE 2
CIPI' OF CARLSBAD, CALIFORNIA
SHEET
1
OF
1
Ri\ll51S\tHyd\615>Ha3-BHP.ilwgC EOB5)M<iy-18-20l)5ilOilll
La Costa Resort & Spa Phase II
Storm Water Management Plan
CHAPTER 2 - STORM WATER CRITERIA
2.1 - Regional Water Qualitv Control Board Criteria
All mnoff conveyed in the proposed storm drain systems will be treated in
compliance with Regional Water Quality Control Board regulations and NPDES
criteria priorto discharging to natural watercourses. California Regional Water
Quality Control Board Order No. 2001-01, dated February 21, 2001, sets waste
discharge requirements for discharges of urban runoff from municipal storm
separate drainage systems draining the watersheds of San Diego County.
Perthe RWQCB Order, post-development runoff from a site shall not contain
pollutant loads which cause or contribute to an exceedance of receiving water
quality objectives or which have not been reduced to the maximum extent
practicable. Post-construction Best Management Practices (BMPs), which refer to
specific stonn water management techniques that are applied to manage
construction and post-construction site mnoff and minimize erosion, include source
control - aimed at reducing the amount of sediment and other pollutants - and
treatment controls that keep soil and other pollutants onsite once they have been
loosened by storm water erosion.
Post constmction pollutants are a result ofthe urban development ofthe property
and the effects of automobile use. Runoff from paved surfaces can contain both
sediment (in the form of silt and sand) as well as a variety of pollutants transported
by the sediment. Landscape activities by homeowners are an additional source of
sediment.
All structural BMPs shall be located to infiltrate, filter, or treat the required runoff
volume or flow (based on the 85"^ percentile rainfall) priorto its discharge to any
receiving watercourse supporting beneficial uses.
2.2 - Citv of Carlsbad SUSMP Criteria
Per the City of Carlsbad SUSMP, the La Costa Resort & Spa Phase II project is
classified as a Priority Project and subject to the City's Permanent Storm Water BMP
Requirements. These requirements required the preparation ofthis Storm Water
Management Plan.
The Storm Water Applicability Checklist, which must be included along with Grading
Plan applications, is included on the following page.
DE:de H:\REPORTS\2503«)HSV™P02.doc
w.o. 2503-1 S/18/2005 9:55 AM
Storm Water Standards
4/03/03
LyirRESGLTRQES & REF_ERENCES _r ^ _ =^_¥£^ "1 _ = - _ , - ~_-
APPENDIXA
STORM WATER REQUIREMENTS APPLICABILITY CHECKLIST
Complete Sections 1 and 2 of the following checklist to determine your project's
permanent and construction storm water best management practices requirements.
This form must be completed and submitted with your permit application.
Section 1. Permanent Storm Water BMP Requirements:
If any answers to Part A are answered "Yes," your project is subject to the "Priority
Project Permanent Storm Water BMP Requirements," and "Standard Permanent Stomri
Water BMP Requirements" in Section III, "Permanent Storm Water BMP Selection
Procedure" in the Stom? Water Standards manual.
If all answers to Part A are "No," and any answers to Part B are "Yes," your project is
only subject to the "Standard Permanent Storm Water BMP Requirements". If every
question in Part A and B is answered "No," your project is exempt from permanent
storm water requirements.
Part A: Determine Priority Project Permanent Storm Water BMP Requirements
Does the project meet the definition of one or more of the priority project
categories?* Yes No
1. Detached residential development of 10 or more units
2. Attached residential development of 10 or more units
3. Commercial development greater than 100,000 square feet
4. Automotive repair shop
5. Restaurant
6. Steep hillside development greater than 5,000 square feet y
7. Project discharging to receiving waters within Environmentally Sensitive Areas
8. Parking lots greater than or equal to 5,000 ft'' or with at least 15 parking spaces, and
potentially exposed to urban runoff
9. Streets, roads, highways, and freeways which would create a new paved surface that is
5,000 square feet or greater
* Refer to the definitions section in the Stomi Water Standards tor expanded definitions ofthe priority
project categories.
Limited Exclusion: Trenching and resurfacing wori< associated with utility projects are not considered
priority projects. Parking lots, buildings and other structures associated with utility projects are
priority projects if one or more of the criteria in Part A is met. If all answers to Part A are "No",
continue to Part B.
30
storm Water Standards
4/03/03
Does the project propose: Yes No
1. New impervious areas, such as rooftops, roads, parking lots, driveways, paths and
sidewalks?
2. New pervious landscape areas and inigation systems?
3. Permanent structures within 100 feet of any natural water body?
4. Trash storage areas?
5. Liquid or solid material loading and unloading areas?
6. Vehicle or equipment fueling, washing, or maintenance areas?
7. Require a General NPDES Pennit for Storm Water Discharges Associated with
Industrial Activities (Except construction)?*
8. Commercial or industrial waste handling or storage, excluding typical office or
household waste?
9. Any grading or ground disturbance during construction?
10. Any new storm drains, or alteration to existing storm drains?
*To find out if your project is required to obtain an individual General NPDES Pennit for Stonn Water
Discharges Associated with Industrial Activities, visit the State Water Resources Control Board web site
at, www.swrcb.ca.gov/stonnwtr/industrial.html
Section 2. Construction Storm Water BMP Requirements:
If the answer to question 1 of Part C is answered "Yes," your project is subject to
Section IV, "Construction Storm Water BMP Performance Standards," and must prepare
a Storm Water Pollution Prevention Plan (SWPPP). If the answer to question 1 is "No,"
but the answer to any of the remaining questions is "Yes," your project is subject to
Section IV, "Construction Storm Water BMP Performance Standards," and must prepare
a Water Pollution Control Plan (WPCP). If every question in Part C is answered "No,"
your project is exempt from any construction storm water BMP requirements. If any of
the answers to the questions in Part C are "Yes," compiete the construction site
prioritization in Part D, below.
Part C: Determine Construction Phase Storm Water Requirements
Would the project meet any ofthese criteria during construction? Yes No
1. Is the project subject to California's statewide General NPDES Permit for Storm Water
Discharges Associated With Construction Activities? /
2. Does the project propose grading or soil disturbance?
3. Would storm water or urban runoff have the potential to contact any portion of the
construction area, including washing and staging areas?
4. Would the project use any construction materials that could negatively affect water
quality if discharged from the site (such as, paints, solvents, concrete, and
stucco)?
/
31
Storm Water Standards
4/03/03
Part D: Determine Construction Site Priority
?'^^°D?fn^® ^'•'^ Municipal Permit, each constmction site with construction storm
water BMP requirements must be designated with a priority: high, medium or low
the SW^PP oJ W^^^^^^ InTr'fh ""'^ • °" P'^"^' '"^'"ded in-the SWPPP or WPCP. Indicate the project's pnority in one of the check boxes using the
criteria below, and existing and surrounding conditions of the project the tvoe of
activities necessary to complete the constmction and any other' extenuating
^nSilir h"^^'*^^K '^^y P°s^ 3 .threat to water quality. The City'reserves the righ tto
adjust the pnonty of the projects both before and during constmction [Note-
The constmction priority does NOT change constmction BMP requirements that applv
to projects; all constmction BMP requirements must be identified on a case-by-case
basis. The cons mction pnority does affect the frequency of inspections that will be
requirements^] "^^'^ "^^^^"^ °" constmction BMP
•f A) High Priority
1) Projects where the site is 50 acres or more and grading will occur during the
rainy season
2) Projects 5 acres or more. 3) Projects 5 acres or more within or directly
adjacent to or discharging directly to a coastal lagoon or other receiving water
within an environmentally sensitive area
Projects, active or inactive, adjacent or tributary to sensitive water bodies
Q B) Medium Priority
1) Capital Improvement Projects where grading occurs, however a Storm Water
Pollution Prevention Plan (SWPPP) is not required under the State General
Construction Permit (i.e., water and sewer replacement projects, intersection
and street re-alignments, widening, comfort stations, etc.)
2) Pennit projects in the public right-of-way where grading occurs, such as
installation of sidewalk, substantial retaining walls, curb and gutter for an
entire street frontage, etc. , however SWPPPs are not required.
3) Permit projects on private property where grading permits are required
however, Notice Of Intents (NOIs) and SWPPPs are not required.
• C) Low Priority
1) Capital Projects where minimal to no grading occurs, such as signal light and
loop installations, street light installations, etc.
2) Permit projects in the public right-of-way where minimal to no grading occurs
such as pedestrian ramps, driveway additions, small retaining walls, etc.
3) Permit projects on private property where grading permits are not required,
such as small retaining walls, single-family homes, small tenant
improvements, etc.
