HomeMy WebLinkAboutCT 04-08; LA COSTA VALLEY TOWNHOMES; SEWER REPORTS;Project Name La Costa Village
Townhomes
Date 5/25/2012 07:37
City Carlbad
Run Number
Operator Name Casey Post
Comments
Asset ID
Pipe Material Polyvinyl Chloride
Lining Method
Length Surveyed 132.2
Year Renewed
Upstream MH 16 Number
UpstreamMH
Location
Downstream MH 14 Number
Downstream MH
Location
Amount of Flow
Media Number
Contractor Name
fl• Index
Project
Location
Direction Of Survey Downstream
P0 Number
Purpose Routine Assessment
Completed Yes
Pipe
Pipe Size 8
Pipe Shape
Total Length
Year Laid 2012
Sewer Use
Manhole
II....4.. 4L
Upstream IVI Notes
Downstream MH
Depth
Downstream MH
Notes
Signs Of Surcharge No
Other
Truck Number
! ler Weather
VCR End Index
KamPac Serial
Number
Pressure of Test
(mBar)
Material Dry
Use Standard
(ENI6IO)
Pressure Test
All Pressure Tests No Passed
Length of Pressure
Test -
No Test Chamber Size
Created with the PD5TM report generator
Project Name: La Costa Vfllage Townhomes
Date: 5/25/2012 7:37:00 AM Asset ID:
Location: Upstream MH Number: 16
Length Surveyed: 0 Downstream MH Number: 14
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
ID Number: 16
(2.5) LL - Position: 9
(24.2) LL - Position: 10
(28.3) LR
(45.5) LL - Position: 10
(49.4) LR
(65.8) LL - Position: 10
(70.0) LR
(88.1) LL - Position: 10
Total Distance: 0
(92.1) LR
(132.2) El
ID Number: 14
Created with the EM report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 7:37:00 AM
Location:
Length Surveyed: 0
Run Number:
Pipe Size: 8
Asset ID:
Upstream MH Number: 16
Downstream MH Number: 14
Direction Of Survey: Downstream
Pipe Material: Poyviny Chloride
Distance Fault Fault Observation Time I Picture
/ --
! t. I 4 •
9, Co 1 • IL ®®t® To D
LATERAL LEFT F
2.5 Position: 9 01:35
Severity: None
LATERAL LEFT
24.2 02:49
Severity: None
I
r
/
ON lbw 19 a i
28.3 RIGHTLATERAL 03:43
j. Severity: None
I I
I •
_ :?___ ..,.. .••/
04:56
LATERAL LEFT
I45.5 Position: 10
Severity: None
I
/4
nL
05:50
[Lf AUR A; RIjG
T4i QT
~B 4
3U - I
Fault Observation •Iiiit 60101
M H 41T6 1'I 4
I
LATERAL RIGHT
Severity: None
I LATERAL LEFT
65.8 1 Position: 10 06:52
I Severity: None
Time Picture Fault Observation
70.0 07:45 LATERAL RIGHT
Seventy: None
08:54
LATERAL LEFT
88.1 Position: 10
Severity: None
/
09:42 92.1 1
LATERAL RIGHT
Severity: None
Fault Observation liiit Picture
NiH 16 NiH 14
5/25/2O1 a U ii 55
End Inspection
Severity: None
End Inspect ion
132.2 FT U
Created with the report generator
KamPac Serial
Number
Pressure of Test
(mBar)
Material Dry
Use Standard
(EN 1610)
Project
La Costa Villae
lownhomes
. .ocaon B.Iac.k Skimmer Dr
5/25/2012 08:15 Direction Of Survey Downstream
Carlsbad P0 Number
Purpose Routine Assessment
Casey Post Completed Yes
Pipe
Pipe Size 8
Polyvinyl Chloride Pipe Shape Circular
Total Length
43.4 Year Laid 2012
Sewer Use
Manhole
1.4 Upstream NIH Depth
Upstream NIH Notes
13 Downstream NIH
Depth
Downstream NIH
Notes
• Signs Of Surcharge No
Other
Truck Number
Weather
• VCR End Index
Pressure Test
All Pressure Tests
Passed No
Length of Pressure
Test
No Test Chamber Size
[I
Project Name
Date
City
Run Number
Operator Name
Comments
Asset ID
Pipe Material
Lining Method
Length Surveyed
Year Renewed
Upstream NIH
Number
UpstreamMH
Location
Downstream NIH
Number
Downstream NIH
Location
Amount of Flow
Media Number
Contractor Name
VCR Start Index
Created with the report generator
Project Name: La Costa Vi llage Townhomes
Date: 5/25/2012 8:15:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 14
Length Surveyed: 43.4 Downstream MH Number: 13
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Materiai: Polyvinyl Chloride
ID Number: 14
(43.4) El
