Loading...
HomeMy WebLinkAboutCT 03-01-01; LA COSTA RESORT & SPA MSTR PLAN; LIMITED SOILS INVESTIGATION PROPOSED;LIMITED SOILS INVESTIGATION PROPOSED NEW PARKING LOT LA COSTA RESORT & SPA COSTA DEL MAR ROAD CARLSBAD, CALIFORNIA -Prepared By- Sladden Engineering 39-725 Garand Lane, Suite G Palm Desert, California 92211 (760) 772-3893 d z o UJ o z CToe.-o) < file*'? O. Sladden Engineering Sladden Engineering 6782 Stanton Ave., Suite E, Buena Park, GA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-13^ 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 June 7,2002 Project No. 544-2063 02-06-343 La Costa Resort and Spa KSL Development Corporation 2100 Costa Del Mar Road Carlsbad, California 92009 Attention: Mr. Mike Cusick Project: Proposed New Parking Lot La Costa Resort & Spa Carlsbad, Califomia Subject: Limited Soils Investigation Presented herewith is the report of our Limited Soils Investigation prepared for the new parking lot to be constructed southeast ofthe entry to the La Costa Resort & Spa on the corner of Costa Del Mar Road and El Camino Real in the City of Carlsbad, Califomia. This report was prepared in order to provide recommendations for design and construction ofthe parking lot. This report presents the results of our limited field investigation and laboratory testing along with conclusions and recommendations for design and construction. This report completes our agreed upon scope of services as described in our proposal dated May 8, 2002. We appreciate the opportunity to provide service to you on this project, regarding this report, please contact the undersigned If you have any questions Respectfully submitted SLADDEN ENGIN Brett L Principal Engineer SER/pc Copies: 4/La Costa Resort and Spa Sladden Engineering LIMITED SOILS INVESTIGATION LA COSTA RESORT & SPA PARKING LOT COSTA DEL MAR ROAD CARLSBAD, CALIFORNIA June 7, 2002 TABLE OF CONTENTS INTRODUCTION SCOPE OF WORK PROJECT DESCRIPTION. SUBSURFACECONDITIONS 1 CONCLUSIONS AND RECOMMENDATIONS 2 Pavement Design 2 GENERAL SITE GRADING 2 Site Clearing ^ Preparation of Slab and Paving Areas 2 Placement of Compacted Fill 3 Testing and Inspection ^ GENERAL APPENDIX A - Site Plan and Boring Logs Field Exploration APPENDIX B - Laboratory Testing Laboratory Test Results 3 Sladden Engineering June 7 2002 -1- ProjectNo. 544-2063 •"'"^ 02-06-343 INTRODUCTION This report presents the results of our Limited Soils Investigation prepared in order to provide recominendations for the design and construction of the proposed parking lot to be located on the southeast corner of El Camino Real and Costa Del Mar Road in the City of Carlsbad, California. The preliminary plans indicate that the parking lot will be constructed near the current surface elevation and will consist of asphalt pavement surrounded by concrete curbs and landscape areas. SCOPE OF WORK The purpose of our investigation was to evaluate certain engineering characteristics of the near surface soils in order to develop recommendations for the design of the parking lot pavement. Our investigation included limited field exploration, laboratory testing, engineering analysis and the preparation of this report. Evaluation of environmental issues or hazardous wastes was not within the scope of services provided. Our investigation was performed in accordance with contemporary geotechnical engineering principles and practice. We make no other warranty, either express or implied. PROJECT DESCRIPTION The proposed new parking lot is to be located in the general area of the existing temporary parking lot on the southeast corner of Ei Camino Real and Costa Del Mar Road in the City of Carlsbad, California. The project includes the construction ofthe paved parking lot and the related improvements. The proposed parking lot is located in a relatively level area that remains vacant. The majority ofthe parking lot site is presently vacant but there are existing temporary modular