Loading...
HomeMy WebLinkAboutCT 04-08; LA COSTA VALLEY TOWNHOMES; SEWER REPORTS;Project Name La Costa Village Townhomes Date 5/25/2012 07:37 City Carlbad Run Number Operator Name Casey Post Comments Asset ID Pipe Material Polyvinyl Chloride Lining Method Length Surveyed 132.2 Year Renewed Upstream MH 16 Number UpstreamMH Location Downstream MH 14 Number Downstream MH Location Amount of Flow Media Number Contractor Name fl• Index Project Location Direction Of Survey Downstream P0 Number Purpose Routine Assessment Completed Yes Pipe Pipe Size 8 Pipe Shape Total Length Year Laid 2012 Sewer Use Manhole II....4.. 4L Upstream IVI Notes Downstream MH Depth Downstream MH Notes Signs Of Surcharge No Other Truck Number ! ler Weather VCR End Index KamPac Serial Number Pressure of Test (mBar) Material Dry Use Standard (ENI6IO) Pressure Test All Pressure Tests No Passed Length of Pressure Test - No Test Chamber Size Created with the PD5TM report generator Project Name: La Costa Vfllage Townhomes Date: 5/25/2012 7:37:00 AM Asset ID: Location: Upstream MH Number: 16 Length Surveyed: 0 Downstream MH Number: 14 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride ID Number: 16 (2.5) LL - Position: 9 (24.2) LL - Position: 10 (28.3) LR (45.5) LL - Position: 10 (49.4) LR (65.8) LL - Position: 10 (70.0) LR (88.1) LL - Position: 10 Total Distance: 0 (92.1) LR (132.2) El ID Number: 14 Created with the EM report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 7:37:00 AM Location: Length Surveyed: 0 Run Number: Pipe Size: 8 Asset ID: Upstream MH Number: 16 Downstream MH Number: 14 Direction Of Survey: Downstream Pipe Material: Poyviny Chloride Distance Fault Fault Observation Time I Picture / -- ! t. I 4 • 9, Co 1 • IL ®®t® To D LATERAL LEFT F 2.5 Position: 9 01:35 Severity: None LATERAL LEFT 24.2 02:49 Severity: None I r / ON lbw 19 a i 28.3 RIGHTLATERAL 03:43 j. Severity: None I I I • _ :?___ ..,.. .••/ 04:56 LATERAL LEFT I45.5 Position: 10 Severity: None I /4 nL 05:50 [Lf AUR A; RIjG T4i QT ~B 4 3U - I Fault Observation •Iiiit 60101 M H 41T6 1'I 4 I LATERAL RIGHT Severity: None I LATERAL LEFT 65.8 1 Position: 10 06:52 I Severity: None Time Picture Fault Observation 70.0 07:45 LATERAL RIGHT Seventy: None 08:54 LATERAL LEFT 88.1 Position: 10 Severity: None / 09:42 92.1 1 LATERAL RIGHT Severity: None Fault Observation liiit Picture NiH 16 NiH 14 5/25/2O1 a U ii 55 End Inspection Severity: None End Inspect ion 132.2 FT U Created with the report generator KamPac Serial Number Pressure of Test (mBar) Material Dry Use Standard (EN 1610) Project La Costa Villae lownhomes . .ocaon B.Iac.k Skimmer Dr 5/25/2012 08:15 Direction Of Survey Downstream Carlsbad P0 Number Purpose Routine Assessment Casey Post Completed Yes Pipe Pipe Size 8 Polyvinyl Chloride Pipe Shape Circular Total Length 43.4 Year Laid 2012 Sewer Use Manhole 1.4 Upstream NIH Depth Upstream NIH Notes 13 Downstream NIH Depth Downstream NIH Notes • Signs Of Surcharge No Other Truck Number Weather • VCR End Index Pressure Test All Pressure Tests Passed No Length of Pressure Test No Test Chamber Size [I Project Name Date City Run Number Operator Name Comments Asset ID Pipe Material Lining Method Length Surveyed Year Renewed Upstream NIH Number UpstreamMH Location Downstream NIH Number Downstream NIH Location Amount of Flow Media Number Contractor Name VCR Start Index Created with the report generator Project Name: La Costa Vi llage Townhomes Date: 5/25/2012 8:15:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 14 Length Surveyed: 43.4 Downstream MH Number: 13 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Materiai: Polyvinyl Chloride ID Number: 14 (43.4) El Total Distance: 43.4 ID Number: 13 Created with the OaPosm report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 8:15:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 14 Length Surveyed: 43.4 Downstream MH Number: 13 Run Number: Direction Of Survey: Downstream minim Q1.7a. A Pinch PrIwin,I ('hInriAch Created with the report generator Project Project Name La Costa Village lownhomes Location Black Skimmer Dr Date 5/25/20 12 08:33 Direction Of Survey Downstream City Carlsbad P0 Number Run Number Purpose Routine Assessment Operator Name Casey Post Completed Yes Comments Pipe Asset ID Pipe Size 8 Pipe Material Poiyyinyi Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 53 Year Laid 2012 Year Renewed Sewer Use • Manhole Upstream NIH 13Number Upstream MH Depth UpstreamMH Location Upstream NIH Notes Downstream NIH