HomeMy WebLinkAboutCT 04-08; LA COSTA VALLEY TOWNHOMES; PAVEMENT RECOMMENDATIONS; 2012-07-02GEOCON
INCORPORATED
G E OT E C H N I C A L • ENVIRONMENTAL U M AT E R I A I S
Project No. 07193-32-03A
June 22, 2012
Revised July 2, 2012
City Ventures •
1900 Quail Street
Newport Beach, California 92660
Attention: Mr. Matthew Jansen
Subject: REVISED PAVEMENT RECOMMENDATIONS
LA COSTA VILLAGE TO WNHOM ES (CARLSBAD 3), CT 04-08
INTERIOR STREETS
CARLSBAD, CALIFORNIA
Dear Mr. Jansen:
In accordance with the request of Mr. Greg Jones, your site superintendent, we obtained subgrade soil
samples from the interior roadways within the subject development. After collection, we performed
Resistance Value (R-Value) tests on the samples. Based on information provided by C&V
Consulting, Inc., the, project civil engineer, and Mr. David Rick with the City of Carlsbad, we
understand that Traffic Indices (Ti) of 4.5 and 5.0 have been assigned to the subject roadways. A
revision to the previous letter was requested after the City of Carlsbad indicated a discrepancy
between the calculated pavement section provided and the City of Carlsbad Minimum Structural
Standard GS-1 7.
Subgrade soil consists predominately of silty to clayey sand, and typically exhibits low to moderate
R-Value characteristics. We performed the laboratory RValiie tests in accordance with ASTM
D 2844 (California Test Method No. 301). The results of the laboratory. tests and the corresponding
roadway station numbers are presented in Table I.
Based on laboratory testing, we calculated the pavement sections in accordance with California
Department of Transportation Highway Design Manual and the City of Carlsbad Minimum Structural
Standard GS-17. The pavement sections and the Traffic Index are presented in Table 11. Calculations
for the pavement sections are presented in Figure 1. Final pavement section approval should be
obtained from the City of Carlsbad.
Asphalt concrete should conform to Section 203-6'of the Standard Specications for Public Works
Construction (Greenbook). Class, 2 aggregate base materials should conform to Section 26-1.02A of
the Standard SpecJIcations of the State of California, Department of Transportation (Caltrans) or
approved equivalent. Additionally, materials should conform to City of Carlsbad specifications.
Prior to placing base materials for roadways and curb/gutter, the upper 12 inches of subgrade should
be scarified, moisture conditioned as necessary, and compacted to a dry density of at least 95 percent
of the laboratory maximum dry density in accordance with ASTM D 1557. The upper 12 inches of
6960 Flanders Drive • San Diego, California 92121-2974 U Telephone 858.558.6900 U Fax 858.558.6159
Trevor E. Myers
RCE 63773
V1 No. CE63773
\ Exp. 09/30112 )
TEM : DB E:clmc
subgrade beneath areas to receive concrete Sidewalks should be compacted to a thy density of at least
90 percent of the laboratory maximum dry density near to slightly above optimum moisture content.
The base materials should be compacted to a dry density of at least 95 percent of the laboratory
maximum dry density near to slightly above optimum moisture content. The asphalt concrete should
be compacted to a density of at least 95 percent of the laboratory Hveern density in accordance with
ASTM D 2726.
The performance of asphalt concrete pavement is highly dependent on providing positive surface
drainage away from the edge of the pavement. Ponding of water on or adjacent to the pavement will
likely result in saturation of the subgrade materials and subsequent pavement distress. To reduce the
occurrence for such situations, a minimum drainage gradient of at least 1 percent should be
maintained for pavement surfaces. Drainage from landscaped areas should be directed to controlled
drainage structures.
Should you have any questions regarding this correspondence, or if we may be of further service,
please contact the undersigned at your convenience.
Very truly yours,
GEOCON INCORPORATED 4t :
David B. Evans
CEG 1860
(OHALG
DAVID B.
EVANS
No. 1860 Cl)
CERTIFIED - * ENGINEERING * 3 GEOLOGIST
QQJ
(e-mail) Addressee
(e-mail) C&V Consulting, Inc.
Attention: Mr. Vince Scarpati
(e-mail) Carlsbad 3 Job Site Trailer
Attention: Mr. Greg Jones
(2) City of Carlsbad
Attention: Mr. Robert Slempa
Project No. 07193-32-03A - 2- June 22,2012
Revised July 2. 2012
FIGURE 1
PAVEMENT SECTION CALCULATIONS
FOR LA COSTA VILLAGE TOWN HOMES (CARLSBAD 3)
Black Skimmer Drive - Stations 10+40 to 16+50
Use subgrade R-Value = 15
Traffic Index (TI) = 5
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(5.0)(100-78.0)+0.2 = 0.55 feet
from Table 608.4B Highway Design Manual.