32
Table 2. Site Design and Souree Control Stonn Water BMP Sefection Matrix
Priority
Project
Category
Site
Design
BMP?'
Sotirce
Control
BMPsF> Requirements Applicable to Individual Priority Project
Categories'^' raways & alnlenance Bays ihicle Wash Areas islng Areas ih Areas a> c a. Ivate Roads jsldentlal DrIv jest Parking ]ck Areas alnlenance Bays ihicle Wash Areas jidoor Procea lulpment Wat irking Areas )adways lellng Areas llslde LandsGi a. ceo Q O LU Q. oc U. I
• d xi (3 •6 ffl d) f
Detached
Residential
Development
R R R R R
Attached
Residential
Deveiopment
R R R
Commercial
Development
>100,000 ft*
R R R R R R
Automotive
Repair Shop R R R R R R R
Restaurants R R R R
Hillside
Development
>5,000 fl*
R R R R
Parking Lots R R
Streets,
Highways &
Freeways
R R R
R = Required; select BMPs as required from the applicable steps In Section Vl.2.a & b, or equivalent as identified
in Appendix A.
(1) Refer to- Section V1.2.a.
(2) Refer to Sedion V1.2.b.
(3) Priority projeot categories must apply specific storm water BMP requirements, where appiicable. Projects are
subject to the requirements of all priority project categories that apply.
(4) Applies if the paved area totals >5,000 square feet or with >15 parking spaces and Is potentially exposed to
urban runoff.
Page 18 of 51 FINAL MODEL SUSMP
Joinlly Developed by
SanDiego Co-Permittees 2/14/02, Approved by SDRWQCB 6/12/02
La Costa Resort & Spa Phase II
Storm Water Management Plan
CHAPTER 3 - IDENTIFICATION OF TYPICAL POLLUTANTS
3.1 - Anticipated Pollutants from Proiect Site
The following table details typical anticipated and potential pollutants generated by
various land use types. The La Costa Resort & Spa Phase II development will
consist of attached multi-family residences. The existing La Costa Resort and Spa
Phase I development consists of attached multi-family and commercial development.
Thus, the Attached Residential Development & Commercial Development categories
have been highlighted to clearly illustrate which general pollutant categories are
anticipated from the project area.
General Pollutant Categories
Priority
Project
Categories
(0
C «
E
0)
10
c
0)
X S
(0 •D C
« E
O O
00
10
10
c
= I
o> 5 >> E a ® O Q
10
.o
Ui
0 (0 n £ o
96
o9
k ffi « w
n .h
CQ >
«o •o o
10 o
Q.
Detached
Residential
Development
Automotive
Repair
Shops
X X X
Restaurants X X X X
Hillside
Development
>5,000 ft^
X X X X X X
Parking Lots p(i) p(1) X X pd) X pd)
Streets,
Highways &
Freeways
X pd) X X(4) X p(5) X
Retail Gas
Outlets X X(4) X X
X = anticipated
P = potential
(1) A potential pollutant if landscaping exists on-site.
(2) A potential pollutant if the project inciudes uncovered parking areas.
(3) A potential pollutant if iand use involves food or animal waste products.
(4) Including petroleum hydrocarbons.
(5) Including solvents.
D&de H:\REPORTS\2503\01\SWMP02.doc
w.o. 2503-1 S/1BQ005 9:55 AM
La Costa Resort & Spa Phase II
Storm Water Management Plan
3.2 - Sediment
Soils or other surface materials eroded and then transported or deposited by the
action of wind, water, ice, or gravity. Sediments can increase turbidity, clog fish gills,
reduce spawning habitat, smother bottom dwelling organisms, and suppress aquatic
vegetative growth.
3.3 - Nutrients
Inorganic substances, such as nitrogen and phosphorous, that commonly exist in the
form of mineral salts that are either dissolved or suspended in water. Primary
sources of nutrients in urban mnoff are fertilizers and eroded soils. Excessive
discharge of nutrients to water bodies and streams can cause excessive aquatic
algae and plant growth. Such excessive production, referred to as cultural
eutrophication, may lead to excessive decay of organic matter in the water body,
loss of oxygen in the water, release of toxins in sediment, and the eventual death of
aquatic organisms.
3.4 - Trash & Debris
Examples include paper, plastic, leaves, grass cuttings, and food waste, which may
have a significant impact on the recreational value of a water body and aquatic
habitat. Excess organic matter can create a high biochemical oxygen demand in a
stream and thereby lower its water quality. In areas where stagnant water is
present, the presence of excess organic matter can promote septic conditions
resulting In the growth of undesirable organisms and the release of odorous and
hazardous compounds such as hydrogen sulfide.
3.5 - Oxvqen-Demandinq Substances
Biodegradable organic material as well as chemicals that react with dissolved
oxygen in water to form other compounds. Compounds such as ammonia and
hydrogen sulfide are examples of oxygen-demanding compounds. The oxygen
demand of a substance can lead to depletion of dissolved oxygen in a water body
and possibly the development of septic conditions.
3.6 - Oil & Grease
Characterized as high high-molecular weight organic compounds. Primary sources
of oil and grease are petroleum hydrocarbon products, motor products from leaking
vehicles, oils, waxes, and high-molecular weight fatty acids. Elevated oil and grease
content can decrease the aesthetic value of the water body, as well as the water
quality.
DE:Cle H:\REPORTS\2503\01\SVVMP02.<)OC
w.0.2503-1 5/1S/2005 9:55 AM
La Costa Resort & Spa Phase 11
Storm Water Management Plan
3.7 - Metals
Metals are raw material components in non-metal products such as fuels, adhesives,
paints and other coatings. Primary sources of metal pollution in storm water are
typically commercially available metals and metal products. Metals of concern
include cadmium, chromium, copper, lead, mercury and zinc. Lead and chromium
have been used as corrosion inhibitors in primer coatings and cooler tower systems.
At low concentrations naturally occurring in soil, metals are not toxic. However, at
higher concentrations, certain metals can be toxic to aquatic life. Humans can be
impacted from contaminated groundwater resources, and bioaccumulation of metals
in fish and shellfish. Environmental concerns, regarding the potential for release of
metals to the environment, have already led to restricted metal usage in certain
applications.
3.8 - Bacteria & Viruses
Bacteria and viruses are ubiquitous micro-organisms that thrive under certain
environmental conditions. Their proliferation is typically caused by the transport of
animal or human fecal wastes from the watershed. Water, containing excessive
bacteria and viruses can alter the aquatic habitat and create a harmful environment
for humans and aquatic life. Also, the decomposition of excess organic waste
causes increased growth of undesirable organisms in the water.
3.9 - Pesticides
Pesticides (including herbicides) are chemical compounds commonly used to control
nuisance growth or prevalence of organisms. Excessive application of a pesticide
may result in runoff containing toxic levels of its active component.
DE:lle H:\REPORTS\2503\01\5VVMP02.doc
wj>. 2503-1 5/18/2005 9:55 AM
La Costa Resort & Spa Phase II
Storm Water Management Plan
CHAPTER 4 - CONDITIONS OF CONCERN
4.1 - Receiving Watershed Descriptions
As shown in the watershed map on the following page, the pre-developed La Costa
Resort & Spa Phase II site drains to San Marcos Creek which eventually discharges
to the Batiquitos Lagoon within the San Marcos Creek watershed.
Development ofthe site will not cause any diversion to or from the existing
watershed to the stomri drain system.
The Regional Water Quality Control Board has identified San Marcos Creek as part
ofthe Carlsbad Hydrologic Unit, San Marcos Creek Watershed, and the Batiquitos
Hydrologic Subarea (basin number 904.51).
4.2 - Pollutants of Concern in Receiving Watersheds
San Marcos Creek and Batiquitos Lagoon are not listed on the EPA's 303(d) List of
endangered waterways (included in this Chapter). Per the "Water Quality Plan for
the San Diego Basin", the beneficial uses forthe Batiquitos Lagoon and San Marcos
Creek includes agricultural supply, contact water recreation, non-contact recreation,
warm freshwater habitat, and wildlife habitat.
Table 3-2 from the "Water Quality Plan for the San Diego Basin" (included at the end
of this Chapter) lists water quality objectives for a variety of potential pollutants
required to sustain the beneficial uses ofthe San Marcos hydrologic area.