Downstream NIH Number Depth Downstream NIH Downstream NIH - Location Notes Amount of Flow • Signs Of Surcharge No Other Media Number Truck Number Contractor Name Weather VCR Start index VCR End index Pressure Test KamPac Serial All Pressure Tests Number Passed No Pressure of Test Length of Pressure (mBar) Test Material Dry No Test Chamber Size Use Standard (ENI6IO) - Created with the report generator P LSevery roject Name: La Costa Village Townhomes J Date: 5/25/2012 8:33:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 13 Moderate Length Surveyed: 83 Downstream MH Number: 5 Average Run Number: Direction Of Survey: Downstream Heavy_________ Pipe Size: 8 Pipe Material: Polyvinyl Chloride Severe ID Number: 13 (83.0) El Total Distance: 83 ID Number: 5 Created with the report generator Project Name: La Costa Village Townhomes Date: 512512012 8:33:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 13 Length Surveyed: 83 Downstream MH Number: 5 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride Fault Observation Picture MH 13 TO NH S 5/25/2012 La Cost,-"a Vil 08:36 End Inspection - Severit~: None I - End 1risectiThn 83.0 FT 0 Created with the report generator -LLkTk KamPac Serial Number Pressure of Test (mBar) Material Dry Use Standard (ENI6IO). Project La Costa Village Location Brant Ln '1 ownhomes 5/25/2012 09:16 Direction Of Survey Downstream Carlsbad P0 Number Purpose Routine Assessment Casey Post Completed Yes Pipe Pipe Size 8 Polyvinyl Chloride Pipe Shape Circular Total Length 59.4 Year Laid 2012 Sewer Use Manhole 10 Upstream MM Depth Upstream MM Notes 9 Downstream MM Depth - Downstream MH Notes Signs Of Surcharge No Other Truck Number Weather VCR End index Pressure Test All Pressure Tests Passed No Length of Pressure Test No Test Chamber Size Project Name Date City Run Number Operator Name Comments Asset ID Pipe Material Lining Method Length Surveyed Year Renewed Upstream MH Number UpstreamMH Location Downstream MH Number Downstream MH Location Amount of Flow Media Number Contractor Name VCR Start index IM Created with the report generator Project Name: La Costa Village Townhomes I Severity Date: 5/25/2012 9:16:00 AM Asset ID: Location: Brant Ln Upstream MH Number: 10 Length Surveyed: 59.4 Downstream MH Number: 9 Run Number: Direction Of Survey: Downstream Heavy Pipe Size: 8 Pipe Material: Polyvinyl Chloride Severe ID Number: 10 (4.3) LR (25.2) LR (46.2) LR (59.4) El Total Distance: 59.4 ID Number: 9 Created with the report generator Project Name: La Costa Village Townhomes Date: 5125/2012 9:16:00 AM Asset ID: Location: Brant Ln Upstream MH Number: 10 Length Surveyed: 59.4 Downstream MH Number: 9 RLm umber: Di rection Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride IDistance Fault Observation Time I Picture /4111 9U 0 • fI i,J • -. -i -I :d' •'. j I 4 LATERAL RIGHT 56 . I Severity: None a: ®r Al : d • !1O0 jo 252 LATERAL RIGHT ° Severity: None I lIi ,® 'E gi 0 • i LATERAL 46.2 RIGHT 02:50Severity: None '1 1 I i IV I - Fault Observation Picture - MH 10 ' MH 9 5/25/2012 a I .. .\09:21 End Inspection Severity: None End,,JnspectJ on, ., . 59.4 0 Created with the PSM report generator KamPac Serial Number Pressure of Test (rnBar) Material Dry Use Standard (ENI6IO) Project La Costa Village Location Black Mustard Ln I ownhomes 5/25/2012 08:48 Direction Of Survey Downstream Carlsbad P0 Number Purpose Routine Assessment Casey Post Completed Yes Pipe Pipe Size 8 Polyvinyl Chloride Pipe Shape Circular Total Length 90.6 Year Laid 2012 Sewer Use Manhole 15 Upstream MH Depth Upstream MH Notes Ii Downstream MH Depth Downstream MH Notes Signs Of Surcharge No Other Truck Number Weather VCR End index Pressure Test All Pressure Tests Passed I\40 Length of Pressure Test No Test Chamber Size Project Name Date City Run Number Operator Name comments Asset ID Pipe Material Lining Method Length Surveyed Year Renewed Upstream MH Number UpstreamMH Location Downstream MH Number Downstream MH Location Amount of Flow Media Number Contractor Name VCR Start index Created with the report generator Project Name: La Costa Village Townhomes Light I Severity Date: 5/25/2012 8:48:00 AM Asset ID: Location: Black Mustard Ln Upstream MH Number: 15 Moderate Length Surveyed: 90.6 Downstream MH Number: 13 Average Run Number: Direction Of Survey: Downstream Heavy Pipe Size: 8 Pipe Material: Polyvinyl Chloride -s evere________ ID Number: 15 (0.4) LL - Position: 9 (6.3) LR (21.6) LL - Position: 10 (26.5) LR (43.1) LL - Position: 9 (47.8) LR (64.9) LL - Position: 10 (69.3) LR (86.2) LL - Position: 10 (90.6) LR Total Distance: 90.6 ID Number: 13 Created with the PDSJ4 report generator Project Name: La Date: 5/25/2012 8:48:00 AM Location: Black Mustard Ln Length Surveyed: 90.6 Run Number: Pipe Size: 8 Costa Village Townhomes Asset ID: Upstream MH Number: 15 Downstream MH Number: 13 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride Distance Fault Observation Time Picture I M a Q0% Euo I ' LATERAL LEFT I 0.4 Position: 9 01:05 Severity: None 6.3 LATERAL RIGHT 01:35 ... - Severity: None ____ '# •g LATERAL LEFT .. ( A ... 