office trailers within the northern portion ofthe site. The southern site boundary consists of the San Marcos Creek that is over 10 feet deep adjacent to the site. SUBSURFACE CONDITIONS Based upon the soil conditions encountered within our borings, the parking lot is underlain by a generally thin profile of artificial fill material consisting primarily of silty clays overlying native silty clays. The artificial fills extended to depths of 4 to 7 feet below existing grade within the area of our borings. The artificial fills consisted ofan inconsistent mixture of silty clays similar to the underlying native silty clays. In general, the artificial fill soils and the underlying native soils appeared somewhat loose and/or soft. The soils were generally wet throughout the depth of our borings. Expansion testing indicates that the surface soils are expansive and fall within the "medium" expansion category in accordance with the Uniform Building Code classification system. Groundwater was encountered within the exploratory boring at depths of 7 to 8 feet below the existing ground surface. Groundwater should not be a factor in foundation design or construction. Sladden Engineering June 7, 2002 -2- Project No. 544-2063 02-06-343 CONCLUSIONS AND RECOMMENDATIONS Based upon our field investigation and laboratory testing performed on the site, it is our opinion that the proposed parking lot and related improvements are feasible from a soU mechanic's standpoint provided that the recommendations included in this report are considered in design and construction. The foilowing recommendations present more detailed foundation design criteria that have been developed on the basis of our field investigation and laboratory testing. Pavement Design: All pavement and improvements should be underlain by a minimum compacted fill thickness of 12 inches (excluding aggregate base). This may be performed as described in the Site Grading Section of this report. R-Value testing conducted during our investigation indicated an R-Value 22. The following preliminary pavement sections are based upon a design R-Value of 20. Parking areas and areas limited to auto and light truck traffic (Traffic Index = 5.0) Use 3.0 inches of asphalt on 8.0 inches of Class 2 base material Primary Roadways and areas of regular heavy truck traffic (Traffic Index = 6.5) Use 4.0 inches of asphah on 8.0 inches of Class 2 base material Aggregate base should conform to the requirements for Class 2 Aggregate base in Section 26 of CalTrans Standard Specifications, January 1992. Asphahic concrete should conform to Section 39 ofthe CalTrans Standard Specifications. The recommended sections should be provided with a uniformly compacted subgrade and precise control of thickness and elevations during placement. Pavement and slab designs are tentative and should be confirmed at the completion of site grading when the subgrade soils are in-place. This will include sampling and testing ofthe actual subgrade soils and an analysis based upon the specific traffic information General Site Grading: All grading should be performed in accordance with the grading ordinance of the City of Carlsbad, California. The following recommendations have been developed on the basis of our field and laboratory testing and are intended to provide a uniform compacted mat of soil beneath the pavement. 1. Site Clearing: Proper site clearing will be very important. Any abandoned underground utilities or irrigation lines should be removed and the resuhing excavations should be properly backfllled. Soils that are disturbed during site clearing should be removed and replaced as controlled compacted fill under the direction of the Soils Engineer. 