DE:(le H:\REPORTS\2503V01\SWMP02.(loc
W.D. 2503-1 S/18/2005 9:55 AM
CARLSBAD
WATEHSHED MAP FOH
LA COSTA RESORT
& SPA PHASE 2
cm/ OF CARLSBAO, CALIFOHNW
Table 2-2. BENEFICIAL USES OF INLAND SURFACE WATERS
BENEFICIAL U SE
1,2
Inland Surface Waters Hydrologic Unit
Basin Number
M
U
N
A
G
R
1
N
D
P
R
0
C
G
W
R
F
R
S
H
P
O
W
R
E
C
1
R
E
C
2
B
1
0
L
W
A
R
M
C
0
L
D
W
1
L
D
R
A
R
E
S
P
W
N
San Dlego Courity Coaistal Streamis- continued
Buena Vlsta Lagoon 4.21 See Coastal Waters- Table 2-3
Buena Vista Creek 4.22 + • • • • •
Buena Vista Creek 4.21 -1-• • • • • • •
Agua Hedionda 4.31 See Coastal Waters- Table 2-3
Agua Hedionda Creek 4.32 • • • • • • •
Buena Creek 4.32 • • • • • • •
Agua Hedionda Creek 4.31 • • • • • • •
Letterbox canyon 4.31 • • • • • • •
Canyon de las Encinas 4.40 + 0 • • •
San Marcos Creek Watershed
Batiquitos Lagoon 4.51 See Coastal Waters-Table 2-3
San Marcos Creek 4.52 + • • • •
unnamed intermittent streams 4.53 + • • • • •
San Marcos Creek Watershed
San Marcos Creek 4.51 • • • •
Encinitas Creek 4.51 + • • • • •
• Existing Beneficial Use
O Potential Beneficial Use
+ Excepted From MUN (See Text)
1 Waterbodies are listed multiple times if they cross hydrologic area or sub area boundaries.
Beneficial use designations appiy to all tributaries to the indicated waterbody, if not listed separately.
Tabla 2-2
BENEFICIAL USES
March 12, 1997
2-27
Table 2-3. BENEFICIAL USES OF COASTAL WATERS
BENEFICIAL USE
Coastal Waters Hydrologic
Unit Basin
1
N
N
A
R
E
R
E
C
.0
B
1 UJ CO w
1
R
A
M
A
A
Q
M
1
S
P
W
A
S
H
Hydrologic
Unit Basin
D V c C M 0 T L R R U G w R E Number V
1 2 M L D E A R N M L
L
Pacific Ocean • • • • • • • • • • • • •
Dana Point Harbor • • • • • • • • • •
Del Mar Boat Basin • • • • • • • • • • •
Mission Bay • • • • • • • • • • •
Oceanside Harbor • • • • • • • • • • •
San Diego Bay ' • • • • • • • • • •
Coastal Lagoons
' Tijuana River Estuary ii.ii • • • • • • • • • •
Mouth of San Diego River 7.11 • • • • • • • • • •
2
Los Penasquitos Lagoon 6.10 • • • • • • • • • •
San Dieguito Lagoon 5.11 • • • • • • • • •
Batiquitos. Lagoon 4.51 • • • • • • • • •
San Elijo Lagoon 5.61 • • • • • • • • •
Aqua Hedionda Lagoon 4.31 • • • • • • • • • •
' Includes the tidal prisms of the Otay and Sweetwater Rivers.
2 Fishing from shore or boat permitted, but other water contact recreational (REC-1) uses are prohibited.
# Existing Beneficial Use
Table 2-3
BENERCIAL USES 2-47
March 12, 1997
Table 3-2. WATER QUALITY OBJECTIVES
Concentrations not to be exceeded more than 10% of tha time during any one ona year pariod.
Const tiuent (mg/L or as noted)
Inland Surface Waters Hydrologic
Unit Basin
Number
TDS Cl SO, %Na N&P Fe Mn MBAS B ODOR Turb
NTU
Color
Units
SAN LUIS REY HYDROLOGIC UNIT 903.00
Lower San Luis HA 3.10 500 250 250 60 a 0.3 0.05 0.5 0.75 none 20 20 1.0
Monserat HA 3.20 500 250 250 60 a 0.3 0.05 0.5 0.75 none 20 20 1.0
Warner Valley HA 3.30 500 250 250 60 a 0.3 0.05 0.5 0.75 none 20 20 1.0
CARLSBAD HYDROLOGIC UNIT 904.00
Loma Alta HA 4.10 ---------none 20 20 1.0
Buena Vista Creek HA 4.20 500 250 250 60 a 0.3 0.06 0.5 0.75 none 20 20 1.0
Agua Hedionda HA 4.30 500 250 250 60 a 0.3 0.05 0.5 0.75 none 20 20 1.0
Encinas HA 4.40 ---------nona 20 20 1.0
San Marcos HA 4.50 500 250 250 60 a 0.3 0.05 0.5 0.75 none 20 20 1.0
Escondido Creek HA 4.60 500 250 250 60 a 0.3 0.05 0.5 0.75 none 20 20 1.0
SAN DIEQUITO HYDROLOGIC UNIT 906.00
Solana Beach HA 5.10 500 250 250 60 a 0.3 0.05 0.5 0.76 none 20 20 1.0
Hodges HA 5.20 500 250 250 60 a 0.3 0.05 0.5 0.75 none 20 20 1.0
San Pasqual HA 5.30 500 250 250 60 a 0.3 0.05 0.5 0.75 none 20 20 1.0
Santa Maria Valley HA 5.40 500 250 250 60 a 0.3 0.06 0.5 0.75 none 20 20 1.0
Santa Ysabel HA 5.50 500 250 250 60 a 0.3 0.05 0.5 0.75 nona 20 20 1.0
PENASQUITOS HYDROLOGIC UNIT 906.00
Miramar Reservoir HA 6.10 500 250 250 60 a 0.3 0.05 0.6 0.75 none 20 20 1.0
Poway HA 6.20 500 250 250 60 a 0.3 0.05 0.5 0.75 none 20 20 1.0
HA - Hydrologic Araa
HSA - Hydrologic Sub Area (Lower casa letters indicate endnotes following the table.)
Table 3-2
WATER QUALITY OBJECTIVES Page 3-23 Saptamber 8. 1994
2002 CWA SECTION 303(d) LIST OF WATER QUALITY LIIMITED SEGMENT
SAN DIEGO REGIONAL WATER QUALITY CONTROL BOARD
R Agua Hedionda Creek 90431000
mmimmimmmmmmmmm^ E Agua Hedionda Lagoon
R Aliso Creek
mmmmKmmmKmmammmmmmmxBammmsm
9 E Aliso Creek (mouth)
9 E Buena Vista Lagoon
90431000
90113000
90113000
90421000
Total Dissolved Solids Low
Urban Runofl/Storm Sewers
Unknown Nonpoint Source
Unknown point source
Bacteria Indicators
Sedimentation/Siltation
Nonpoint/Point Source
Nonpoint/Point Source
Low
Low
Bacteria Indicators
Urban Runoff/Storm Sewers
Unknown point source
Nonpoint/Point Source
Phosphorus
ImpairmenI locaied at lower 4 miles.
Urban Runofl/Storm Sewers
Unknown Nonpoint Source
Unknown point source
Toxicity
Urban Runofl/Storm Sewers
Unknown Nonpoint Source
Unknown point source
Medium
Low
Low
Bacteria Indicators Medium
Nonpoint/Point Source
Bacteria Indicators Low
Nonpoint/Point Source
Nutrients Low
Eslimaied size of ImpairmenI is 150 acres located in upper portion of lagoon.
Nonpoint/Point Source
Sedimentation/Siltation Medium
Nonpoint/Point Source
7 Miles
6.8 Acres
6.8 Acres
19 Miles
19 Miles
19 Miles
0.29 Acres
202 Acres
202 Acres
202 Acres
Page 1 of 16
2002 CWA SECTION 303(d) LIST OF WATER QUALITY LIMITED SEGMENT
SAN DIEGO REGIONAL WATER QUALITY CONTROL BOARD
9 R Sandia Creek
9 E Santa Margarita Lagoon
9 R Santa Margarita River (Upper)
9 R Segunda Deshecha Creek
90222000
90211000
90222000
90130000
Total Dissolved Solids Low 19 Miles
Total Dissolved Solids
Eutrophic
Phosphorus
Phosphorus
Turbidity
Page 13 of 16
Industrial Point Sources
Agriculture-storm runoff
Urban Runofl/Storm Sewers
Surface Mining
Flow Regulation/Modification
Natural Sources
Golfcourse activities
Unknown Nonpoint Source
Unknown point source
Low
Urban Runofl/Storm Sewers
Flow Regulation/Modification
Natural Sources
Unknown Nonpoint Source
Unknown point source
mmmmummmmiimumimaimmmmm^ smmmamm
Low
Nonpoint/Point Source
L,ow
Urban RunofC'Storm Sewers
Unknown Nonpoint Source
Unknown point source
Urban RunoftfStorm Sewers
Unknown Nonpoint Source
Unknown point source
Construction/Land Development
Urban Runofl/Storm Sewers
Channelization
Flow Regulation/Modification
Unknown Nonpoint Source
Unknown point source
Low
Low
1.5 Miles
mmmmsmmmmsimtmM
28 Acres
18 Miles
0.92 Miles
0.92 Miles
La Costa Resort & Spa Phase II
Storm Water Management Plan
Chapter 5 - FLOW-BASED BMPs
5.1 - Desiqn Criteria
Flow-based BMPs shall be designed to mitigate the maximum flowrate of runoff
produced from a rainfall intensity of 0.2 inch per hour. Such BMP's utilize either
mechanical devices (such as vaults that produce vortex effects) or non-mechanical
devices (based on weir hydraulics and specially designed filters) to promote settling
and removal of pollutants from the runoff.
