Loading...
HomeMy WebLinkAboutCT 03-02; CARLSBAD RANCH PA 5; PAD CERTIFICATIONS; 2012-03-26O'V EXCEL LEVIN & DENTINO INC. 0i 3.A. EXCEL ENGINEERING ESCOND 100 440 State Place • Escondido, CA 92029 (760) 745-8118 .Fax 745-1890 March 26, 2012 RE: Certification of Pad Grade for Villa 68 of the City of Carlsbad Drawing No. 428-9G, Project No. CT 03-02, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site - Phase 2 To whom it my concern, Excel Engineering performed a field survey on March 20, 2012 to confirm finish pad grade for the referenced site. A minimum of 7 shots were taken and the finished pad grade is as follows: Pad Average Pad Elevation Design Pad Elevation Villa 68 190.58 190.56 The maximum deviation from design to finish pad for said pad was found to be 0.06'. The pad is in substantial conformance with the approved grading plan. If you have any further questions or need any additional information do not hesitate to call. Sincerely, ,44ichael D. Levin, .PLS Q:\1 11 1008\DocsIPAO CERTS\PAO CERT VILLA 68 ioc 14 EXCEL ENGINEERING 4'O3'O2-' LEVIN & DENTINO INC. D.B.A. EXCEL ENGINEENG ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118 • Fax 745-1890 March 22, 2012 RE: Certification of Pad Grade for Activity Center of the City of Carlsbad Drawing No. 428-9G, Project No. CT 03-02, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site - Phase 2 To whom it my concern., Excel Engineering performed a field survey on March 20, 2012 to confirm finish pad grade for the referenced site. A minimum of 4 shots were taken and the finished pad grade is as follows..- Pad Average Pad Elevation Design Pad Elevation Activity Center 189.97 190.02 The maximum deviation from. design to finish pad for said pad was found to be 0.07'. The pad is in substantial conformance with the approved grading plan. If you have any further questions or need any additional information do not hesitate to call. Sincerely, f e1 D. Levin, PLS. 011 111 1008\DccsIPAID CERTSIPAO CERT ACTIVITY CENTER.doc EXCEL ENGINEERING LEVIN & DEN TINO INC. 0 S.A. EXCEL ENGINEERING ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118 .Fax 745-1890 March 22, 2012 RE: Certification of Basement Pad Grade for Fitness Center of the City of Carlsbad Drawing No. 428-9G, Project No. CT 03-02, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site - Phase 2 To whom it my concern, Excel Engineering performed a field survey on March 20, 2012 to confirm finish pad grade for the referenced site. A minimum of 6 shots were taken and the finished pad grade is as follows: Pad Average Pad Elevation Design Pad Elevation Fitness Center 181.03 1.80.99 The maximum deviation from design to finish pad for said pad was found to be 0.07'. The pad is in substantial conformance with the approved grading plan. If you have any further questions or need any additional information do not hesitate to call. Sincerely, iiihael D. Levin, PLS QII Ill 18IOocs\PAO CERTStPAD CERT FFNESS CENTER.doc