GE = 0.55 feet for AC yields actual thickness = 2.61 inches
Use.4.0 inches of AC - City Minimum
GE for 4.0 inches of AC = 0.85 feet
GE for base = (0.0032)(5.0)(100-I5.0) -0.85 = 0.51 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base = 1.1
Base thickness = 5.62 inches
Use base thickness = 6 inches, City of Carlsbad minimum
Design Street Structural Section ***
Asphalt Concrete Thickness = 4 inches.
Class 2 Aggregate Base Thickness = 6 inches.
Black Skimmer Drive - Stations 10+40 to 16+50 (Parking Stalls)
Use subgrade R-Value = 15
Traffic Index (TI) = 4.5
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(4.5)(100-78.0)+0.2 = 0.52 feet
from Table 608.4B Highway Design Manual
GE = 0.52 feet for AC yields actual thickness = 2.32 inches
Use 4.0 inches of AC - City Minimum
GE for 4.0 inches of AC = 0.85 feet
GE for base = (0.0032)(4.5)(I00-I5.0) -0.85 = 0.33 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base = 1.1
Base thickness = 3.63 inches
Use base thickness = 5 inches, City of Carlsbad minimum
Design Street Structural Section
Asphalt Concrete Thickness = 4 inches. DV-
Class 2 Aggregate Base Thickness = 5 inches.
Project No. 07I93-32-03, June 22, 2012
Revised July 2. 2012
FIGURE 1 (Continued)
PAVEMENT SECTION CALCULATIONS
FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3)
Black Skimmer Drive - Stations 16+50 to 19+82
Use subgrade R-Value = 25
Traffic Index (TI) = 5
Methodology = CALTRANS. Highway Design Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(5.0)(100-78.0)+0.2 = 0.55 feet
from Table 608.4B Highway Design Manilial
GE = 0.55 feet for AC yields actual thickness = 2.61 inches
Use 4.0 inches of AC - City Mininium
GE for 4.0 inches of AC = 0.85 feet
GE for base = (0.0032)(5.0)(100-25.0) - 0.85 = 0.35 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base = 1.1
Base thickness = 3.87 inches
Use base thickness = 4 inches, City of Carlsbad minimum
Design Street Structural Section
Asphalt Concrete Thickness = 4 inches.
Class 2 Aggregate Base Thickness = 4 inches.
Black Skimmer Drive - Stations 16+50 to 19+82 (Parking Stalls)
Use subgrade R-Value = 25
Traffic Index (TI) = 4.5
Methodology = CALTRANS Highway Des ign Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(4.5)(100-78.0)+0.2 = 0.52 feet
from Table 608.4B Highway Design Manual
GE = 0.52 feet for AC yields actual thickness = 2.32 inches
Use 4.0 inches of AC - City Minimum
GE for 4.0 inches of AC = 0.85 feet
GE for base = (0.0032)(4.5)(100-25.0) -0.85 = 0.19 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base = 1 .
Base thickness = 2.06 inches
Use base thickness = 4 inches, City of Carlsbad minimum
Design Street Structural Section 1*1
Asphalt Concrete Thickness = 4 inches. OIL
Class 2 Aggregate Base Thickness = 4 inches.
Project No. 07193-32-03A June 22, 2012
Revised July 2, 2012
FIGURE 1 (Continued)
PAVEMENT SECTION CALCULATIONS
FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3)
Brass Buttons Street and Brant Lane
Use subgrade R-Value = 13
Traffic Index (TI) = 4.5
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(4.5)(100-78.0)+0.2 = 0.52 feet
from Table 608.4 B Highway Design Manual
GE = 0.52 feet for AC yields actual thickness = 2.32 inches
Use 4.0 inches of AC - City Minimum
GE for 4.0 inches of AC = 0.89 feet
GE for base = (0.0032)(4.5)(100-13.0) - 0.89 = 0.36 feet
from Table 608.413 Highway Design Manual with GF for Class 2 base = 1 .I
Base thickness = 3.95 inches
Use base thickness = 5 inches, City of Carlsbad minimum
Design Street Structural Section ***
Asphalt Concrete Thickness = 4 inches. V
Class 2 Aggregate Base Thickness = 5 inches.
