HomeMy WebLinkAboutCT 03-02; CARLSBAD RANCH PA 5; AS-GRADED GEOTECHNICAL REPORT OF ROUGH AND FINE GRADING; 2006-08-02 (3)ITC AS-GRADED GEOTECHNICAL REPORT OF ROUGH AND FINE GRADING, HOTEL ONE, RESORT AND CONFERENCE FACILITIES, SALES BUILDING, AND VILLAS NO. 53 THROUGH 56, LOTS 10, 11 AND A PORTION OF LOT 1, GRAND PACIFIC CARLSBAD, CARLSBAD, CALIFORNIA Prepared for: I: GRAND PACIFIC RESORTS 5900 Pasteur Court,; Suite 200 Carlsbad, California 92008 Project No. 040575-005 August 2, 2006 4 Leighton and Associates, Inc. A. LEIGHTON GROUP COMPANY I: ..-. 40 I Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY I. . .• August 2, 2006 Project No. 040575-005 To: .. Grand Pacific Resorts 5900 Pateur' Court, Suite 200 . . : I . . Carlsbad, California 92008 . . I Attention: Mr. Bruce Zelinka _Subject".--.. •... As-Graded .Geotecbnical.. Report of Rough. and Fine Grading, Hotel One, Resort :and Conference Facilities,. Sales Building, and Villas No. 53 through 56, Lots 10 I •. . .. ..... .1 Land. a Portion of Lot 1, Grand Pacific. Carlsbad, Carlsbad, California. . I . Introduction . :. . . . . I .... Tn.accor.dance.withyourrequestand authorization- ,Leighton . and Associates, Inc. (Leighton) has ........................provided geotechnical- .,obseation- and testing -services during the rough- rand fine grading operations .for .Lots .10, .11 anda portion of Lot 1 at the Grand Pacific Carlsbad resott, located in ..I .:.................arIsbad,..California.cThisreport -summarizesourgeotechnical obsei-vations, field -and laboratory •.• . ....................... test-results, . an&the.geotechnicaFconditions:encountered; during .the--rough and'finrading:---- . .: I operations of the site. . . . . .. . The conclusions and recommendations presented in thern Geotechnical Investigation- report . (Leighton, 2005). are still -.considered pertinent and applicable to the. development, of the .project ...... .I and should be followed during the post-grading and construction phases of site developmen t.-'As, ....................of.the .date.Of this repôrt-the...rogh and- finegrading opetations at Lotsi 0, 11 an a portion of ...... ....... ..........Lot 1, forHotel One; Resort and .Conference Facilities; Sales Building and Villas No.53through 56, of the proposed. Grand ; Pacific Carlsbad, Planning.-Area .5 -. Phase l improvements: are.. essentially complete. . . . . . . . . I .. . • .. I I . . . .. . 3934 Murphy Canyon Road, Suite B205 u San Diego, CA 92123-4425 858.292.8030 m Fax 858.292.0771 • www.leightongeo.com Li 04O575005 I Summary of Rough and Fine Grading Operations The rough and fine grading operations for the project were performed between October'17, 2005. and July 21, 2006. The grading operations were observed and tested by a representative of Leighton in accordance with the project geotechnical recommendations (Appendix A), recommendations made during the course of grading, and the requirements of the 'City of Carlsbad. I Prior to rough and fine grading, the areas of the proposed development were stripped of surface vegetation and debris. These materials were disposed off-site. The primary grading activity • for I the proposed Hotel One Building, Resort and Conference Facilities Building, Sales Building and Villas No. 53 through 56 on Lot 10, 11, and a portion of Lot 1, consisted of removal of highly expansive clay to competent formational material The removal depths extended 10 feet below I the finish grade and extended laterally to a minimum 10 feet beyond the building limits The depths of removals were observed by a representative of Leighton.' I Replacement fill slopes were placed along the proposed slopes on the north and east sides of the Sales Building Pad, on the northeast side of the Lot 10 building pad, the western side of the Resort Hotel Building Pad, and along the proposed slope between the Sales Building and the I Resort Conference Facilities Building. .The backcut for the replacement fill slopes started 15 feet behind the top of the slope except the backcut adjacent to the Resort Conference Facility building I which started 5 feet behind the top of the proposed slope To mitigate the potential for accumulation of seepage water, subdrain systems were installed alongside the replacement fill slopes. The subdrains were typically placed along the top of the I existing clay bed to intercept the ground water present on the top of the clay bed.*The subdrain typically consists of a 4-inch perforated PVC pipe (placed holes down) surrounded by a minimum 4 cubic feet (per linear foot) of crushed rock and wrapped in a filter. fabric The subdrains were designed to have a minimum fall of at least 1 percent to the outlet into a storm drain system. I A cut/fill transition was encountered at the Conference Facilities Building In order to mitigate adverse affects in the cut/fill transition zone, all the fill soils placed within, 10 feet of the. building limits were compacted to 'a minimum, of 95 percent relative: compaction. The cut portion extending at least 10 feet outside the building limits was scarified to a depth of 12 inches, moisture conditioned, and compacted to a minimum of 95 percent relative compaction I The onsite soil was moisture-conditioned and reused as fill Fill soils were compacted to a minimum 90 percent relative compaction at near optimum. moisture contents. The 'very highly I expansive clays that' were used 'as compacted fill were placed at moisture contents at least 4 percent above the optimum moisture content The results of the field density tests are summarized in Appendix B The approximate locations of the density tests are presented on I Plate 1 Compaction of the fill soils was achieved by use of heavy-duty construction equipment 8 I -2- Leighton 040575-005 Areas of fill in which field density tests indicated compactions less than the recommended relative compaction or where the soils exhibited nohuniformity or had field moisture contents less than the minimum moisture content were Ireworked The reworked areas were re compacted and re-tested until the recommended minimum 90 percent relative compaction and minimum moisture content was achieved. Materials in.the Conference Building pad were compacted and tested to a minimum of 95 percent relative compaction. : Laboratory maximum dry density tests of representative on-site soils were performed in general accordance with ASTM Test Method D1557. Expansion potential and soluble sulfate content tests of representative finish grade soils of the building pad were performed in accordance with ASTM D4829 and standard geochemical methods The test results are presented in Appendix C Conclusions The geotechnical conditions encountered during the rough and fine grading operations for Lots 10, 11 and a portion of Lot I of the proposed Grand Pacific Resort project were generally as,. anticipated It is our professional opinion that the site is suitable for the intended use provided the recommendations in the project geotechnical reports (Appendix A) and presented herein are incorporated into the post-grading and construction phases of the project The following is a summary of our conclusions concerning the rough and fine grading operations Site preparation was geotechnically observed Very highly expansive clays were excavated and replaced as compacted fill during the grading operations These materials were placed outside of proposed building pad areas at least 8 feet below grade The expansive clays were placed at least 4 percent above optimum moisture content The upper 12 inches of existing ground surface within the limits of the proposed cut areas were removed and/or scarified prior to fill placement The fill soils placed on the site were moisture conditioned to obtain near optimum moisture content and compacted to a minimum 90 percent relative compaction (in accordance with ASTM Test Method D1557) Materials in the Conference Building Pad were compacted to a minimum 95 percent relative compaction. Replacement fill slopes along with subdram systems were mstalled along the proposed slopes to dram out the saturated soils and seepage conditions encountered Expansion potential testing of the finish grade soils on the building pads is pending and will be issued under separate cover. ' •' 4 Leighton" 1 040575-005 I Recommendations I Recommendations concerning the post-grading and construction phases of site development for the project have previously been presented in the project preliminary geotechnical report (Leighton. 2005a). The recommendations presented in the project geotechnical report are still considered I applicable to the planned development and should he followed :during the future post grading and construction phases of site development. Additional or addendum recommendations are presented below: I • Building Pad I Finish grade test results for expansion potential and soluble sulfate are to he provided under separate cover. Any modifications to the recommendations will he provided at that time. 1 If you have any questions regarding this report, please do not hesitate to contact this office. We appreciate this opportunity to he of service. I Respectfully submitted \QAL G LEIGHTON AND ASSOCIATES. INC. Coto Sean RCE 54033 EV to Director of Engineering 1*1/ CIVIL I . Michael R. Stew EG 1349 Principal Geologist Attachments: Plate I -As-Graded Geotechnical Map Plate 2 - As-Graded Geotechnical Map 1 Plate 3 - Field Density Test Location Map Plate 4 - Field Density Test Location Map I Appendix A - References Appendix B - Summary of Field Density Tests Appendix C - Laboratory Testing Procedures and Test Results I Distribution: (8) Addressee Sean RCE 54033 1 4' I Leighton - __ \N / / ____ - EE _____ - N N / N I—: : / -: - - - - c-: N \ - N = :- =- - - - - = = - - N = - - __ -; y / __ __ __ I—: _i __ __ - __ C - - ; 7- --- -- ---- --j --- ----- --- \N I - - - - - N \ -K / - - - N \ N N N 7-N - _ - / - - - - - - - S - \\ S - -- - N >\ - - - 7-i K N T ---_ -- - - \N N ___ N - - 1-T - - 11 - - EI _ > - - K -:IIEIIK - - - \ - j_78_h N N N -- -- __ - -- - - \ \ N - - -- -- N N - - - \_ N - = ,1 79 - - N N S - 5' - '\' -. \' S I18O1 7- _I ii- Lot 4 N7- N - N - / N - - NN 7-N N - - //\\ /N N - - -- - N - N N - / N N NN N7- N 7- N - N Ii82 1/ N 7- N N7-N7- N7-7- N7- 7-NN\ \ \, N / / \ \ - I NN N7-N7- N N N \N NN N7- 7-N7-NN N \ N - \I \\ ____ N 7- N N I NN N7-NNNN - N N N - ' 1 81 / , \\ / 0 - /S S S - N N NN NNN NNNN 7- - NNN' 7- 7-N NN' - \ ( \ A / N N NN N N N N - - N - - N N - \ / / Qf - - \\\ Qf NN 7-7-7-7/KN7- N \\ \\\ / // / /\t - / N /- N - INN N \/__ ___ - N// N N - N N / -- - - - - /\ f/ / - N - -- N / N N S I\ 7-5 - ' ' ' , S 7- I<-K , N K - /// / / / / - / -' Strockpite 7-N N N N N 1821' - -1 /// \ i N N N N - - - / S N ' IJA'/t • ' 7- / N / - - - I - / -' / / • 4 I - 7- N 77 / / / _7— / • - N / 7 N N N N 86I \/77"5\\ ' \\ / 7 /\ /7 5/ 7; /,' N , N L 0 t 6/<x> /N/Z / - N / // / / // / / _____ I N 217I - - N /7- 7-77-7-/ '\ \\ _\ / / / / 1 12031 . - N / //, - - - - \\/ j / / / / - . APPROXIMATE '7 I 2 194 / /1 CLAY BED N \ \ N f _i__ \/(\7NK/N / 11981 N '12061 • : N \ ' N N / -' , N S - • N 7N\ I - N : N 3} \ \ N - N , - S Af .- .5 , N/ N\ I '\\kI'S 'S - N N \ I \\ Lo f 8 \ N N N ' 1 N N N N N N I - j N A rximte Approximate \\ \ \7/7\N - • \\ N N - 1 Location of x Location of N \ \ I - -12051 N I Af NN N - BuriedCIay N N N BuriedClay / \ \7- N 03 • \N\ \\ NN N NNN N d_7-1 A N N N NN \ N\N \\ 7 /555/ 77 I2i6l ! I N N I N ______ I - 7 • •. 7- IN N N 11671 - N N /7 \\ 1 L 11851 I \\\ 1 \' N7 /7 - Il - ' - S \N - \\ \N5\N\ \ \ N • N / N 'N N N N \/ ____ N - N - - - \\7-\/2\N\ N\ N\\ / >77N \ 7 N N N - Li_74\J N 7- N N oxm ate \\ 171 \\ A f 1 N I / P \ - \ / \ / N N N N Lot 6\ \ 777- / I N \ N • 7- N N 1 N N \ / 7-, /' 7-7- I 7- • - N - - - - - - - - - - --- N - 7- ________'7- N ______ N - N 7zI/2'-7- \ / ____ I 1 77 • N _ - 7- -- - - N N - , j182j N 7///3// 1/ \ Lt91 I 77 1, ___ I S N N I 17 N - N - / N \ NNN 7/2 5/ N \ / I ___ Af (LOCATIONS ARE APPROXIMATE, LEIGHTON IS NOT RESPONSIBLE FOR LINE AND GRADE) 7' •5 •/7/7-_-_ 5 /\N \ \ \\ \ \ I ______ I' /' \ N /5/7- i9 - / -' \ \ S i ___ l200— •-• . • , - - - I • / -- / N I I ______ I - - -, Af ARTIFICiALFiLL(placedduringthisphaseof grading) • / >_--------- _c_____ -. 1' 1 '' ___-1_.- s ' •S N - - I /N 1180 ____ - 7- _____ 1/ • I - Tsa TERTIARY SANTIAGO FORMATION (not differentiated) N - - - I S77 I 1 I f N / / I , I , S 221 - I N7 J I _____ N I N • I • - - - — • . .'