Loading...
HomeMy WebLinkAboutCT 03-02; CARLSBAD RANCH PA 5; SOILS COMPACTION REPORT; 2008-08-14SOILS COMPACTION REPORT Building Pad - Villa 53 Carlsbad Ranch Carlsbad, California laterial nspection and Testing ___ Geotechnical Engineering Services SOILS COMPACTION REPORT Building Pad - Villa 53 Carlsbad Ranch Carlsbad, California Prepared For: Grand Pacific Carlsbad, L.P. 5900 Pasteur Court, Suite 200 Carlsbad, CA 92008 Prepared By: MTGL, Inc. 7313 Carroll Road, Suite G San Diego, California 92121 Project No. 1916-GO1 Log No. 08-1330 Geo technical Engineering Construction Inspection Materials Testing Environmental Office Locations August 14, 2008 Grand Pacific Carlsbad, L.P. 5900 Pasteur Court, Suite 200 Carlsbad, CA 92008 Project No. 1916-GO1 Log No. 08-1330 Attention: Mr. Bruce Zelenka Subject: Soils Compaction Report Project: Building Pad - Villa 53 Carlsbad Ranch, Carlsbad, CA CT 03-02, Drawing No. 428-9A Dear Mr. Zelenka: In accordance with your request and authorization, we have completed our observation and testing services during the grading of the building pad for Villa 53. The results of our findings, together with our test results and recommendations are to be found in the accompanying report. Based on the results of our observation and testing services performed between August 4 and 13, 2008, it is our opinion that the described earthwork has been completed in general accordance with the intentions and recommendations of the geotechnical report by Leighton & Associates, Inc., dated April 11, 2005 and August 2, 2006, and the approved grading plans. MTGL, Inc. appreciates the opportunity to provide observation and testing services for this project. Should you have any questions regarding this report, please do not hesitate to contact our office. . Respectfully submitted, MTGL, Inc. No. 57217 Ui EXP.1V31/Jr Eduardo C. Dizon, RCE It Project Engineer RCE 57217, Exp. 12/31/09 Orange County Corporate Branch: 2992 E. La Palma Avenue Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego Imperial County 7313 Carroll Road Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empire 14467 Meridian Parkway Building 2A Riverside, CA 92518 Tel: 951.653.4999 Fax: 951.653.4666 DC/LA/Inland Empire Dispatch 800.491.2990 San Diego Dispatch 888.844.5060 www.mtglinc.com TABLE OF CONTENTS INTRODUCTION...........................................................................................................................1 GEOTECHNICALREPORT ..........................................................................................................1 SITEDESCRIPTION ......................................................................................................................1 GRADING AND EARTHWORK ............................................................................................. 1 GEOTECHNICAL TESTING ........................................................................................................2 CONCLUSIONS..............................................................................................................................2 RECOMMENDATIONS................................................................................................................2 LIMITATIONS...............................................................................................................................3 References Figures 1 - Field Density Test Location Plan Table 1 - Laboratory Compaction Test Results Table 2 - Field Density Test Results Carlsbad Ranch Villa 53 Project No. 1916-GO1 Carlsbad, CA Log No. 08-1330 INTRODUCTION This report presents the results of our observation and testing services performed during the grading of the building pad for Villa 53 at Carlsbad Ranch in Carlsbad, California. This report covers testing services performed between August 4 and 13, 2008. GEOTECHNICAL REPORT Geotechnical information pertaining to the site was presented in the geotechnical report by Leighton and Associates, Inc. dated April 11, 2005 and August 2, 2006. Those reports included a geotechnical review of site conditions, recommendations regarding site grading and fine gading, building pad preparation, foundation design parameters, pavement design and other geotechnical considerations. Our function during grading was limited to observation and testing of earthwork conducted for the building pad between August 4 and 13, 2008. SITE DESCRIPTION Prior to this grading work, the project site consists of a sheet