2. Preparation of Slab and Paving Areas: All surfaces to receive asphalt concrete paving or exterior concrete slabs-on-grade, should be underlain by a minimum compacted fill thickness of 12 inches. This may be accomplished by a combination of overexcavation, scarification and recompaction of the surface, and replacement ofthe excavated material as controlled compacted fill. Compaction of the subgrade soils within the slab and pavement areas should be to a minimum of 95 percent relative compaction. Sladden Engineering June 7,2002 -3- 02^-06^-343 3. Placement of Compacted Fill: Fill materials should be spread in thin lifts, and compacted at near optimum moisture content to a minimum of 95 percent relative compaction. Imported fill material shall have an Expansion Index not exceeding 20. Because the deeper soils may be wet when excavated, some drying or stabilization should be expected in the areas of deeper cuts. Stabilization may be accomplished utilizing crushed rock and if necessary geotextile fabric. The wet soils removed during excavation should be dried back to near optimum moisture content or mixed with dry soils prior to placement as engineered fill material. The bottom ofthe excavations should be stable and unyielding prior to fill placement. The contractor shall notity the Soils Engineer at least 48 hours in advance of importing soils in order to provide sufficient time for the evaluation of proposed import materials. The contractor shall be responsible for delivering material to the site that complies with the project specifications. Approval by the Soils Engineer will be based upon material delivered to the site and not the preliminary evaluation of import sources. Our observations of the materials encountered during our investigation indicate that compaction within the native soils will be most readily obtained by means of heavy rubber tired equipment and sheepsfoot compactors. A uniform and near optimum moisture content should be maintained during fill placement and compaction. 4. Testing and Inspection: During grading tests and observations should be performed by the Soils Engineer or his representative in order to verify that the grading is being performed in accordance with the project specifications. Field density testing shall be performed in accordance with applicable ASTM test standards. The minimum acceptable degree of compaction shall be 90 percent ofthe maximum dry density as obtained by the ASTM Dl557-91 test method. Where testing indicates insufficient density, additional compactive effort shall be applied until retesting indicates satisfactory compaction. GENERAL The findings and recommendations presented in this report are based upon an interpolation ofthe soil conditions between the exploratory boring locations and extrapolation of these conditions throughout the proposed parking lot area. Should conditions encountered during construction appear different than those indicated in this report, this office should be notified. This report is considered to be applicable for use by La Costa Resort and Spa and KSL Development for the specific site and project described herein. The use of this report by other parties or for other projects is not authorized. The recommendations of this report are contingent upon monitoring ofthe parking lot operations by a representative of Sladden Engineering. All recommendations are considered to be tentative pending our review ofthe foundation construction. If others are employed to perform any soil testing, this office should be notified prior to such testing in order to coordinate any required site visits by our representative and to assure indemnification of Sladden Engineering. Sladden Engineering APPENDIX A Site Plan Boring Log Sladden Engineering APPENDIX A FIELD EXPLORATION For our field investigation, 4 exploratory borings were excavated on May 30, 2002, using a truck mounted hollow stem auger rig (Mobile B61). The borings were excavated in the approximate location ofthe proposed parking lot. Continuous logs of the materials encountered were made on the site by a representative of Sladden Engineering. Boring logs are included in this