Total Distance: 43.4 ID Number: 13
Created with the OaPosm report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 8:15:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 14
Length Surveyed: 43.4 Downstream MH Number: 13
Run Number: Direction Of Survey: Downstream
minim Q1.7a. A Pinch PrIwin,I ('hInriAch
Created with the report generator
Project
Project Name La Costa Village
lownhomes Location Black Skimmer Dr
Date 5/25/20 12 08:33 Direction Of Survey Downstream
City Carlsbad P0 Number
Run Number Purpose Routine Assessment
Operator Name Casey Post Completed Yes
Comments
Pipe
Asset ID Pipe Size 8
Pipe Material Poiyyinyi Chloride Pipe Shape Circular
Lining Method Total Length
Length Surveyed 53 Year Laid 2012
Year Renewed Sewer Use • Manhole
Upstream NIH 13Number Upstream MH Depth
UpstreamMH
Location
Upstream NIH Notes
Downstream NIH Downstream NIH
Number Depth
Downstream NIH Downstream NIH
- Location Notes
Amount of Flow • Signs Of Surcharge No
Other
Media Number Truck Number
Contractor Name Weather
VCR Start index VCR End index
Pressure Test
KamPac Serial All Pressure Tests
Number Passed No
Pressure of Test Length of Pressure
(mBar) Test
Material Dry No Test Chamber Size
Use Standard
(ENI6IO) -
Created with the report generator
P LSevery roject Name: La Costa Village Townhomes J
Date: 5/25/2012 8:33:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 13 Moderate
Length Surveyed: 83 Downstream MH Number: 5 Average
Run Number: Direction Of Survey: Downstream Heavy_________
Pipe Size: 8 Pipe Material: Polyvinyl Chloride Severe
ID Number: 13
(83.0) El
Total Distance: 83 ID Number: 5
Created with the report generator
Project Name: La Costa Village Townhomes
Date: 512512012 8:33:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 13
Length Surveyed: 83 Downstream MH Number: 5
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
Fault Observation Picture
MH 13 TO NH S
5/25/2012 La Cost,-"a Vil 08:36
End Inspection
-
Severit~: None
I -
End 1risectiThn
83.0 FT 0
Created with the report generator
-LLkTk
KamPac Serial
Number
Pressure of Test
(mBar)
Material Dry
Use Standard
(ENI6IO).
Project
La Costa Village Location Brant Ln '1 ownhomes
5/25/2012 09:16 Direction Of Survey Downstream
Carlsbad P0 Number
Purpose Routine Assessment
Casey Post Completed Yes
Pipe
Pipe Size 8
Polyvinyl Chloride Pipe Shape Circular
Total Length
59.4 Year Laid 2012
Sewer Use
Manhole
10 Upstream MM Depth
Upstream MM Notes
9 Downstream MM
Depth
- Downstream MH
Notes
Signs Of Surcharge No
Other
Truck Number
Weather
VCR End index
Pressure Test
All Pressure Tests
Passed No
Length of Pressure
Test
No Test Chamber Size
Project Name
Date
City
Run Number
Operator Name
Comments
Asset ID
Pipe Material
Lining Method
Length Surveyed
Year Renewed
Upstream MH
Number
UpstreamMH
Location
Downstream MH
Number
Downstream MH
Location
Amount of Flow
Media Number
Contractor Name
VCR Start index
IM
Created with the report generator
Project Name: La Costa Village Townhomes I Severity
Date: 5/25/2012 9:16:00 AM Asset ID:
Location: Brant Ln Upstream MH Number: 10
Length Surveyed: 59.4 Downstream MH Number: 9
Run Number: Direction Of Survey: Downstream Heavy
Pipe Size: 8 Pipe Material: Polyvinyl Chloride Severe
ID Number: 10
(4.3) LR
(25.2) LR
(46.2) LR
(59.4) El
Total Distance: 59.4 ID Number: 9
Created with the report generator
Project Name: La Costa Village Townhomes
Date: 5125/2012 9:16:00 AM Asset ID:
Location: Brant Ln Upstream MH Number: 10
Length Surveyed: 59.4 Downstream MH Number: 9
RLm umber: Di rection Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
IDistance Fault Observation Time I Picture
/4111
9U 0 • fI i,J • -. -i
-I :d' •'.