. LOCATION OF GEOLOGIC CONTACT _- - - / / NINzz: I : I I I \ • • • 'N/ - - ________________ - - - - - -- - r - 7-77. N N I - I • - - - - _N_N_7/ - N\ I I - I - -- -I - -- NN N - 7-//7 / I / ___ LP!l II\\\\ \ 1 \\ >I\ - \NN IN77 N7- / / / / -- ' •• •\ \\ \7- \ \k\\\V \ / / •\\ /S I / / \ I \\ I \I\<N\ 1 1 216, Qt \ Qt \,V I X 1\ \V V\ : / fi \ • I N 1 H :I I I \- 2 • •• 5' - S f I , I H //s il NI 00 Xx` 00 N \\ \ 2707271 \ \ /H\ \ 005; W N, V\ 1 V l x V, \'A Z 1 t v 1;: \,,~ixx I 11< 10 r Qt I I iI 1 1 'N7 to 207 0 7T21 a- I I /• \ - --çH' I \ 1 217, A f t • \\ N \ o / I / — / I 'a 0/0 Qt A f 10 202 F213 x Outlet ipe k \\\ I \1 I I I I Q • 21 9' 1,223 .01 Af 230 x 1110o, ) -L-5 \I\l. ?I /fIfI\\\ I / \L\I H 1/ I / L 214 'A f At 60 APPRO [MATE LOCATION I LL_J 'Af j FD S X_ ~x F i- \ _ E 21 : __ H 'L ______ •1 it :' "\\'HNHHHN I/NN S\. II / 0 MA I L /\I \ / / • S • 7__ I I / f /IJ 222 230 -' I I I ___ If ___ •. \ 1 / I /5 ..fl ,////// \\\/ NN\\\\N ' \\s N N' / / f t 11232 1 ,f Lot ~Q t n3 I V, Q Af 20 "X ~Af C1 A - i3 / OOOPP 19 Dr 6t At 0 QL1 \\\ I \ S J \\ • / / l_ \ [of i 6 ~1 99 213 \tranSyste U2~m S r./\\\/ 'Af, I \kl Qf / S / / / S / / N • S \\ \ \/ \\ Ii tL Q0 0-1 So fle +00 CL sa, fill f iN - Q :7r Qt ~z z /A f __ ___ 95 Qi R Rw - - - --- - - - - - - FF JL t 44 I I —HT—Ni/ I PLATE 2 SEE LEGEND ON PLATE 1 V r V /s N / / //I , I;/ I f' fS// 'S AS—GRADED GEOTECHNICAL MAP GRAND PACIFIC CARLSBAD CARLSBAD, CALIFORNIA V Proj 04575-005 Scale 1"=40' Date 7/06 0 40 so SCALE FEET Leighton P:\DRINGU4O5J5\005\OFOS-07-28\PLATE2DWG (08-14-08 10:47:13AM) Plaited by: - __('7 \ \\ \\\ \\ \\\ /, \r12 ) N N N - / / / /// / / / / // // /// / / I ' / /1 //// ///// / // // \ \N _ / / / / // // //t /J /S//\// -' ---- - - - - -> T /// //// 7///7 / / / //\ / \\ \ / S / / / / 7 - - N N N NN 7 / \ - ______I / \_ \ \ \ \ \ - - N N - 7 - - - - - \__ S S 1 - / N - '- - / - -- N - - - N -_ - '/N - N\\ 7 N T) -- N / FG 972 ,CF \ FG \/N\ k \\ \\\/ , \ / N - / / \ CF 89 / N I - / // / \N N 7 N N N \ \\ / \ /\\\ / 7 / / N / \ / / N N NT N \\ \\ \ FO CF 754 / / NN / 7 - — - - — / N N \ / / \/ \ \ PG / \\\ \ \' / / /7 - / ___/_ \\\ \ 7 \\\ \\ \ \\ \ \ N // / / / / \\\ / / / / I / / / / N \ - N / - N / - S / - - N N N p CF19 ( ecF::i ( •CIS7 / •/1 - N - / / // \ / S/IH \ S / - / CF-2 L / CF-I9 - \ / S - I / / 0 -- - // // / //( / ///// CF 90 tCF \\/ \\ N - CF-I N I / I I // F IF - / / c J )/ / /1 /, / /N / / 4 I / i / / / :;: cF:7 1CL4 CF 1Th 1 / CF N N (I CF CFN \CF 298 /1 / / CF 24 /// / / / N N / / I N N I /CF I CF-61 P N -\ / 7 7 77 - N CF284 - 1 - / \/' /1 \ \ \ N \ N 7 / _769 /_\ I 7 \\ / N CF-43 /7\ tFI'\ \\ '/$ / / \/ / CF72\/ / \/N'N\\\N\ / F8SF CF / // \ CF 624 \ \ /CF 23 / C278 / // CF 241 / / / \ \/\N / - / CF 51 CF 25 N\ \ \ N \ / // / CF 209 NP - / / / / / 7 - N F-4 CF-ES -N - -/ N I 7cF-210 / F-83 N' - - 7 \N//I N J - CFI22 4/ CF -H / /4 / 4 I \ \ / \7/7 \ N N CF CF 427 e CF pF 44J // / / h / / / / 7 - - \ //\//\/\ /1 1 / / r__ [ L7 L4 L \/ \/ \ \ F // // //// / 1// I - / \ \ / I\ k _ _____ __ - \ CF330 ( / CF45\ // ___________ - - ____ -- - -- - -- 72 P CF 3 \ CF 391 tI/__ \ cF41\ / \ \ 77 ' - - - F-73 CF-32 ,SS _____ II / F47 1 - I - - I __________ __-_/ / / CF-3O / / / I CF0 I / e / - - CARLSBAD, CALIFORNIA N -- - /'P/ \- //CFP /\/ _____________________________________ 40 80 CF 77_ /1 ///\/ - / / N F7 (CFSE /- ) / CF504 \:cF02 rF2.1 i, \:\' , i 5 N CF Z20 CF 2: CF 273 / \ / \ N / y \ //N rnCr7NNN3O7\ , \V 'V - \VV 7' ////// 211 / FGc1 \ ' \ r \ \ C \ / / / ___ I _ ____ H4 //JcF./E \ F2 _ _ T CF39 _- ______ I____ / ___ /t \ \ / J \\NN\\\ I --- I 4O L I / \ \ F45 C5C2 _______________ / / _+_i 'VI 'V N N / / z // CF // I 1 \ CFF crI / N \\\ N N \\\\ N NNN - 2\ (\/ \ N / / \\ \ \ '\ - ______ ____ / \ 'V // /1 \\ / / // N 7 \ N NN N 'V\'\ CF 1\F6FG \ 'V \ 'V I 'V / N ) N N 'V 57 / / *N/ / I / / F L N I / / / / / I / / \\ \ \ \ 'V ____/2 7NN\ \ \ ) / / / / I / N /// / - I / / \ \\ \\ \ \ 'V N // ç 'L , j/I / o -Li \// \\\ \ \ \/ \ // \\\\ \\ \\ N N CF 2 'V /> \ CFN\ f— / / I / / // /J (7 L: 'V 1 / \\ 'V 7 N \/NNC: N / I I / // / / - / / ! / T N\\\\\ \N. /\ \G \ \\\Y\ \\ \ \\ \ 'VN 'V''V __ 1k \\ \ \ \/ \ \ \ \ \ \ \ \\N I ' f// I /// ____ ' / \ \ A N - - / C 25 / A \ \ \\NN 7N _±1-1 T // /7 // __ 7 \ \ \' \NN 'N/ 7 //// A1//J2 / /z 7'V N \/ \ /\ 'V\J N / // __ _____1 - yI/JP/ II / ,/\ \\ / 'VAA N N /y7 //i/T-/ // N H 7/ (/ \/' \\'V'V N N / 2o5 — \A7\/ b " N N A // // / // I N1!h1 iiJ / / / j1' I I I / /7/ /) I - / / I' / ) / / // /J7N 7 / 7 PLATE FIELD DENSITY LOCATION MAP GRAND PACIFIC CARLSBAD, CALIFORNIA Proj: 040575-005 Scale: 1"40' Plot Date: 8/1/06 0 40 80 Eng/Geol: SAC/MRS Created By: KMT Updated: 7/25/06 SCALE FEET \\CIS\POJECT\SANDIEG0\04 0575_GrandpacUic\0405750[N 1 sht2_36X48_005mxd LEGEND 075 e L_. / "V 1/ Approximate Location of Field Density Test - I L / / / /j/ ) C / // / / f/i i /I / if / / / A - . . • ., .- -- I 040575-005 4 ,, • . ... . . . .' . -. - I APPENDIX A I References F California Building Standards Commission (CBSC), 2001, California Building Code, Volume I - I Administrative, Fire- and Life-Safety, and Field Inspection Provision, Volume II - Structural Engineering Design Provision, and Volume. III - Material, Testing and 1 . Installation Provision, ICBO.-.. , '• . - . . ' Leighton and Associates, Inc., 2005a, Geotechnical Investigation, Proposed 53-Acre Resort I Development— Phase 1, Carlsbad Ranch, Planning Area M-5,1 Carlsbad, California, Project No. 040575-003, dated April 11, 2005. 2005b, Clarification of Remedial Earthwork ,Removal Assumptions of the On-Site TopsoillColluvium,'Proposed Grand Pacific Resort, Carlsbad Ranch Planning Area PA-5, I .Carlsbad, California., Project No. 040575-005, dated December14, 2005. . 2006a, Stability Fill/Revised Fill Slope' Ke,' and Highly Expansive Clay Removal Recommendations, Western Side of the resort Hotel Building Pad,; Proposed Grand Pacific Carlsbad Resort, Carlsbad Ranch Planning Area PA-5, Carlsbad, California, Project No. 040575-005, dated January 23, 2006. . •. '• . ' I , 2006b, Addendum R&ommendations Concerning the Sales Building Stability Fill and Resort Conference Facility Building Pad; Proposed 'Grand Paèific Carlsbad Resort, - Carlsbad Ranch Planning Area PA-5, Carlsbad; ,Californiã; Project No.' 040575-005, dated' I January 31, 2006. 2006c, Addendum Recommendations Concerning the Sales Building Stability Fill and Lot 10 Building Pad Stability Fills, removals of the Clay'Bed Beneath the Building Pads, and 'Subdrãin Installation, Proposed Grand Pacific Carlsbad Resort, Carlsbad Ranch I ' Planning Area PA-5, Carlsbad, California, Project No: 040575-005, dated January 31, 2006. 2006d, Recommendations Concerning the Backfilling of the Temporary Stability, I Backcut Slope, Sales Building and Lot 10 Building Pad Stability Fills, Proposed Grand Pacific Carlsbad Resort, Carlsbad Ranch Planning Area PA 5'. Carlsbad, California, Project No. 040575-005,'datéd April 6, 2006. 2006e, Geotechnical Review of Structural Foundation Plans, Propcised' Conference" Facility, Carlsbad Ranch Resort and Hotel Phase 1, Carlsbad, California, Project No I. 040575-005, datedMay 17, 2006.,.:, - $ I - A-i I 4 : Test No Test of Test No 1 Test of Prefix Test of Abbreviations Prefix Test of Abbreviations (none) GRADING Natural Ground NG (SG) SUBGRADE Original Ground , OG (AB) AGGREGATE BASE Existing Fill EF - (CB) CEMENT TREATED BASE Compacted Fill CF (PB) PROCESSED BASE Slope Face SF (AC) ASPHALT CONCRETE Finish Grade FG Curb C (S) SEWER (SD) STORMDRAINI , Gutter i - Curb and Gutter G CG (AD) AREA DRAIN . Cross Gutter XG (W) DOMESTIC WATER Street ST (RC) RECLAIMED WATER - Sidewalk . - SW (SB) SUBDRAIN - Driveway D (G) - GAS -, Driveway Approach DA (E) ELECTRICAL Parking Lot PL (T) TELEPHONE Electric Box Pad EB (J) JOINT UTILITY Trash Enclosure TE (I) IRRIGATION Loading Ramp oLR Bedding Material B Building Pad BP Shading Sand Main M - Lateral L Crossing . • Manhole ME Hydrant Lateral Catch Basin C • Riser' -, Inlet Fire Service FS - Water Services .: WS .•. - Head Wall HW (RW) RETAINING WALL (P) PRESATURATION (CW) CRIB WALL (LW) LOFFELL WALL Moisture Content M (SF) STRUCT FOOTING Footing Bottom F Backfill B Wall Cell C (IT) INTERIOR TRENCH Sewer Lateral 'S Storm Drain SD Electric Line E I N - represents nuclear. gauge j tests that were performed in. geñerai accordance with most recent version of ASTM -Test-. Methods D2922 and D3Ol7 S represents sand cone tests that were performed in general accordance with most recent version of ASTM Test Method D1556 15A represents first retest of Test No 15 I ,B-1 l • 4 - 4. -•- . -• • 4 4' ) 4' c__, -. --• -t . -. 2 Test Test Test Location Test - Soil . Dry Density Moisture (%) Relative (%) No Date Of Lot # Elev (ft) Type Field Max Field Opt Compaction Remarks 1 10/20/05 CF South Lot . 5 185.0 01 117.5 126.0 11.7 11.0 93 2 10/20/05 CF North Lot 6 6 178.0 02 123.4 134.5 8.7 8.5 92 3 10/20/05 CF North Lot 6 6 181.0 02 121.7 134.5 9.4 8.5 90 4 10/20/05 CF North Lot 6 186.0 01 119.2 126.0 12.5 • 11.0 95 5 10/20/05 CF North Lot 6 - 6 179.0. 02 124.1 134.5 9.8 8.5 92, 6 10/21/05 CF North Lot 6 6 1850 02 1208 1345 86 85 90 7 10/21/05 CF North Lot . 6 177.0 02 124.9 134.5 9.0 8.5 93 • 8 10/21/05 CF North Lot 6 • 6 178.0 02 125.3 134.5 8.8 . 8.5 93 • 9 10/21/05 CF'North Lot 6 c 6 182.0 02 124.7• 134.5 8.2 8.5 93 10 10/21/05 CF North Lot 6 6 %181.0 02 122.9 134 5 9.1 8.5 91 11 10/21/05 CF North L6t6 • 6 1820 02 1250 1345 93 85 93 12 10/24/05 CF North Lot 6 • 6 178.0 02 123.4 134.5 8:7 8.5 92 13 10/24/05 CF North Lot 6 1800 02 1252 1345 91 85 93 14 10/24/05 CF North Lot 6 • . 6 183.0 02 127.4 134.5 7.8 8.5 95 15 10/24/05 CF North Lot 6 • • 6 184.0 02 122.8 134.5 . 8.3 8.5 91 16 10/25/05 CF South Lot 6 . 6 177.0 02 120.9 134.5 8.8 8.5 90 17 .10/25/05 CF North Lot • • • . 6 176:0 •01 . 116.2 126.0 10.1 • 11.0 92 • - 18 10/25/05 CF -South Lot 6 • 6 • 176.0. 01 118.5 126.0 9.4 11.0 94 19 10/25/05 CF South Lot 6 6 179.0 02 121.4 134.5 8.8 8.5 90 20 10/25/05 CF North Lot6 6 1780 01 1158 1260 96 110 92 • 21 10/26/05 CF South Lot • 6 177.0 02 121.6 134.5 8.4 8.5 90 22 10/26/05 CF SouthLot14 14 1800 01 1187 1260 117 110 - 94 23 10/26/05 CF South Lot 14 14 182.0" 02 120.9 134.5 9.1 8.5 90 24 10/26/05 CF South Lot • . 6 . 180.0 01 116.3 126.0 9.6 11.0 - 92 25 10/26/05 CF South Lot 6 . 6 . . 179.0 03 121.8 130.0 7.8 8.5 94 26 10/27/05 CF North Lot 6 6 1820 03 1195 1300 89 85 92 27 10/27/05 CF South Lot6 .. 6 1790 01 11.7.2 1260 103 110 93 28 10/27/05 CF North Lot 14 14 1780 02 1212 1345 100 85 90 29 10/27/05 CF South Lot 6 1795 01 1142 1260 96 110 91 30 10/27/05 CF South Lot 6 1780 02 1222 1345 82 85 91 .31 10/27/05 CF South Lot 14 • 14 . 180.0 :01 117.3 126.0 11.4 11.0 93 • - 32 - 10/28/05 CF South Lot 14 14 1830 01 1165 1260 123 110 92 Project Number 040575005 - 40,1 Project Name Grand Pacific Carlsb Project Location Carlsbad Client 0 Page 1 of 34 7/27/2006 7 18 43AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test. Test Test Location Test Soil Dry Density Moisture (%) Relative Na. Date Of * Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 33 10/28/05 CF 'South Lot, 14 14 180.5 of 117.8 126.0 10.5 11.0 ' 93 34 10/28/05 CF North Lot 14 14 181.0 01 119.2 126.0 9.8 11.0 95 35 10/28/05 CF North Lot 6 '6 180.0 02 123.1 134.5 10.1 8.5' .92 36 10/31/05 CF. North Lot . 6 187.0 02 124.3 134.5 9.1 8.5 92 37 10/31/05 CF North Lot 6 . 6 185.0 02 125.2 134.5 8.5. 8.5 93 38 10/31/05 CF North Lot 6 - 6 188.0 02 127.4 134.5 8.3 8.5 95 39 10/31/05 CF North Lot 6 186.0 03 118.7 130:0 10.8 8.5 91 40 11/1/05 CF South Lot 6 . 6 184.0 03 121.7 130.0 -6.8, 8.5 .94 41 11/1/05 CF South Lot 6 182.5 03 122.3 130.0 9.5 8.5 94 42 11/1/05 CF South Lot '6 183.0 03 121.5 130.0 8.8 . 8.5 93 43 11/1/05 CF North Lot 6 6 . 185.0 03 119.6 130.0 9.4 8.5 92 44 11/1/05 CF North Lot 6 6 184.0 02 124.9. 134.5 8.2 8.5 93 45 11/2/05 CF .North Lot 14 14 179.0 02 122.0 134.5 10.3 8.5 91 46 . 11/2/05 CF North Lot 6 . 6 . 181.0 02 125.8 134.5 9.4 8.5 94 47 11/2/05 CF South Lot 14 ' . 14 180.0 02 123.7 1345 .8.8 8.5 . 92 48 1.1/2/05 CF South Lot 6 . . 6 182.0' 02 120.9 .134.5 10.6 8.5 90 49 , 11/2/05 CF South Lot 14 ' . 14 181.0 02 124.6 134.5 8.2 8.5 93 50 11/2/05 CF '"South Lot 6 6 . 184.9 02. . 121:3 , 134.5 105 8.5 . . 90 51' 11/2/05 CF South Lot 6 6 185.0 02 126.1 134.5 8.0 8.5. 94 52 11/2/05 CF North Lot 6 6 186.0 02 128.7 134.5 8.6 8.5 96 53 11/3/05 CF South Lot 6 6 180.0 02 126.2 134.5 7.8 8.5 94 54 11/3/05 CF . South Lot . . 6 182.0 02 ' 120.8 134.5 9.6 8.5 90 55 11/3/05 CF ' South Lot . 6 . 183.0 03 119.8 130.0 10.3 8.5' 92 56 11/3/05 CF South Lot . 6 184.0 02 124.7 134.5 8.1' 8.5 93 57 11/4/05 CF North Lot 6 6 . 1840 -02 124.9 134.5 10.7 8.5 . 93 58 11/4/05 CF North Lot 6 . . . 6 182.0 02* 123.7 134.5 9.8 8.5.. 92 59 11/4/05 CF North Lot 14 ' .14, 183.0 02 122.5 134.5 9.8 8.5 91 - 60 11/4/05 CF North Lot 14 14 " 185.0 01 115.1 126.0 9.9 11.0 91 61. 11/4/05 CF South Lot 14 ' . ' 14 181.5 01 . 118.8 126.0 9.2 11.0 94 62 11/4/05 CF South Lot 8 . ' 8 182.5 01 117.5 126.0 10.7 11.0 93 63 11/7/05 CF South Lot 8 182.5 02 122.7 134.5 9.1 . 8.5. 91 ' 64 11/7/05 ,CF South Lot 14 , 14 184.0 02' 124.6 134.5 7.9 8.5 93 Project Number: 040575005 ' - - ' ' , ' Project Name; , Grand Pacific Carlsb Project Location: Carlsbad Client: 0 , . - Page 2of34 . 7/27/2006, '7:18:44AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test ., Location , Test Soil Dry Density Moisture (%) Relative (%) No. - Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks O Ill//U.) LI' INOLfl LUL / - I lO'+.J VI ILU.I ILQ.0 IV.' I IV Yo 66 .11/8/05 CF North Lot 7 184.0 02 122.4. 134.5 8.3 '8.5 91 67 11/8/05 CF South Lot . 7 183.5 01 118.6 126.0 10.4 Th1.0 94 68 11/8/05 CF. South Lot 7' 7 183.0 02 124.7 134.5 9:2 8.5 93 69 11/8/05 CF South Lot 14 14 185.0 '02 126.4 134.5 9.7 8.5 94 '70 11/9/05 CF North Lot 14 . . 14 188.0 02 124.7 134.5 8.2 8.5 93 71 . 11/9/05 CF North Lot ' 7 184.0 01 113.8; 126.0 11.6 11.0 90 .72 11/9/05 CF Resort Drive Sta 7+12 . 12 191.5 01 115.2 126.0 9.9 11.0 91 73 11/9/05 CF South Lot 7 7 185.0 01 115.8 126.0 11;6 11.01 92 74 11/10/05 CF North Lot 7 7 185.5 02 121.5 134.5 7.9 8.5 . 90 75 .11/10/05 CF South Lot,7 7 '187.0 02 124.0 134.5 11.1 8.5 92 76 11/10/05 CF South Lot 7 7 186.0 02 121.3 134.5 10.7 . '8.5 90 77 11/14/05 CF South Lot 14 . 14 .184.0 02 121.4 134.5 9.5 ' 8.5 . 90 78 .11/14/05 CF South Lot 14 - . 14 185.0 02 122.5 134.5 17.8 . 8.5 91 79 11/14/05 CF North Lot . . 7 187.0 01 116.9 126.0 10.4 11.0 93 .80 11114/05 CF North Lot 14. 14 187.0 .02 125.8 134.5 '9.6 8.5 94 81 . 11/14/05 CF North Lot 7. . 7 186.0 01 117.8 126.0 13.4 . 