Per the request of the City of Carlsbad, 85* percentile flow calculations were
performed using the Rational Method. The basic Rational Method runoff procedure
is as follows:
Design flow (Q) = C * I * A
Runoff Coefficient C - In accordance with the County of San Diego standards, the
weighted njnoff coefficient for all the areas draining to the treatment unit was
determined using the areas analyzed in the final engineering hydrology report. The
runoff coefficient is based on the following characteristics of the watershed:
- Land Use - Multi-Family and Commercial.
- Soil Type - Hydrologic soil group D was assumed for all areas. Group D
soils have very slow Infiltration rates when thoroughly wetted. Consisting
chiefly of clay soils with a high swelling potential, soils with a high
permanent water table, soils with clay pan or clay layer at or near the
surface, and shallow soils over nearly impervious materials, Group D soils
have a very slow rate of water transmission.
Rainfall Intensity (I) - Regional Water Quality Control Board regulations and NPDES
criteria have established that flow-based BMPs shall be designed to mitigate a
rainfall intensity of 0.2 inch per hour.
Watershed Area (A) - Corresponds to totai area draining to treatment unit.
5.2 - Grassy Swales
Grass-lined swales, herein referred to as grassy swale, is an example of a flow-
based BMP. Designed to trap pollutants through filtration, grassy swales have the
following basic requirements:
• Serves areas with soil groups C or D (A or B with liners)
• Maximum maintained side slopes = 4:1
• Water application rate = peak flow rate from water quality design storm
DE:ie H:\REPORTSV2503«)1\SWMP02.()oc
W.0.2503-1 S/18/2005 9:55 AM
La Costa Resort & Spa Phase 11
Storm Water Management Pian
Perthe City of Portland, Oregon Stormwater Management Manual
(September 2000), the swale width and profile shall be designed to convey the water
quality design storm event as follows:
• Maximum design depth = 0.33 foot
• Maximum design velocity = 0.9 foot per second
• Hydraulic residence time > 9 minutes
• Minimum longitudinal slope = 1.5 percent
• Maximum longitudinal slope = 5 percent
• For longitudinal slopes > 5 percent, use check dams
• Use Manning "n" value of 0.25
• Minimum swale length = 100 feet
A minimum of 1 foot of freeboard above the standard storm design water surface
shall be provided for facilities not protected by high-flow diversion devices. Velocity
through the facility shall not exceed 3 feet per second during the high-flow events.
The swale shall incorporate a flow-spreading device at the inlet. The flow spreader
shall provide a uniform flow distribution across the swale bottom. In swales with a
bottom width greater than 8 feet, a flow spreader shall be installed at least every 100
feet. To minimize flow channelization, the swale bottom shall be smooth, with
uniform longitudinal slope, and with a minimum bottom width of 4 feet. Check dams
may need to be installed to reduce flow channelization.
Woody or shrubby vegetation shall not be planted in the active treatment area ofthe
swale. Grasses shall be established as soon as possible after the swale is
completed. Grasses shall be seeded within 2 days. The initial rate of application
shall be 5 pounds of see mix per 1,000 square feet, or as approved by the City.
All 85'" percentile mnoff from the La Costa Resort & Spa Phase II and neighboring
La Costa Resort and Spa Phase I development will be treated via a single grassy
swale.
5.3 - Pollutant Removal Efficiencv Table
The table on the following page shows the generalized pollutant removal efficiencies
for grassy swales.
DE:de H:\REPORTS\2503\01VSWMP02.doc
W.O.2S03-1 5/16/2005 9:55 AM
Table 3. Treatment Conirol BMP Selection Matrix^\
PoButant at
Concern Treatment Control BMP Categories
Biofilters Detant'on
Basins
infiltration
Basins^*
Wet Ponds
or Wetlands
Drainage
Inserts
Ritration Hydrodynamic
Separator
Systems'''
Sediment M H H H L H M
Nutrients L M M M L • M L
Heavy Metals M M M H L H L
Organic
Compounds U U U U L M L
Trash & Debris L H U U M H M
Oxygen
Demanding
Substances
L M M M L M L
Bactena U U H U L M L
Oil & Grease M M U u L H L
Pesticides U •U u u L U L
(1) Ckjpemiittaes ars 8ru:ouraged to periodically assess the perfonTiance charactarisGcs of many of these BMPs to
update this table.
(2) Including trenches and porous pavement
(3) Also known as hydrodynamic devices and baffle boxes.
L: Low removal efficiency
M: Medium removeil efficiency
H: High removal effidency
U: Unknown removal efflciency
Sources: Guidanca Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters (1993),
National Stormwater Best Management Practices Database (2001), and Guide for BMP Selection in Urban
Developed Areas (2001).
a. Site Design BMPs
Priority projects shall be designed so as to minimize, to the maximum extent
practicable, the introduction of pollutants and conditions of concem that may result in
significant impacts, generated from site runoff to the storm water conveyance system.
Priority Projects shall also control post-development peak stonn water runoff discharge
rates and velocities to maintain or reduce pre-development downstream erosion and to
protect stream habitat. Although nest mandatory, priority projects can address these
objectives through the creation of a hydrologically functional project design that
attempts to mimic the natural hydrologic regime. Mimicking a site's natural hydrologic
regime can be pursued by:
» Reducing imperviousness, conserving natural resources and areas, maintaining
and using natural drainage courses in the stonn water conveyance system, and
minimizing clearing and grading.
• Providing runoff storage measures dispersed uniformly throughout a site's
landscape with the use of a variety of detention, retention, and runoff practices.
• Implementing on-lot hydrologically functional landscape design and management
practices.
These design prindples offer an innovative approach to urban storm water
management, one that does not rely on the conventional end-of-pipe or in-the-pipe
Page 19 of 51 HNAL MODEL SUSMP
Jointly Developed by
San Diego Co-Pennittees 2/14/02, Approved by SDRWQCB 5/12/02
La Costa Resort & Spa Phase II
Storm Water Management Plan
5.4 - Maintenance Requirements
Maintenance for grassy swales is minimal and aimed at keeping grass cover dense
and vigorous. A pest management plan should be developed for vegetated areas
specifying how problem insects and weeds will be controlled with minimal use of
insecticides and herbicides. Lawn-mowing should be performed routinely
throughout the growing season. Grass height should be maintained at two inches
above the design water depth. Swales should be inspected at least twice annually
to check for erosion and damage to vegetation, debris and litter. Excess sediment
should be removed periodically as determined through inspection.
5.5 - Operations and l\/laintenance Plan & Costs
Maintenance for grassy swales will consist of:
o Trash and Debris Removal
o Grass height maintenance (Mowing)
o Sediment Removal
All costs of maintaining the water quality basin will be the responsibility of the La
Costa Resort & Spa Phase II Homeowners Association and also the La Costa
Resort and Spa.
The following outlines approximate Annual Maintenance costs for the proposed
grassy swales:
- Cut Vegetation to average height of 6" = $540
- Ensure adequate vegetation = $550
- Inspect for debris and sediment = $1,050 General Maintenance
- Inspection = $750
Subtotal = $2890
10% Contingency = $289
Approximate Total Annual Maintenance Costs
of Swale = $3200
DE:de H:\RePORTS\2503\01\SWMP02.doc
WJl. 2503-1 5/ie«105 9:S5AM
Grassy Swale
Description: Grassy swales are long narrow grassy depressions used to coUect
and convey stormwater runoff, aUowing poUutants to settle and fUter out as the
water infiltrates into the ground or flows through the faciHty. In addition to
providing poUution reduction, flow rates and volumes can also be managed for
smaU projects (<15,000 square feet of impervioxis surface) with grassy swales.
Swales should be integrated into the overaU site design and can be used to help
fulfUl a site's required landscaping area requirement An approved conveyance
and disposal method per Section 1.4 wiU be required at the end of the swale.