j I
4 LATERAL RIGHT 56 . I Severity: None a:
®r Al
: d • !1O0 jo
252 LATERAL RIGHT ° Severity: None
I lIi ,® 'E gi
0 • i
LATERAL 46.2 RIGHT 02:50Severity: None
'1
1 I
i IV
I -
Fault Observation Picture
-
MH 10 ' MH 9
5/25/2012 a I .. .\09:21
End Inspection
Severity: None
End,,JnspectJ on, ., .
59.4 0
Created with the PSM report generator
KamPac Serial
Number
Pressure of Test
(rnBar)
Material Dry
Use Standard
(ENI6IO)
Project
La Costa Village Location Black Mustard Ln I ownhomes
5/25/2012 08:48 Direction Of Survey Downstream
Carlsbad P0 Number
Purpose Routine Assessment
Casey Post Completed Yes
Pipe
Pipe Size 8
Polyvinyl Chloride Pipe Shape Circular
Total Length
90.6 Year Laid 2012
Sewer Use
Manhole
15 Upstream MH Depth
Upstream MH Notes
Ii Downstream MH
Depth
Downstream MH
Notes
Signs Of Surcharge No
Other
Truck Number
Weather
VCR End index
Pressure Test
All Pressure Tests
Passed I\40
Length of Pressure
Test
No Test Chamber Size
Project Name
Date
City
Run Number
Operator Name
comments
Asset ID
Pipe Material
Lining Method
Length Surveyed
Year Renewed
Upstream MH
Number
UpstreamMH
Location
Downstream MH
Number
Downstream MH
Location
Amount of Flow
Media Number
Contractor Name
VCR Start index
Created with the report generator
Project Name: La Costa Village Townhomes
Light
I Severity
Date: 5/25/2012 8:48:00 AM Asset ID:
Location: Black Mustard Ln Upstream MH Number: 15 Moderate
Length Surveyed: 90.6 Downstream MH Number: 13 Average
Run Number: Direction Of Survey: Downstream Heavy Pipe Size: 8 Pipe Material: Polyvinyl Chloride -s
evere________
ID Number: 15
(0.4) LL - Position: 9
(6.3) LR
(21.6) LL - Position: 10
(26.5) LR
(43.1) LL - Position: 9
(47.8) LR
(64.9) LL - Position: 10
(69.3) LR
(86.2) LL - Position: 10
(90.6) LR
Total Distance: 90.6 ID Number: 13
Created with the PDSJ4 report generator
Project Name: La
Date: 5/25/2012 8:48:00 AM
Location: Black Mustard Ln
Length Surveyed: 90.6
Run Number:
Pipe Size: 8
Costa Village Townhomes
Asset ID:
Upstream MH Number: 15
Downstream MH Number: 13
Direction Of Survey: Downstream
Pipe Material: Polyvinyl Chloride
Distance Fault Observation Time Picture
I M a Q0% Euo I '
LATERAL LEFT I
0.4 Position: 9 01:05
Severity: None
6.3 LATERAL RIGHT 01:35 ...
-
Severity: None
____
'# •g
LATERAL LEFT .. ( A ...
21.6 Position: 10 02:18 M
Severity: None .
1,Distance Fault Observation Time Picture
.1 -'
i1 [Lj' •
26.5 L(::iA 9
T 03:00
A
ne
R I!ri) &aM WOO 85s. I_.
LATERAL LEFT
43
.1 Position: 9 04:00
Severity: None
iiicj frif
[Lii @@6tQ 91Et
47.8 RIGHTLATERAL 04:35 __ Severity:
1Distance! Fault Observation (_Time Picture
tJI
LATERAL LEFT
649 0553
Severity: None
IV
69..s LATERAL RIGHT 06.28 1.
Severity: None .. .1
do MIN
LATERAL LEFT
86.2 Position: 10 07:22
Severity: None
Distance Fault Observation Time Picture
I'
9.6 . . I flj
906 LATERAL RIGHT 07
04.
Severity: None
flIi1L &O1?