appendix. Representative undisturbed samples were obtained within our boring by driving a thin-walled steel penetration sampler (California split spoon sampler) with a hand operated hammer. The California samplers are 3.0 inches in diameter, carrying brass sample rings having inner diameters of 2.5 inches. The standard penetration samplers are 2.0 inches in diameter with an inner diameter of 1.5 inches. Undisturbed samples were removed from the sampler and placed in moisture sealed containers in order to preserve the natural soil moisture content. Bulk samples were obtained from the excavation spoils and samples were then transported to our laboratory for further observations and testing. Sladden Engineering I I I El Catnino Real i North ^ Approximate Boring Locations Boring Location Map La Costa Resort & Spa Parking Lot Costa Del Mar Road Carlsbad, Califomia Sladden Engineering Project Number: 544-2063 | Date: 6-11-02 o o CQ O a, o o a| o o o oi OQ Cfi I—i C/J O u C53 +^ on O U ca .s u g 5b W <L) Q s-c O o • l-H O o O CQ o Si DH OH < o (N I Tt-io rO a PL, U t3 Q ^ ca cfi .—H Cfi s-l O 00 La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-30-02 Boring No. 1 Job No.: 544-2063 ft"" CO o s DESCRIPTION ft o CQ fH Q 5 3 f-1 CD 'o 03 cc REMARKS 12/21/26 10 20 25 30 120/36/38 150/50-3" 120/50-6' 40 50 55 I-35/50-5' 40/60-6' Silty Clay: Brown, sandy CL 121 11.1 Sandy Silt: Brown, slightly clayey ML 114 13.6 Silty Sand: Brown, very siity, fine grained SM 108 8.1 Silty Sand: Brown, fme grained SM 102 2.0 Silty Clay: Brown, trace gravel CL 112 15.6 Silty Clay: Brown with interbedded silty sand layers I Recovered Sample CL 99 8.7 Asphah 2.5" thick Total Depth = 31.5' No Bedrock No Groundwater Note: The stratification hnes represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-21-02 Boring No. 2 Job No.: 544-2063 +j CD o I—I CQ DESCRIPTION CD a >^ 'o CO fH Q 5 3 CD CO -P CJ 03 d REMARKS 40 45 50 55 Silty Clay: Brown, sandy CL Asphalt 3" thick 14/32/44 120 13.0 10 15 20 25 30 I" 28/50-5 24/34/36 14/18/36 Silty Clay: Brown with fine to coarse grained sand CL 119 8.7 Silty Sand: Brown, very silty, fine grained SM 5.3 3.6 Recovered Sample I J I Standard Penetration Sample Total Depth = 21.5' No Bedrock No Groundwater Note: The stratification hnes represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-21-02 CD Ci cn o m Boring No. 3 Job No.: 544-2063 DESCRIPTION 'o fH Q ^ s fH 0 cc REMARKS 0 Silty Clay: Brown, sandy CL 10 i- r 13/36/50 20 25 30 45 50 55 1 I 8/10/10 10/20/26 13/23/23 30/50-6' 18/22/30 18/18/24 Silty Sand; Brown, fine grained with scattered gravel SM Sand: Brown, slightly silty, fine grained SP/SM Silty Clay: Brown with interbedded silty fine sand layers CL 8/10/12 28/30/35 15/28/30 Silty Clay: Brown CL Clayey Silt: Brown, sandy ML Sandy Silt: Brown, clayey ML 121 12.4 4.7 5.8 1.5 1.0 13.0 29.0 13.6 16.3 Asphah 3.5" thick 53% passing #200 39% passing #200 12% passing #200 37% passing #200 16% passing #200 7% passing #200 72% passing #200 98% passing #200 41% passing #200 33% passing #200 Recovered Sample I ^ I Standard Penetration Sample Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. Total Depth = 51.5' No Bedrock No Groundwater La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-21-02 a^ CO OJ fH o O "cS O Boring No. 4 Job No.: 544-2063 DESCRIPTION 0) a o CO fH Q P 3 CD fH cn 'o o . .H CJ cS a S o O REMARKS 10 20 25 35 40 45 50 55 Asphah 3.5" thick Sandy Silt: Brown, clayey ML 13/30/40 130/50-6" 18/40/50 130/50-6" 107 104 7.0 Sand: Grey brown, fine grained SP 99 2.6 Silty Sand: Grey brown, fine grained SM 95 1.0 Recovered Sample Total Depth = 21.5' No Bedrock No Groundwater Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. Date: 5-21-02 a'^ CD srj CO O O cn O s La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Boring No. 5 Joh No.: 544-2063 DESCRIPTION OJ a o CO fH Q CO cc cC a a o 5?0 OJ 'A REMARKS 10 15 20 25 30 35 45 50 55 Sandy Silt: Brown, clayey