Design Considerations: When designing grassy swales, slopes and depth should
be kept as mUd as possible to avoid safety risks and prevent erosion within the
facility.
Construction Considerations: Grassy swale areas should be clearly marked
before site work begins to avoid soU disturbance during construction. No
vehicular traffic, except that specificaUy used to construct the faciUty, should be
aUowed within 10 feet of swale areas.
Design Requirements:
Son Suitability: Grassy swales are appropriate for aU soU types. TopsoU shaU be
used within the top 12 inches of the facUity, or the soU shaU be amended per
Appendix F to support plant growth.
Dimensions and Slopes: FacUity storage depth may vary from 6 to 12 inches.
Maximum side slopes are 4 horizontal to 1 vertical. Minimum flat bottom width
is 2 feet for private swales, and 4 feet for pubUc swales. Maximum longitudinal
slope is 5%, whUe minimum slope is 0.5%. Maximum surrounding ground
slopes shaU be 10%.
Stormwater Management Manual
Adopted JxUy 1,1999; revised September 1,2004
Page 2-70
Grassy Swale
Setbacks: Required setback from centerUne of swale to property lines is 5 feet,
and 10 feet from buUding foundations unless Hned with impermeable fabric.
Sizing: Grassy swales sized with the simpHfied approach shaU be designed to
receive less than 15,000 square-fe§t of impervioiis area mnoff. For fhese projects,
a simplified approach sizing factor of 0.1 may be used to receive credit for
poUution reduction and flow control. A high-flow by-pass mechanism wUl not
be required in fhese cases, but a high-flow overflow must be provided at the
downstream end of the swale to an approved disposal point, per Section 1.4. In
cases when poUution reduction is the only stormwater management goal, or
there is more than 15,000 square feet of impervious area to manage, fhe
presumptive approach must be used size the swale for poUution reduction, and
additional facUities wUl be required to meet flow control requirements, where
appHcable.
Presumptive Approach Sizing Criteria:
Exhibit 2-15 shows swale side slopes of 4:1 and lengthwise slopes of IV2 percent,
3 percent, and 5 percent. These charts are based on the City standards shown
below and may be used to easUy determine swale length, given the peak flow
rate and the desired swale bottom width.
Stormwater Management Manual Page 2-71
Adopted July 1,1999; revised September 1,2004
Grassy Swale
0)
a
j£
D) C 0)
_J
(0
180
170
160
150
140
130
120
110
100
90
Exhibit 2-15 (Sheetl)
Swaie Length at 1.5% Longitudinal Slope
Bottom Width = 6'
Bottom Width = 4' ^.-^Bottom Width = 8'
Swale Data
Side slopes are 4:1
Minimum length is
100'
1
1
Side slopes are 4:1
Minimum length is
100'
1
1 1 1 1
Side slopes are 4:1
Minimum length is
100'
1
1
0.2 0.4 0.6
Flow Rate, Q, cfs
0.8
Stormwater Management Manual
Adopted July 1,1999; revised September 1,2004
Page 2-72
Grassy Swale
270
250
230
210
190
170
150
130
110
90
Exhibit 2-15 (Sheet 2)
Swale Length at 3.0% Longitudinal Slope
Swale Data
Side slopes are 4:1
Minimum length is 100"
Bottom Wicith = 4'
0.4 0.6 0.8
Flow Rate, Q, cfe
1.2 1.4 1.6
340
290
240
ra c
0)
190
140
90
Exhibit 2-15 (Sheet 3)
; \ Bottom Width =
1
1
6- ;
1 ^^,00-^
Swale Data
Side slopes are 4:1
Minimum length is 100'
Bottom Width = 4' Swale Data
Side slopes are 4:1
Minimum length is 100' ^^^"^ ^^^^
Bottom Width = 8'
-
1 1 , ! 1 ^ 1
0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8
Flow Rate, Q, cfs
Stormwater Management Manual
Adopted July 1,1999; revised September 1,2004
Page 2-73
Grassy Swale
1) The swale widfh and profile shaU be designed to convey runoff from the
poUution reduction design storm intensity (see Section 1.5.2) at
• Maximum design depth of 0.33 feet
• Maximimi design velocity of 0.9 feet per second.
• Minimum hydrauHc residence time (time for Qdesign to pass through
the swale) of 9 minutes.
• Minimum longitudinal slope of 0.5 percent, maximum slope of 5
percent For slopes greater than 5 percent, check dams shaU be used
(one 6-inch high dam every 10 feet).
• Designed using a Manning "n" value of 0.25.
• 4:1 (or flatter) side slopes in the treatment area.
• Minimum length of 100 feet
A minimimi of 1 foot of freeboard above the water surface shaU be
provided for facilities not protected by high-flow storm diversion devices.
Swales without high-flow diversion devices shaU be sized to safely convey
the 25-year storm event, analyzed using the Rational Method (peak 25-
year, 5 minute intensity = 3.32 inches per hour).
Velocity through the faciHty shaU not exceed 3 feet per second (fps) during
the high-flow events (i.e., when flows greater than those resulting from
the poUution reduction design intensity are not passed around the
faciHty).
2) The swale shaU incorporate a flow-spreading device at fhe inlet The flow
spreader shaU provide a uniform flow distribution across fhe swale
bottom. In swales with a bottom width greater than 6 feet a flow
spreader shaU be instaUed at least every 50 feet.
3) To minimize flow channeHzation, the swale bottom shaU be smooth, with
uniform longitudinal slope, and with a nunimum bottom widfh of 2 feet
for private facUities and 4 feet for pubHc faciHties. Maximum bottom
width shaU be 8 feet.
4) Grasses or sod shaU be estabUshed as soon as possible after the swale is
completed, and before water is aUowed to enter the faciHty.
5) Unless vegetation is established, biodegradable erosion control matting
appropriate for low-velodty flows (approximately 1 foot per second) shaU
be instaUed in the flow area of the swale before aUowing water to flow
through the swale.
Stormwater Management Manual Page 2-74
Adopted July 1,1999; revised September 1, 2004
Grassy Swale
6) Access routes to the swale for maintenance pmrposes must be shown on the
plans. PubHc swales wUl need to provide a minimum 8-foot wide access
route, not to exceed 10 percent in slope.
Stormwater Report Requirements For Presumptive Approach: See Exhibit 2-2.
Landscaping: Plantings shaU be designed at the foUowing quantities per 200
square feet of facUity area. FaciHty area is equivalent to the area of the swale
calculated from Form SIM. (Note: FaciHties smaUer than 200 square feet shaU
have a mirumum of one tree per faciHty.):
1 Evergreen or Deciduous tree:
Evergreen trees: Minimum height 6 feet
Deciduous trees: Minimum caHper: 1 V2 inches at 6 inches above
base.
Grass: Seed or sod is required to completely cover the grassy swale
bottom and side slopes. (Shrubs are optional)
For the swale flow path, approved native grass mixes are preferable and may be
substituted for standard swale seed mix. Seed shaU be appHed at fhe rates
specified by fhe suppHer. The appHcant shaU have plants established at the time
of faciHty completion (at least 3 months after seeding). No runoff shaU be
aUowed to flow in the swale until grass is established. Trees and shrubs may be
aUowed in the flow path wilhin swales if fhe swale exceeds fhe minimum length
and widths specified.
Native wUdflowers, grasses, and ground covers used for BES-maintained
facUities shaU be designed not to reqtiire mowing. Where mowing cannot be
avoided, faciHties shaU be designed to require mowing no more than once or
twice annuaUy. Turf and lawn areas are not aUowed for BES-maintained
faciHties; any exceptions wiU require BES approval.
Environmental zones shaU meet requirements established by Titie 33 for grass in
E-zones.
*Link to Grassy Swale Recommended Seed Mixes
Checklist of minimal information to be shown on the permit drawings:
(Additional information may be required on the drawings diuing permit review,
depending on individual site conditions.)
Stormwater Management Manual Page 2-75
Adopted July 1,1999; revised September 1,2004
Grassy Swale
1) FacUity dimensions and setbacks from property lines and structures
2) Profile view of facUity, including typical cross-sections with dimensions
3) Growing mediiun spedfication
4) FUter fabric specification (if appHcable)
5) AU stormwater piping associated with fhe fadHty, including pipe materials,
sizes, slopes, and invert elevations at every bend or connection
6) Landscaping plan
Inspection requirements and schedtde: The foUowing table shaU be used to
determine which stormwater fadUty components require Qty inspection, and
when the inspection shaU be requested:
Facility Component Inspection Requirement
Swale grading CaU for inspection
Piping CaU for inspection
FUter fabric (if appHcable)
Growing medium
Plantings/ seeding/ sod CaU for inspection
Operations and Maintenance requirements: See Chapter 3.0.