Created with the 4UPOSM report generator
Project
Project Name
Date
City
Run Number
Operator Name
Comments
La Costa Village
Townhomes
5/25/2012 11:41
Carlsbad
Casey Post
Location Black Skimmer Dr
Direction Of Survey Downstream
P0 Number
Purpose Routine Assessment
Completed Yes
KamPac Serial
Number
Pressure of Test
(mBar)
Material Dry
Use Standard
(ENI6IO)
Pipe
Pipe Size 8
Polyvinyl Chloride Pipe Shape Circular
Total Length
72.8 Year Laid 2012
Sewer Use
Manhole
2 Upstream MH Depth
Upstream MH Notes'
Downstream MH Depth
Downstream MH
Notes
Signs Of Surcharge No
Other
Truck Number
Weather
VCR End Index
Pressure Test
All Pressure Tests
Passed No
Length of Pressure
Test
No Test Chamber Size
Asset ID
Pipe Material
Lining Method
Length Surveyed
Year Renewed
Upstream MH
Number
U pstreamMH
Location
Downstream MH
Number
Downstream MH
Location
Amount of Flow
Media Number
Contractor Name
VCR Start Index
Created with the report generator
Project Name: La Costa Village Townhomes I Severity
Date: 5/25/2012 11:41:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 2
Length Surveyed: 72.8 Downstream MHNumber: I
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
ID Number: 2
(72.8) El
Total Distance: 72.8 ID Number: 1
Created with the report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 11:41:00 AM
Location: Black Skimmer Dr
Length Surveyed: 72.8
Run Number:
Pipe Size: 8
Asset ID:
Upstream MH Number: 2
Downstream MH Number: I
Direction Of Survey: Downstream
Pipe Material: Polyvinyl Chloride
Distance Fault Observation Time Picture
/
728 End Inspection
Severity: None 0236
r',
_\)
OW
Created with the report generator
Project
La Costa Village Location Black Skimmer Dr Townhomes
5/25/2012 11:38 Direction Of Survey Downstream
Carlsbad P0 Number
Purpose Routine Assessment
Casey Post Completed Yes
Pipe
Pipe Size 8
Polyvinyl Chloride Pipe Shape Circular
Total Length
48.4 Year Laid 2012
Sewer Use
Manhole
3 Upstream MH Depth
Upstream MH Notes
2 Downstream MH
Depth
- Downstream MH
Notes
Signs Of Surcharge No
Other
Truck Number
Weather
VCR End Index
Project Name
Date
City
Run Number
Operator Name
Comments
Asset ID
Pipe Material
Lining Method
Length Surveyed
Year Renewed
Upstream MH
Number
UpstreamMH
Location
Downstream MH
Number
Downstream MH
Location
Amount of Flow
Media Number
Contractor Name
VCR Start Index
KamPac Serial
Number
Pressure of Test
(mBar)
Material Dry
Use Standard
(ENI6IO)
Pressure Test
All Pressure Tests
Passed No
Length of Pressure
Test
No Test Chamber Size
Created with the report generator
Project Name: La Costa Village Townhomes Severity
Date: 5/25/2012 11:38:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 3
Length Surveyed: 48.4 Downstream MH Number: 2
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
ID Number: 3
(48.4) El
I1
Total Distance: 48.4 ID Number: 2
Created with the report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 11:38:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 3
Length Surveyed: 48.4 Downstream MH Number: 2
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
Distance Fault Observation Time Picture
I -
48.4 End Inspection 01:55 Severity: None
Created with the report generator
Project
Project Name La Costa Village Location Townhomes Slope/Easment
Date 5/25/2012 11:14 Direction Of Survey Downstream
City Carlsbad P0 Number
Run Number Purpose Routine Assessment
Operator Name Casey Post Completed Yes
Comments
Pipe
Asset ID Pipe Size 8
Pipe Material Polyvinyl Chloride Pipe Shape Circular
Lining Method Total Length
Length Surveyed 78.5 Year Laid 2012
Year Renewed Sewer Use
Manhole
Upstream MH
Number 4 Upstream MH Depth
UpstreamMH
Location Upstream MH Notes
Downstream MH Downstream MH
Number Depth
Downstream MH Downstream MH
Location Notes
Amount of Flow Signs Of Surcharge No
Other
Media Number Truck Number
Contractor Name Weather
VCR Start Index VCR End Index
Pressure Test
KamPac Serial All Pressure Tests
Number - Passed No
Pressure of Test Length of Pressure
(mBar) Test
Material Dry No Test Chamber Size
Use Standard
(EN 1610)
Created with the M report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 11:14:00 AM Asset ID:
Location: Slope/Easment Upstream MH Number: 4
Length Surveyed: 78.5 Downstream MH Number: 3
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
ID Number: 4
(78.5) El
Total Distance: 78.5 ID Number: 3
Created with the report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 11:14:00 AM
Location: Slope/Easment
Length Surveyed: 78.5
Run Number:
Pipe Size: 8
Asset ID:
Upstream MH Number: 4
Downstream MH Number: 3
Direction Of Survey: Downstream
Pipe Material: Polyvinyl Chloride
—Fault Observation Ii,it
MH 3
Cos tfll 11. :18
',
InspectionEnd
.