11.0 93 82 11/14/05-CF South Lot 7 . 7 185.0 01 117.6 126.0 10.8 11.0 93 83 11/15/05 CF South Lot . 5 187.0 02 123.8 134.5 8.7 8.5 92 84 11/15/05 CF North Lot 7 7 188.0 02 121.6 134.5 8.0 8.5 90 85 11/15/05 CF North Lot 7 . 7 187.0 01 120.7 126.0 11.3, 11.0 96 86 . 11/15/05 CF North Lot 7 a , 7 188.0 01 118.2' 126.0 10.8 11.0 94 87 11/15/05 CF North Lot 7 7 188.5. 02 123.9 134.5 11.0 ' 8.5 . 92 88 11/16/05 CF, South Lot 14 . . 14 187.0 02 121.7 134.5 10.2 8.5 90 89 .11/16/05 CF NorthLot7 . 7 189.0 02 123.7 134.5 11.3 8.5 92 90 11/16/05 CF . North Lot 7 . . . 7 190.0 02 125.8 134.5 8.2 8.5 94 91 11/17/05 CF, South Lot 14 14 186.0 02 122.8 134.5 9.6 8.5 91 92 11/17/05 CF South Lot 7. 188.0 02 126.4 134.5 8.8 8.5 .93 11/17/05CF South Lot 8 - 8 187.0 01 .119.3 126.0 11.5 11.0 95 '.94 11/17/05 CF South Lot ' '6 186.0 02 121.9 134.5 10.7 8.5 91 ' 95 11/17/05 CF South Lot . 6 187.0. 02 123.8 134.5 . 10.1 8.5 92 96 11/18/05 CF South Lot ' 6 181.0 02 124.4 .134.5 8.2 . 8.5 92 Project Number: 040575005 Project Name: Grand Pacific Carlsb ' .. . . Project Location: Carlsbad Client: 0 . . . Page 3 of 34 - . . . 7/27/2006 7:18:44AM - - - -. - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS - Test Test Test ' Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of - 'Lot # Elev (ft) Type Field Max Field 'Opt. Compaction Remarks 97 11/18/05 CF South Lot 14 14 1880 02 1252 1345 99 85 93 98 11/18/05 CF South Lot 8 189.0 02 121.6 134.5 10.0 8.5 90' 99 11/23/05 CF South Lot 6 6 188.0 01 110.2 126.0 7.7 11.0 87 RI ON 99A 99A 11/23/05 CF South Lot 6 . 6 . 188.0 01 '116.7 126.0 9.4 11.0 93 100 11/23/05 CF South Lot 7 7; 188.0 01 118.3 126.0 11.7 11.0 94 101 11/23/05 CF South Lot8 8 1860 01 1120 1260 106 110 89 RTON 101A 1OiA11/23/05 CF . South Lot 8 . . . 8 186.0 01 115.2 126.0 12.6 11.0 , '91 102 11/23/05 CF. South Lot 7 .185.0 01 117.4 126.0 9.7 11.0 93 103 11/28/05 CF South Lot 14 - 14 - 191.0 ol 115.6 126.0 12.7 11.0 92 104 11/28/05 CF South Lot 14. 14 191.5 01 117:0 126.0 10.8 11.0 93 105 11/28/05 CF South Lot 7 1890 01 1154 1260 113 110 92 106 11/28/05 CF South Lot 7 1860 02 1216 1345 82 85 90 107 11/28/05 CF South Lot 7 . 7 187.0 .01 118.6 126.0 10.1 11.0 - 94 108 11/30/05 CF South Lot "- . 8 194.5 02 125.8 134.5 8.3 8.5 . 94 .109 11/30/05 CF North Lot 8 . 191.0 03 121.9 130.0' 9.0 . - 8.5 94. 110 .11/30/05 CF North Lot . .- 8. . 192.0 03 118.4 130.0 8.6 -8.5 91 ' 111 11/30/05 CF North Lot . - 7 189.5 02 120.8 134.5 , 9.1 8.5 90 112 12/1/05 CF South Lot 6 1920 02 1254 1345 94 85 93 113 12/1/05' CF South Lot 8 8- 193.5 03 121.5 130.0 10.7 8.5 93 114 12/1/05 .CF North Lot . . '7 187.5 03 . 124.6 130.0 8.2 8.5 96 115 12/1/05 CF South Lot . . 7 . 190.0 02 123.8' 134.5 9.4 8.5 . 92 . 116 12/2/05 CF South Lot 8 190.5 02 127.3 134.5 8.1- 8.5 . . 95 117. 12/2/05 CF South Lot14 14. 191.0 . 03 . 118.7 130.0 9.3. 8.5 91 118 12/2/05 CF South Lot . - 8 . 192.0 02 '122.6 134.5 11.5 8.5 91 119 12/2/05 CF West Lot 15 .. 15 186.0. 02 . '127.4 134.5 8.6 8.5 95 120 12/2/05 CF West Lot 15 - 15 189.0 .02 . 121.5 . 134.5 10.8 8.5. . 90 121 12/2/05 CF South Lot 6 6 1920 03 1209 1300 100 85 93 122 12/2/05 CF West Lot 15 :15 , 188.5 02 . 124.4 134.5 10.9 8.5 92 123 12/6/05 CF West Lot 15 15 1950 02 1216 1345 113 85 90 124 12/6/05 CF South Lot 6 1985 02 1298 1345 87 85 97 125 12/6/05 CF ' West Lot 15 15 197.0 02 . '127.6 134.5 9.2 8.5 . 95 126 12/6/05 CF Tennis Court 14 1965 02 1239 1345 88 85 92 Project Number:. - 040575005 Project Name Grand Pacific Carlsb Project L26cation: - Carlsbad Client 0 Page 4of34 7/27/2006 7:18:44AM - M, low SUMMARY OF FIELD DENSITY TESTS -• . - F. Test Test Location Test Soil Dry Density - Moisture (%) Relative (%) No. Date Of. - Lot #. Elev (ft) Type Field Max Field Opt. Compaction Remarks 127 12/6/05 CF Tennis Court 6 , 195.5 02 128.3 134.5 8.4 8.5 95 128 12/6/05 CF Tennis Court 6 198.0 02 122.7 134.5 10.4 8.5 91 129 12/6/05 CF North Lot 14 . 14 195.5 03 . 117.6 130.0 9.9 8.5 90 130 12/6/05 CF Resort Drive Sta 9+65 12 196.0 031 120.8 130.0 8.2 8.5 93 131 12/6/05 CF Resort Drive Sta 8+45 12 192.0 03 119.6 130.0 -10.1 8.5 92 - 132 12/7/05 CF Resort Drive Sta ll+10 12 198.5 03 121.5 130.0 10.5 8.5 93 133 12/7/05 CF Resort Drive Sta 12+30 . 12 194.5 03 119.0 130.0 9.7 . 8.5 92 134 12/7/05 CF Resort Drive Sta 12+10 14 194.0 02. 124.9 134.5 8.7 8.5 93 .135 12/8/05 CF Resort DriveSta 10+50 . '14 200.5 02 126.9 134:5 8.2 8.5 94 136 12/8/05 CF Resort Drive Sta9.+50 7 199.0 03 117.2 130.0 12.3 8.5 90 137 12/8/05 CF Resort Drive Sta 8+10 12 195.0 02 127.6 134.5 9.3 8.5 95 138 12/8/05 CF Resort Drive Sta 7+00 •. • 12 201.0 02 126.8- 134.5' - 9.4 8.5 94 139 12/8/05 CF West Lot 3 198.0 02 122.6 134.5 10.6 8.5 91 140 12/8/05 CF Resort Drive Sta 10+80 12 200.0 03 116.8 130.0 12.4 8.5 90 141 12/8/05 CF Resort Drive Sta 11+90 12 202.0 02 - 124.2 134.5 10.7 8.5 .92 142 • 12/9/05 CF North Lot 3 202.0 02 124.7 134.5 - 8.2 8.5 93 143 12/9/05 CF South Lot 3 3 204.0 02 121.8 134.5 9.6 . 8.5 91 144 12/9/05 CF Resort Drive Sta 7+75 12 194.0 02 125.3 .134.5 8.8 8.5 93 145 12/12/05' CF Resort Drive Sta l0+30 .12 200.0 01 .114.4 126.0 11.2 11.0 91 146 12/12/05 CF Resort Drive Sta 10+70 14 . 202.0 01 116.9 126.0 10.2 11.0 93 147 12/12/05 CF Resort Drive Sta 9+05 12 195.0 02 130.6 134.5 9.0 8.5 97 148 12/12/05 CF Resort Drive Sta 7+20 12 .195.5 02 122:7 134.5 11.6 8.5 91 149 12/12/05 CF' North Lot 3 . 3 197.0 01 121.5 ' 126.0 12.2 11.0 96 150 12/12/0.5 CF South Lot 3 3 201.0 01 120.8 126.0 10.7 . 11.0 - 96 151. 12/12/05 CF Resort Drive Sta 6+55 ' . 12 193.0 02 126.4 134.5 8.0 8.5 -94 . . . - 152 12/12/05 CF Resort Drive Sta ll+50 12 203.5 01 117.6. 126.0. 11.5- .11.0 , 93 153 12/12/05 CF 'Resort Drive Sta ll+20 ' 12 . 204.5 01 116.4 . 126.0 - 12.8 11.0 92 154. 12/12/05 CF. . North Lot 3 ' 3 200.5 01 119.2 126.0 10.1 . 11.0 95 - - 155 ' 12/13/05 CF .South Lot 13 . . . 13 . 207.0 01 . 118.2 126.0 12.6 11.0 94 1.56 12/13/05 .CF South Lot 13 . . • 13 202.0 02 123.8 134.5 '8.7 8.5 92 157 12/13/05 CF South Lot 13 13 -204.0 03 . 120.4 130.0 10.7 8.5 .93 158 12/13/05 CF, South Lot 13 • 13 203.0 03 124.3 130.0 9.2 8.5 96 Project Number:' 040575005 Project Name: Grand Pacific Carlsb - . .- - Project Location: 'Carlsbad - . . . . -. .: Client: . 0 . . Pages of 34 7/27/2006 7:18:44AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS - Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No Date Of Lot # Elev (ft) Type Field Max Field Opt Compaction Remarks 159 12/13/05 - -.' CF South Lot 13" ' 13 .208.0 03 117.4 130.0 - 11.3 8.5 ' 90 - 160 12/15/05 CF Resort Drive 'Sta 9+10 ' 14 198.0 01 116.9 126.0 12.7 . 11.0 93 101 12I1I0 Ut Resort L)rlVe Sta 10+10 14 200.0 01 120.8 - .120.0 10.' 11.0 YO 162 12/15/05 CF Resort Drive Sta 11+90 14 " 201.0 '02 125.7 134.5 8.9.. 8.5 - 93 163 12/15/05 CF Resort Drive Sta 7+65 12 . 197.5 02 123.7 134.5 10.0 8.5 92 164 12/15/05 CF "Resort Drive Sta 9+40 . 12 205.0 ' 02 124.6, 134.5 10.8 8.5 93 165 12/15/05 CF ' Resort Drive Sta lO+25 '' 12 207.0 02 .' .121.1 134.5 11.7" -' 8.5 90 100 1 12/15 D UI' Resort Drive Sta zs+/u - 12 ' 202,0 02 ' 12i.0 1i4.D 6.5 ö.D . Y2 167 12/15/05' CF Resort Drive Sta 6+05 ' " ' 12 195.0 Al 116.9 126.0 11:0 11.0 " - 93 168 12/15/05 CF -. West Lot - '' . . 3 204.5 02 . 120.8 134.5 9.8 8.5 '90 169 '12/16/05 CF "' East Lot.3 '' - - 3 ' - 207.0 .02 121.7 134.5' 10.6 8.5 -. 90 170 12/16/05 CF North Lot l ' - - iT ' 206.5 03 ' 117.4 - 130.0 10.3 8.5- 90 - 171. '12/16/05 CF North Lot l - ' 1 . .208.5 02: 121.5 134.5 -9.8 - '8.5. 90 172 12/16/05 CF South Lot 13 ' . ,- . -- 13 -- 208.0 ' 03 - ' 118.2 130.0 8.9 8.5 ' 91 " 173 12/16/05 CF North Lot - ' ' .1 ' 210.0 02', 122.4 134.5 '9.1' 8.5 * .: 91 174 12/19/05 CF ' North Lot 1 - - 1 213.0 01 .111,3 126.0 9.6' 11.0 "88 'RT-ON 174A - 174A 12/1.9/05 CF North Lot l . - -- I . 213.0 01 - 114.8, 126.0 10.7 - 11.0 - ,'91 ' ' ,• - 175 '12/19/05 CF North Lot 1 H - - - ..- -1 ,2140 03" 113.6 ' 130.0!, 7.8 ' 8.5 87 , RT ON, 175A 175A 12/19/05 CF North Lot I -' ' I 214.0 "'03 . 118.2 - 130.0 8.4 ' 8.5 . 91 - 176 ' 12/19/05 CF ' North Lot I - -- - 1 212.0 02 122.0 .134.5 9.9 8.5 91' 177 12/19/05 CF East Lot 3 - 3 211.5 - 01 ' 116.2 126.0 '12.7 11.0 - - - 92 178 - 12/19/05 CF:South Lot 3 - - - ' - - 31. - 209:0 Al 120.8 126.0 11.7 11.0 96 179 12/20/05 CF North Lot 1 1 220.0 02 122.2 - 134.5 9.0 : 8.5 91 180 12/20/05 CF North Lot I ' , ' 1 217.0 01 118.4 126.0 10.8 11.0 94 181 12/20/05 CF North Lot 'l ' '. , 1 212.5 02 126.2 134.5 8.7 8.5 . . 94 182 12/20/05CF North Lot 1 '- 1 216.5 02 123.8 134.5 9.4 -8.5 92- 183 12/20/05 'CF North Lot .1 -. ' ' 1 218.0 01 117.2 126.0 12,4 11.0 93 184 12/20/05 CF North Lot . ' 2 217.0 .02*: 121.6 134.5 10.1 .. 8.5' ' , 90 ' 185 12/20/05 CF "North Lot 2 ' : 216.0 02 124.7 134.5 8.3 ' 8.5 ' .93 186 ' 12/20/05 CF' North"Lot I - , 1.1 215:0' .02 125.2 134.5 9.5 ' 8.5 93. : 187 12/20/05 'CF . South Lot 13 . 13 210.0 .02 -'.127.3 134.5 , 8.2 8.5 95 ' 188 12/20/05 CF ,South Lot 13 . , 13 .209.0' 02 121.0 134.5 11.7 8.5 , 90 Project Number: ' 040575005 Project Name Grand Pacific Carlsb * 'Project Location: Carlsbad Client: " 0 , ' . ' ' Page 6 of 34 7/27/2006 -. 10:43:04AM NO on - -. ,- - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaétion Remarks 189 12/21/05 CF North Lot l 1 222.5 02 124.3 134.5 10.1 8.5 92 190 12/21/05 CF North Lot 1 1 225.0 02 120.5 134.5 9.4 8.5 90 191 12/21/05 CF North Lot 2 2 224.0 03 117.6 130.0 10.0 8.5 . 90 192 12/21/05 CF South Lot 13 13 213.0 02 125.7 134.5 9.8 8.5 93 193 12/21/05 CF South Lot 13 13 208.0 03 120.2 130.0 10.7 8.5 92 194 12/21/05 CF East Lot 3 205.5 03 118.6 130.0 8.7 8.5 91 195 12/22/05 CF North Lot 3 . 3 202.0 02 124.8 134.5 8.8 8.5 93 196 12/22/05 CF North Lot 3 201.0 02 127.0 134.5 7.9 8.5 94 197 12/22/05 CF - Resort Drive Sta 9+10 . . 12 207.0 01 116.2 126.0 12.5 11.0 92 198 12/22/05 CF South Lot 3 . 3 211.0 02 123.8 134.5 9.7 8.5 92 199 12/22/05 CF North Lot 1 . 1 212.0 02 122.8 134.5 9.9 8.5 91 200 12/22/05 CF North Lot 1 1 215.0 02 126.4 p134.5 8.7 8.5 94 201 12/22/05 CF North Lot l . 1 224.0 03 118.3 130.0 11.2 8.5 91 202 12/22/05 CF North Lot 1 1 . 223.0 02 126.1 134.5 9.3 8.5 94 203 12/22/05 CF North Lot l 1 218.0. 02 121.5 134.5 10.8 8.5 90 204 12/23/05 CF Resort Drive Sta 12+90 - 14 202.0. 03 . 117.9 130.0 11.3 8.5 91 205 12/23/05 CF Resort Drive Sta 13+75 14 199.0 04 108.7 115.5 15.3 16.5 - 94 206 12/23/05 CF Resort Drive Sta 14+15'.' 14 201.0 01 114.8 126.0 12.9 11.0 91. 207 12/27/05 CF Resort Drive Sta 13+00 12 204.0 03 118.3 130.0 10.2 8.5 91 208 12/27/05 CF Resort Drive Sta 14+10 12. 202.0 03 116.9 130.0 11.6 8.5 90 209 12/27/05 CF Tennis Court 14 200.0 02 121.1 134.5 9.8 8.5 90 - 210 12/27/05 CF Tennis Court . 14 202.0 02 124.9 134.5 9.9 8.5 93 211 12/27/05 CF Tennis Court . 14 204.0 02 124.0 134.5 11.1 8.5 92 212 12/27/05 CF Resort Drive St&14+60 14 . . 205.0 03 120.1 130.0 10.5 8.5 92 213 12/27/05 CF Reort Drive Sta' 14+35 12 203.5 03 119.2 130.0 10.7 8.5 92 214 12/27/05 CF West Lot 1 1 204.5 02 122.8 134.5 8.7 8.5 91 215 . 12/27/05 CF Resort Drive Sta 11+85 12 205.0 02 122.4 134.5 8.6 8.5 . 9 216 12/27/05 CF Resort Drive Sta 12+30 14 2030 03 1178 1300 118 85 91 217 12/28/05 CF Resort Drive Sta 13+20 . .- 12 . 207.0 02 122.7 134.5 8.5 8.5 91: 218 . 12/28/05 CF Resort Drive Sta14+20 12 205.0 02 121.3 134.5 8.6 8.5 .90 219 12/28/05 CF Resort Drive Sta 14+85 12 - 209.0 01 117.3 126,0 11.7 11.0 93 220 12/28/05 CF Resort Drive Sta 13+40 12 205.0 02 122.3 134.5 8.6 8.5 91 Project Number: 040575005 . . . Project Name: Grand Pacific Carlsb . . . - . . 401 ... Project Location: Carlsbad Client: 0 Page 7of34 7/27/2006 7:18:44AM 221 12/28/05 CF Resort Drive Sta 13+50 222 12/28/05 CF Resort Drive Sta 15+35 223 12/29/05 CF Resort Drive Sta 15+60 224 12/29/06 CF Resrt Drive Sta 14+00 225 12/29/05 CF Resort Drive Sta 13+15 226 12/29/05 CF Resort Drive Sta 15+20 227 12/29/05 CF' Resort Drive Sta 14+29 228 12/29/05 CF Resort Drive Sta 13+25 229 12/30/05 CF Resort Drive Sta 12+30 229A 12/30/05 CF Resort Drive Sta 12+30 230 12/30/05 CF Resort Drive Sta 13+43 230A 12/30/05 CF Resort Drive Sta 13+43 231 12/30/05 CF . Resort Drive Sta 13+30 232 1/6/06 CF West Lot 1 233 1/6/06 CF West Lot I 234 1/6/06 .CF West, Lot 1 235 1/6/06 CF West Lot 1 236 1/6/06 CF- Resort Drive Sta 14+50 237 1/6/06 CF West Lot 1 238 1/9/06 CF West Lot I 239 1/9/06 CF Resort Drive Sta 15+00 240 1/9/06 CF West Lot 1 - 241 1/9/06 CF Northwest Lot 1 242 1/9/06 CF Northwest Lot 1 243 1/9/06 CF Northweit Lot 1 244 1/9/06 CF Northwest Lot I 245 • 1/9/06 CF Northwest Lot 1 246 1/10/06 CF Northwest Lot 1 247 1/10/06 CF Northwest Lot 1 248 1/10/06 CF Northwest Lot 1 249 1/10/06 CF West Lot 1 250 1/10/06 'CF West Lot I Project Number: 040575005 Project Name: Grand Pacific Carlsb 'Project Location: Carlsbad Client: 0 119.8 130.0 8.6 ' 8.5 92 123.3 134.5 8.2 8.5 92 119.9 130.0 8.3 ' 8.5 92 123.8 134.5 • 9.6 8.5 92 127.0 134.5 8.5. 8.5 • 94 125.4 134.5 8.6 8.5 93 127.4 134.5 8.6 8.5 95 120.7 130.0 13.0 8.5 93 118.7 134.5 13.2 ' 8.5 88 121.3 134.5 12.9 8.5 ' 90 117.1 134.5 ' 11.1 8.5 87 122.6 134.5 11.3 8.5 91. 124.7 134.5 10.8 8.5 93 119.8 130.0 12.8 8.5 92 117.3 130.0 . 8.2 8.5 90 123.6 134.5 9.2 8.5 ' 92 121.9 134.5 - 9.1 8.5 , 91 122.3 134.5 10.8 8.5 91 120.8 1345 , 11.3 8.5 90 123.6 134.5 8.8 8.5 92 123.2 134.5 9.3 8.5 92 120.6 ' 126.0 .10.6 11.0 96 123.8 134.5 9.7 8.5 92 122.5 130.0 10.2 8.5 ' 94 129.2 134.5 8.8 8.5 96 128.3 134.5 8.9 8.5 -95 125.0 ' 134.5 10.1 8.5 . ' 93.. 123.4 134.5 10.3 8.5 92 120.7 126.0 11.8 11:0 96 122.9 134.5 . 10.8 8.5 '91 114.5 126.0 12.9 11.0 91 116.2 126.0 '14.3 11.0 '92 12 ' 206.0 03 12 210.0 02 12 . 