graded lot, which is relatively level. The site is bounded by ascending graded slope to the north and west, by recently built villa to the south and by Hidden Valley Road. Generally, the project site was essentially in the same condition as reported in the reference as-graded geotechnical report, dated August 2, 2006. GRADING AND EARTHWORK Prior to the grading operation, existing minor surface vegetation and refuse were removed from the areas to be graded. Grading of the building pad consisted of the removal and recompaction of the existing soil. The existing soil over the entire building pad was removed and recompacted such that there is at least 5 feet of compacted fill below finish pad elevation. Exposed subgrade to receive fill was scarified, moisture conditioned and compacted. The horizontal limits of the earthwork grading for the building pad extended laterally to at least 5 feet beyond the building footprint, where practical. Engineered fill soils used consisted of the existing on-site soils suitable for recompaction per the recommendations of the reference geotechnical reports. Fill soils were moisture conditioned to within optimum moisture Content. Fill soils were placed in lifts and compacted with heavy compaction equipment. 1 Carlsbad Ranch Villa 53 Project No. 1916-GOl Carlsbad, CA Log No. 08-1330 GEOTECHNICAL TESTING Field Tests Test procedures based upon ASTM D2922 and ASTM D3017 (NU) were used for field density testing of the soil density and moisture content. Field density testing was at random locations and elevations. The approximate extent of the compacted fill and location/elevation of the performed density tests described in this report are indicated on Figure 1. Fill soils were compacted to a minimum relative compaction of 90 percent based on Test Method ASTM D1557, in accordance with the requirements of the reference geotechnical report. Laboratory Tests The maximum density and optimum moisture content of representative samples of the fill soils were determined in the laboratory in accordance with ASTM D1557 test procedures. The results of the laboratory maximum density tests are presented in Table 1. CONCLUSIONS Based upon the information presented in the reference geotechnical reports and on the observation and testing conducted by MTGL, Inc. as described herein, it is our opinion that the grading of the building pad for Villa 53 as described in this report has been completed in general accordance with the intentions and recommendations of the reference geotechnical reports and approved grading plans. It is our opinion that the Site is suitable for the intended use provided the recommendations presented in this report and the reference geotechnical reports are considered for final planning and structural design, and implemented during construction. RECOMMENDATIONS The recommendations presented in the reference geotechnical reports are considered to remain in effect, except where superseded by addendum recommendations or as specifically recommended herein. The reference geotechnical reports should be considered a part of the project plans and specifications. 2 Carlsbad Ranch Villa 53 Project No. 1916-GO I Carlsbad, CA Log No. 08-1330 Continuous and spread footings are suitable for support of the proposed structure. It is our opinion that the recommendations and soil criteria for soil bearing values for foundations and slab-on-grade contained in the reference geotechnical reports are applicable and shall be implemented in the design of the proposed structure. LIMITATIONS This report has been prepared in accordance with generally accepted geotechnical practices. Our work is considered to be in accordance with the usual standards of the profession and with local practice. No other warranty is expressed or implied as to the professional advice or data included in this report. It should be recognized that that our work does not constitute a guarantee that the grading contractor has performed his work in accordance with the project specifications. In addition, no representations are made as to the quality or extent of materials not observed, for any subsequent change to the site, or failure of others to properly repair damages by the uncontrolled actions of water. 