Black Mustard Lane, Alkali Heath Lane, Arroyo Willow Lane
Use subgrade R-Value = 12
Traffic Index (TI) = 4.5
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(4.5)(100-78.0)+0.2 = 0.52 feet
from Table 608.4B Highway Design Manual
GE = 0.52 feet for AC yields actual thickness = 2.32 inches
Use 4.0 inches of AC - City Minimum
GE for 4.0 inches of AC = 0.89 feet
GE for base = (0.0032)(4.5)(100-12.0) - 0.89 = 0.38 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base =
Base thickness = 4.1 inches
Use base thickness = 5 inches, City of Carlsbad minimum
Design Street Structural Section ***
DK- Asphalt Concrete Thickness = 4 inches.
Class 2 Aggregate Base Thickness = 5 inches.
Project No. 07193-32-03A June 22, 2012
Revised July 2. 2012
FIGURE 1 (Continued)
PAVEMENT SECTION CALCULATIONS
FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3)
Sea Rocket Lane, Cliff Swallows Lane
Use subgrade R-Value = 29
Traffic Index (TI) = 4.5
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(4.5)(100-78.0)+0.2 = 0.52 feet
from Table 608.4B Highway Design Manual
GE = 0.52 feet for AC yields actual thickness = 2.32 inches
Use 4.0 inches of AC - City Minimum
GE for 4.0 inches of -AC = 0.89 feet
GE for base = (0.0032)(4.5)( 100-29.0) - 0.89 = 0.13 feet
From Table 608.4B Highway Design Manual with GF for Class 2 base = 1 .1
Base thickness = 1.43 inches
Use base thickness = 4 inches, City of Carlsbad minimum
Design Street Structural Section
Asphalt-Concrete Thickness = 4 inches. 0
Class 2 Aggregate Base Thickness = 4 inches.
Project No. 07193-32-03A . June 22, 2012
Revised July 2, 2012
TABLE I
SUMMARY OF' R-VALUE TEST RESULTS
ASTM D 2844-01 (CALIFORNIA TEST METHOD NO. 301)
Sample Number Street (Sample Location) R-Value
R-1 Black Skimmer Drive - Station 10+40 to 13+40 (11+10) 15
R-2 Black Skimmer Drive — Station 13+40 to 16+50(15+00) 15
R-3 Black Skimmer Drive - Station 16+50 to 19+82 (18+00) 25
R-4 Brant Lane - Station 10+60 to 12+30 (12+25) 13
R-5 Sea Rocket Lane - Station 1+20 to 2+17 (1+75) 29
R-6 Black Mustard Lane - Station 1+15 to 2+30 (1+75) 12
TABLE II
PAVEMENT SECTION RECOMMENDATIONS
Traffic Asphalt Class 2*
Location Index (TI) R-Value Concrete Aggregate
(inches) Base (inches)
Black Skimmer Drive 5.0 IS . 4 6
(Station 10+40 to 16+50) - Roadway
Black Skimmer Drive 4.5 15 4 5 (Station 10+40 to 16+50) - Parking Stalls
Black Skimmer Drive 5.0 25 4 4
(Station 16+50 to 19+82) - Roadway
Black Skimmer Drive 4.5 25 4 4
(Station 16+50 to 19+82) - Parking Stalls
Brass Buttons Street, Brant Lane 4.5 13 4 5
Black Mustard Lane, 4.5 12 4 5
Alkali Heath Lane, Arroyo Willow Lane
Sea Rocket Lane, Cliff Swallows Lane 4.5 29 4 4
*Or approved equivalent.
/
/
/
Dy.
I
Project No. 07193-32-03A June 22, 2012
Revised July 2. 2012
GEOCON
INCORPORATED
GEOTECHNICAL • ENVIRONMENTAL.
Project No. 07193-32-03A
June 28, 2012
City Ventures
1900 Quail Street
Newport Beach, California 92660
Attention: Mr. Matthew Jansen
M A T E . R I A L S
Subject: PAVEMENT RECOMMENDATIONS
LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3), CT 04-08
EL CAMINO REAL STATION NOS. 225+62 TO 242+00
CARLSBAD, CALIFORNIA
Dear Mr. Jansen:
In accordance with the request of Mr. Greg Jones, your site superintendent, we obtained subgrade soil
samples from El Camino Real adjacent to the subject development. After collection, we performed
Resistance. Value (R-Value) tests on the samples. Based on information provided by C&V
Consulting, Inc., the project civil engineer, we understand that a Traffic index (TI) of 9.0 has been
assigned to the subject roadway.