-
Severity: None
E1i'1 I
Fjr
Created with the report generator
Project
Project Name La Costa Village Location Sea Rocket Ln Townhomes
Date 5/25/2012 11:06 Direction Of Survey Downstream
City Carlsbad P0 Number
Run Number Purpose Routine Assessment
Operator Name Casey Post Completed Yes
Comments
Pipe
Asset ID Pipe Size 8
Pipe Material Polyvinyl Chloride Pipe Shape Circular
Lining Method Total Length
Length Surveyed 99 Year Laid 2012
Year Renewed Sewer Use
Manhole
Upstream MH
Number s Upstream MH Depth
UpstreamMH
Location ' Upstream MH Notes
Downstream MH Downstream MH
Number Depth
Downstream MH Downstream MH
Location Notes
Amount of Flow Signs Of Surcharge No
Other
Media Number Truck Number
Contractor Name Weather
VCR Start Index VCR End Index
Pressure Test
KamPac Serial All Pressure Tests
Number N Passed
Pressure of Test Length of Pressure
(mBar) Test
Material Dry No Test Chamber Size
Use Standard
(ENI6IO)
Created with the report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 11:06:00 AM Asset ID:
Location: Sea Rocket Ln Upstream MH Number: 5
Length Surveyed: 99 Downstream MH Number: 4
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
ID Number: 5
(30.5) LR
(36.0) LL - Position: 12
(52.8) LR
(57.3) LL - Position: 10
(72.6) LR
(80.6) LL - Position: 10
(92.0) LR
(95.4) LL - Position: 10
(99.0) El
Total Distance: 99 ID Number: 4
Created with the report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 11:06:00 AM Asset ID:
Location: Sea Rocket Ln Upstream MH Number: 5
Length Surveyed: 99 Downstream MH Number: 4
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
LDistance 1 Fault Observation Time Picture
' -
( 305 LATERAL RIGHT 0t07 Severity: None
T
I
.jJw (O sIii
36.0
LATERAL LEFT
Position: 12 01:43
Severity: None
528 LATERAL
Severity: No nHeT 0243
IROWU
Distance Fault Observation Time Picture
i; If
57.3
LATERAL LEFT
Position. 10 03.27
.
1
Severity: None .• _______________
8
/
72.6 LATERAL RIGHT 04:21 .
Severity: None
WMTM~ mom ve I
[4CA 4'
LATERAL LEFT
80.6 Position: 10 04:58
Severity: None
Distance Fault Observation Time Picture
ErI1J1 ffi PH
@MrM 011 I \ its 9z
I
92.0 LATERAL 05:39 Severity: No
nHeT
Ir[A
- U 0
LATERAL LEFT
95.4 Position: 10 06:14
Severity: None
P ..