210.0 03 12 208.0 02 12 206.0 02 12 210.0 02 12 209.0 02 12 207.0 03 12 204.0 02 12- 204.0 02 12' 211.0 02 12 211.0 02 12 206.0 02 1 206.0 03 1' 206.0 03 Ir 211.0 02 1 207.0 . 02 12 211.0 02 1 207.0 02 1 219.0 02 12 213.0 02 11 211.5 01 1 . 218.5 02 1 212.0 03 213.0 02 1 222.0 02 1 ' 220.0 02 223.0 02 1 215.0 01 '1 218.5 02 1 . 214.0 01 1 217.5 01 Page 8 of 34 RI ON 229A RTON23OA 7/27/2006 - - - - - - - - - - - - - an - - - - - SUMMARY OF FIELD DENSITY TESTS . Test Test Test Location Test Soil: Dry Density Moisture (%) Relative (%) No. Date Of . Lot # Elev (ft) Type Field -Max Field Opt. Compaction Remarks - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITYTESTS - Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No Date Of Lot # Elev (ft) Type Field Max ,,Field Opt Compaction Remarks 251 1/11/06 CF West Lot 1 1 220.0 02 123:6 - 134.5 10.8 8.5 92 252 1/11/06 CF Resort Drive Sta 14+70 12 212.0 02, 122.9 134.5 9;5 8.5 91 253 1/11/06 CF. Resort Drive Sta 14+05 '12 213.0. 01 115.4 126.0 14.3 . 11.0 92 254 1/1 1/06 CF Resort Drive Sta 12+65 , 12 . .211.0 01 113.8 126.0 13.4 11.0. -.90 255 1/11/06 CF Resort Drive Sta 11+90 . 12 . 212.0 01 119.6 126.0 12.3 11.0 95 ' * 256 1/11/06 CF Northwest Lot 1 2150 02 1218 1345 101 85 91 257 1/12/06 CF Northwest Lot 1 ' 1 216.0 01 117.8 126.0 13,7 11.0 93 258 1/12/06 CF Resort Drive Sta 10+55 .12 210.0. 02 124.2 134.5 11.0. , 8.5 92 259 1/12/06' CF South Lot 3 . . , . 214.0. 03 ' 120.3 130.0 9.8 ' 8.5 93 260 1/12/06 CF 'Northwest Lot I .' . 217.0 02 , 120.9 1345 8.7 8.5 90 261 1/12/06 CF Northwest Lot l 1 2180 02 1227 1345 113 85 .r 91 262 ' 1/13/06 . CF Northwest Lot 1 . ' - I 220.5 01 115.6 126.0' 12.2 '1 1.0 ' 92 263 1/13/06 CF Northwest Lot 1 , . 1 . . . 222.0 '01 . 117.4 126.0 4-10.5 11.0 ' 93 264 1/13/06 CF . Northw'est Lot I 1 223.0' 02 125.1 134.5 11.0 8.5 93 265 1/13/06 CF West Lot 1 1 221.0 02 120.8 134.5 9.6 8 5 • 90 266 1/13/06 CF WestLoti 1 2195 01 1145 1260 116 110 91 267 1/16/06 CF Tennis Court 6 2040 02 1213 1345 116 8.54- 268 1/16/06 'CF Tennis Court ,. 6 206.0 01 115.8 '126.0 11.9 11.01 - 92 . .,269 1/16/06 CF Tennis Court' ' . . 14 207.5 02 122.8 134.5' 10.5 8.5 91 270 1/16/06. CF Northwest Lot 1 . -1 221.0. 01 119.2 126.0 . 12.1 11.0 95 271 1/16/06 CF Northwest Lot l ' 1 - 215.0 01 117.4 126.0 13.8 . 11.0 93 272 1/16/06 CF Northwest Lot 1 1 2270 01 . 1206 1260 11.7 11.0 96 273 1/16/06 CF ' West 1 . 1 . 225.5 02 .125.2 ' 134.5 9.8 8.5 93 274 1/17/06 CF West Lot l . 1 218.0 01 114.6' 126.0 14.2, 11.0 '. ' 91 ' 275 1/17/06 CF Tennis Court . ' 14 210.0 02 121.8 134.5 "103 8.5 91 276 1'/17/06 CF 'Tennis Court , .. 6 ' 209.0 01 117.0 126.0 11.9 1L0 . 93 277 1/17/06 CF West Lot i 1 2190 01 1168 1260 133 110 93 278 1/17/06 CF Northwest Lot' l 1 2160 01 1189 1260 121 110 94 279 1/18/06-.CF Northwest Lot 1 1 2200 02 113.8 134.5 72 8.5 85 RT ON 279A 279A 1/18/06 CF Northwest Lot 1 - ' ' 1 220.0 02 121.4 134.5 9.4 8.5 90 280 1/18/06 CF Northwest Lot 1 1 2145 01 1088 1260 83 110 86 RTON28OA 280A 1/18/06 CF Northwest Lot 1 1 2145 01 1165 1260 116 110 92 Project Number 040575005 ' Project Name Grand Pacific Carlsb Project Location Carlsbad Client: 0 . Page 9 of 34 7/27/2006 7:18:44AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date . Of • . . Lot # Elev (ft) Type Field Max Field, Opt. Cmpaction Remarks 281 1/18/06 CF Northwest Lot 1 - 1 219.0 01 118.7 126.0 12.1 11.0 94 282 1/18/06 CF Tennis Court - 6 208.0 01 118.3 126.0 12.4 11.0 94 283 1/18/06 CF Tennis Court .' . 6 209.0 02 - 120.9 134.5 - 11.5 8.5 90 284 1/19/06 CF Resort Drive Sta ll+00 12 213.0 01 119.6 126.0 13.4 ilø 95 285 1/19/06 CF Resort Drive Sta ll+90 .12 ' 215.5 01 116.8 126.0 11.4 11.0 93 286 - 1/19/06 CF Northwest Lot 1 . - . 1 216.5 01 118.1 126.0 , 12.5 11.0 94 287 1/19/06 CF Northwest Lot 1' 1 ' 214.5 01 114.9 126.0: 10.5 '1i0 91 288 1/19/06 CF Southeast Lot 1 . 1 ' 254.0 01 119.5 1260 10.6 11.0 95 289 1/19/06 CF 'Southeast Lot 1 1 -'' 256.0, 01 115.4 126.0. 9.9 . 11.0 92 '. 290 1/19/06 'CF Southeast Lot 1. - - 1 258.0 01 114.6 126.0 103 11.0 91 291 1/23/06 CF ResortDriveSta9+85 12 .211.0 01 119.9 126.0 11.4 11.0 95 292 1/23/06 CF . Resort Drive Sta 11+05 12 217.0 01 116.8 126.0.. 13.8 1,1.0 93 - .293. 1/23/06 CF . West Lot 1 1 219.0 01 117.0 126.0 14.4 11.0 93 294 1/23/06 CF West Lot 1 1 224.0 02: 124.1 134.5 - 9.2, 8:5 . 92 295 .1/23/06 . CF West Lot I , 1 223.0 01 117.6 126.0 11.9' 11.0 , 93 - .296 1/23/06 CF Resort Drive Sta 14+50 ' 14 .219.0 02 , 121.7 134.5 9.8 8.5 90 297 .1/23/06 CF . Resort Drive Sta 13+00 12 220.0 01 ' 118.1 126.0 I1-.6, 11.0 ' 94 298 1/23/06 CF West Lot 1 . 1 -' 221.0 01 ' 118.2 126.0 12.7. 11.0 94 299 '1/23/06 CF West Lot 1 . i 224.5 02 '122.7 134.5 ' 11.1 - 8.5 91' 300 1/25/06 CF Northwest Lot 1 1 226:5 01 113.5 126.0 , 11.7 11.0 90 301 1/25/06 . CF Northwest Lot 1 ' 1 225.0 01 116.9 , 126.0 12.7 11.0 , 93 302 1/25/06 'CF Northwest Lot . I , .224.5 01--114.5 126.0 10.3 11.0 - ' 91. 303 1/25/06 'CF -:Northwest Lot I - I ' 224.0 01 118.1 126.0 12.0 11.0 94 304 1/25/06 CF Northwest Lot 1 1 . '. 225.0 01 - . 113.9 126.0' 11.3 .11.0 ' 90 305 1/25/06 CF Resort Drive Sta 12+05 '1 220.0 01 , 114.6 126.0 11.8 . 11.0 91 306 1/25/06 CF Resort Drive Sta' ll±00 ' 1 , 214.0 01 ' 117.9 126.0 13.1 11.0 - 94 307 , 1/25/06 CF ResortDrive Sta 15+60 12 223.5 01 -119.0 126.0 12.3 11.0 94 308 1/26/06 CF Northwest Lot i 1 '223.0 01 111.2 126.0 12.6 11.0 88 RT ON 308A 308A 1/26/06 CF . Northwest Lot I ' ' 1 223.0 01 115.8 126.0 13.1 11.0 92' 309 1/26/06 CF Northwest Lot 1 . ' 1' 225.0 -01 ' 118.2 126.0 12.7 ' 11.0 94 310 - 1/26/06 CF Resort DriveSta12+15 ' 12 . 221.0 01 116.6 126.0' 13.7 11.0 93 311 1/26/06 CF Resort Drive Sta 14+20 12 - , 221.5 01 - 120.4 126.0 11.8 11.0 96 . Project Number: '040575605 Project Name: - Grand Pacific Carlsb Project Location: Carlsbad Client: 0 , ' Page 10 of 34 7/27/2006 7:18:44AM -. •SUMMARY OF FIELD DENSITY TESTS. Test Test. Test Location Test Soil : Dry Density Moisture (%) Relative (%) No. Date Of " . . Lt # Elev (ft) Type- Field Max Field Opt. Compaction Remarks 312 1/26/06 CF Resort Drive Sta 15+00 12 223.0 01 116.7 126.0, 13.5 11.0 * 93 313 - 1/26/06 CF Northwest Lot 1 1 224.0 01 117.9 126.0 10.9. 1:1.0 94 314 1/26/06. CF Northwest Lot I . 1 225.5 01 114.2 126.0 14.1 11.0 91 315 1/27/06 CF Northwest Lot 1 1 226.0 02 124.1 134.5 9.6 . 8.5 92 316 1/27/06 CF . Northwest Lot 1 1 223.0 02 ' 120.6 134.5 , 11.4 8.5 90 317 1/27/06 CF Northwest Lot 1 . . . - I - 227.0 01 117.2 .126.0 12.2 11.0 ' 93 - 318 .1/27/06 CF Northwest Lot 1 , ' ' ' .. 1 227.5 03 118.7 130.0 10.8 . 8.5 91 ' 319 1/27/06 CF Northwest Lot 1 . 1 - . 228.0 02 . 120.9 134.5 8.7 8.5 ' 90 320 1/27/06 CF Northwest Lot 1 1 ' 228.0 01 115.3 126.0 11.6 A10 ' 92 321 1/31/06 CF Resort Drive Sta 11+65 . 12 . 220.0 02 123.0 134.5 11.1 ' 8.5 91 322 1/31/06 CF - Resort Drive Sta 8+15 ' 12, - 205.0 02 120.6 134.5 10.7 - 8.5 ' 90 323 1/31/06 CF Resort Drive Sta 12+60 12 ' 223.0 02 125.3 134.5 9.1 8.5 93 324 ' 1/31/06 CF Resort Drive Sta 14+05 12 226.0 01 117.7 126.0 .13.8 11.0 93 325 -1/31/06 CF Resort Drive Sta 10+10 ., 12 . 214.0 .02 121.8 134.5 14.2 8.5- 91 326 2/2/06 CF Lot 15 . . ' 15 192.5 01' 116.4 126.0 12.2 11.0 . 92 327 2/2/06 CF Lot 15 15 1870 03 1200 1300 88 85 92 328' 2/2/06 CF Lot 15 . 15 ' 192.0 . 02 '121.8 134.5 9.5. 8.5 , 91, 329 2/2/06 CF Lot 15 15 1960 03 1189 1300 114 85 91 330 2/2/06 CF Lot 15 15 ' 194.0 02 120.9 134.5 9.3 8.5 ' 90 331 2/2/06 CF Lot 15 15 195.0 01 115.3 126.0 12.3 11.0 92 332 .2/2/06 .CF Lot 15 15 188.0 02 .121.8 134.5 '9.1 8.5 91 333 2/2/06 CF Lot 15 . 15 188.0 01 116.3 126.0 13.3 11.0 92 334 - 2/2/06 CF- Lot 15 • ' 15 - 183.0 01 114.2 126.0 11.6 11.0 . 91 ' 335 2/2/06 CF Lot 15 15 185.0 01 1117 126 0 -12.1 11 0 90 336 2/3/06 CF Lot 15 , 15 ' 193.0 01 115.6 126.0 11.1' 11.0 ' 92 337 2/3/06 CF Lot 15 , • ' 15 . 194.0 01-i. 114.3 ' 126.0 11.8 11.0 91 338 2/3/06 CF Lot 15 - ' - ' 15 180.0 01 115.2' 126.0 11.6' - 11.0 91 339 2/3/06 CF Lot 15 - 15 182.0 03 121.0 '130.0 10.5 ' 8.5 - 93 340 2/3/06,. CF Lot 15 ' ' 15 186.5 .02 120.6 134.5' 9.7 8.5 ' 90 341 2/3/06 CF . Lot 15 15 ' ' 190.0 02 - 122.1 134.5 ' 8.3 - - 8.5 ' , 91 342 2/3/06 CF Lot 15 -, 15 188.0 01 113.8 126.0 14.6 11.0 90 343 2/3/06 CF Lot 15 . ' ' 15 . 182.0 02 - 120.4 , 134.5 9.1 . ' 8.5 90 Project Number: 040575005- . ' ' - " . * . ' ' .- Project Name Grand Pacific Carlsb 'Project Location: - Carlsbad Client: 0 - Page 11 of 34 7/27/2006 7:18:44AM - , SUMMARY OF FIELD DENSITY TESTS - - '- .-.- - --• -'." f-.. .4 .-' --• '. - - - - 1- , - - . ..- - I - ---- -- & Test Test Test Loation Test' Soil Dry Density Moisture (%) Relative (%) No..Date Of Lot # Elev (ft) Type 'Field Max Field Opt Compaction Remarks 344;• 2/3/06 CF Lot 15 - , - 15 ,84.0 01 114.8 126.0' .-L1.7 11.0., , 911 . 345 2/3/06 "CF Lot 15 15 1930 01 1164 1260 132 110 92 346 2/6/06 CF •- Lot 15- .. . 15 193.0 Al -. 114.4 .126.0 Z13.5.:, 11.0 91 '. 347 2/6/06 CF Lot 15 15 1910 01 1182 1260 118 110 .. 94 348 2/6/06 CF Lot 15 15 - 187.0' 02 121.0- 1345 10.9. 8.5 90 349 2/6/06 CF Loti5 15 ' . 184.0 02 120.6' 134.5 11.6 8.5 90 350 1/6/06 CF Lot 15 15 1830 01 1187 1260 91 110 94 351 2/6/06 CF Lot 15 15 1940 01 1138 1260 143 110 90 352 2/6/06. CF Lot 15 - . . . - 15 192.0 02 •.:. 120,5 134.5 ,10.3 -. 8.5. 90 .-•, -i-. 353 2/6/06 CF Lot 15'15 1850 03 1187 1300 103 85 91 354 2/6/06 CF Lot 15 .- 45 1930 01 1159 1260 118 110 92 355 2/6/06 CF Lot 15 .- 15 1900 01 1142 1260 "146 110 91- .356 2/6/06 CF Lot 15 15 1870 01 1154 1260 133 110 92 357 2/7/06 CF 'Lot 15, 15 1950 01 1148 1260 123 110 91 358 "2/7/06 CF Lot 15 15 , 1930 02 1204 1345 113 85 90 359 2/7/06 CF Lot 15 15 1850 01 1178 1260 128 110 93 '360 2/7/06 CF Lot 15 15 1840 01 1149 1260 118 110 91 361 2/7/06-. CF Lot 15 15 1870 01 1143 1260 138 11.0 91 362 2/7/06 CF Lot 15 15 193 0 02 120 8 134 5 10 7 8 5 90 363 2/7/06 CF'. Lot 15 . . * 15 ' 196.0 02 121.5 134.5- . -9.8 -8.5 '90- 364 2/7/06 CF Lot 15 •- 15 '1890 02 121.1 .134.5 10.7 , 8:5 ' 90 ' 365 2/7/06 CF Lot 15 15 1860 01 1142 1260 117 110 91 366 2/7/06 CF 1& 15 15 1980 01 1143 1260 132 110 91 367 2/7/06 CF Lot 15 - 15 196.0 02 120.8 '134.5 10 8 8 5 90 368 2/7/06 7. CF Lot 15 15.,. 1910 01 1158 1260 127 110 92 369: 2/8/06 . CF -. Lot :15 C • . 15 .., , 200.0 02- 120.8 134.5: 93' 8.5 90 370 2/8/06 CF Lot 15 15 1980 01 1147 1260 142 110 91 371 2/8/06 CF Lot 15 15 1910 01 1138 1260 138 110 90 372 2/9/06 CF Lot 15 - 15 1930 02 1208 1345 114 85 90 373 2/9/06 CF Lot 15 15 1970 01 1183 1260 112 110 -.- ' 94- _j74 2/9/06 CF Lot 15 ., 15 2000 01 1163 1260 135 110 92 375 2/9/06 CF Lot 15 . 15 2010 02 1240 1345 115 85 92 Project Number 040575005 All 'Project Name: - Grand Pacific Carlsb- - -. . .- - . . . - -" . . . - . ' - Project Location:- ''' Carlsbad Client: .0 . - - - Page 12 of 34 7/27h006 7'1-44AM - - - - - - M. MON.= - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density . Moisture(%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. .. Compaction Remarks 376 2/9/06 CF Lot 15 • 15 195.0 06 93.8 104.0 24.8 17.0 90 377 2/9/06 CF Lot 15 - 15 193.0 05 97.8 107.5 22.6 16.5 91 - 378 2/9/06 CF Lot 15 15 203.0 02 120.9 134.5 10.8 8.5 90 379 2/9/06 CF' Lot 15 15 201.0 02 121.3 134.5 99 8.5 90 380 2/9/06 CF Lot 15 15 198.0 01 114.3 126.0 12.8 1,1.0 91 381 2/10/06 CF Lot 15 15 194.0 05 97.0 107.5 21.4 16.5 90 382 2/10/06 CF Lot 15 - 15 1960 06 966 1040 254 170 93 383 2/10/06 CF Lot 15 15 201.0 06 95.6 104.0 23.8 17.0 92 384 2/10/06 CF Lot.15 15 . 198.0 06 .93.9 104.0 25.1 17.0 . 90 385 2/10/06 CF Lot 15 15 196.0 06 94.2 104.0 21.8 17.0 91 386 2/10/06 CF Lot 15 - 15 194.0 06 93.8 104.0 23.2 17.0 . 90 387 2/10/06 CF Lot 15 15 193.0 06 95.9 104.0 21.7 17.0 92 388 2/10/06 CF Lot 15 15 204.0 01 115.9 126.0 11.2 11.0 92 389 2/1 0/06 CF Lot 15 - 15 202.0 02 121.0 134.5 11.3 8.5 90 390 2/13/06 CF Lot 15 15 203.0 05 96.3 107.5 24.9* 16.5 90 391 2/13/06 CF Lot-15 15 197.0 06 93.7 .. 104.0 25:1 17.0 90 392 2/13/06 CF Lot 15 15 202.0 05 97.6 107.5 22.5 16.5 91 393 2/13/06 CF Lot 15 : 15 . 197.0 06 .93.2 104.0 25.1 17.0 90 394 2/13/06 CF Lot 15 - 15 204.0 05 99.2 107.5 21.6 16.5 92 395 2/13/06 CF Lot 15 - 15 205.0 06. 95.2 .104.0 24.1 170 92 396 2/13/06 CF Lot 15 15 198.0 06 93.2 104.0 25.8 17.0 90 397 2/13/06 CF. Lot 15 15 - 199.0 05 98.2 107.5 23.6 16.5 91 398 2/14/06 CF Lot15 . 15 205.0 06 93.4 104.0 24.5 -,17.0 - 90 399 2/14/06 CF Lot 15 15 ..149.0 06 93.9 104.0 24.1 17.0 90 400 2/14/06 CF Lot 15 . . 15 206.0 05 98.2 107.5 23.3 16.5 91 401 2/14/06 CF Lot 15 15 2010 06 934 1040 248 170 90- 402 2/14/06 CF Lot 15 . . 15 202.0 06 93.5 104.0 . 25.2 17.0 90 403 2/14/06 CF Lot 15 . 15 - 207.0 06 94.2 104.0 23.8 17.0 91 404 2/14/06 CF Lot 15 - 15 204.0 06 94.6 - 104.0 24.8 17.0 91 405 2/14/06 CF Lot 15 15 207.0 05 96.6 107.5 23.4 16.5 90 . 406 2/14/06 CF Lot 15 . . 15 1950 02- 122.8 134.5 9.3 8.5 . 91 407 2/14/06 CF Lot 15 15 1970 01 1158 1260 133 110 - 92 Project Number 040575005 Project Name Grand Pacific Carlsb Project Location: Carlsbad Client: 0 Page 13 of 34 . . - 7/27/2006 7:18:44AM Page 14 of 34 7/27/2006 Project Number: . 040575005 Project Name: Grand Pacific Carlsb Project Location: Carlsbad .. - Client: 0 El - - - - - - - - - - - - - - - - - - .- SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of - Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 408 2/15/06 CF West Lot 15 409 2/15/06 CF West Lot 15 410 2/15/06 .CF West Lot 15 411 2/15/06 CF Northwest Lot 15 412 2/15/06 CF West Lot l5 413 2/16/06 CF West Lot 15 414 2/16/06 CF West Lot 15 415 2/16/06 CF West Lot 15 416 2/16/06 CF West Lot 15 417 2/16/06 CF West Lot 15 418 2/16/06 CF Northwest Lot 15 419 2/21/06 CF South Lot 14 420 2/21/06 CF Northwest Lot 15 421 2/21/06 CF Northwest Lot 15 422 2/21/06 CF Resort Drive Sta 16+30 422A 2/21/06 CF Resort Drive Sta 16+30 423 2/21/06 CF Resort Drive Sta 17±05 424 2/21/06 CF Resort Drive Sta 19+10 424A 2/21/06 CF Resort Drive Sta 19+10 425 2/23/06 CF West Lot 15 426 2/23/06 CF West Lot 15 427 2/23/06 CF Northwest Lot 15 428 2/23/06 CF Wet Lot 15 429, 2/23/06 CF Northwest Lot 15 430 2/23/06 CF South Lot 15 431 2/24/06 CF West Lot.] 5 432 2/24/06 CF Resort Drive Sta 20+25 433 2/24/06 CF West Lot 15 434 2/24/06 CF North Lot 15 435 2/24/06 CF North Lot 15 436 2/24/06 CF South Lot 14 437 2/24/06 CF North-Lot 15 15 201.0 06 94.3 104.0 26.7 17.0 91 15 205.0 06 93.4 104.0 24.8 17.0 90 15 203.0 05 97.2 107.5 25.5 16.5 90 15 208.0 06 . 96.4 104.0 22.7. 17.0 93 1.5 204.0 06 95.2 104.0 27.3 17.0 92 15 202.0 01 114.3 126.0 13.8 11.0 91 15 201.0 01 116.0 126.0 12.6 11.0 92 15 204.0 01, , 113.2 126.0 14.1 11.0 90 15 213.5 04 109.2 115.5 16.4 16.5 95 15 208.0 07 . . 112.8 122.5 15.3 12.0 92 15 205.0 05 98.3 107.5 28.7 16.5 91 15 '206.5 06 95.9 104.0 26.1 17.0 92 15 202.5 07 110.6 122.5 15.2 12.0 90 15 . 196.0 07 113.4. 122.5 13.8 12.0 93 12 212.0 01 108.4 126.0 9.5 11.0 86 RTON422A 12 212.0 01 115.7 126.0 11.2 . 11.0 92 15 214.0 07 . 111.6 122.5 12.7 12.0 12.0 ' 91 15 - 215.0 07 107.6 122.5 10.5 88 RTON424A 15 215.0 07 1123 122.5 . 14.0 12.0 . 92 15 208.0 03 116.8 130.0 . 9.8 8.5 90 15 205.5 01 113.4 126.0 13.9 11.0 90 15 - 200.0 01 117.2 126.0 10.7' '11.0 93 15 198.0 04 107.6 115.5 17.0 16.5 . 93 15 197.5' 01 114.3 126.0 11.5 11.0 91 15 213.0 01 115.0 126.0 10.6 11.0 91 15 214.5 07 113.2 122.5 15.1 12.0 92 12 216.0 01 114.8 126.0 13.5 11.0 ' 11.0 91 15 215.0 01 116.7 126.0 11.0 93 15 211.0 07 - 112.9 122.5 14.8 12.0 92 15 209.0 01 113.9 126.0 12.4 11.0 90 14 210.0 01 117.6 126,0 13.7 11.0 93 15 214.5 04 105.8 115.5 17.5 16.5 '92 - - - - .- _N ._._ -. _•_._.. - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil No. Date Of Lot # Elev (ft) Type Dry Density Moisture (%) Relative (%) Field Max Field Opt. Compaction Remarks 438 2/24/06 CF West Lot 15 15 214.5 01 118.3 126.0 13.4 11.0 94 439 2/27/06 CF North Lot 15 . 15 212.0 01 117.8 126.0 14.6 11.0 93 440 2/27/06 CF North Lot 15 15 213.0 07 115.4 122.5 15.7 12.0W 94 441 2/27/06 CF North Lot 15 15 - 211.0 08 111.2 118.5 14.6 14.0 .94 442 .2/27/06 CF .North Lot 15 15 204.0 01 116.9 126.0 11.7 11.0 93 443 -2/27/06 CF North Lot 15 15 201.0 04 105.6 115.5 18.2 . 16.5 91 - 444 2/27/06 CF Northwest Lot 15 15 - 197.5 08 108.6 118.5 13.9 14.0 . 92 445 3/2/06 CF West Lot 15 15 200.5 08 103.8 118.5 12.6 14.0 88 ' RTON44SA 445A 3/2/06 CF West Lot 15 .15 200.5 08 109.2 118.5 15.3 ' 14.0 :92 446 3/2/06 - CF Northwest Lot 15 15 194.0 08 104.0 118.5 1.1.6 14.0 88 RI ON 446A- 446A 3/2/06 CF NorthwestLot 15 15 . 194.0 08 . 107.8 118.5. 14.1 - 14.0 91 - 447 3/2/06 CF West Lot 15 - 15 208.5, 08 109.7 118.5 15.2 14.0 93 448 3/2/06 CF West Lot 15 .15 207.5 08 106.5, '118.5 . 16.8 14.0 90 449 3/2/06 . CF Northwest Lot 15 15 199.5 08 116.5 118.5 15.7 14.0 93 450 3/2/06 . CF Northwest Lot 15 15 196.0 04 105.4 115.5 18.3 16.5 91 - 451 3/3/06 .CF West Lot 15 - 15 209.0 08 103.7 118.5 10.6 14.0 88 RI ON 451A 451A P3/3/06 CF West Lot l5 15 . 209.0 08 111.4 118.5 15.5 14.0 • 94 452 3/3/06 CF West Lot 15 - . 15 - 210.0 08 106.0 118.5 11.3 140 89 RTON4S2A 452A 3/3/06 CF West Lot 15 , - 15 210.0 08 108.8 118.5 16.7 14.0 - 92 453 3/3/06 CF Resort Drive Sta 19+40 12 217.0 08 109.6 118.5 17.2 14.0 92 - 454 3/3/06 CF Resort Drive Sta 18+40 ' 15 . ' 218.0 08 - 108.2 118.5 15.8 - 14.0 91 - 455 3/3/06 CF Resort Drive Sta 15+90 12 216.0 '08 112.1 118.5 14.3 14.0 95 456 3/6/06 CF Resort Drive Sta 20+20 - 12 218.0 08 102.6 118.5 13.8 , .14.0 - 87 RTON4S6A 456A 3/6/06 CF Resort Drive Sta 20+20 ' 12 - 218.0 08 109.2 11:8.5 16.7 14.0 ' - 92 457 3/6/06 CF ' Resort Drive Sta 17+40 - 15 '220.0 04 100.4 115.5 15.3 16.5 , 87 RI ON 457A 457A 3/6/06 CF Resort Drive Sta 17+40 15 ' 220.0 04, 106.7 115.5 17.5 '16.5 92 458 3/6/06 CF Resort Drive Sta 18+30 - 12 221.0 08 107.7 118.5 , 14.9 14.0 91 459 '3/6/06. CF Lot 15 . - 15 219.0 04 99.7 115.5 16.4 16.5 86 RI ON 459A 459A 3/6/06 CF Lot 15 , 15 219.0 04 - 108.2 115.5 16.1 16.5 94 460 3/6/06 CF Resort Drive Sta 16+1O . - 12 218.0 01 ' 114.6 126.0 12.7 11.0 - 91 461 . 3/7/06 CF Resort Drive Sta 17+80 12 221.0 01 118.7 126.0 11.9 11.0 '. 94 462 ' 3/7/06 CF Resort Drive Sta 19+05 12 222.0 01 ' 115.6 126.0 12.2 11.0 92 Project Number: 040575005 Project Name: Grand Pacific CarIsb . . , . Project Location: - Carlsbad Client: 0 Page 15 of 34 . . 7/27/2006 7:18:44AM Test No. Test Date Test Of Location - Lot # Test Elev (ft) Soil Type Dry Density ' Field Max Moisture (%) Field Opt. Relative (%) Compaction Remarks 463 3/7/06 CF Resort Drive Sta 20+35 12, 221.5 01 116.1 126.0 10.8 11.0 92 464 3/7/06 CF Resort Drive Sta 20+70 15 219.5 03 . 120.4 130.0 . 11.1 8.5 93 465 3/7/06 CF Resort Drive Sta 16+55 . 12 221.0 01 , 118.7 126.0 13.2 11.0 94 466' 3/8/06 CF Resort Drive Sta 18+60 - 12 223.0 01 117.4 126.0 12.7 11.0 93 '467 3/8/06 CF Resort Drive. Sta 20+00 12 223.5 07 113.3 , 122.5 14.6 12.0 92 468 3/8/06 CF Resort Drive Sta 20+90 12 221.0 01 117.9 126.0 13.8 11.0 94 469 3/8/06 CF Resort Drive Sta 18+00, 12 224.0 07 111.3 122.5 13.5 12.0 91 470 . 3/8/06 CF Resort Drive Sta 16+90 12 222.0 07 110.7 122.5 15.2 12.0 90 471 3/8/06 CF ResortDriveSta 15+50 12.. 221.0 01 116.9 126.0 12.0 11.0 93 472 3/9/06 CF Resort Drive Sta 19+60 12 224.5 02 122.8 134.5 11.3 8.5 91 473 3/9/06 CF Resort Drive Sta 18+15 12 '- 225.0 02. 125.9 134.5 -. 9.2 8.5 94 474 3/9/06 CF Resort Drive Sta 17+15 12 . 224.0 01 1186 126.0 13.8 11.0 -94 475 3/9/06 CF Resort Drive Sta 15+90 . 12 .223.5 01 115.7 126.0 14.5 11.0 92 . 476 3/9/06 CF Resort Drive Sta 17+00 12 225.0 02 123.8 134.5 10.7 8.5 92 477 3/9/06 CF Resort Drive Sta 18+80 12 225.0 01 117.1 126.0 12.8 '11.0 93 478 3/10/06 CF Resort Drive Sta 16+15 . . 12 . 223:0 '01 115.4 126.0 12.7 11.0 92 479 3/10/06 CF Resort Drive Sta 15+70 12 2240 01 1183 1260 117 110 94 480 3/10/06 CF Resort Drive Sta 18+25 12 2270 01 1163 1260 10.8 11 0 92 481 3/10/06 CF Resort Drive Sta 19+55 12 . 226.0 02 121.6 134.5 .10.8 8.5 90 482 3/10/06 CF Resort Drive Sta 20+65 . 12 225.0 01 119.3 126.0 11.5 11.0 95 483 3/10/06 CF ResortDrive Sta 20+20 15 226.0 01 115.6 126.0 12.3 11.0 92 • . 484 3/16/06 CF 'East Lot 14 ' 144 184.0 05 97.0 107.5 26.7 16.5- 90 485 3/16/06 'CF East Lot 14 -* 14 183.0 OS ' 94.4 '107.5 20.6 - 16.5 88 RI ON 485A 485A 3/16/06 CF East Lot 14 14 1830 05 983 1075 251 165 91 486 3/16/06 CF East Lot 14 . . ' 14 182.0 05 96.9 107.5 28.3 16.5 90 487 3/16/06 CF ' East Lot 14 14 j84.0 05 97.5 107.5 '25.4 16.5 91 V 488 3/16/06 CF East Lot 14 V 14 187.0 05 96.8 107.5 26.2 16.5 90 . 489. 3/16/06 CF East Lot 14 -. • V 14 186.0 05 92.7 107.5 29.2 16.5 86 RTON489A 489 A 3/16/06 CF East Lot 14 ' • 14 186.0 05 - 97.2 107.5 27.8 16.5 90 V ' 490 3/17/06 CF' Resort Drive Sta, 20+20 12 . 227.0 08 106.8 118.5 13.3 14.0 - 90 491 3/17/06 CF Resort Drive Sta. 19+00 . • 12 226.5 08 .110.7 118.5 14.6 '14.0 93 V V 492 3/17/06 CF' . Resort Drive Sta 18+90 . 12 225.5 08 108.7 118.5 . 15.5 14.0 92 Project-Number: 040575005. Project Name Grand Pacific Carlsb Project Location: Carlsbad Client: . 0 Page 16 of 34 •V •V V 7/27/2006 7 18 44AM SUMMARY OF FIELD DENSITY TESTS Test Test Test Location . Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 493 3/17/06 CF Resort Drive Sta 16+00 12 223.0 08 112.4 118.5 12.8 14.0 95 494 3/17/06 CF Resort Drive Sta 16+60 12 224.0 08 109.2 118.5 14.9 14.0 92 495 3/20/06 CF Resort Drive Sta 19+80 12 228.0 01 115.9 126.0 11.7 11.0 92 496 3/20/06 CF Resort Drive Sta 19+65 12 228.0 08 109.2 118.5 15.6 14.0 92 497 3/20/06 CF Resort Drive Sta 18+35 12 227.5 08 111.5 118.5 14.8 14.0 94 498 3/20/06 CF Resort Drive Sta 17+90 12 226.0 01. 116.4 126.0 12.3 11.0 92 499 3/20/06 CF Resort Drive Sta 20+40 . . 12 228.0 08 108.6 118.5 15.1 14.0 92 500 3/21/06 CF Resort Drive Sta 20+90 12 224.0 08 110.7 118.5 16.3 14.0 93 501 3/21/06 CF Resort Drive Sta 21+35 12 226.0 01 113.6 126.0 13.4 11.0 90 502 3/21/06 CF Resort Drive Sta, 20+70 12 228.0 08 107.8 118.5 14.4 14.0 91 503 3/21/06 CF Resort Drive Sta 22+00 12 224.0 08 109.2 118.5 15.5 14.0 92 504 . 3/21/06 CF Resort Drive Sta, 21+60 12 222.0 08 108.5. 118.5 17.2 14.0 92 505 3/21/06 CF Resort Drive Sta 21+05 12 225.5 08 111.5 118.5 13.8 14.0 94 506 3/22/06 CF Slop'e Resort Dr Sta 24+55 9 198.0 01 108.3 126.0 8.9 11.0 86 RT ON. 506A 506A 3/22/06 CF Slope Resort Dr Sta 24+55 9 198.0 01 114.9 126.0 10.6 11.0 91 507 3/22/06 CF Slope Resort-Dr Sta 25+35 9 199.0 01 113.7 126.0 12.1 11.0 90 508 . 3/22/06 CF Slope Resort Dr Sta 24+95 . 9 200.0' 04 106.3 115.5 18.7 16.5 92 509W 3/22/06 CF Slope Resort Dr Sta 24+70 9 201.5 07 106.6 122.5 10.2 12.0 87 Ri ON 509A. 509A 3/22/06 CF Slope Resort Dr Sta 24+70 9 201.5 07 112.1 122.5 12.3 12.0 92 510 3/22/06 CF Slope Lot 15 15 198.0 08 110.5 118.5 14.6 14.0 93 511 3/22/06 CF Slope Lot 15 15 197.0 08 . 103.8 118.5 13.4 14.0 . 88 RTONSIIA 511A 3/22/06 CF Slope Lot ls 15 197.0 08 108.7 118.5 15.3 14.0 . 92 512 3/22/06 CF Slope Lot 15 15 .198.5 07 111.2 122.5 13.5 12.0 91 513 3/23/06 CF Slope Lot ls 15 200.0 07 113.9 122.5 12.7 12.0 93 514 3/23/06. CF West Lot 15 15 178.0 03 118.6 130.0 9.9 8.5 91 515 3/23/06. CF West Lot 15 15 180.0 02 122.7 134.5 10.3 8.5 91 516 3/23/06 CF West Lot l5 15 182.0 02 122.1 A34.5 9.5 8.5 91 * 517 3/24/06 CF South Slope Lot 15 15 202.0 07 111.8 122.5 14.4 12.0 91 518 3/24/06 CF Slope ResortDr Sta 25+00 . . 9 203.0 08 109.2 118.5 15.6 14.0 92 519 3/24/06 CF. Slope Resort Dr Sta 24+70 9 205.0 07 105.3 122.5 15.8 12.0 86 Ri ON 519A 519A 3/24/06 CF Slope Resort Dr Sta 24+70 . 9 205.0 07 109.9 122.5 14.8 12.0 90 520 3/27/06 CF Slope Resort DrSth25+15 9 204.0 08 103.7 118.5 16.9 14.0 88 RTONS2OA Project Number: 040575005 Project Name: Grand Pacific Carlsb . . Project Location: Carlsbad . . . -. . Client: 0 Page 17of34 7/27/2006 7:18:44AM --- SUMMARY OF FIELD DENSITY TESTS - Test" Test Test Location Test Soil Dry Density Moisture (%) Relative,(%) - . No. Date Of , . Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 520A 3/27/06 CF Slope Resort Dr Sta 25+15 9 204.0 08 106.4 118.5 17.2. 14.0 90 '521 3/27/06 CF Slope Resort Dr Sta 24+85 9 207.0 08 106.0 118.5 14.2 14.0 89 RT ON 521A 521A 3/27/06 CF ' Slope Resort Dr Sta 24+85 -9 207.0 08 108.3 118.5 15.4 14.0 91 522 3/27/06 CF Slope Resort Dr Sta 25+30 , 9 206.5 08 109.7 118.5 15.6 , 14.0 93 1. 523 3/27/06 CF Slope, Resort Dr Sta 24+50 .. 9 . 209.0 08 '107.5 i18.5' 16.6 14.0 91 524 3/27/06 CF South Slope Lot 15 . 15 204.0 08 109.8 118.5 15.2 14.0 93 525 3/27/06 CF South Slope Lot 15 15, 205.0 08 105.2 118.5 16.8 14.0 89 RI ON 525A 525A 3/27/06 CF South Slope Lot 15 15 205.0 08 107.7 118.5 15.9 14.0 91 '. -526 3/27/06 CF -. South Slope Lot 15' ' 15 207.0 - 07 110.6 122.5 14.7 ' 12.0 . 90 V527 3/27/06 CF South Slope Lot 15 15 204.0 , 08 . 106.8 118,5 17.0 14.0 90 528 3/27/06 CF SouthSlopeLot15 15 208.0 08' 108.1 118.5 15.9 14.0 91 ' . ... 529 3/28/06 - 'CF ' South Slope Lot 15 15 209.0 08 104.6 118.5 17.2 . 14.0 ' 88 . RI ON 529A- 529A 3/28/06 CF V South Slope Lot 15 ' 15 - 209.0 08 106.5 118.5 17.1 .. 14.0 . 90 530 3/28/06 CF South Slope Lot 15 V - 15 210.0 07 110.6 122.5 15.4 12.0' ' 90 531 . 3/28/06 CF Slope Resort Dr Sta 24+55 ' 9 . ' 211.0 08 . 102.8 . 118.5 16.8 ' 14.0 . 87 RTON 531A 531A 3/28/06 CF . Slope Resort Dr Sta 24+55 V 9 ' 211.0' 08 ' , 106.7 118.5 .15.7 14.0 90. 532 3/28/06 CF Slope Resort Dr Sta 25+05 9 209.0 08 ' , 105.6 118.5 17.3 , 14.0 89 ' RI ON 532A 532A 3/28/06 CF, Slope Resort Dr Sta 25+05 , . 9 209.0 08 ' 108.2 118.5 16.0 14.0 ' 91 533. .3/28/06 CF South Slope Lot 15 -' 15 211.0 08 ' 108.5 118.5 16.2 '14.0 92 V V 534 3/30/06 CF Slope Resort Dr Sta 25+40 ' 9 208.0 08 - 105.4 118.5 - 11.6 14.0 V 89, V RI ON 534A 534A, 3/30/06 CF Slope ResoitDr Sta 25+40 9 - 208.0 08, 108.7 118.5 ' 15.3 14.0 .92 . 535 3/30/06 ,CF -Slope Resort Dr Sta 25+10 •V 9 210.0 08 ' 109.1 118.5 16.2 14.0 . 92 V V ,536. 3/30/06 CF Slope Resort Dr Sta 24+65 , 9 V 212.0 '08 - 107.6 11V8.5 14.9 14.0 - 91- 537 ' 3/30/06 'CF' . South Slope Lot 15 '-" 15 V 212.0 08 , 104.4 118.5 13.5 ' 14.0 88 . .RI ON 537A 537A 3/30/06 CF South Slope Lot ls . 15 ' - 212.0 08 107.9, 118.5 15.6 - 14.0 '. 91 538 :3/30/06 CF South Slope Lot 15 - , 15 214.0 08 V 110.3 118.5 .17.0 14.0 93 . 539 ' 3/31/06 CF SouthSlopeLot'15 - iSV 2105 08 102.7 118.5 10.9 14.0 87VVVV RTON539A. V 539A 3/31/06 . CF South Slope Lot iSV . . 15. 210.5 08 106.4 118.5 . .,. 1.5.5 . 14,0 90 540 3/31/06 CF South SlOpe Lot15 - V V 15 , 211.5 08 109.3 118.5 16.8 14.0 92 541 3/31/06 CF . South Slope Lot 15 , V 15 210.0 08 , 107.6 118.5 . 17.2 14.0 91 542 3/31/06 CF 'South Slope Lot lS 15 211.0 08 '107.9 118.5 16.2 14.0 . 91 543 4/3/06 CF South Slope Lot 15 , '5 '' 213.0 ' 08 109.8 118.5 14.8 V 14.0 V 93 - V Project Number:. 040575005 Project Name:. (rand Pr'ifir (rkh V V,V V ,iV V W Prdject Lcatidn Carlsbad V V Page 18 of 34 ' V 7/27/2006 7'1R'44AM Client: 0 ' V - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks '544 4/3/06 CF South Slope Lot 15 . 15 212.5 08 108.3 118.5 16.7 14.0 91 V 545 4/3/06 CF South Slope Lot 15 15 . 214.0 08 108.8 118.5, VV 15.4 14.0 V 92 546 4/3/06 CF Slope Resort Dr Sta 24+40 V 9 V 215.0 08 110.2 118.5 17.3 14.0 93 V 547 4/3/06 CF V Slope Resort Dr Sta 25+25 V 9 V 214.0 08 ' 109.4 118.5. 15.9 '14.0 . 