Subgrade soil consists predominately of silty to clayey sand, and typically exhibits low to moderate
R-Value characteristics. We performed the laboratory R-Value tests in accordance with ASTM
D 2844 (California Test Method No. 301). The results of the laboratory tests and the corresponding
roadway station numbers are presented in Table 1.
Based on laboratory testing, we calculated the pavement sections in accordance with California
Department of Transportation Highway Design Manual and the City of Carlsbad Minimum Structural
Standard GS-1 7. The pavement sections and the Traffic Index are presented in Table II. Calculations
for the pavement sections are presented in Figure 1. Final pavement section approval should be
obtained from the City of Carlsbad.
Asphalt concrete should conform to Section 2036 of the Standard Specifications for Public Works
Construction (Greenbook). Class 2 aggregate base materials should conform to Section 26-1.02A of
the Standard Specifications of the State of California, Department of Transportation (Caltrans) or
approved equivalent. Additionally, materials should conform to City of Carlsbad specifications.
Prior to placing base materials for roadways and curb/gutter, the upper 12 inches of siibgrade should
be scarified, moisture conditioned as necessary, and compacted to a dry density of at least 95 percent
of the laboratory maximum dry density in accordance with ASTM D 1557. The upper 12 inches of
subgrade bei'ieath areas to receive concrete sidewalks, should becompacted to a dry density of at least
90 percent of the laboratory maximum dry density near to slightly above optimum moisture content.
6960 Flanders Drive • San Diego, California 92121-2974 • Telephone 858.558.6900 • Fax 858.558.6159
The base materials should be compacted to a dry density of at least 95 percent of the laboratory
maximum dry density near to slightly above optimum moisture content. The asphalt concrete should
be compacted to a density of at least 95 percent of the laboratory Hveem density in accordance with
ASTM D 2726.
The performance of asphalt concrete pavement is highly dependent on providing positive surface
drainage away from the edge of the pavement: Ponding of water on or adjacent to the pavement will
likely result in saturation of the subgrade materials and subsequent pavement distress. To reduce the
occurrence for such situations, a minimum drainage gradient of at least 1 percent should be
maintained for pavement surfaces. Drainage from landscaped areas should be directed to controlled
drainage structures.
Should you have any questions 'regarding this correspondence, or if we may be of further service,
please contact the undersigned at your convenience.
Very truly yours,
GEOCON INCORPORATED
flax OC—)
Trevor E. Myers No. RCE63773
RCE 63773 \' Exp.09130112
CIV
TEM:dmc OPC
(e-mail) Addressee
(e-mail) C&V Consulting, Inc.
Attention: Mr. Vince Scarpati
(2) City of Carlsbad
Attention: Mr. Robert Slempa
(I/del) 'Carlsbad 3 Job Site Trailer
Attention: Mr. Greg Jones
Project No. 07193-32-03A -2 - June'28. 2012
FIGURE 1
PAVEMENT SECTION CALCULATIONS
FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3)
El Camino Real - Stations 239+50 to 242+00
Use subgrade R-Value = 37
Traffic index (TI) = 9
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor= 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(9.0)(100-78.0)+0.2 = 0.83 feet
from Table 608.4B Highway Design Manual
GE = 0.83 feet for AC yields actual thickness = 5.29 inches
Use 6.0 inches of AC - City Minimum
GE for 6.0 inches of AC = 0.95 feet
GE for base = (0.0032)(9.0)(100-37.0)- 0.95 = 0.87 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base = I..]
Base thickness = 9.5 inches
Use base thickness = 10 inches
,* Design Street Structural Section ***
Asphalt Concrete Thickness = 6 inches.
Class 2 Aggregate Base Thickness = 10.inches.
El Camino Real - Stations 236+50 to 239+50
Use subgrade R-Value = 10
Traffic Index (TI) = 9
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(9.0)(I00-78.0)+0.2 = 0.83 feet
from Table 608.4B Highway Design Manual
GE = 0.83 feet for AC yields actual thickness = 5.29 inches
Use 6.0 inches of AC - City Minimum
GE for 6.0 inches of AC = 0.95 feet
GE for base = (0.0032)(9.0)(100-10.0) -0.95 = 1.65 feet.
from Table 608.4B Highway Design Manual with GF for Class 2 base = 1 .
Base thickness = 18.0 inches
Use base thickness = 18 inches
Design Street Structural Section ***
Asphalt Concrete Thickness = 6 inches. V
Class 2 Aggregate Base Thickness = 18 inches.