0•40 9
- 99.0 End Inspection
Severity: None 06:43
Created with the report generator
Project
Location Alkali Heath Ln
Direction Of Survey Downstream
P0 Number
Purpose Routine Assessment
Completed Yes
Project Name
Date
City
Run Number
Operator Name
Comments
La Costa Village
Townhomes
5/25/2012 10:33
Carlsbad
Casey Post
KamPac Serial
Number
Pressure of Test
(mBar)
Material Dry
Use Standard
(ENI6IO)
Pipe
Pipe Size 8
Polyvinyl Chloride Pipe Shape Circular
Total Length
138.2 Year Laid 2012
Sewer Use
Manhole
12 Upstream MH Depth
Upstream MH Notes
6 Downstream MH
Depth
Downstream MH
Notes
Signs Of Surcharge No
Other
Truck Number
Weather
VCR End Index
Pressure Test
All Pressure Tests
Passed No
Length of Pressure
Test
No Test Chamber Size
Asset ID
Pipe Material
Lining Method
Length Surveyed
Year Renewed
Upstream MH
Number
UpstreamMH
Location
Downstream MH
Number
Downstream MH
Location
Amount of Flow
Media Number
Contractor Name
VCR Start Index
Created with the report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 10:33:00 AM Asset ID:
Location: Alkali Heath Ln Upstream MH Number: 12
Length Surveyed: 138.2 Downstream MH Number: 6
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
ID Number: 12
(4.7) LR
(9.0) LL - Position: 10
(24.7) LR
(29.5) LL - Position: 10
(46.3) LR
(51.4) LL - Position: 10
(73.2) LL - Position: 10
(90.0) LR
(94.7) LL - Position: 10
(t38.2) El
Total Distance: 138.2 ID Number: 6
Created with the report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 10:33:00 AM
Location: Alkali Heath Ln
Length Surveyed: 138.2
Run Number:
Pipe Size: 8
Asset ID:
Upstream MH Number: 12
Downstream MH Number: 6
Direction Of Survey: Downstream
Pipe Material: Polyvinyl Chloride
Dis6-n-c'el Fault Observation Time Picture J
'ii II 8,99
1/ 47 LATERAL RIGHT
Severity: None 7
tui:l1lf)&12fl= 410VIF1F\.
UIVU? -. • lL • ii
LATERAL LEFT f' 9.0 Position: 10 01:27 1
Seventy: None
WDO .5
( 247 LATERAL RIGHT 0217 Severity: None _
Distance Fault Observation Time Picture
ji R 11 -'
LATERAL LEFT
I
-- I / 29.5 Position: 10 02:48 I Severity: None / •. // / ------'
ILLI
jjIT7Lg C7i.N &ke
46.3 LATERAL RIGHT 03.. 36 Severity: None j .4
1u __
;..
LATERAL LEFT
51.4 Position: 10 04:11 -
Severity None
Distance Fault Observation Time Picture
ct
68.6 LATERAL RIGHT 04:56 Severity: None
woo VV
'_a
• 1'JU ti one 6@
LATERAL LEFT /
73.2 Position: 10 05:28 Severity: None /
I
.1
llr'!J ftffift tO
(
90.0 LATERAL 06:2006:20 None
Distance Fault Observation Time Picture
N
WD 0
LATERAL LEFT
947 0
c1 1
646Severity: None
DA @WMft Ii
138.2 End Inspection 08:33Severity: None
Created with the report generator
k'A..
Project
Project Name La Costa Village
Townhornes Location Cliffs Swallons Ln
Date 5/25/2012 10:15 Direction Of Survey Downstream
City Carlsbad P0 Number
Run Number Purpose Routine Assessment
Operator Name Casey Post Completed Yes
Comments
• Pipe
Asset ID Pipe Size 8
Pipe Material Polyvinyl Chloride Pipe Shape Circular
Lining Method V Total Length
Length Surveyed 113.4 Year Laid V
2012
Year Renewed Sewer Use
Manhole
Upstream MH 17 Upstream MH Depth Number
UpstreamMH Upstream MH Notes Location
Downstream MH Downstream MH
Number Depth
Downstream MH Downstream MH V
Location Notes
Amount of Flow Signs Of Surcharge No
Other
Media Number Truck Number
Contractor Name Weather
VCR Start Index V VCR End Index
Pressure Test
KamPac Serial All Pressure Tests
Number
V Passed N °
Pressure of Test . Length of Pressure
(mBar) Test S
Material Dry No Test Chamber Size
Use Standard
(ENI6I0)
V Created with the Pt3M report generator
Project Name: La Costa Village Townhomes I Severity
Date: 5/25/2012 10:15:00 AM Asset ID: !t€1i1
Location: Cliffs SwaUons Ln Upstream MH Number: 17
Length Surveyed: 113.4 Downstream MH Number: 7
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
ID Number: 17
(6.4) LR
(35.0) LL -.Position.- 10
(36.7) LR
(56.8) LL - Position: 10
(59.5) LR
(77.9) LL - Position: 10
(80.9) LR
(113.4) El
Total Distance: 113.4 ID Number: 7
Created with the report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 10:15:00 AM
Location: Cliffs Swallons Ln
Length Surveyed: 113.4
Run Number:
Pipe Size: 8
Asset ID:
Upstream MH Number: 17
Downstream NIH Number: 7
Direction Of Survey: Downstream
Pipe Material: Polyvinyl Chloride
Distance Fault Observation Time Picture
C41 T i'.ij II JIE SU
/1
64 LATERAL RIGHT 58 Severity: None
(f
Oi1600 otsa@
7'
LATERAL LEFT
35.0 Position: 10 02:17
Severity: None
..