3 REFERENCES Leighton and Associates, Inc., 2005, Geotechnical Investigation, Proposed 53-Acre Resort Development - Phase 1, Carlsbad Ranch, Planning Area No. 5, Carlsbad, CA, Project No. 040575-003, dated April 11, 2005. Leighton and Associates, Inc., 2006, As-Graded Geotechnical Report of Rough and Fine Grading, Hotel One, Resort and Conference Facilities, Sales Building, and Villas 53 Through 56, Lots 10, 11 and A Portion of Lot 1, Grand Pacific Carlsbad, Carlsbad, California, Project No. 040575-005, dated August 2, 2006. Excel Engineering, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site - Phase 1, Project No. CT 03-02, Drawing No. 428-9A, Sheet 25 of 48. MTGL, Inc., 2008, Change of Geotechnical Engineer letter, Project No. 1916-CO1, Log No. 08- 076, dated February 6, 2008. r -- 09 \042 - o3 ' DEM VALLEY RO.ADn LEGEND: 046 Approximate Location of Field Density Tests — - - Approximate Limits of Grading L FIELD DENSITY LOCATION MAP T CARLSBAD RANCH - VILLA 53 Project No. 1926-GUI Date: Aug. 2006 Figure 1 MTGL, INC. TABLE 1 LABORATORY COMPACTION TEST RESULTS Lab No. Description Dry Density PCF Optimum Moisture, % 0761 Light olive clayey sand 125.1 9.9 0762 1 Mix light olive and brown clayey sand 125.0 9.6 Table 2 Field Density Test Results Test No. J Date Location Depth/ Elev. (Feet) Moisture Content (%) Dry Density (pcf) Curve No. Relative Comp. % Test Type Remarks 1 8/4/08 See Figure l 221 10.4 115.6 0761 92 MU 2 8/4/08 See Figure l 221 10.1 115.3 0761 92 NIl 3 8/4/08 See Figure l 222 10.4 115.8 0761 93 MU 4 8/4/08 See Figure l 222 10.7 116.1 0761 93 MU 5 8/4/08 See Figure l 223 10.0 117.9 0761 94 MU 6 8/4/08 See Figure l 223 10.0 116.3 0761 93 NIl 7 8/4/08 See Figure l 224 11.3 118.1 0761 94 NIl 8 8/4/08 See Figure l 224 10.3 114.6 0761 92 MU 9 8/4/08 See Figure 1 225 10.0 114.4 0761 91 N1J 10 8/4/08 See Figure l 225 10.4 116.2 0761 93 NU 11 8/5/06 See Figure l 221 11.8 115.8 0761 93 NTJ 12 8/5/06 See Figure l 221 11.1 112.5 0761 90 MU 13 8/5/06 See Figure 1 222 9.5 117.7 0761 94 NTJ 14 8/5/06 See Figure 1 222 12.3 112.6 0761 90 MU 15 8/5/06 See Figure 1 223 9.0 116.5 0761 93 MU 16 8/5/06 See Figure l 223 10.7 116.3 0761 93 MU 17 8/5/06 See Figure 1 224 8.7 112.9 0761 90 1 MU 18 8/5/06 See Figure l 224 11.5 117.4 0761 94 MU 19 8/5/06 See Figure l 225 10.1 115.3 0761 92 MU 20 8/5/06 See Figure 1 225 10.2 116.2 0761 93 MU 21 8/7/06 See Figure l 221 10.1 116.7 0761 93 MU 22 8/7/06 See Figure 1 221 9.9 115.8 0761 93 MU 23 8/7/06 See Figure 1 222 10.4 117.1 0761 94 MU 24 8/7/06 See Figure l 222 10.1 116.9 0761 93 NU 25 8/7/06 See Figure 1 223 9.9 115.5 0761 92 MU 26 8/7/06 See Figure 1 223 11.3 117.1 0761 94 MU 27 8/8/06 See Figure l 224 10.3 116.3 0761 93 MU 28 8/8/06 See Figure 1 224 9.9 116.3 0761 93 MU 29 8/8/06 See Figure 1 225 9.9 117.0 0761 94 MU 30 8/8/06 See Figure 1 225 10.0 117.4 0761 94 NIl 31 8/8/06 See Figure l 221 9.3 115.2 0761 92 MU 32 8/8/06 See Figure l 222 10.1 115.8 0761 93 NU 33 8/8/06 See Figure 1 223 9.7 115.5 0761 92 MU 34 8/8/06 See Figure 1 224 10.4 117.1 0761 94 MU 35 8/8/06 See Figure 1 225 10.1 116.6 1 0761 93 MU Test No. Date Location Depth! Elev. (Feet) Moisture Content (%) Dry Density (pcf) Curve No. Relative Comp. % Test Type Remarks 36 8/11/08 See Figure l 221 12.4 115.7 0761 92 NV 37 8/11/08 See Figure l 222 12.2 113.2 0761 91 NU 38 8/11/08 See Figure l 223 10.1 114.9 0761 92 NU 39 8/11/08 See Figure l 223 10.7 114.4 0761 91 NU 40 8/11/08 See Figure l 224 8.6 116.7 0761 93 NU 41 8/11/08 See Figure l 224 .9.7 117.7 0761 94 NU 42 8/13/08 See Figure l FSG 11.1 119.3 0761 95 NU 43 8/13/08 See Figure 1 FSG 12.4 120.1 0761 96 NU 44 8/13/08 See Figure 1 FSG 10.7 123.1 0761 98 NU 45 8/13/08 See Figure 1 FSG 10.2 119.9 0761 96 MU 46 8/13/08 See Figure l FSG 9.8 121.2 0761 97 MU -o EXCEL ENGINEERING LEVIN& DENTINO INC. D.B.A. EXCEL ENGINEERING ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118 • Fax 745-1890 August 14, 2008 RE: Certification of Pad Grade for Villa 53 of the City of Carlsbad Drawing No. 428-9A, Project No. CT 03-02, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site - Phase 1 To whom it my concern, Excel Engineering performed a field survey on August 14, 2008 to confirm finish pad grade for the referenced site. A minimum of 9 shots was taken. The finished pad grade is as. follows: Pad Elevations Design Elevation Villa 53 226.05 226.05 The maximum deviation from design to finish pad for said pad was found to be 0.081. The pad is in substantial conformance with the approved grading plan. If you have any further questions or need any additional information do not hesitate to call. Sincerely, M* ael D. Lev n,'P4- A Mkoh Levin EX No. 8Sg6. OF c' 0:\05\05060\docslpadcet villa 53.doc