* Link to grassy swale O&M form
Additional photos and drawings:
Link to grassy swale photos
Link to grassy swale drawings
Stormwater Management Manual Page 2-76
Adopted July 1,1999; revised September 1,2004
La Costa Resort & Spa Phase II
Storm Water Management Plan
CHAPTER 6 - SOURCE CONTROL BMPS
6.1 - Landscapinq
Manufactured slopes shall be landscaped with suitable ground cover or installed with
an erosion control system. Homeowners will be educated as to the proper routine
maintenance to landscaped areas including trimming, pruning, weeding, mowing,
replacement or substitution of vegetation in ornamental and required landscapes.
Per the RWQCB Order, the following landscaping activities are deemed unlawful
and are thus prohibited:
- Discharges of sediment
- Discharges of pet waste
- Discharges of vegetative clippings
- Discharges of other landscaping or construction-related wastes.
6.2 - Urban Housekeepinq
Fertilizer applied by homeowners, in addition to organic matter such as leaves and
lawn clippings, all result in nutrients in storm water runoff. Consumer use of
excessive herbicide or pesticide contributes toxic chemicals to runoff. Homeowners
will be educated as to the proper application of fertilizers and herbicides to lawns
and gardens.
The average household contains a wide variety of toxins such as oil/grease,
antifreeze, paint, household cleaners and solvents. Homeowners will be educated
as to the proper use, storage, and disposal ofthese potential storm water runoff
contaminants.
Per the RWQCB Order, the following housekeeping activities are deemed unlawful
and are thus prohibited:
Discharges of wash water from the cleaning or hosing of impervious
surfaces Including parking lots, streets, sidewalks, driveways, patios,
plazas, and outdoor eating and drinking areas (landscape irrigation and
lawn watering, as well as non-commercial washing of vehicles in
residential zones, is exempt from this restriction)
Discharges of pool or fountain water containing chloride, biocides, or other
chemicals
Discharges or runoff from material storage areas containing chemicals,
fuels, grease, oil, or other hazardous materials
Discharges of food-related wastes (grease, food processing, trash bin
wash water, etc.).
DE:(le H:\REPORTS\2503\01\SWMP02.doc
W.CI. 2503-1 5/16/2005 9:55 AM
La Costa Resort & Spa Phase II
Storm Water Management Pian
6.3 - Automobile Use
Urban pollutants resulting from automobile use include oil, grease, antifreeze,
hydraulic fluids, copper from brakes, and various fuels. Homeowners will be
educated as to the proper use, storage, and disposal of these potential storm water
contaminants.
Per the RWQCB Order, the following automobile use activities are deemed unlawful
and are thus prohibited:
- Discharges of wash water from the hosing or cleaning of gas stations,
auto repair garages, or other types of automotive service facilities.
Discharges resulting from the cleaning, repair, or maintenance of any type
of equipment, machinery, or facility including motor vehicles, cement-
related equipment, port-a-potty servicing, etc.
Discharges of wash water from mobile operations such as mobile
automobile washing, steam cleaning, power washing, and carpet
cleaning.
The Homeowners Association will make all homeowners aware of the
aforementioned RWQCB regulations through a homeowners' education program.
Sample information has been provided at the end of this chapter.
6.4 - Site Desiqn BMPs
Priority projects, such as the La Costa Resort & Spa Phase II development, shall be
designed to minimize, to the maximum extent practicable the introduction of
pollutants and conditions of concern that may result in significant Impact, generated
from site runoff to the storm water conveyance system. Site design components can
significantly reduce the impact of a project on the environment The following design
techniques have been proposed to accomplish this goal.
- Implementing on-lot hydrologically functional landscape design and
management practices; Additional detail regarding landscaping design is
discussed in section 6.1.
- Minimizing project's impervious footprint. Methods of accomplishing this goal
include constructing streets, sidewalks, and parking lots to the minimum
widths necessary without compromising public safety. Another example for
minimizing impervious area includes incorporating landscaped areas in the
drainage system to encourage infiltration and reduce the amount of directly
connected impervious areas.
- Minimizing directly connected Impervious Areas. Where landscaping Is
proposed, drain rooftops into adjacent landscaping prior to discharging to the
storm water conveyance system.
DE:tle H:\REPORTS\2503\01\SWMP02.()oc
W.O. 2503-1 5/18/2005 9:55 AM
A clean environment is
important to all of us!
Did you know that storm drains are
NOT connected to sanitary sewer
systems and treatment plants? The
primary purpose of storm drains is to
carry rainwater away from developed
areas to prevent flooding. Untreated
storm water and the pollutants it
carries, flow directly into creeks,
lagoons and the ocean.
In recent years, sources of water
pollution like industrial waters from
factories have been greatly reduced.
However now, the majority of water
pollution occurs from things like cars
leaking oil, fertilizers from farms, lawns
and gardens, failing septic tanks, pet
waste and residential car washing Into
the storm drains and into the ocean
and watenways.
All these sources add up to a pollution
problem! But each of us can do small
things to help clean up our water and
that adds up to a pollution solution!
Motor oil photo Is used
courtesy of the Water
Quality Consortium, a
cooperative venture
between the Washington
State Department of
Ecology, King County and
the cities of Bellevue,
Seattle and Tacoma.
Only Rain in the Storm DrainI
City of Carlsbad
Storm Water Protection
Program
City of Carlsbad
1635 Faraday Avenue
Carlsbad CA 92008
Storm Water HOTIine:
760-602-2799
Funded by a grant
from the California
Integrated Waste
Management Board
Motor Oil
Only Rain in the Storm Drain!
City of Carlsbad
Storm Water Protection
Program
Storm Water HOTIine:
760-602-2799
^ \Printed on recycled paper
What's the problem with
motor oil? How can YOU help keep our environment clean?
mi
•It!
•i
Oil does not dissolve in water. It
lasts a long time and sticks to
everything from beach sand to bird
feathers. Oil and other petroleum
products are toxic to people, wildlife
and plants.
One pint of oil can make a slick
larger than a football field. Oil that
leaks from our cars onto roads and
driveways is washed into storm
drains, and then usually flows
directly to a creek or lagoon and
finally to the ocean.
Used motor oil is the largest single
source of oil pollution in our ocean,
creeks and lagoons. Americans spill
180 million gallons of used oil each
year Into our waters.
This is 16 times the
amount spilled by the
Exxon Valdez In
Alaska.
Having a clean environment
is of primary importance for
our health and economy.
Clean waten/vays provide
commercial opportunities,
recreation, fish habitat and
add beauty to our
landscape. YOU can help
keep our ocean, creeks and
lagoons clean by applying
the following tips:
• Stop drips. Check for oil
leaks regulariy and fix them
promptly. Keep your car tuned to
reduce oil use.
• Use ground cloths or drip pans
beneath your vehicle if you have leaks
or are doing engine work.
• Clean up spills immediately.
Collect all used oil in containers with
tight fitting lids. Do not mix different
engine fluids.
4 When you change your oil,
dispose of it properly. Never dispose
of oil or other engine fluids down the
storm drain, on the ground or into a
ditch.
• Recycle used motor oil. There
are several locations in Carisbad that
accept used motor oil. For hours and
locations, call 760-434-2980.
• Buy recycled ("refined") motor oil
to use in your car.
What you should know
before using Concrete
and Mortar ...
in the City of Carlsbad, storm drains flow
directly into local creeks, lagoons and the
ocean without treatment. Storm water
pollution is a serious problem for our
natural environment and for people who
live near streams or wetlands. Storm
water pollution comes from a variety of
sources including oil, fuel, and fluids,
from vehicles and heavy equipments,
pesticide runoff from landscaping, and
from materials such as concrete and
mortar from construction activities. The
City of Carlsbad is committed to
improving water quality and reducing the
amount of pollutants that enter our
precious waterways.
A Clean Environment is
Important to All of Usi
\othes.
'^^Protec'^°''
City of Carlsbad
l^&P 1635 Faraday Avenue
Carlsbad, CA 92008
Storm Water HOTIine: 760-602-2799
stormwater@ci.carlsbad.ca.us
March 2003
nly Rain in the Storm Drain!
Pollution Prevention is up
to YOU!
Did you know that storm drains are NOT
connected to sanitary sewer systems or
treatment plants? The primary purpose of
storm drains is to carry rainwater away
from developed areas to prevent flooding.
Untreated pollutants
such as concrete and
mortar flow directly
into creeks, lagoons
and the ocean and
are toxic to fish,
wildlife, and the
' aquatic environment
Disposing ofthese materials into storm
drains causes serious ecological
problems—and is PROHIBITED by law.
Do the Job Right!