92 548 4/3/06 CF Slope Resort Dr Sta 24+85 9 213.0' 08 109.6 118.5 15.8 14.0 92 V 549 4/4/06 SF West Lot V 6 186.0 03 118.3 1300 9.2 8.5 91 550 4/4/06 SF West Lot 6 6 183.0 03. V 117.9 130.0 10.2 8.5 91 V 551 V 4/4/06 SF. West Lot 6 - 6 185.0 03' 119.4 130.0 8.8 8.5 92 V 552 4/4/06 SF West Lot 6. , V .6 .1800 03 117.7 130.0 11.6 V 8.5 91 V 553 4/4/06 SF West Lot '6 V 184.0 -03 11'6.8 '130.0 9.6 8.5 V 90 554 4/4/06 SF West Lot 6 6 181.0 03 118.2 130.0 10.3 8.5' 91 4/11/06V CF South Lot V V 9 V 170.0 08 V 108.8 118.5 16.5 14.0 V . 92 - V 556 4/11/06 'CF South Lot 9 V 9 173.0 08 110.4 118.5 ' 15.7' 14.0 93 V 557 4/11/06 CF South Lot 9 9 175.0 08 107.6 118.5 17.4 14.0 V 91 558 4/11/06 CF South Slope Lot 15 V V V 15 215.5 01 115.3 126.0 14.3 11.0 92 559 4/11/06 CF South Slope Lot l5 ' 15 . 215.0 01 113.8 126.0 12.7 11.0 V 90 V V VV560 4/11/06 CF South Slope Lot 15 - 15 212.5 '01 V 117.6 126.0 14.2 11.0 ' 93 - 561 ' 4/11/06 CF V South Slope Lot 15 V V - 15 V 21L0 01 114.7 126.0 12.4 11.0' 91.. . V 562 4/11/06 CF South Slope Lot 15 "V - 212.0 01 V 116.1 126.0.. 14.0 11.0 .92 563 4/11/06. CF South Slope Lot 15 V 15 2130 01 115.4 126.0 13.5 ' 11.0 92 V V 564 4/11/06 CF South Slope Lot 15 15 V 214.5 01 114.6 126.0 11.9 .11:0 . 91 V V 565- 4/11/06 CF South Slope'-Lot 15 V ' 15V .. 218.0- 01. ..V...1182 126.0. 12.7 11.0 94 566 4/12/06 CF South Lot 15 15 2200 01 1139 1260 138 110 90 567 4/12/06 CF South Lot- 15 V 5 217.0' 01 V 115.2 126.0 12.3 11.0 V 9.1 568 4/12/06 CF South Lot 15 15 2110 01 1164 1260 126 110 92 .569 4/12/06 CF South Lot 15 - 15 215.0 01 114.3 126.0 11.7 11.0 V 91 570 4/12/06. CF V South Lot -15 ' - V 15 V V 222.0 01 115.0 1260 .13.2 11.0 91 V 571 4/12/06 CF North Lot 9 2180 01 1177 1260 126 110 93 V 572 4/13/06 CF North Lot lO 10 - 218.5 01 115.8 126.0' 12.7 V 11.0 ' V 92 V V V V V 573 4/13/06 CF North Lot 10 - 10 V 220.0' 01 * 113.4 126.0 . 13.8 V 11.0 . 90 574 4/13(06 CF Rèsort Drive Sta 24+80 12 ' 218.0 08 109.6 118.5 16.4 ' 14.0 . '92 V 575' 4/13/06 CF South Lot 15 V 15 2190 01 V V 114.2 V 126.0 13.5 V .11.0 ' 91 VProject Number: 040575005 V V V V V V V - V V Aftab Project Name Grand Pacific Carlsb Project Location Carlsbad V Client: , 0 . ' Page 19 of 34 V 7/27/2006 '7:18:44AM - - - -- SUMMARY OF FIELD DENSITY TESTS. Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 576 4/13/06 CF East Lot 14 14 191.0 05 98.4 107.5 25.1 16.5 92 577 4/13/06 CF East Lot 14 14 189.0 05 97.3 - 107.5 : 26.8 16.5 91 578 4/13/06 CF East Lot 14 14 188.0 05 99.2 107.5 24.7 16.5 92 579 4/17/06 CF North Lot 10 10 217.0 01 114.2 126.0 12.7 11.0 91 580 4/17/06 CF Lot 16 . 16 215.0 01 115.6 , 126.0 12.5 11.0 92 581 4/17/06 CF South Lot. 11 . 11 213.0 01 113.8 126.0 13.2 11.0 90. 582 4/17/06 CF North Lot ll 11 212.0 01 116.1 126.0 11.9 11.0 92 583 4/17/06. CF East Lot 15 15 216.0 01 113.7 126.0 14.2 .11.0 90 584 4/17/06 CF North Lot 15 V 15 .215.5 01 116.3 126.0 13.8 11.0 92 V 585 4/17/06 CF North Lot 15 15 209.0 01 118.2 126.0 12.6 11.0 94 586 4/17/06 CF South Lot 15 15 217.5 01 115;8 126.0 P13.0 11.0 . 92 587 4/18/06 CF Conference Facility 11 213.0 01 115.6 126.0 12.7 11.0 92 RI ON 587A 587A 4/19/06 CF Conference Facility 11 213.0 01 119.5 126.0 12.3 11.0 . 95 588 4/18/06 CF Conference Facility 11 212.0 01 117.3 126.0 12.4 11.0 93 RTONS88A 588A 4/19/06 CF Conference Facility 11 212.0 01 120.0 126.0 11.7 11.0 95 589 4/18/06 CF South Lot 15 . 15 217.5 01 113.2 126.0 15.4 11.0 - 90 590 4/18/06 CF South Lot 6 5 15 208.5 01 - 114.9 126.0 14.1 .11.0 91 591 4/19/06 CF Resort Drive Sta 22+ 10, . 12 222.0 01 117.8 126.0 13.5 11.0 93 592 4/19/06 CF South Lot 15 15 218.0. 01 120.4 126.0 12.7 11.0 96 593 4/19/06 CF East Lot 15 15 214.0 01 116.2 126.0 14.1 11.0. 92 594 4/20/06 CF West Lot li 11 214.0 01 117.3 126.0 13.6 11.0 93 595 4/20/06 CF West Lot lO V 10 216.0 01 115.8. -.126.0 14.0 11.0 . 92 596 4/20/06 CF West Lot 10 V 10 219.5 01 118.4 126.0 12.3 11.0 . 94 V -. 597 4/20/06 CF West Lot lO 10 221.0 01 116.6 .126.0 13.7 11.0 93 598 4/20/06 CF . South Lot 15 15 210.5 01 119.1 126.0 11.6 11.0 95 599 4/20/06 CF South Lot 15 15 208.5 '0 1 117.6 126.0 14.8 11.0 93 600 4/20/06 CF North Lot 15 15 212.0 01 116.9 126.0 13.7 11.0 93 601 4/21/06 CF East Lot 14 14 182.0 01 114.2 126.0 13.3 11.0 91 602 4/21/06 CF East Lot 14 - 14 185.0 01 116.2 126.0 12.8 11.0 92. V 603 4/21/06 CF East Lot 14 . .14 V 187.0 01 117.7 126.0 14.3 11.0 . 93 V V 604 4/21/06 CF East Lot 8 189.0 01 115.8 1 126.0 12.6 11.0 92 6.05 4/25/06 CF South Lot 14 . - 14 173.0 05 98.6 107.5 26.4 16.5 - 92 V Project Number: - 040575005 Project Name: Grand Pacific Carlsb V V Project Location: Carlsbad V V V Client: 0 . Page 20 of 34 V - 7/27/2006 7:18:44AM SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot# Elev.(ft) Type Field Max Field Opt. Compaction Remarks 606 4/25/06 CF South Lot 6 6 172.0 05 96.3 107.5 27.2 . 16.5 90 607 4/25/06 CF South Lot 14 14 171.0 05 99.4 107.5 24.6 16.5 92 608... 4/25/06 CF South Lot 14 14 174.0 05 97.5 107.5 28.3 16.5 91 609 4/25/06 CF South Lot 14 . 14 173.0 05 96.9 107.5 27.8 16.5 90 610 . 4/25/06 CF South Lot 14 14 170.6 05 . 98.0 107.5 25.4 16.5 91 611 4/26/06 CF South Lot,14 14 ' 174.0 05 ' .- .96.3 107.5 27.2 16.5 90 .612 4/26/06' CF South Lot . :6 175.0 05 99.1 107.5 24.8 16.5 92 613 4/26/06 CF South Lot 14 . 14 176.0 05 96.8 107.5 25.5 16.5 90 614 4/26/06 CF South Lot 14 . . 14 . 177.0 05 .97,4 107.5 26.3 16.5 91 615 . 4/26/06 CF South Lot 14 , 14 178.0 05 98.8 107.5 24.5 16.5 . 92 616 4/26/06 CF South Lot 14 .' 14 180.0 05 96.6 107.5 28.4 16.5 90 617 4/26/06 CF South Lot 14 14 177.5 05 97.5 107.5 25.2 16.5 91 618 4/27/06 CF South Lot 14 14 176.5 05 97.4 107.5 26.2 16.5 91 619 4/27/06 CF South Lot 14 14 179.0 05 964 107.5 27.1 16.5 90 620 4/27/06 CF South Lot 14 14 181.0 05 96.8 107.5 24.7 16.5 90 621 4/28/06 CF East Lot 14 14 . 192.0 02 121.6 134.5 9.7 8.5 90 622 4/28/06 CF East Lot 14 . 14 194.0 02 12418 134.5 10.6 8.5 93 623 4/28/06 CF East Lot 14 ' 14 . 195.0 03 118.9 130.0 11.4 8.5 91 . 624 .4/28/06 CF East Lot l4 14 197.0 02 123.7 134.5 9.41 8.5 92 625 5/1/06 CF North Lot 15 . 15 218.0 01 116.2 126.0 '13,3 11.0 92 626 5/1/06 CF South Lot 15 . 15 215.5 01 , 115.8 126.0 , .11.9 11.0 92 627 5/1/06 CF North Lot 15 . . 15 - 208.5 . 01 117.5 - 126.0 12.4 11.0 93 628 5/1/06 CF North Lot 15 ' 15 216.0.. 01 114.2 126.0 14.1 11.0 91 ' 629 5/1/06 CF South Lot 15 15 224.5 .01 117.2 126.0 12.6 11.0 93 630 5/2/06 .' CF Resort Drive Sta27+25 12 216.0 01 118.3 126.0 11.6 11.0 . 94 631 5/2/06 CF Resort Drive Sta 28+50 12 214.0 01 115.5 126.0 13.6 11.0 92 632 5/2/06 CF West Lot 16 , .16 215.0 01 . 116.7 126.0 13.1 ILO 93 633 5/2/06 CF West Lot lO . 10 216.0 01 1.14.8 126.0 14.2 11.0 91 634 5/3/06 CF West Lot lO 10 ' 219.0 01 117.3 126.0 12.4 11.0 . 93 635 5/3/06 CF West Lot 1 . I 224.0 01 116.9 126.0 11.7 11.0 93 636 5/3/06 CF West Lot 1 1 224.5 01 119.5 126.0 10.6 11.0 95 637 5/3/06 CF Conference Facility 1 226.0 01 - 120.2 126.0 11.4 11.0 . 95 Project Number: 040575005 Project Name: Grand Pacific, Carlsb Project Location: Carlsbad Client: 0 - Page 21 of 34 7/27/2006 7:18:44AM - - - - - - - -, - - - - - SUMMARY OF FIELD DENSITY TESTS - -S.- -.- - - Test Test Test ,. Location Test Sdill Dry Density Moisture (%) Relative (%) No. Date Of ' Lot # Elev (ft) Type Field, Max Field 0pt Compaction, Remarks 638 5/3/06 CF West Lot 10 . 10 218.0 01 115.8 126.0 13.8 11.0 92 639 5/3/06 CF South Lot 11 , 11 217.0 01 118.1 126.0'. 12.6 11.0 94 640 5/3/06 CF Resort Drive Sta 25+05 12 2150 01 1146 1260 115 110 91 -- 641 5/3/06 CF East. Swinmiing Pool . 1 218.0 01 116.2 126.0 13.3 11.0 92 642. 5/3/06 CF East Swimming Pool 1 219.5 01 .. 118.3 126.0 12.8- 11.0 94 643 5/3/06 CF East Swimming Pool 1 221.0 01 117.6 126.0 14.2 .11.0 93 644 5/4/06 CF East Swimming Pool 1 22310 01 116.8' 126.0 12.4 11.0 93 645 5/4/06 CF Conference Facility 1 ' 230.0 01 115.7 126.0 11.8 11.0 92 RT ON 645A' 645A 5/4/06 CF Conference Facility . 1 230.0 01 119;2 126.0 11.4 11.0 '95 646 5/4/06 - CF 'South Lot 10 . 10 - 220.0 02 121.4 134.5 10.6 .8.5 90 647 5/4/06 CF East Swimming Pool 1 225.0 01 117.3 126.0 13.4 11.0 93 648 5/4/06 CF East Swimming Pool . 1 227.0 01 115.5 126.0, 11.9 ' 110 92 .. 649, 5/4/06 CF East Swimming Pool . . - 1 228.0 01 116:1 126.0 13.8 11.0 92 . 650 5/5/06 CF Conference Facility ' - 1 228.0, 01 115.3 126.0 11.1 11.0 92 RT ON 650A 650A, 5/5/06 CF Conference Facility' .1 . 228.0 01 ' 120.7 126.0 10.6., 11.0 - 96 ., 651 5/5/06 CF Conference Facility 1 2300 01 1192 1260 118 110 95 652 5/5/06 CF South Lot 14 - .14 184.0 '05 '98.2 107.5 24.7 16.5 91 653 5/5/06. CF ' South Lot 14. . 14 . 182.0 05 96.9 107.5 27.4 16.5 - 90 - 654 5/8/06 CF Conference Facility 1 231.0 01,, 115.8 126.0 12.4 ' 11.0 92 RI ON 654A 654A 5/8/06 CF Conference Facility 1 231.0 01 119:3 126.0 11.8. 11.0. 95 655 5/8/06 CF Conference Facility -' 1 , 230.5 01 117.4 126.0 11.4' 11.0 93 RION6SSA 655A 5/8/06 CF - Conference Facility I ' . 230.5 01 . 120.8 126.0 . .12.0 11.0 96 656 5/8/06 CF Conference Facility . .1 ' .231.5 '01 113:5 126.0 13.9 - 11.0 . 90 RI ON 656A 656A 5/9/06 CF Conference Facility . I 231.5 01 119.2 126.0 12.6. . 11.0 . 95 657 5/8/06 CF South Lot 14 ' 14 180.0 05 97.6 107.5 28.3 16.5 91 658 5/8/06 CF .South Lot 14' . '14 178.0 05 ' 96.7- 107.5 25.3 16.5 90 659 '5/9/06 CF Conference Facility ' I 232.5 01 115.6 126.0 13.7 11.0 92 RI ON 659A 659A 5/10/06 CF Conference Facility 1 232.0 01 119.2' 126.0 "12.6 11.0 ' 95 660 5/9/06 CF Conference Facility , " 1 232.5 01 . 114.6 126.0 . 14.8 11.0.. 91 RTON66OA 660A 5/10/06 CF Conference Facility . 1 . 232.5 01 120.2 , 126.0 - .11.8 11.0 95- 661 5/9/06 CF South Lot 14 ' . - . 14 186.0 05 96.6 107.5 27.0 16.5 90 . . 662 5/9/06 CF SoüthLot 14 . . ' 14 183.0 05 98.2 107.5 24.8 16.5 91 Project Number: 040575005 Project Name Grand Pacific Crlsb Project Location: Carlsbad Client: 0 . Page 22 of 34 . S 7/27/20.06 , 7:18:44AM 663 5/9/06 CF. South Lot 14 664 5/9/06 CF South Lot 14 665 5/10/06 CF South Lot ll 666 5/10/06 CF North Lot 11 667 5/11/06 CF North Lot ll 668 5/11/06 SF Slope Resort Dr Sta 9+80 669 5/11/06 SF Slope Resort Dr Sta 10+30 670 5/11/06 SF Slope Resort Dr Sta 11+20 671 5/11/06 SF Slope Resort Dr Sta 12+05 672 5/11/06 SF Slope Resort Dr Sta 12+70 673 5/11/06 SF Slope Resort Dr Sta 13+40 674 5/11/06 SF Slope Resort Dr Sta 13+80 675 5/11/06 SF N. Slope Tennis Court 676 5/11/06 SF N. Slope Tennis Court 677 5/11/06 SF NW Slope Tennis Court 678 5/11/06 SF W. Slope Tennis Court' 679 5/11/06 SF W. Slope Tennis Court 680 5/11/06 CF . Conference Facility 681 5/11/06 CF Conference Facility 682 5/11/06 CF Conference Facility 683 5/11/06 CF South Lot ll 684 5/11/06 CF North Lot 11 685 5/12/06 CF East Lot 1 686 5/12/06 CF East Lot 1 687 5/12/06 CF East Lot 1 688 5/12/06 - CF East Lot I 689 5/12/06 CF East Lot 1 690 .5/12/06 CF North Lot 11 691 5/12/06 CF South Lot 11 692 5/12/06 CF South Lot 11 693 5/12/06 CF, North Lot 11 694 5/15/06 CF South Lot 11 Project Number: 040575005 Project Name: Grand Pacific Carlsb Project Location: Carlsbad Client: 0 14 181.0 05 97.8 107.5 26.1 16.5 91 14 - 179.5 05 96.3 107.5 29.4 16.5 90 11 217.0 01 116.9 126.0. 12.6 11.0 93 11 214.0 01 115.9 126.0 11.8 11.0 '92 11 214.5 01 118.3 126,0 12.7 11.0 94 12 208.0 03 116.5 130.0 7.7 8.5 90 12 204.0 03 118.4 130.0 8.8 8.5 91 12 216.0 01 114.4 126.0' 9.2 11.0 91 12 204.0 01 113.8 126.0 10.2 ' 11.0 90 12 216.0 03 117.4 130.0 9.1 8.5 90 12 220.0 01 115.4 126:0 10.8 11.0 92 12 206.0 01 113.5 126.0 8.4 11.0 90 14 209:0 03 118.6 130.0 8.7 8.5 ' 91 14 .203.0 01 114.3 126.0 9.4 11.0 91 14 198.0 03 117,2 130.0 7.7 8.5 90 6 210.0 01' 115.2 126.0 10.6 11.0 91 6 203.0 01 . .113.8 - 126.0 8.9 .. 11.0 90 I 233.0 01 120.6 126.0 12.8 11.0 96 1 233.5 01 119.3 126.0 11.9 11.0 95 1 233.0 01 119.5 126.0 12.3 11.0 95 Il 218,0 01 117.5 126.0 13.7 11.0 93 11 - - 215.0 01 117.2 126.0 13.4 11.0 93 221.0 01 116.7 126.0 12.5 11.0 93 '1 222.0 01 114.9 126.0 14.8 11.0 91 218.0 01 118:3 126.0 12.1 11.0 94 220.0 01 114.7 126.0 14.0 11.0 91 220.0 01 119.2 126.0 12.4 11.0 95 11 216.0 01 114.8 . 126.0 12.7 11.0 91 11 219.0 01 116.8 126.0 14.1 11.0 93 11 218.0 01 115.6 126.0 13.3 11.0 92 .11' 217.0 01 117.5 126.0 11.8 11.0 93 11 221.5 01 116.9 126.0 .11.3 11.0 93 - Page 23 of 34 .- - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 7/27/2006 7:18:44AM SUMMARY OF FIELD DENSITY TESTS . Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 695 5/15/06 CF South Lot 11 11 223.0 01 117.5 126.0 12.2 11.0 93 696 5/15/06 CF North Lot 11 11 220.0 01 114.8' 126.0 13.4 11.0 91 697 5/15/06 CF North Lot 11 11 222.0 01 113.6 126.0 13.8 11.0 90 698 5/15/06 CF Resort Drive Sta 17+20 12 224.0 08 107.8 118.5 13.6 14.0 91 699 5/15/06 CF . Resort Drive Sta 18+80 . 12 226.5 08 106.3 118.5 12,2 14.0 90 700 5/15/06 CF Resort Drive Sta 20+70 12 228.0 08 108.0 118.5 143 1.4.0 91 701 5/16/06 CF Resort Drive Sta 24+80 12 219.0 01 117.6 126.0 13.6 11.0 93 702 5/16/06 CF Resort Drive Sta 25+50 12 218.0 01 114.7 126.0 13.1 11.0 91 703 5/16/06 CF Resort Drive Sta 26+45 . 12 218.5 01 116.2 126.0 12.8 11,0. 92 704 . 5/16/06 CF Resort Drive Sta 25+35 12 220.0 01 1163 126.0 14.2 11.0 92 705 5/16/06 CF North Lot ll 11 222.0' 01 118.3 126.0 12.7 11.0 94 706 5/16/06 CF North Lot ll 11 223.5 01 115.2 126.0 12.5 11.0 91 707 .5/16/06 SF West Slope Lot 15 15 195.0 03 118.3 130.0 ' 7.6 8.5 91 708 5/16/06 SF West Slope Lot 15 ' 15 202.0 03 116.6 130.0 9.1.. ' 8.5 90 709 . 5/16/06 SF West Slope Lot 15 15 198.0 01 113.5 126.0 9.6 11.0 90 710 5/16/06 SF West Slope Lot 15 15 209.0 01 115.2 126.0 10.4 ' 11.0 91 711 5/16/06 SF West Slope Lot l5 15 213,0 01 113.8 126.0 9.2 11.0 90 712 5/16/06 SF West Slope Lot 15 15 218.0 01 116.7 126.0 '8,7 11.0 93 713 5/16/06 SF West Slope Lot 15 15 208.0 08 108.6 118.5 11.1 14.0 92 714 5/16/06 SF West Slope Lot 15 ' 15 223.0 01 115.2 126.0 9.4 11.0 91 715 . 