I • I
oIv •
Oi
4(01 -. E1JJJ
Thfll_. -
V
36.7 02:47
Distance Fault Observation Time Picture
N T1i
LATERAL LEFT
56.8 Position: 10 03:43
Severity: None
ca 94I • -2RO 8®'
59.5 LATERAL RIGHT 04:22 Severity: None
C..?
MIVfll t
I . ••.i [•Q
_____
L
LATERAL LEFT \ ';
77.9 05:45
Distance Fault Observation Time Picture
W 919 •
809 LATERAL RIGHT 06•22 Severity: None
L!J11tIL
1h1I?LT
113.4 End Inspection 08:17Severity: None
AL
Created with the report generator
SM
Project
Project Name La Costa Village Location Townhomes Black Skimmer Dr
Date 5/25/201209:55 Direction Of Survey Downstream
City Carlsbad P0 Number
Run Number Purpose Routine Assessment
Operator Name Casey Post Completed Yes
Comments
Pipe
Asset ID Pipe Size 8
Pipe Material Polyvinyl Chloride Pipe Shape Circular
Lining Method Total Length
Length Surveyed 53.8 Year Laid 2012
Year Renewed Sewer Use
Manhole
Upstream MH 6 Upstream MH Depth Number
UpstreamMH Upstream MH Notes Location
Downstream MH Downstream MH
Number Depth
Downstream MH Downstream MH
Location Notes
Amount of Flow Signs Of Surcharge No
Other
Media Number Truck Number
Contractor Name Weather
VCR Start Index - VCR End Index
Pressure Test
KamPac Serial All Pressure Tests
Number Passed N
Pressure of Test Length of Pressure
(mBar) Test
Material Dry No Test Chamber Size
Use Standard
(EN 1610)
Created with the 'PDSIV1 report generator
Project Name: La Costa ViHage Townhomes SeverityJ
Date: 5/25/2012 9:55:00 AM Asset ID:
Location: Black Skimmer Dr Upstream NIH Number: 6 -
Length Surveyed: 53.8 Downstream MH Number: 5 Average
Run Number: Direction Of Survey: Downstream Heavy
Pipe Size: 8 Pipe Material: Polyvinyl Chloride Severe_________
ID Number: 6
(53.8) El
Total Distance: 53.8 ID Number: 5
Created with the report generator
- Project Name: La Costa Village Townhomes
Date: 5/25/2012 9:55:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 6
Length Surveyed: 53.8 Downstream MH Number: 5
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
Fault Observation •li,it Picture
/ 'MR B MH
End Inspection
End Inspection
53.8' FT 0
Created with the report generator
IULi.k"k
Project
Project Farne La Costa Village
lownhornes Locati on Black Skimmer Dr
Date 5/25/2012 09:49 Direction Of Survey Downstream.
City Carlsbad P0 Number
Run Number Purpose Routine Assessment
Operator Name Casey Post Completed Yes
Comments
Pipe
Asset 1D Pipe Size S
Pipe Material Polyvinyl Chloride Pipe Shape Circular
Lining Method Total Length
Length Surveyed 85.2 Year Laid 2012
Year Renewed Sewer Use
Manhole
Upstream MH
Number
UpstreamMH
Location
Downstream MH
Number
Downstream MH
Location
Amount of Flow
Media Number
Contractor Name
VCR Start Index
Upstream MH Depth
Upstream MH Notes
6 Downstream MH
Depth
Downstream MH
Notes
Signs Of Surcharge No
Other
Truck Number
Weather
VCR End Index
KamPac Serial
Number
Pressure of Test
(mBar)
Material Dry
Use Standard
(EN1610)
Pressure Test
All Pressure Tests
Passed No
Length of Pressure
Test
No Test Chamber Size
Created with the PDEM report generator
Project Name: La Costa Vi llage Townhomes
Date: 5/25/2012 9:49:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 7
Length Surveyed: 85.2 Downstream MH Number: 6
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
ID Number: 7
(85.2) El
Total Distance: 85.2 ID Number: 6
Created with the Ovmsm report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 9:49:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 7
Length Surveyed: 85.2 Downstream MH Number: 6
Run umber: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
l'1iii. IIiit Picture
MH 7 MH S
.O9:53
End Inspection
Severity: None ___
k.
