Loading...
HomeMy WebLinkAboutCT 03-02; CARLSBAD RANCH PA 5; PAD CERTIFICATION; 2014-07-16C'Th3-o2 Geotechl nkai Engin eering Construction thspection Materials Testing Envfronuidntal Otncr LorviloNs July 16, 2014 SDiuo hIpRE%t Cot vrt 6295 Ferris Square Suite C San Dego,CA 92121 Tel: 858.537.3909 Fax: 858.537.3990 MTGL Project No: 1916A09 MTGL Log No: 14-561 Grand Pacific Resorts, Inc. 5900 Pasteur Court, Suite 200 Carlsbad, California 92008 Attention: Mr. Houston Arnold Subject: BUILDING PAD CERTIFICATION - VILLA 59 Marbrisa Resorts Carlsbad, California ORANGE Coti'T CORPORATE BRANd, 2992 E, U PlIr.3 Avenue Suite A Anaheim. CA 92806 Tel: 714.632.2999 Fax: .714.632.2974 Dear Mr. Arnold: Per your request, we have prepared this letter to certify that remedial grading for Villa 59 building pad at the Marbrisa Resorts was accomplished in general accordance with the approved plans, specifications and geotechnical investigation. I7'LVfl E\IPiRh Remedial grading consisted of over-excavation of five feet of soil from finished pad 14467 Meridian Purtway elevation. The excavated soils were then moisture conditioned and compacted to a Building 2A Riveide.CA 92518 I minimum of 95 percent of the maximum dry density as determined by ASTM B 1557. Tel: 951653,4999 Fav, 431653.4606 I We observed grading at the site from July 1 to July 10, 2014. Based on our observations and the results of our tests the building pad construction complies with INDIO the project approved documents. 44917 Golf Centcr Piwy Suite liid, CA 92201 We appreciate this opportunity to be of continued service to you. Should you have any questions regarding the information contained herein, please contact us at your earliest Ni~.760 342.4525 convenience. OC/L-Vlit..'wExlriutE D!SPTCU I Respectfully submitted, . 800,491 2990 1 MTGL, Inc. DuCo DISPY%TCII 838:844 5060 Sam E. Valdez, RCE 56226, ROE 2813 Vice President Chief Engineering CAL www,t2linc.crn EXCEL ENGINEERING LEV1N & DENTINO INC. O.B.A. EXCEL ENGINEERING' ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118 'Fax 745-8134 July 15, 2014 RE: Certification of Pad Grade for Villas 59 and 60 of the City of Carlsbad Drawing No. 428- 9G, Project No. CT 03-02, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site - Phase 2 To whom it my concern, Excel Engineering performed a field survey on July 14, 2014 to confirm finish pad grade for the referenced site. A minimum of 9 shots were taken and the finished pad grade is as follows: Villa Pads Average Pad Elevations Design Pad Elevations 59 190.11 190.10 60 190.01 189.96 The maximum deviation from design to finish pad for said pad was found to be 0.09'. The pad is in substantial conformance with the approved grading plan. If you have any further questions or need any additional information do not hesitate to call. Sincerely, Michael D. Levin, PLS Q:\I 1\I 10O8Docs\PAD CEflTSPAD CERT VILLAS 5960 . 07•1520144cc