5/17/06 CF East Lot 1 Drive ' 1 . 222.0 . 02 122.8 134.5 10.3 8.5. 91 716 5/17/06 CF East Lot I Drive 1 223.0 02 120.6 134.5 11:7 8.5 90 717 5/17/06 CF East Lot 1 Drive 1 , 221.0 02 124.2 134.5 9.1 ' 8.5 92 718 5/17/06 CF East Lot 1 Drive 1 221.0 02 121.8 134.5 10.9 8.5 91 719 5/19/06 CF Conference Facility. 1 229.0 01 119.4 126.0 12.0 11.0 95 720 5/19/06 CF East Swimming Pool 1 230.0 01 116.2 126.0 14.1 11.0 92 721 5/19/06 CF East Swimming Pool 1 228.0 01 115.8 126.0 13.7 11.0 '92 722 5/19/06 CF East Swimming Pool 1 229.0 01 117.5 126.0 12.6 11.0 93 723 5/19/06, CF South Lot 14 14 183.0 01 116.8 126.0 12.2 11.0 93 724 5/19/06 CF South Lot 14 14 185.0 01 114.9 126.0 '13.4 11.0 91 725 5/19/06 CF South Lot 14 14 188.0 01. 117.3 126.0 11.6 11.0 '93 726 5/19/06 CF West Lot 16 16 218.0 01 . 115.6 126.0 13.2 11.0 92 Project Number, 040575005 . . Project Name: Grand Pacific Carlsb. Project Location: Carlsbad Client: 0 Page 24 of 34 7/27/2006 7:18:44AM SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density. Moisture (%) Relative(%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 727 5/19/06 CF West Lot 16 16 216.0 01 117.2 126.0 12.8 11.0 93 728 5/19/06 CF South Lot 12 12 213.0 01 114.6 126.0 12.7 11.0 91 729 5/23/06 CF East Swimming Pool : 1 231.0 02 121.2 134.5 11.8 8.5 90 730 5/23/06 CF East Swimming Pool 1 229.5 02 120.8 134.5 12.4 .8.5 90 731 5/23/06 CF East Swimming Pool 1 230.0 02 123.7 134.5 11.5 8.5 92 732 5/23/06 CF Conference Facility 1 231.0 02 127.8 134.5 9.6 8.5 95 733 5/23/06 CF SouthLot 14 14 190.0 01 118.6 126.0 11.9 .11.0 94 734 5/23/06 CF South Lot 14 . 14 . 186,0 01 117.9 126.0 13.0 11.0 94 735 5/23/06 CF South Lot 14 14 185.0 01 116.7 126.0 12.7 11.0 93 736 5/24/06 CF Conference Facility . 1 332.0 01 122.6 126.0 11.4 11.0 97 737 5/24/06 CF East Swimming Pool 1 230.5 01 118.4 126.0 13.5 11.0 94 738 5/24/06 CF East Swimming Pool 1 231.0 01 116.8 126.0 12.7 11.0 93 739 5/24/06 CF East Swimming Pool . 1 231.0 01 117.2 126.0 . 12.8 11.0 .93 740' .5/25/06 CF Northwest Lot 11 11 215.0 01 114.6 126.0 13.7 11.0 91 741 5/25/06 CF Resort Drive Sta 24+15 12 217.0 01 '116.2 126.0 12.3 11.0 92 742 5/25/06 CF South Lot 12 12 219.0 01 113.8 126.0 13.0 11.0 90 743 5/25/06 CF East Swimming Pool . 1 . 231.0 01 117.0 126.0 12.9 11.0 93 744 5/25/06 CF East Lot 1 Driveway 1 225.0 01 114.4 126.0 11.6 11.0 91 745 5/26/06 CF Resort Drive Sta 9+00 14 203.0 01 116.7 126.0 12,6 11.0 93 746 5/26/06 CF Resort Drive Sta 9+00 .8 194.0 01 114.8 126.0 13.4 11.0 91 747 5/26/06 CF Resort Drive Sta ?+00 8 198.0 01 115.2 126.0 10.9 11.0 91 748 5/26/06 CF •East Lot I Driveway , . 1 227.0 01 115.3 126.0 13.5 11.0 '92 749 5/30/06 CF Lot 5 185.0 02 " 123.6 134.5 10.2 , 8.5 ' 92 750 5/30/06 CF Lot 5, 184.0 02 125.7 134.5 9.6 8.5 93 751 5/30/06 CF Lot . . 5 187.0 02 122.8 . 134.5 11.3 8.5 91 752 5/30/06 CF Lot . . 5 185.0 02 120.6. 134,5 11.4 8.5 90 753 5/31/06 CF Lot . 5 186.0 02 121.5 134.5 10.5 8.5 90 754 5/31/06 CF Lot . 5 186.0 01 118.4 126.0 12.5 11.0 94 755 5/31/06 CF Lot 5 188.0 01 117.3 126.0 13.2 11.0 93 756 5/31/06 CF West Lot 14 14 169.0 06 91.4 104.0 35.2 . 17.0. 88 RI ON 756A 756A 5/31/06 CF West Lot 14 14 169.0 06 .93.8 104.0 28.3 17.0 90 757 5/31/06 CF West Lot 14 - 14 169.0 06 94.7 104.0 24.7 17.0 91 Project Number: 040575005 . . . Project Name: Grand Pacific Carlsb . Project Location: Carlsbad . . Client: 0 ' . Page 25 of 34 . 7/27/2006 7:18:44AM. - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location ITest Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 758 5/31/06 CF West Lot 14 14 - 170.0 06 90.6 104.0 33.8 17.0 87 RTON 758A 758A 5/31/06 CF West Lot 14 14 170.0 06 95.1 104.0 27.4 17.0 91 759 '6/1/06 CF West Lot lO 10 220.0 01 118.4 126.0 11.8 11.0 94 760 6/1/06 CF West Lot 10 10 221.0 01 116.7 126.0 13.4 11.0 93 761 6/1/06 CF Conference Facility . 1 220.0 09 116.5 121.5 13.8 12.0 96 762 6/1/06 CF Conference Facility 1 ' 221.0 09 112.8 121.5 12.7 12.0 93 RTON762A 762A 6/2/06 CF Conference Facility 1 . 221.0 09 115.8 121.5 12.4 12.0 95 763 6/1/06 CF Conference Facility 1 219.0 01 119.7 126.0 11.8 11.0, 95 764 6/1/06 CF Conference Facility 1 223.0 09 114.6 121.5 12.2 12.0 94 RT ON 764A 764A 6/2/06 CF Conference Facility 1 223.0 09 116.7 121.5 11.9 12.0 96 765 6/1/06 CF West Lot 10 10 221.0 02 121.3 134.5 10.2 8.5 90 766 6/1/06 CF South Lot 10 10 221.5 02 120.7 134.5 11.5 8.5 90 767 6/1/06 CF South Lot 10 • 10 222.0 01 116.8 126.0 12.6 11.0 93 768 6/1/06 CF West Lot 14 14 172.0 06 93.8 104.0 27.3 17.0 90 769 6/1/06 CF West Lot 14 14 172.0 06 94.2 104.0 25.0 17.0 91 770- 6/2/06 CF South Lot 10 10 - 223.0 09 112.7 121.5 14.6 12.0 93 771 6/2/06 CF South Lot 10 10 223.0. 03 117.2 130.0 11,2 8.5 90 772 6/2/06 CF West Lot lO 10 222.5 01 114.8 126.0 12.7 11.0 ' 91 773 6/2/06 CF Southeast Lot 1 1 224.0 09 113.5 121,5 12.6 12.0 93 774 6/5/06 CF Southeast Lot 1 1 223.0 09 111.7 121.5 13.9 12.0 92 775 6/5/06 CF West Lot 16 16 224.0 02 121.4 134.5 9.6 8.5 90 776 6/5/06 CF West Lot lO 10 223.0 09 114.2 121.5 12.3 12.0 94 777 6/5/06 CF West Lot 10 - 10 224.0 03 118.3 130.0 10.4 ' 8.5 91 778 6/5/06 CF South Lot 10 10 224.0 01 115.6 126.0 13.1 11.0 92 779 6/6/06 CF Conference Facility 1 224.0 09 116.7 121.5 13.1 12.0 96 780 6/6/06 CF Conference Facility 1 224.0 09 115.2 121.5 12.8 12.0 95 781 6/6/06 CF West Lot lO 10 225.0 07 114.6 122.5 116 12.0 94 782 6/6/06 CF South Lot 10 . 10 224.5 02 121.7 134.5 11.6 8.5 90 783 6/6/06 CF South Lot l0 10 225.0 01 116.8 126.0 13.4 11.0 93 784 6/6/06 CF West Lot lO 10. 224.0 08 109.5 118.5 . 16.3 14.0 92, 785 6/6/06 CF Conference Facility, 1 225.0 08 115.2 118.5 15.7 14.0 97 786 6/6/06 CF South Lot 1 1 225.0 08 112.7 118.5 16.2 14.0 95 Project Number: 040575005 Project Name: Grand Pacific Carlsb Mew Project Location: Carlsbad Client: . 0 Page 26 of 34 7/27/2006 7:18:44AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test '' Test Test Location . Test Soil Dry Density Moisture (%) Relative (%) No. ' Mate Of. . •. Lot # Elev(ft) Type Field Max Field Ont. ComDaction Remarks 787 6/7/06 CF South Lot 10 788 6/7/06 CF Conferene Facility 789 6/7/06 CF West Lot 10 790 6/7/06 CF West Lot 10 791 6/7/06 CF West Lot 10 792 6/7/06 CF West Lot 16 793 6/7/06 CF Conference Facility, 794 6/8/06 CF Subdráin Tightline Lot 15 795 6/8/06 CF Subdram Tightline Lot 15 796 6/8/06 CF East Lot 11 797 6/8/06 CF South Lot 16 798 6/8/06 CF South Lot 10 798A 6/8/06. CF South Lot 10 799 6/8/06 CF. South Lot 10 800 6/9/06 CF West Lot 16 - 801 6/9/06 CF South Lot 16 802 6/9/06 CF West Lot 16. 803 6/13/06 CF Conference Facility 804 6/13/06 CF Conference Facility 805 6/13/06 CF Conference Facility 806 6/13/06 CF . South Lot 1 807 6/13/06 CF South Lot 10 808 6/13/06 CF Lot 5- 809 6/13/06 CF Lot 5 810 6/13/06 CF North Lot 5 811 6/13/06 CF North Lot 5 812 - 6/13/06 CF North Lot 813 6/13/06 CF Lot 814 6/14/06 CF West Lot 14 815 6/14/06 CF West Lot 14 816 6/15/06 CF West Lot 14 816A 6/21/06 CF West Lot 14 Project Number: 040575005 Project Name: Grand Pacific Carlsb Project Location: Carlsbad Client: 0 - 10 225.5 03. 117.9 130.0 10.8 8.5 91 1 224.0 09 117.2 121.5 13.0. 12.0 . 10 ' 225.0 09- 115.6 121.5 13.2 12.0 ' 95 10 225.5 02 121.8 134.5 '10.7 8.5 91 10 p225.5 03 119.2 130.0 11.3 8.5- 92 - 16 227.0 01 116.8 126.0 12.6 11.0 93 . -1 ' 225.0 01 - - 119.7 126.0 12:2 11.0 • 95 15 212.5 01 117.6 126.0. 12.4 11.0 93 15 211.0 02 121.4 134.5 13.6 8.5 -90 11 . 227.0 01 116.8 126.0 14.2 11.0 93 S 16 227.5 01 117.2 126.0 12.7 1.1.0 93 10 226,0' 01 116.2 126.0 12.4 11.0 . 92 RT0N798A 10 226.0 01. 119.3 126.0 - 11.9 11.0 95 10 225.0 01 120.7 126.0 12.0 11.0 96 16 - 228.0 01 '1156 126.0 13.7 11.0 . - 92 - 16 229.5 01 : 114.8 • 126.0 11.8 -11.0 91 16 - 229.0 01 117.2 126.0 12.5 11.0 93 1 227.0 01 122.4 126.0 11.3 11.0 . 97 1 227.5 01 120.8 126.0 :12.2 11.0 - 96 1 228.5 01 119.6 126.0 11.9 11.0 95 - 1 230.0 01 117.1 126.0 13.5 11.0 93 - 10 . 230.0 01 115.7 126.0 12.4 11.0 - 92 5 187.0 .01 116.3 126.0 11.5 11.0 92 5 187.0 03 119.5 130.0 9.8 8.5 . 92 5 183.0 01 118.6 126,0 13.4 11.0 94 5 182.0 01 114.9 126.0 12.6 '11,0 91 • . 5 184.0 01 . 117.2 126.0. 13.1 11.0 93 5 183.5 .01 - 119.3 126.0 11.7 11.0 95 14 174.0 06 94.0 104.0 30.2 . 17.0 - 90 14 174.0 06 - 93.3 104.0 28.6 17.0 14 175.0 10 83.8 98.0 33.8 . 24.0 - 86 RTON 816A 175.0 10 89.5 - 98.0 33.0 24.0, 91 Pae27of34 •. S ' • 8/1/2006 9:59:03AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) • No. Date Of . . Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks 995 7/25/06 FG Conference Facility . 1 0.0 01 120.0. 126.0 7.0 - 11.0 95 996 7/25/06 FG Conference Facility . 1 O.O 01 123.8 126.0 9.9 11.0 98 997 7/25/06 FG Conference Facility .1 0.0 01 122.7 126.0 6.9 11.0 97 998 7/25/06 FG Conference Facility 1 0.0 01 122.4 .126.0 11 8 A1 0 97 ' 999 7/25/06 FG Conference Facility 1 0.0 01 120.1 126.0 12.1 11.0- 95 - 1000 7/25/06 FG Conference Facility . l 0,0 - 01 123.2 126.0 - 10.4 11.0 . 98- 1001 7/25/06 FG Conference Facility 1 0.0 01 123.7- 126.0 '7.9 11.0 . 98 1002 7/25/06 FG Conference Facility 1 0.0 09 110.0 121.5 8.0 12.0 98 1003 7/25/06 FG Conference Facility 1 0.0 09 119.5 121.5 7.9 12.0 98 * 1004 7/25/06 CF Lot Slope . 4 188;0 03 118.6 130.0 10.3 . 8.5 91 1005 7/25/06 CF Lot Slope .. • . 4 188.0 03 119.3 130.0 10.1 8.5 92 1006 7/25/06 CF Lot Slope 4 190.0.1 03 1169 1300 111 85 90 1007 7/25/06 SF L6t4 Slope 4 1850 03 1178 1300 122 85 91 1008, 7/25/06 FG Lot 4 0.0 02 . 122.6 134.5 6.4 8.5 91 1009 7/25/06 FG Lot 5 5 0.0. 02 122 9 134 .5,. 7.2 8.5 91 -• -_•4 * .. . - .*•• - *-.-* . .: -. .,- 4 Project Number 040575005 Project Name Grand Pacific Carlsb Project Location Carlsbad Client 0 Page 34 of 34 7/27/2006 7:1 8:44AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS - - Test Test Test . Location 'Test Soil Dry Density Moisture (%) Relative (%) No. Date Of . . Lot # Elev (ft) Type -Field Max Field Opt. Compaction Remarks • 817' 6/15/06 CF West Lot 14 - 14 176.0 10 79.4 98.0; 34.5 24.0 81 RTON8I7A 817A 6/21/06 CF West Lot 14 ' .14 176.0 10 88.6 98.0 34.4 24.0, 90 818 6/15/06 CF West Lot 14 14 177.0 10 82.7 98.0 32.6 24.0 . 84 . RT ON 818A 818K 6/21/06 CF West Lot 14 14 177.0 10 .87.9 98.0 36.5 24.0 90 819 '6/15/06 CF West Lot ". 6 173.0 .01 . 115.7 126.0 13.8 11.0 92 820 6/15/06 CF West Lot 6 6 175.0 01 113.8 126.0W 14.2 11.0 90 821 6/15/06 CF Subdrain lightline Lot l5 15 214.0 03 '118.9 130.0 10.5 -. 8.5 91 822" 6/15/06. CF Subdrain Tightline Lot 12 12 219.0 02 120.7 134.5 9.7 8.5 90 823 6/15/06 CF ' Subdrainlightline.Lot 12 . '12, 221.0 02 122.4 134.5 10.8 8.5 91 824 6/16/06 CF Northwest Lot .5 185.0 . 02 .125.4 134.5 9.8 8.5 93 825 6/16/06 CF. Lot ' . 5 186.0 02 . 121.5 134.5 9.2, 8:5 90 .826 3/16/06 CF Northwest Lot - - 5 185.0 02 . 125.2 134.5 9.6 8.5 93 - 827 6/16/06 CF Subdrain Resort Dr 15+60 .12 226.0 02 . 121.7 134.5 10.1 8.5, ' 90 828 6/16/06 CF Subdrain Tightline Lot 1 ' 1 228.0 02 124.0 134.5 8:2 ' 8.5 92 ' 829. 6/16/06 CF 'Subdrain'Tightline Lot 1 , . . 1- 227.0 02 121.5 134.5 11.5 8.5 ' . 90 830 .6/19/06 'CF Lot . ' 5 189.0 02 122.0 134.5 .9.5 . 8.5 91 831 6/19/06 CF Lot .. 5 . 191.0 ' 02 126.3 134.5 11.5 .8.5 94 '. 832 .6/19/06' CF . LotS .. 5 ' 191.0 02 . 126.3 134:5 , 11.2' 8.5 w 94 - 833 6/19/06 'CF . Southeast Sl6pe Lot 9 . 9' 182.0 01 11.3.6 126.0 . 10.0 11.0 90 ' 834. 6/19/06 CF Lot 16 ' , . 16 233.0 02 123.3 134.5 10.4 8.5 92 835 . 6/19/06 CF Lot! . 1 ' ' 230.0 .03 114.4 130.0 10.2. 8.5 88. RI ON 835A 835A 6/20/06 CF South Lot I . - . 1 - 230.0 01 . 119.9 126.0 9.8 11.0 . 95 836 .6/19/06 . CF South Lot 10 10 233.0 01 110.6 126.0 10.4 11.0 88 'RTON 836 836A 6/20/06 CF South Lot 10 ' 10 . - 234.0 .02 - 126.0 134:5 9.6 , 8.5 94 837 6/20/06 CF South Lot 10 . 10 234:0 02 ' 124.8 134.5 9.8 8.5 93 838 6/20/06 CF South Lot I .' 1 230.0 01 . 123.0. 126.0 .10.4 11.0 . 98 839 6/20/06 CF Southeast Slope Lot 9 ' ' . 9 , 276.0 01 113.8 126.0 9.3 ' 11.0 90 840' 6/20/06 CF Southeast Slope Lot 10 10 236.0 09 ' 110.3 121.5 14.0 12.0 , 91 841 6/20/06, CF * Lot 9 ' . . 235.0 09 , 114.2 121.5 . 12.3 12.0 94 842 6/20/06 CF East Slope Lot 9 ' .9%280.0 09 112.2 121.5 7.4 12.0 92 843 6/20/06 ' CF East Slope Lot 9 ., ' '9 , 279.0 09 111.0 121.5 7.9 12.0 91 . 844 6/21/06 'CF Lot ' - .9 283.0' 01 .115.0 126.0 13.1 11.0 . 91 Project Number: 040575005 , . ' ' . .• . - ' . - ' Project Name: . Grand Pacific Carlsb 'Project Location: Carlsbad Client: . 0 Page 28 of 34 7/27/2006 7:I844AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS - Test Test Test Location . Test Soil Dry Density Moisture (%) - Relative (%) No. Date Of - . Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 845 6/20/06 CF. Lot - 6 277.0 01 116.8 126.0 11.3 11.0 93 846 6/20/06 CF Lot 6 180.0 03 117.9 130.0 10.8 8.5 91 847 6/21/06 CF West Lot 14 14 278.0 10 88.8 98.0 36.1 24.0 91 848 6/21/06 CF West Lot 14 14 178.0 10 88.2 98.0 36.2 24.0 90 849 6/21/06 CF West Lot 14 14 276.0 10 89.0 98.0 38.5 24.0 91 850 6/21/06 CF Lot 6 175.0 02 122.0 134.5 9.1 8.5 91 851 6/22/06, CF West Lot 14 14 177.0 10 88.3 98.0 32.0 24.0 90 852 6/22/06 CF West Lot 14 - 14 178.0 10 88.7 98.0 33.0 24.0 91 853 6/22/06 CF •Lot 6 . 178.0 03 119.1 130.0 10.9 8.5 92 854 6/22/06 CF Lot 6 1800 03 1186 1300 102 85 91 855 6/22/06 CF West Lot 14 14 1800 10 879 980 338 240 90 856 6/22/06 CF. West Lot 14 14 179.0 10 88.4 98.0 32.6 24.0 90 857 6/22/06 CF West Lot 14 14 179.0 10 883 98.0 33.0 24.0 90 858 6/23/06 SF Lot 10 10 233.0 .01 . 112.8 126.0 10.6 11.0 90 859 6/23/06 CF Lot 10 . 