This brochure was designed for do-it-
yourself remodelers, homeowners, masons
and bricklayers, contractors, and anyone
else who uses concrete or mortar to
complete a construction project Keep
storm water protection in mind whenever
you or people you hire work on your house
or property.
STORM WATER HOTLINE
760-602-2799
Best Management Practices
Best Management Practices
or BMPs are procedures and
practices that help to prevent
pollutants such as chemicals,
concrete, mortar, pesticides,
waste, paint, and other
hazardous materials from entering our storm
drains. All these sources add up to a
pollution problem. But each of us can do
our part to keep storm water clean. These
efforts add up to a pollution solution!
What YOU Can Po:
• Set up and operate small mixers on tarps
or heavy plastic drop cloths.
• Don't mix up more fresh concrete or
mortar than you will need for a project.
• Protect applications of fresh concrete
and mortar from rainfall and runoff until
the material has dried.
• Always store both dry and wet materiais
under cover, protected from rainfall and
runoff and away from storm drains or
waterways.
• Protect dry materials from wind. Secure
bags of concrete mix and mortar after
they are open. Don't allow dry products
to blow into driveways, sidewalks,
streets, gutters, or storm drains.
• Keep all construction debris away from
the street, gutter and storm drains.
Never dispose of washout into the
street, storm drains, landscape drains,
drainage ditches, or streams. Empty
mixing containers and wash out chutes
onto dirt areas that do not flow to
streets, drains or waterways, or allow
material to dry and dispose of properiy.
Never wash excess material from
bricklaying, patio, driveway or sidewalk
construction into a street or storm drain.
Sweep up and dispose of small amounts
of excess dry concrete, grout, and
mortar in the trash.
Wash concrete or brick areas only
when the wash water can flow onto a
dirt area without further runoff or drain
onto a surface which has been bermed
so that the water and solids can be
pumped off or vacuumed up for proper
disposal.
Do not place fill material, soil or
compost piles on the sidewalk or street.
If you or your contractor keep a
dumpster at your site, be sure it is
securely covered with a lid or tarp
when not in use.
During cleanup, check the street and
gutters for sediment, refuse, or debris.
Look around the corner or down the
street and clean up any materials that
may have already traveled away from
your property.
{OT connected to sanitary sewer
^:systems and treatment plants? The
primary purpose of storm drains is to
carry rainwater away from developed
areas to prevent flooding. Untreated
storm water and the pollutants it
carries flow directly into creeks,
-lagoons and the ocean.
iln recent years, sources of water
5£ -pollution like industrial waters from
^y'factories have been greatly reduced.
^ However, now the majority of water
pollution occurs from things like cars
leaking oil, fertilizers from farms and
•'•gardens, failing septic tanks, pet waste
:jt" and residential car washing into the
storm drains and into the ocean and
:watenways.
|vAII these sources add up to a pollution
i'jsroblem! But each of us can do our
Bart tb help clean up our water and mi
pfb'at adds up to a pollution solution!
Car washing
courtesy of
Quality Con
cooperative
between the|^|
State Depart "
Ecology, Kin
the cities of
Seattle and
City of CarJ
1635 Farac ^
Carlsbad
Storm Wat?
760-602-2:
i's no problem with washing your
ijSar. It's just how and where you do it.
•Mostsoap contains phosphates and
other chemicals that harm fish and
water quality. The soap, together with
1^*. the dirt, metal and oil washed from
your car, flows into nearby storm
•drains which run directly into lakes,
livers or marine waters.
tt^ phosphates from the soap can
•Kise excess algae to grow. Algae
Bi bad, smell bad, and harm water
;quality. As algae decay, the process
uses up oxygen in the water that fish
need.
How can YOU help keep the environment clean?
Having a clean environment
is of primary importance for
bur health and economy.
Clean waten/vays provide
commercial opportunities,
recreation, fish habitat and
add beauty to our
'*j!r. landscape. YOU can help
*• keep our ocean, creeks and
lagoons clean by applying
the follovving tips:
• Use soap sparingly.
<? Use a hose nozzle with a trigger to
jsave water.
• Pour your bucket of soapy water
down the sink when you're done, not
-In, the street.
• Avoid using engine and wheel
fcleaners or degreasers.
|B6^' • Take your car to a commercial car
ii?" wash, especially ifyou plan to clean
the engine or the bottom of your car.
Most car washes reuse wash water
several times before sending it to the
sewer system for treatment.
• Hire only mobile detail operators
that will capture wash water and
chemicals. It is unlawful for
commercial vehicle washing
operators to allow wash water to
enter the storm drain system.
A Clean Environment is
Important to All of Us!
In the City of Carlsbad, storm
drains flow directly into local
creeks, lagoons and the ocean
without treatment. Storm water
pollution is a serious problem for
our natural environment and for
people who live near streams or
wetlands.
Storm water pollution comes from
a variety of sources including oil,
fuel, and fluids, from vehicles and
heavy equipment, pesticide runoff
from landscaping, and from
materials such as concrete,
mortar and soil from construction
activities.
The City of Carlsbad is committed
to improving water quality and
reducing the amount of pollutants
that enter our precious
waterways.
Storm Water Protection Program
stormwater@ci.carlsbad.ca.us
760-602-2799
City of Carlsbad
1635 Faraday Avenue
Carlsbad, CA 92008
Printed on recycled paper
"St.,;;.-'
It's All Just Water,
Isn't It?
Only Rain in the Storm brain!
How Do I Get Rid of Chlorine? Pool Filters
Although we enjoy the fun and relaxing times
in them, the water used in swimming pools
and spas can cause problems for our creeks,
lagoons and the
ocean if not
disposed of
properly. When
you drain your
swimming pool,
fountain or spa
to the street, the high concentrations of
chlorine and other chemicals found in the
water flows directly to our storm drains.
Did you know that these storm drains are
NOT connected to sanitary sewer systems
and treatment plants? The primary purpose
of storm drains is to carry rainwater away
from developed areas to prevent flooding.
Improperly disposing of swimming pool and
spa water into storm drains may be harmful
to the environment.
Best Management Practices
Best Management Practices or B/WPs are
procedures that help to prevent pollutants
like chlorine and sediment from entering our
storm drains. Each of us can do our part to
keep storm water clean. Using BMPs adds up
to a pollution solution!
Pool and spa water may be discharged to thc
storm drain if it has been properly
dechlorinated and doesn't contain other
chemicals. The good news is that chlorine
naturally dissipates over time. Monitor and
test for chlorine levels in the pool over a
period of 3 to 5 days. Drain the water
before algae starts to grow.
Consider hiring a professional pool service
company to clean your pool, fountain, or spa
and make sure they dispose of the water and
solids properly. For more information about
discharging wastewater to the sanitary
sewer, please
contact the
Encina
Wastewater
Authority at
(760) 438-
3941.
Before you discharge your swimming pool
or spa water to the storm drain, thc
water:
• Must not contain chlorine, hydrogen
peroxide, acid, or any other chemicals.
• Can not carry debris or vegetation.
• Should have an acceptable pH of 7-8.
• Can not contain algae or harmful bacteria
(no "green" present).
• Flow must be controlled so that it does
not cause erosion problems.
Clean filters over a lawn or other landscaped
area where the discharge can be absorbed.
Collect materials on filter cloth and dispose into
the trash. Diatomaceous earth cannot be
discharged into the street or storm drain
systems. Dry it out as much as possible, bag it
in plastic and dispose into the trash.
Acid Washing
Acid cleaning wash water is NOT allowed into
the storm drains. Make sure acid washing is
done in a proper and safe manner that is not
harmful to people or the environment. It may be
discharged into the sanitary sewer through a
legal sewer connection after the pH has been
adjusted to no lower than 5.5 and no higher
than 11.
Do the Job Rightl
• Use the water for irrigation.Try draining
de-chlorinated pool water gradually onto a
landscaped area. Water discharged to
landscape must not cross property lines and
must not produce runoff.
• Do not use copper-based algaecides.
Control algae with chlorine or other
alternatives to copper-based pool chemicals.
Copper is harmful to the aquatic
environment.
• During pool construction, contain ALL
materials and dispose of properly.
Materials such as cement, Gunite, mortar,
and sediment must not be discharged into
the storm drains.
}id you know that storm drains are
iNOT connected to sanitary sewer
kystems and treatment plants?
The primary purpose of storm drains
•V IS to carry rainwater away from
developed areas to prevent flooding.
Untreated storm water and the
pollutants it can-ies, flow directly into
creeks, lagoons and the ocean.
'In recent years, sources of water
p pollution lil<e industrial waters from
iactories have been greatly reduced,
however now, the majority of water
Fpollution occurs from things lil<e cars
Idaking oil, fertilizers from farms and
>ff-gardens^ failing septic tanks, pet
^.^waste and residential car washing into
Slhe storm drains and into the ocean
and watenvays.