Asphalt 3.5" thick ML 13/24/36 14/24/36 16/32/50 18/34/50 105 Sand: Grey brown, slightly silty, fine grained SP/SM Silty Sand: Grey brown, fine grained SM Sand: Grey brown, slightly silty, fine grained SP/SM Recovered Sample 95 93 98 3.6 4.7 1.5 Total Depth = 21.5' No Bedrock No Groundwater Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-21-02 Boring No. 6 Job No.: 544-2063 -U CD a CO DESCRIPTION CD a o C/2 fH Q t5 3 CD fH cC CO a « S „ o REMARKS Silty Clay: Brown, trace sand CL 26/36/50 10 15 20 25 30 24/38/45 120/50-5" 130/38/50 140/50-5' 135/45/50 Silty Sand: Grey brown, fine grained, slightly clayey Sand: Grey brown, fine grained 40 45 50 55 Silty Sand: Grey brown, fine grained I Recovered Sample 115 116 SM 100 94 SP 98 SM 103 17.7 16.3 10.5 4.7 1.5 4.2 Asphah 8" thick Total Depth = 31.5' No Bedrock No Groundwater Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-21-02 Boring No. 7 Job No.: 544-2063 4J CD a'" CD c! CO o DESCRIPTION CD a .,-H O CO fH a D 3 CD ;3 g O cC cc PC? a „ o REMARKS Silty Clay: Brown CL 14/50-6" 113 18.3 10 15 20 25 30 35 40 45 50 55 15/38/50 124/50-6" 130/50-6" Silty Sand: Brown, very silty, fine to coarse grained, clayey SM 108 9.9 Silty Sand: Grey brown, fme grained SM Silty Sand: Brown, fine grained, slightly clayey SM Recovered Sample 92 95 3.6 5.3 Asphalt 2" thick Total Depth = 21.5' No Bedrock No Groundwater Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-21-02 Boring No. 8 Joh No.: 544-2063 a^ CD c! CO o s DESCRIPTION CD a •rH o CO fH P t5 3 CD fH CO 'o ±2 o cC cC REMARKS 10 20 25 30 35 40 55 Silty Sand: Brown, very silty, fine to coarse grained, clayey SM Asphalt 2.5" thick 12/25/29 123/40/50 128/50-6" 116 Sand: Brown, slightly silty, fine to coarse grained with scattered gravel SP/SM 128/50-5" Silty Sand: Brown, fine grained Sand: Brown, slightly silty, fine grained Recovered Sample 123 2.6 SM 96 3.6 SP/SM 3.6 Total Depth = 21.5' No Bedrock No Groundwater Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-21-02 Boring No. 9 Joh No.: 544-2063 Depth (in feet) Symbol Core Blows/ft. DESCRIPTION Soil Type Unit Dry Wt. (pcf) % Moisture % Relative Compaction REMARKS 0 - Sand: Brown, slightly silty, fme grained SP/SM Asphah 3" thick 5 - 12/18/20 102 3.6 — 10 -120/28/46 Sand: Grey brown, slightly silty, fine grained SP/SM 116 4.7 — 15 1 30/50-5" Silty Clay: Brown with interbedded sandy silt layers CL 110 19.1 — 20 25/40/50 Sand: Grey brown, slightly silty, fine grained SP/SM 111 15.0 --- 25 Recovered Sample Total Depth = 21.5' No Bedrock No Groundwater 30 35 40 45 50 55 Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-30-02 Boring No. 10 Joh No.: 544-2063 a^ Ol fl ps CO CD O o CD o s DESCRIPTION CD a >^ 'o CO fH p P 3 fH S 2 cC cC 1^.. a REMARKS 10 15 20 25 30 35 40 45 50 Silty Sand: Brown, fme to coarse grained SM 130/50-6" 124/40/50 132/36/50 131/50-5" 108 3.6 140/50-5" Sand: Brown, slightly silty, fine to coarse grained SP/SM 103 5,3 Silty Sand: Brown, fine to coarse grained, clayey SM 111 7.5 Silty Sand: Brown, fme grained, clayey SM 100 8.7 Sand: Grey brown, slightly silty, fme grained SP/SM 97 4.2 Recovered Sample Asphalt 4" thick Total Depth = 26.5' No Bedrock No Groundwater Note: The stratification lines represent the approximate boundaries between the sod types; the transitions may be gradual La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California • ^. 