Project No. 07193-32-03A ,. June 28: 2012
FIGURE 1 (Continued)
PAVEMENT SECTION CALCULATIONS
FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3)
El Camino Real - Stations 233+50 to 236+50
Use subgrade R-Value = 28
Traffic Index (TI) = 9
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(9.0)(100-78.0)+0.2 = 0.83 feet
from Table 608.4B Highway Design Manual
GE = 0.83 feet for AC yields actual thickness = 5.29 inches
Use 6.0 inches of AC - City Minimum
GE for 6.0 inches of AC = 0.95 feet
GE for base = (0.0032)(9.0)(100-28.0) 0.95 = 113 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base = ].I
Base thickness = 12.3 inches
Use base thickness = 13 inches
Design Street Structural Section ***
Asphalt Concrete Thickness = 6 inches.
Class 2 Aggregate Base Thickness = 13 inches.
El Camino Real - Stations 230+50 to 233+50
Use subgrade.R-Value = 16
Traffic Index (TI) = 9
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(9.0)(100-78.0)+0.2 = 0.83 feet
from Table 608.4B Highway Design Manual
GE = 0.83 feet for AC yields actual thickness = 5.29 inches
Use 6.0 inches of AC - City Minimum
GE for 6.0 inches of AC = 0.95 feet
GE for base = (0.0032)(9.0)(100-16.0) - 0.95 = 1.47 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base =
Base thickness = 16.1 inches
Use base thickness = 16 inches, Per City of Carlsbad GS-17
Design Street Structural Section ***
Asphalt Concrete Thickness = 6 inches.
Class 2 Aggregate Base Thickness = 16 inches (Per GS-17). .1
Project No. 07193-32-03A, June 28, 2012
FIGURE l(Continued)
PAVEMENT SECTION CALCULATIONS
FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3)
El Camino Real - Stations 228+00 to 230+50
Use subgrade R-Value = 11
Traffic Index (TI) = 9
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor = 0.2 -Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(9.0)(I00-78.0)+0.2 = 0.83 feet
from Table 608.4B Highway Design Manual
GE = 0.83 feet for AC yields actual thickness = 5.29 inches
Use 6.0 inches of AC - City Minimum
GE for 6.0 inches of AC = 0.95 feet
GE for base = (0.0032)(9.0)(100-11.0) - 0.95 = 1.62 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base =
Base thickness = 17.7 inches
Use base thickness = 18 inches
Design Street Structural Section
Asphalt Concrete Thickness = 6 inches. 0
Class 2 Aggregate Base Thickness = 18 inches.
El Camino Real - Stations 225+62 to 228+00
Use siibgrade R-Value = 16
Traffic Index (TI) = 9
Methodology = CALTRANS Highway Design Manual Section 608.4
Safety Factor = 0.2 - Applied to Asphalt Concrete (AC)
GE for AC = (0.0032)(9.0)(100-78.0)+0.2 = 0.83 feet
from Table 608.4B Highway Design Manual
GE = 0.83 feet for AC yields actual thickness = 5.29 inches
Use 6.0 inches of AC - City Minimum
GE for 6.0 inches of AC = 0.95 feet
GE for base = (0.0032)(9.0)(100-16.0) -0.95 = 1.47 feet
from Table 608.4B Highway Design Manual with GF for Class 2 base = 1.1
Base thickness = 16.1 inches
Use base thickness = 16 inches, Per City of Carlsbad GS-17
Design Street Structural Section
Asphalt Concrete Thickness = 6 inches. V
Class 2 Aggregate Base Thickness = 16 inches (Per GS-17).
Project No. 07193-32-03A June 28, 2012
I
TABLE I
SUMMARY OF R-VALUE TEST RESULTS
ASTM D 2844-01 (CALIFORNIA TEST METHOD NO. 301)
Sample Number Street (Sample Location) R-Value
R-7 El Camino Real (24 1+00) 37
R-8 El Camino Real (238+00) 10
R-9 El Camino Real (235+00) 28
R-10 El Camino Real (232+00) 16
R-I I El Camino Real (229+00) . 11
R-12 El Camino Real (227+00) . 16
TABLE II
PAVEMENT SECTION RECOMMENDATIONS
Location
-
Traffic
Index (TI) ...R-Value
Asphalt
Concrete
(inches)
Class 2*
Aggregate
Base (inches)
El Camino Real (239+50 to 242+00) 9 37 6 JO
El Camino Real (236+50 to 239+50) . 9 10 6 18
El Camino Real (233+50 t0236+50) 9 28 6 13
El Camino Real (230+50 to 233+50) 9 16 6 16
El Camino Real (228+00 to 230+50) 9 11 6 18
El Camino Real (225+62 to 228+00) 9 16 6 16
*Or approved equivalent.
Project No. 07193-32-03A June 28, 2012