End Inspectiôr
85.2 FT 0
Created with the EM report generator
KamPac Serial
Number
Pressure of Test
(mRar)
Material Dry
Use Standard
(EN 1610)
Project
La Costa Village Location Black Skimmer Dr I ownhomes
5/25/2012 09:45 Direction Of Survey Downstream
Carlsbad P0 Number
Purpose Routine Assessment
Casey Post Completed Yes
Pipe
Pipe Size 8
Polyvinyl Chloride Pipe Shape Circular
Total Length
48.4 Year Laid 2012
Sewer Use
Manhole
8 InQ,.? zli~-i NIH Depth
Upstream NIH Notes
Downstream NIH
Depth
Downstream NIH
Notes
Signs Of Surcharge No
Other
Truck Number
Weather
VCR End Index
Pressure Test
All Pressure Tests
Passed No
Length of Pressure
Test
No Test Chamber Size
Project Name
Date
City
Run Number
Operator Name
Comments
Asset ID
Pipe Material
Lining Method
Length Surveyed
Year Renewed
Upstream NIH
Number
UpstreamMH
Location
Downstream NIH
Number
Downstream NIH
Location
Amount of Flow
Media Number
Contractor Name
VCR Start Index
Created with the Ouposm report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 9:45:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 8
Length Surveyed: 48.4 Downstream NIH Number: 7
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
4. lD Number: 8
Total Distance: 48.4 ID Number: 7
Created with the VROSM report generator
Project Name: La Costa Village Townhomes
Date: 5/25/2012 9:45:00 AM Asset ID:
Location: Black Skimmer Dr Upstream MH Number: 8
Length Surveyed: 48.4 Downstream MH Number: 7
Run Number: Direction Of Survey: Downstream
Pipe Size: 8 Pipe Material: Polyvinyl Chloride
Distance t Fault Observation Time Picture
484 End Inspection 0229Severity: None
Created with the 4UPMSM report generator
i:3SM
KamPac Serial
Number
Pressure of Test
(mBar)
Material Dry
Use Standard
(ENI6IO)
Project
La Costa Village Locatiop Brant Ln I ownhornes
5/25/2012 09:22 Direction Of Survey Downstream
Carlsbad P0 Number
Purpose Routine Assessment
Casey Post Completed Yes
Pipe
Pipe Size 8
Polyvinyl Chloride Pipe Shape Circular
Total Length
68.4 Year Laid 2012
Sewer Use
Manhole
9 Upstream MH Depth
Upstream MH Notes
8 Downstream MH
Depth
Downstream MH
Notes
Signs Of Surcharge No
Other
Truck Number
Weather
VCR End Index
Pressure Test
All Pressure Tests
Passed No
Length of Pressure
Test
No Test Chamber Size
Project Name
Date
City
Run Number
Operator Name
Comments
Asset ID
Pipe Material
Lining Method
Length Surveyed
Year Renewed
Upstream MH
Number
UpstreamMH
Location
Downstream MH
Number
Downstream MH
Location
Amount of Flow
Media Number
Contractor Name
VCR Start Index
Created with the Ouposm report generator
Project Name: La Costa Village Townhomes Severity
Date: 5/25/2012 9:22:00 AM Asset ID:
Location: Brant Ln Upstream MH Number: 9
Length Surveyed: 68.4 Downstream MH Number: 8 Average
Run Number: Direction Of Survey: Downstream Heavy_________
Pipe Size: 8 Pipe Material: Polyvinyl Chloride Severe
ID Number: 9
(6.6) LR
(28.6) LR
(68.4) E
Total Distance: 68.4 ID Number: 8
Created with the report generator
Project Name: La
Date: 5/25/2012 9:22:00 AM
Location: Brant Ln
Length Surveyed: 68.4
.. M. ....L... e
Pipe Size: 8
Costa Village Townhomes
Asset D:
Upstream MH Number: 9
Downstream MH Number: 8
Direction Of Survey: Downstream
Pipe Material: Polyvinyl Chloride
Fault Observation Picture
LATERAL RIGHT
Severity: None .)T
E Rfl LRJ1IG Hit
BG FJT 0
LATERAL RIGHT I'iR 1
1
Severity: None
t_wJ
0
MH 9 TO MH 8
5/25/2012 La Costa Vi I 09:28
68.4 End Inspection
Severity: None
End Inpection
68.4 FT - 0
Created with the 14MMSM report generator