91-09 Boring No. 11 Job No.: 544-2Uba Depth t (in feet) \ Symbol c Core ^ t Blows/ft. DESCRIPTION Soil Type Unit Dry Wt. (pcO % Moisture % Relative Compaction REMARKS 0 Grass area --15/34/44 Silty Sand: Brown, fine grained SM 117 11.1 — 5 • 10/12/15 „ 110 8.7 — 10 - 8/12/14 Sand: Brown, slightly silty, fine to medium grained SP/SM 111 10.5 15 Recovered Sample Total Depth = 11.5' No Bedrock No Groundwater 20 25 30 35 40 45 50 55 Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-21-02 Boring No. 12 Joh No.: 544-2063 cn o s DESCRIPTION a o CO fH p p 3 CD fH -w CO 'o cC cC 5?o REMARKS Silty Clay: Brown, slightly silty, trace fine to medium grained sand CL Grass Area 10 15 20 30 35 40 45 50 17/8/8 19/10/15 18/24/34 119 13.0 Silty Clay: Brown CL I Recovered Sample 112 124 16.3 9.9 Total Depth = 11.5' No Bedrock No Groundwater Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-30-02 Boring No. 13 Joh No.: 544-2063 jH CD +3 CD a'" CD fl PS CO cn o s DESCRIPTION CD a >, 'o CO fH p t5 3 CD fH ^3 -u CO 'o 0 g cC CC ""^ fl REMARKS 10/14/24 Silty Clay: Brown, slightly sandy CL 115 13.6 r 9/12/15 10 15 20 25 30 35 40 45 50 55 I Silty Clay: Brown with fine to medium grained sand CL 121 11.1 \7 Groundwater @ 8 to 9' 3/5/8 Silty Clay: Dark grey and black, stiff CL 30.7 Recovered Sample I J I Standard Penetration Sample Total Depth = 11.5' No Bedrock Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-30-02 Boring No. 14 Job No.: 544-2063 •+J .0) ft'" <D fl P CO o DESCRIPTION CD a 'o CO fH p 5 3 <D fH pl -(-> CO 'o CD ^ >.2 •f-H 4-3 fl REMARKS Silty Clay: Brown CL 10 3/6/10 96 23.4 20 25 30 35 40 45 50 1/1/1 1/1/3 3/6/7 3/4/7 3/5/8 4/6/7 Silty Clay: Brownish grey, stiff CL Silty Clay: Grey, stiff CL 34.2 49,3 41.9 18.3 17.0 7.5 Silty sand layer less than 1' thick \7 Groundwater @ 8 to 9' 96% passing #200 91% passing #200 92% passing #200 91% passing #200 93% passing #200 90% passing #200 Ujill Recovered Sample I ^ I Standard Penetration Sample Total Depth = 36.5' No Bedrock No Groundwater Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Date: 5-30-02 3^ a • • QJ fl ps CO o O o Boring No. 15 Joh No.: 544-2063 DESCRIPTION QJ a "o CO fH p 5 3 0) fH 73 cC cC „ o JS O REMARKS Silty Clay; Brown and black, slightly sandy CL i-5/14/18 122 12.4 10 5/5/6 20 25 30 35 40 45 50 Silty Clay: Grey and black, stiff CL \/ Groundwater @ 9 to 10' 89 33.3 Recovered Sample Total Depth = 11.5' No Bedrock Note: The stratification Hnes represent the approximate boundaries between the soil types; the transitions may be gradual. Date: 5-30-02 +J ,QJ a"" P^ 10 15 20 30 35 40 45 50 55 CO o 7/19/20 i-5/10/15 5/6/7 La Costa Resort & Spa Parking Lot Costa Del Mar Road / Carlsbad, California Boring No. 16 Joh No.: 544-2063 DESCRIPTION Silty Clay: Brown, sandy Silty Clay: Brown with scattered gravel Silty Clay: Brown and black. Recovered Sample I J I Standard Penetration Sample CD a . rH O CO CL CL CL fH P 5 3 121 110 QJ fH CO 'o 11.7 17.0 29.8 cC cc fl tf a - o REMARKS Silty sand layer less than 1' thick \/ Groundwater @ 10' Total Depth = 11.5' No Bedrock Note: The stratification hnes represent the approximate boundaries between the soil types; the transitions may be gradual. APPENDIX B Laboratory Testing Laboratory Test Results Sladden Engineering APPENDIX B LABORATORY TESTING Representative bulk and relatively undisturbed soil samples were obtained in the field and returned to our laboratory for additional observations and testing. Laboratory testing was generally performed in two phases. The first phase consisted of testing in order to determine the compaction of the existing natural soil and the general engineering classifications of the soils underlying the site. This testing was performed in order to estimate the engineering characteristics of the soil and to serve as a basis for selecting samples for the second phase of testing. The second phase consisted of soil mechanics testing. This testing including consolidation, shear strength and expansion testing was performed in order to provide a means of developing specific design recommendations based on the mechanical properties of the soil. CLASSIFICATION AND COMPACTION TESTING Unit Weight and Moisture Content Determinations: Each undisturbed sample was weighed and measured in order to determine its unit weight. A small portion of each sample was then subjected to testing in order to determine its moisture content. This was used in order to determine the dry density of the soil in its natural condition. The results