10 232.0 01 114.4 126.0 10.8 11.0 91 860 6/23/06 CF Lot 10 10 234.0 01 113.6 126.0 10.9 11.0 90 861 6/23/06 CF Conference Facility . 10 230.0 03 123.0 130.0 9.3 8.5 95 862 6/23/06 CF Conference Facility . 1 230.0 09 116.3 121.5 11.3 12.0- 96 863. 6/23/06 CF Lot 10 Slope 10 210.0 08 110.2 118.5 13.3 14.0 93 864 6/26/06 CF Conference Facility 10 231.0 03 123.3 130.0 12.0 8.5 95 865 6/26/06 CF Conference Facility - . 1 231.0 03 125.0 130.0 10.9 8.5 96 866 6/26/06 CF Lot . 9 184.0 08 .107.6 A18.5 12.9 14.0 91 -- 867 6/26/06 CF Lot 9 . . 9 184.0 01 114.0 126.0 13.6 11.0 90 868 6/27/06 CF West Lot 14 14. 180.0 05 97.2 • 107.5 26.1 16.5 90 869 6/27/06 CF West Lot 14 14 280.0 05 98.0 107.5 27.1 16.5 91 870 6/27/06 CF West Lot 14 14 281.0 10 91.8 98.0 28.5 24.0 94 871 6/27/06. CF Lot I . I . 233.0 02 120.4 134.5 14.8 8.5 90 .. S 872 6/27/06. CF Lot 10 Slope . 10 212.0 08 108.4 118.5 14.5 14.0 91 873 6/28/06 CF Lot 10 Slope 10 214.0 01 106.9 126.0 9.1 11.0 85 RI ON 873A 873A 6/28/06 CF Lot 10 Slope . 10 214.0 08 104.4 118.5 13.9 . 14.0 88 RI ON 87313 873B 6/28/06 CF Lot 10 Slope 10 214.0 01 110.6 126.0 11:2 11.0 88 RI ON 873C 873C 6/28/06 CF - Lot 10 Slope - 10 214.0 08 109.4 118.5 14.1 14.0 92 . Project Number: 040575005 . Project Name: Grand Pacific Carlsb Project Location:. Carlsbad Client: 0 Page 29 of 34 . 7127/2006 7-JR-44AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test . Soil Dry Density Moisture (%) Relative (%) No. Date Of . - Lot# Elev(ft) Type Field Max Field Opt. Compaction Remarks 874 6/28/06 CF Resort Drive Sta 24+00 12 226.0 09. 112.6 121.5 10.0 12.0 93 875 6/28/06 CF Lot 10 Slope 10 217.0 08 • 106.6 118.5 14.4 14.0 90 876 6/29/06 CF Lot 12 South Slope 12 201.0 02 121.3 134.5 9.5 8.5 90 877 6/29/06 CF Lot 9 Southeast Slope 9 186.0 08 105.8 118.5, 3.7 14.0 89 RT ON 877A 877 A 6/29/06 CF Lot 9 Southeast Slope 9 186.0 08 109.0 118.5 10.0 . 14.0 92 878 6/29/06 . CF Lot 9 Southeast Slope ., 9 ' 185.0 01 , 113.9 126.0 13.0 11.0 90 879 '6/29/06 CF Lot 12 South Slope 12 203.0 02 . 120.7 134.5 10.9 8.5 90 880 6/29/06 SF . Lot 9 South Slope ' 9 220.0 09 109.5 121.5 8.7 12.0 90 881 6/29/06 CF Lot 12 South Slope 12 205.0 02 122.3 134.5 9.2 8.5 . 91 882 6/29/06 SF Lot 15 South Slope , 15 222.0 03 118.9 130.0 9.0 8.5 '91 883 6/29/06 CF Lot 9 South Slope ' . 9 187.0 08 106.1 118.5 15.2 14.0 90 884 6/29/06 CF Lot 12 South Slope .' . .. 12 207.0 02 121.2 . 134.5 9.1 8.5 .90 885 6/29/06 CF Lot South Slope . 9• 188.0 08 106.4 118.5 15.4 14.0 90 :886 6/29/06 CF Lot 12 South Slope 12 , 211.0 03 116.9 130.0 11.9 8.5 90 887 6/30/06 CF Lot 12 South Slope ' 12 216.0 09 109.6 121.5., 12.4 12.0 90,' 888- 6/30/06 CF Lot Southeast Slope 9 187.0 08 106.4 . 118.5 8.5 14.0 90 889 6/30/06 CF Lot 9 Southeast Slope 9 187.0 08 106.9 ,118.5 12.5 14.0 ' 90 890 6/30/06 CF West Lot 14 . 14 188.0 08- 111.0 118.5 13.5 14.0 94 891 '6/30/06 CF Lot 12 South Slope 12 213.0 03 - 117.6 130.0 10.7 8.5 90 892 6/30/06 CF West Lot 14 ' 14 181.0 07 110.9 122.5 16.8 12.0 91 893 6/30/06 CF West Lot 14 14 182.0 07 110.8 122.5 16.8 12.0 90 894 6/30/06 CF West Lot 14 . . ' 14' ' 182.0 07 ' 109.8 122.5 16.4 12.0 90 895 7/5/06 CF Lot 9 Southeast Slope ' 9 ' 191.0 08 106.1 . 118.5 18.8 '14.0 ' 90 896 7/5/06 CF Lot 9 Southeast Slope' ' 9 190.0 , 08 1 10;4 118'.5 14.5 14.0 , 93 •' 897 7/5/06 CF Lot 9 Southeast Slope . 9 . 188.0 08 110.4 118.5 .15.3 14.0 93 898 7/5/06 CF West Lot 14 14 ' 283.0 07 113.3 122.5 .12.3 12.0 . 92 899 7/5/06 CF West Lot 14 V ' . 14 '183.0 07 110.5 ' 122.5 162 12.0 90 ' 900 7/5/06 - SF Lot I South Slope 1 230.0 09 113.1 121.5 ' 8.2 ' 12.0 93 901 7/5/06 ' SF Lot'! Southeast Slope 1 230.0 09 113.6 ' 121.5 11.5 12.0 93 902 7/5/06 SF Lot 10 South Slope ' , 10 ' 223.0 03 . 117.6 130.0 10.6 8.5 90- 903 7/7/06 SF Lot 10 South Slope ' , 10 222.0 08 99.6 118.5 16.8 14.0 84 RI ON 903A 903A 7/13/06 SF Lot 10 South Slope .. , - - 10 222.0 08 106.6 118.5 13.8 14.0 90- Project Number: 040575005 Project Name: Grand Pacific Carlsb V , Project Location: Carlsbad Client: - - 0 ' V Page 30 of 34 V . 7/27/2006 7:18:44AM - - - - - - - -. - - - - - - - - - - - ' SUMMARY OF FIELD DENSITY TESTS - Test Test Test Location Test Soil Dry Density Moisture (%)' Relative (%) No. Date Of - Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 904 7/6/06 CF West Lot 14 14 184.0 02 121.4 134.5 11.0 8.5 90 905 7/6/06 CF West Lot 14 14 184.0 03 117.5 130.0 12.6 8.5 90 906 7/6/06 CF West Lot 14 14 184.0 07 106.7 122.5 16.9 120 87 RTON 906A 906A 7/6/06 CF West Lot 14 14 184.0 03 116.7 130.0 12.5 8.5 90 907 7/6/06 CF Lot ' 6 . 186.0 01 113.8 126.0 11.2 11.0 90- 908 7/7/06 CF West Lot 14 14 185.0 02 122.9 134:5 10.4 8.5 91 909 7/7/06 CF Lot 6 6 1'87.0 02 121.6 134.5 11.2' 8.5 . 90 910 7/7/06 CF West Lot 14 . 14 187.0 '02 125.1 134.5 9.0 8.5 93 911 7/7/06 CF West Lot 14 '. 14 188.0 02 120.4 134.5 9.6 8.5 . 90 912 '7/7/06 CF West Lot 14 14 187.0 02 121.0 134.5 9.5 ' 8.5 90 913' 7/7/06 CF West Lot 14 - 14 186.0 02 121:6 134.5 10.4 8.5 90 914 7/7/06. CF Lot Southeast Slope 9 192.0 09 110.8 121.5 10.8 12.0 91 915 7/7/06 CF Lot9 Southeast Slope 9 190.0 08 107.8 118.5 14.6 14.0 91 916 ' 7/10/06' CF, Lot 9 Southeast Slope 9 ' 190.0 01 114.9 126.0 11.1 11.0 91 917 ' 7/10/06 CF Lot 9 Southeast Slope . . 9 , . 193.0 01 112.9 126.0 14.5 11.0 90 918 7/10/06 CF Lot 9 Southeast Slope . 9 .193.0 01 115.6 126.0 9.1 11.0 92 919 7/11/06 CF Hotel iBasement 1 217.0 02 120.5. 134.5 11.2 8.5 ' 90 920 7/11/06 CF Hotel 1 Basement . 1 213.5 02 122.1 ' 134.5 9.5 ' 8.5 91 921 7/11/06 CF Hotel 1 Basement . 1 . 211.0 02 . 121.9 134.5 12.2 8.5 91 922 7/11/06 CF Lot 9 Southeast Slope 9 194.0 09 . 111.9 121.5 12.2 12.0 92 923 7/11/06 CF . Lot 9 Southeast Slope 9 194.0 '09 112.2 121.5 . 12.0 12.0 92 924 - 7/11/06 CF Lot 9 Southeast Slope - . 9 194.0 09 112.7 121.5 '14.2 . 12.0W , 93 925 . 7/12/06' CF Hotel! Basement. , 1 214.0 02 .123.9 134.5 13.2 8.5 92 926 7/12/06 CF - Hotel I Basement 1 220.0 02 122.4 134.5 11:4 : 8.5 91 927 7/12/06 CF ' Hotel I Basement 1 . -216.0 '02 126.9 134.5 10.6 8.5 94 928 7/12/06 CF Lot 1 North Driveway ' 1 228.0 09 ' 115.4 121.5 10.9 . 12.0 95 929 7/12/06 CF Hotel! Basement . 1 219.0 02 121.0 134.5 11.1 8.5 90 930 7/12/06 CF . Hotel I Basement 1 216.0 02 . 121.1 134.5 10.2 8.5 .90 931 7/12/06 CF Hotell Basement 1 213.0 02 122.3 134.5 10.6 8.5 91'. 932 7/12/06 CF Lot 12 Slope 12 220.0 01 , 113.5 126.0 10.9 - 11.0 ' 90 933 7/13/06 CF Lot 9 Southeast Slope 9 195.0 01 114.9 126.0 12.4 11.0 91 934 7/13/06 CF Lot 9 Southeast Slope ' 9 195.0 03 122.0 130.0 9.5 8.5 94 Project Number: 040575005 Project Name: Grand Pacific Carlsb Project Location: 'Carlsbad - - - Client: - . 0 Page 31of34 . ' . 7/27/2006 7:18:44AM SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of .. . Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 935 7/13/06 CF Lot 9 Southeast Slope 9 195.0 01 113.5 .126.0 9.4 11.0 90 936 7/13/06 FG Building Pad Lot 10 . 10 0.0 07 115.4 122.5 8.6 12.0 94 937 7/13/06 FG Building Pad Lot 10 10 - 0.0 02 128.8 134.5 10.6 8.5 96 938 . 7/13/06 FG Building Pad Lot 10 10 0.0 02 123.6 134.5 10.4 8.5 92 939 7/13/06 FG Building Pad Lot 10 10 0.0 09 110.6 121.5 9.0 12.0 91 940 7/13/06 CF Hotel 1 Basement . 1 219.0 02 118.7 134.5 10.9 8.5 88 RT0N940A 940A 7/13/06 CF Hotel 1 Basement 1 219.0 02 126.1 134.5 12.5 8.5 94 941 7/13/06 CF Hotel 1 Basement 1 217.0 02 122.8. 134.5 9.4 8.5 91 942 7/13/06 CF Hotel 1 Basement 1 213.0 02 121.1 134.5 -10.6 8.5 90 943 7/13/06 CF Hotel 1 Basement 1 212.0 01 114.9 126.0 12.2 11.0 91 944. 7/14/06 CF Hotel 1 Basement . 1 220.0 01 113.6 126.0 13.4 -11.0 90 945 7/14/06 CF Hotel I Basement 1 216.0 02 123.9 134.5 12.2 8.5 92 946 7/14/06 CF Hotel I Basement 1 214.0 01 109.3 126.0 9.3 11.0 87 RI ON 946A 946A 7/14/06 CF Hotel 1 Basement 1 214.0 03 118.4 130.0 10.2 8.5 91 947 7/14/06 FG Sales Building Pad .11 0.0 02 120.9 134.5 10.1 8.5 90 948 7/14/06 SF Lot 12 Southwest Slope 12 .215.0 '0 1 . . 113.3 126.0 11.0 11.0 90 949 7/17/06 CF Hotel 1 Basement . I 220.0 01 116.4 126.0 12.5 11.0 92 950 7/17/06 CF Hotell Basement - 1 219.0 01 115.6 126.0 14.6 11.0 92 951 7/17/06 CF Hotel 1 Basement I 217.0 03 116.9 130.0 14.9 8.5 90 952 7/17/06 CF . Hotel 1 Basement 1 219.0 02 120.7 134.5 10.1 8.5 90 953 7/17/06 CF Hotel I Basement 1 220.0 02 121.0 134.5 10.4 8.5 90 954 7/18/06 CF Hotel 1 Basement 1 221.0 01 115.0 126.0 13.7 11.0 91 955 7/18/06 CF Hotel I Basement 1 . 221.0 01 113.3 126.0 12.3 11.0 90 956 7/18/06 CF Hotel I Basement I 220.0 03 '117.6 130.0 13.7 8.5 90 957 7/18/06 CF Hotel 1 Basement 1 222.0 08 109.1 118.5 16.5 . 14.0 92 958 7/18/06 CF Hotel 1 Basement 1 221.0 03 118.0 130.0 12.4 8.5 91 959 7/18/06 CF Hotel 1 Basement 1 220.0 02 121.7 134.5 11.6 8.5 90 960 7/19/06 CF Hotel 1 Basement - 1 220.0 03 117.9 130.0 12.0 8.5 91 961 7/19/06 CF Hotel I Basement 1 222.0 01 113.3 126.0 10.7 11.0 90 962 7/19/06 FG Sales Building Pad 11 0.0 02 121.1 134.5 9.0 8.5 90 963 7/19/06 FG Sales Building Pad 11 0.0 02 .121.0 134.5 6.5 8.5 90 964 7/19/06 CF Hotel 1 Basement 1 223.0 01 115.4 126.0 12.3 11.0 92 Project Number: 040575005 ' Aeaw Project Name: Grand Pacific Carlsb ' Project Location: Carlsbad Client: . 0 ' Page 32 of 34 7/27/2006 7:18:44AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. - Date Of . Lot # E!ev (ft) Type Field Max Field Opt. . Compaction Remarks 965 7/19/06 CF. Hotel I Basemênt 1 . 223.0 03 117.7 130.0 7.5 8.5 91 966 7/19/06 CF Hotel 1 Basement 1 223.0 03 118.1 130.0 9.2 8.5 91 967 7/20/06. CF Hotel 1 Basement 1 224.0 02 120.9 134.5 9.1 8.5 90 968 7/20/06 CF Hotel 1 Basement . 1 222.0 09 113.8 121.5 10.0 12.0 94 969 7/20/06 CF Hotel 1 Basement . 1 223.0 09 112.6 121.5 11.2 12.0 93 970 7/20/06 CF Hotel 1 Basement . 1 224.0 01 115.0 126.0 9.3 . 1L0 91 971 7/20/06 CF South Lot 6 6 212.0 02 115.2 134.5 6.8 •8.5 86 RT ON 971A 971A 7/20/06 CF : South Lot 6 . 212.0 02 120.8 134.5 9.0 8.5 90 972 7/20/06 FG Lot Parking Lot . 5 0.0 03 117.0 130.0 8.0 8.5 90 973 7/20/06 FG Lot Parking Lot . 5 0.0 02 . 131.0 134.5 9.5 8.5 97. 974 7/20/06 FG Lot Parking Lot . 5 . 0.0 02 124.9 134.5 9.5 8.5 93 975 7/20/06 CF East Lot 1 1 . 228.0 03 105.2 130.0 8.6 8.5 81 RT ON 975A 975A 7/20/06 CF East Lot 1 1 228.0 03 - 121.2 .130.0 9.4 . 8.5 . 93 976 .7/21/06 SF East Lot I . 1 . 227.0 03 117.3 130.0 10.0 8.5 90 977 7/21/06 CF East Lot 1 1 229.6 :03 119.3 130.0. 10.6 8.5 92 978 7/21/06 FG Lot 1 0.0 03 117.7 130.0 8.2 8.5 91 979 7/21/06 FG Lot . 1 0.0 03 118.6 130.0 9.4 8.5 91 980, 7/21/06 FG . Lot 6 . . . . 1 0.0 03 119.1 130.0 .8.7 - 8.5 92 981 7/21/06 FG Lot 14 . 14 0.0 03 118.3 130:0 7.8 8.5 91 982 7/24/06. CF Lot I - 1 230.0 03 118.5 .130.0 9.5 8.5 91 983 7/24/06 CF Lot Key 4 178.0 03 . 117.1 130.0 10.4 8.5 9p 984 7/24/06 CF Lot 4Key . 4 - 183.0 03 118.2. .130.0 11.4 . 8.5 . 91 985 . 7/24/06 CF Lot Key . . 4 182.0 03 118.8 1300 11.6 8.5 91 - . 986 7/25/06 FG Hotel 1 Basement 1 0.0 02 124.9 134.5 9.4 8.5 93 -987 7/25/06 FO Hotel 1 Basement 1 0.0 02 121.3 .134.5 8.2 8.5 90 988 7/25/06 FG Hotel I Basement 1 0.0 02 122.5 134.5 9.2 8.5 91 989 7/25/06 .FG Hotel 1 Basement 1 0.0 01 117.9 126.0 8.8 11.0 . 94 990 7/25/06 FG . Hotel 1 Basement . I 0.0 01 116.8 .126.0 8.0. 11.0 93 991 7/25/06 FG Hotel 1 Basement I . 0.0 01 115.1 126.0 7.5 11.0 91 992 7/25/06 FG Hotel I Basement . 1 0.0 01 . 117.8 126.0 8.6 11.0 93 993 7/25/06 CF Lot Slope 4 187.0 02 124.1 .134.5 9.2 8.5 92 994 7/25/06 CF Lot Slope 4 185.0 02 122.3. 1345 9.0 8.5 91 Project Number: . 040575005 • . . . . . Project Name: Grand Pacific Carlsb Project Location: Carlsbad - Client: . - 0 . -- Page 33 of 34 . . - . • . • - . • 7/27/2006 7:18:44AM Sample No Sample Description Expansion Index Expansion Potential* MD-4 Brown lean CLAY 110 High MD-5 Green heavy CLAY 154 Very High MD-6 Green heavy CLAY 254 Very High 1 040575-005 I APPENDIX C Laboratory Testing Procedures and Test Results I Expansion Index Tests The expansion potential of selected matenals'was evaluated by the Expansion Index Test, ASTM D4829. Specimens are molded under a giveir compactive energy to * approximately 50 percent saturation The prepared 1-inch thick by 4-inch "diameter specimens are I loaded to an equivalent 144 psf surcharge and are inundated with water until volumetric equilibrium is reached The results of these tests are presented in the table below I * Based on the 2001 edition of the California Building Code Table 18-I-B I Soluble Sulfates The soluble sulfate contents of selected samples were determined by standard geochemical methods The test results are presented in the table below - Sample Location Sample Description Sulfate Potential Content Degree of (%) Sulfate Attack* Northeast Side of Building Pad Pale yellow-brown silty less than Negligible 0.015 Southwest Side of Building Pad Pale yellow-brown silty • less than Negligible 0.015 i - - •. . :- •. I 040575-005 .1: •:- APPENDIX C (continued) I -• Mximüm Density Tests: The maximum-dry density and optimum moisture- content of typical materials were determined in accordance with ASTM Test Method D1557. The results of these 4 E tests are presented in the table below: .. . . . Sample - Maximum Dry Moisture Optimum Number Sample Description Density 'E 'Content(%) MD-1 Yellow-brown silty SAND : 126.0 11.0 MD-2 Dark-brown silty SAND ; i 134:5 8.5 - MD-3 Dark-brown silty SAND- - 130.0 8.8 - MD-4 Brown silty/clayey SAND * ' 115.5 16.5 MD-5 Olive-brown fat CLAY. .107.5 -. . 16.5 MD-6 Gray-brown sandy CLAY - - - 104.0 17.0 - MD-7 Gray-brown clayey SAND, 122.6 12.0 MD-8 : Yellow-brown silty, clayey SAND 118.5 14.0 MD-9 Red-brwri silty SAND -121.5 12.0 MD-10 Greengray heavy CLAY - . 98.0 - .24.0.