Loading...
HomeMy WebLinkAboutCT 03-02; CARLSBAD RANCH PA 5; PAD ELEVATION CERTIFICATION; 2012-03-22ENGINEERING LE VIN & OENTINO NC 0 a.A. EXCEL EM. \ ESCONDIDO. 440 State pace EàcondidojA 92029 (760) 745-8118 o Fax. 745-1890 March 22,Z012 RE: Certification of Pad Grade for Activity Center of the City of Carlsbad Drawing Nb. 428-9G, Project No. CT 03-02, GradingPlans for Carlsbad Ranch, Planning Area No 5, Resort Site - Phase 2. To whom.it iny. •• Excel Engineering perfoth'ed a field suryey on..March 20, 2012 to confirmfinish pad grade for the referenced site .,A minimum of 4 shots were taken and the finished pad grade is as'follbws: Pad Average Pad Elevation Design Pad Elevation Activity Center 189.97 The maximum deviation from design to finish pad for said pad was found to be 0.07".i The pad is in substantial conformance with the approved' grading plan. If you have any further questions or need any additiOnal iaformatiOi do not hesitate to call.. • Sincerely, . • . 1ichael D. Levin. PLS . •. 31 .. . • #vJ4) 1P r' •;q /.... . I. -: • .. ... S .•:y • S S S S S