of this testing are shown on the Boring Logs. Maximum Density-Optimum Moisture Determinations: Representative soil types were selected for maximum density determinations. This testing was performed in accordance with the ASTM Standard Dl 557-91, Test Method A. The results of this testing are presented graphically in this appendix. The maximum densities are compared to the field densities of the soil in order to determine the existing relative compaction to the soil. This is shown on the Boring Logs, and is useful in estimating the strength and compressibility ofthe soil. Classification Testing: Soil samples were selected for classification testing. This testing consists of mechanical grain size analyses and Atterberg Limits determinations. These provide information for developing classifications for the soil in accordance with the Unified Classification System. This classification system categorizes the soil into groups having similar engineering characteristics. The results of this testing are very useful in detecting variations in the soils and in selecting samples for further testing. SOIL MECHANIC'S TESTING Direct Shear Testing: One bulk sample was selected for Direct Shear Testing. This testing measures the shear strength of the soil under various normal pressures and is used in developing parameters for foundation design and lateral design. Testing was perforined using recompacted test specimens, which were saturated prior to testing. Testing was performed using a strain controlled test apparatus with normal pressures ranging from 800 to 2300 pounds per square foot. Expansion Testing: One bulk sample was selected for Expansion testing. Expansion testing was performed in accordance with the UBC Standard 18-2. This testing consists of remolding 4-inch diameter by l-inch thick test specimens to a moisture content and dry density corresponding to approximately 50 percent saturation. The samples are subjected to a surcharge of 144 pounds per square foot and allowed to reach equilibrium. At that point the specimens are inundated with distilled water. The linear expansion is then measured until complete. Sladden Engineering ANAHEIM TEST LABORATORY 3008 S. ORANGE AVENUE SANTA ANA, CALIFORNIA 92707 PHONE (714) 549-7267 SLADDEN ENGINEERING: 6782 STANTON AVE. SUITE E BUENA PARK, CA. 90621 ATTN: BRETT/DAVE PROJECT: #544-2063 DATE: 6/10/02 P.O. No. Chain of Custody Shipper No. Lab. No. A-1 4 3 5 Specification: Material: SOIL LA CASTA RESORT ANALYTICAL REPORT CORROSION SERIES SUMMARY OF DATA pH SOLUBLE SULFATES SOLUBLE CHLORIDES MIN. RESISTIVITY per Ca. 417 per Ca. 422 per Ca. 643 ppm ppm ohm-cm 9.2 40 25 2,613 02 POPPYi 1997 UNIFORM BUILDING CODE INFORMATION The Intemational Conference of Building Officials 1997 Uniform Building Code contains substantial revisions and additions to the earthquake engineering section summarized in Chapter 16. Concepts contained in the 1997 code that will be relevant to constmction of the proposed stmctures are summarized below. Ground shaking is expected to be the primary hazard most likely to affect the site, based upon proximity to significant faults capable of generating large earthquakes. Major fault zones considered to be most likely to create strong ground shaking at the site are listed below. Fault 2k)ne Approximate Distance From Site Fault Type (1997 UBC) Rose Canyon 8.8 km B Newport-Inglewood 16.8 km B Based on our field observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is SD, generally described as stiff or dense soil. The site is located within UBC Seismic Zone 4. The following table presents additional coefficients and factors relevant to seismic mitigation for new constmction upon adoption of the 1997 code. Seismic Source Near-Source Acceleration Factor, Na Near-Source Velocity Factor, Nv Seismic Coefficient Ca Seismic Coefficient Cv Rose Canyon 1.05 1.3 0.44 Na 0.64 Nv Newport- Inglewood 1.0 1.0 0.44 Na 0.64 Nv Sladden Engineering