^•i^ll these sources add up to a pollution
Iproblemi But each of us can do small
1 hgs to help clean up our water and
iat adds up to a pollution solution!
it-.'
What's the problem with fertilizers
and pesticides?
Fertilizer isn't a problem—IF it's used
carefully. If you use too much
fertilizer or apply it at the wrong time,
it can easily wash off your lawn or
garden into storm drains and then
flow untreated into lakes or streams.
Just like in your garden, fertilizer in
lagoons and streams makes plants
grow. In water bodies, extra fertilizer
can mean extra algae and aquatic
plant growth. Too much algae harms
water quality and makes boating,
fishing and swimming unpleasant. As
algae decay, they use up oxygen in
the water that fish and other wildlife
need.
Fertilizer photo is used courtesy
of the Water Quality Consortium,
a cooperative venture between
the Washington State Department
of Ecology, King County and the
cities of Bellevue, Seattle and
Tacoma.
Storm Water HOTIine: 760-602-2799
stormwater@>cl .carlsbad.ca.us
City of Carlsbad
1635 FaradayAvenue
Carlsbad CA 92008
www.ci .carl s bad .ca.us
£^ ^Printed on recydod paper
How can YOU help keep the environment clean?
-laving a clean environment is of
fpnmary importance for our health and
^conomyi Clean watenn/ays provide
jmmercial opportunities, recreation,
fish habitat and add beauty to our
landscape. YOU can help keep our
^creeks lagoons and ocean clean by
Ifpplying the following tips:
&h Don't blow or rake leaves and other
yard waste into the street or gutter.
ft' Recycle yard waste or start your own
*^ compost pile.
Don't over irrigate. Use drip
• irrigation, soaker hoses or micro-
fj; spray system and water early in the
5.^ morning.
f' • If you have a spray head sprinkler
^•.jssystem, consider adjusting your
vatering method to a cycle and
I soak Instead of watering for 15
'"^^ minutes straight, break up the
session into 5 minute intervals
allowing water to soak in before the
next application.
Keep irrigation systems well-
maintained and water only when
needed to save money and prevent
over-watering.
Use fertilizers and pesticides
sparingly.
Have your soil tested to determine
the nutrients needed to maintain a
healthy lawn.
Consider using organic fertilizers—
they release nutrients more slowly.
Leave mulched grass clippings on
the lawn to act as a natural fertilizer.
• Use pesticides only when absolutely
necessary. Use the least toxic
product intended to target a specific
pest, such as insecticidal soaps,
boric acid, etc. Always read the label
and use only as directed.
• Use predatory insects to control
hannful pests when possible.
• Properly dispose of unwanted
pesticides and fertilizers at
IHousehold Hazardous Waste
collection facilities.
For more information on
landscape irrigation, piease
call 760438-2722.
Master Gardeners
San Diego County has a
Master Gardener program
through the University of
California Cooperative
Extension. Master
Gardeners can provide good infonnation
about dealing with specific pests and
plants. You may call the Master
Gardener Hotline at 858-694-2860 or
check out their website at
www.masterqardenerssandieqo.org.
The hotline is staffed Monday—Friday,
9 am—3 pm, by experienced gardeners
who are available to answer specific
questions. Information from Master
Gardeners is free to the public.
La Costa Resort & Spa Phase 11
Storm Water Management Plan
CHAPTER 7 - TREATMENT CONTROL BMP DESIGN
GRASSY SWALE
7.1 - BMP Locations
The proposed grassy swale is located within the existing natural open space to the
west ofthe proposed La Costa Resort & Spa Phase 11 development, bordering the
adjacent El Camino Real (see BMP Location Map on the following page).
7.2 - Determination of Design Treatment Flows
The BS*' percentile design flow rates have been calculated using the Rational
Method. Required data for the Rational Method treatment flow determination include
the following:
- Runoff Coefficient (C) = 0.82 for Commercial Development
- Rainfall Intensity (I) = 0.20 inches per hour
Drainage area to treatment unit (A)
The following table summarizes the parameters used for determination of design
flows to the grassy swale.
DESIGN RUNOFF DETERMINATION SUMMARY TABLE
BMP Drainage Area
(acres)
Rainfall
Intensity
(inches/hour)
Runoff
Coefflcient
85*" Pct.
Design Flow
(cfs)
Grassy Swale 23.3* 0.2 0.82 3.8
*Note: Inclusive of the adjoining La Costa Resort and Spa Phase I
7.3 - Grassy Swale Sizinq
The grassy swale has been designed with a 20 foot bottom width, a depth of 0.33 ft,
a channel slope of 4% and a side slope of 1:3. The required flow length to attain the
9 minute hydraulic residence time is 296.3 linear feet. Based on these parameters,
calculations (included at the end of this chapter) show the grassy swale is capable of
treating a peak flow of 3.8 cfs (refer to section 5.1 for treatment flow determination
and treatment flow determination spreadsheet at the end ofthis chapter).
DErde H:tREPORTS\2S03\01\SWMP02.dac
W.0.2503-1 5/18/2005 9:55 AM
_/4— r-BMP LOCATION EXHIBIT FOR
l_A COSTA RESORT & SPA
PHASE 2
CITY OF CARLSBAD, CALIFORNIA
SHEET
1
OF
1
R\06l5\lHyd\615»H03-BHP*.BC S085>tay-l8-eiXI5.HMI)
85TH PERCENTILE PEAK FLOW AND VOLUME DETERMINATION
Modified Rational Method - Effective for Watersheds < 1.0 mi^
Hunsaker & Associates - San Diego
Note: Only Enter Values in Boxes - Spreadsheet Will Calculate Remaining Values
Project Name La Costa Resort & Spa Phase 2 |
Work Order 2503-1 1
Jurisdiction City of Carlsbad |
BMP Location {Open Space adjacent to El Camino ReaT
Developed Drainage Area = 23.3
Natural Drainage Area = 0.0
Total Drainage Area to BMP = 23.3
Dev. Area Percent Impervious = 85 1
Overall Percent Impervious = 85
Dev. Area Runoff Coefficient = 0.82
Nat. Area Runoff Coefficient =
Runoff Coefficient = 0.82
Time of Concentration = 13.8 1
(from Drainage Study)
RATIONAL METHOD RESULTS
acres
acres
acres
Q = CIA where Q = 85th Percentile Peak Flow (cfs)
C = Runoff Coefficient
I = Rainfall Intensity (0.2 inch/hour per RWQCB mandate)
A = Drainage Area (acres)
Using tlie Total Drainage Area:
C = 0.82
I = 0.2 inch/hour
A= 23.3 acres
Q = 3.82 cfs
Villas of La Costa
Grassy Swaie
Grassy Swale Sizing
(based on Manning's Equation)
Given:
Manning's n = 0.25
Bottom Width = 20.0 ft.
Side Slope, z = 3.0
Channel Slope = 0.04 ft/ft
if Depth = 0.33 ft
Hyd. Residence Time = 9.0 min
Results
then Q = 3.80 cfs
Flow Area = 6.927 ft^
Wetted Perimeter = 22.09 ft
Top Width = 21.98 ft
Velocity = 0.55 fps
Swale Length = 296.3 ft
La Costa Resort & Spa Phase II
Storm Water Management Plan
CHAPTER 8 - REFERENCES
"Standard Urban Storm Water Mitigation Plan - Storm Water Standards", City of
Carisbad, April 2003.
"Standards for Design and Construction of Public Works Improvements in the City of
Carlsbad", City of Carisbad, California; April 1993.
"Master Drainage and Storm Water Quality Management Plan", City of Carisbad,
Califomia; March 1994.
"Drainage Study for La Costa Resort and Spa - Phases I & IF, Hunsaker &
Associates; May, 2005.
"Hydrology Manual", County of San Diego Department of Public Worths - Flood
Control Division; Updated April 1993.
"San Diego County Hydrology Manual", County of San Diego Department of Public
Worths - Flood Control Section; June 2003.
"Order No. 2001-01, NPDES No. CAS0108758 - Waste Discharge Requirements for
Discharges of Urban Runoff from the Municipal Separate Stonv Sewer Systems
(MS4s) Draining the Watersheds ofthe County of San Diego, the Incorporated Cities
of San Diego County, and San Diego Unified Port District", California Regional
Water Quality Control Board - San Diego Region; February 21, 2001.
"Water Quality Plan for the San Diego Basin", California Regional Water Quality
Control Board - San Diego Region, September 8,1994.
DE:de H:\REPORTS\2503\01\SWMP02.dOC