21.6 Position: 10 02:18 M Severity: None . 1,Distance Fault Observation Time Picture .1 -' i1 [Lj' • 26.5 L(::iA 9 T 03:00 A ne R I!ri) &aM WOO 85s. I_. LATERAL LEFT 43 .1 Position: 9 04:00 Severity: None iiicj frif [Lii @@6tQ 91Et 47.8 RIGHTLATERAL 04:35 __ Severity: 1Distance! Fault Observation (_Time Picture tJI LATERAL LEFT 649 0553 Severity: None IV 69..s LATERAL RIGHT 06.28 1. Severity: None .. .1 do MIN LATERAL LEFT 86.2 Position: 10 07:22 Severity: None Distance Fault Observation Time Picture I' 9.6 . . I flj 906 LATERAL RIGHT 07 04. Severity: None flIi1L &O1? Created with the 4UPOSM report generator Project Project Name Date City Run Number Operator Name Comments La Costa Village Townhomes 5/25/2012 11:41 Carlsbad Casey Post Location Black Skimmer Dr Direction Of Survey Downstream P0 Number Purpose Routine Assessment Completed Yes KamPac Serial Number Pressure of Test (mBar) Material Dry Use Standard (ENI6IO) Pipe Pipe Size 8 Polyvinyl Chloride Pipe Shape Circular Total Length 72.8 Year Laid 2012 Sewer Use Manhole 2 Upstream MH Depth Upstream MH Notes' Downstream MH Depth Downstream MH Notes Signs Of Surcharge No Other Truck Number Weather VCR End Index Pressure Test All Pressure Tests Passed No Length of Pressure Test No Test Chamber Size Asset ID Pipe Material Lining Method Length Surveyed Year Renewed Upstream MH Number U pstreamMH Location Downstream MH Number Downstream MH Location Amount of Flow Media Number Contractor Name VCR Start Index Created with the report generator Project Name: La Costa Village Townhomes I Severity Date: 5/25/2012 11:41:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 2 Length Surveyed: 72.8 Downstream MHNumber: I Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride ID Number: 2 (72.8) El Total Distance: 72.8 ID Number: 1 Created with the report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 11:41:00 AM Location: Black Skimmer Dr Length Surveyed: 72.8 Run Number: Pipe Size: 8 Asset ID: Upstream MH Number: 2 Downstream MH Number: I Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride Distance Fault Observation Time Picture / 728 End Inspection Severity: None 0236 r', _\) OW Created with the report generator Project La Costa Village Location Black Skimmer Dr Townhomes 5/25/2012 11:38 Direction Of Survey Downstream Carlsbad P0 Number Purpose Routine Assessment Casey Post Completed Yes Pipe Pipe Size 8 Polyvinyl Chloride Pipe Shape Circular Total Length 48.4 Year Laid 2012 Sewer Use Manhole 3 Upstream MH Depth Upstream MH Notes 2 Downstream MH Depth - Downstream MH Notes Signs Of Surcharge No Other Truck Number Weather VCR End Index Project Name Date City Run Number Operator Name Comments Asset ID Pipe Material Lining Method Length Surveyed Year Renewed Upstream MH Number UpstreamMH Location Downstream MH Number Downstream MH Location Amount of Flow Media Number Contractor Name VCR Start Index KamPac Serial Number Pressure of Test (mBar) Material Dry Use Standard (ENI6IO) Pressure Test All Pressure Tests Passed No Length of Pressure Test No Test Chamber Size Created with the report generator Project Name: La Costa Village Townhomes Severity Date: 5/25/2012 11:38:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 3 Length Surveyed: 48.4 Downstream MH Number: 2 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride ID Number: 3 (48.4) El I1 Total Distance: 48.4 ID Number: 2 Created with the report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 11:38:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 3 Length Surveyed: 48.4 Downstream MH Number: 2 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride Distance Fault Observation Time Picture I - 48.4 End Inspection 01:55 Severity: None Created with the report generator Project Project Name La Costa Village Location Townhomes Slope/Easment Date 5/25/2012 11:14 Direction Of Survey Downstream City Carlsbad P0 Number Run Number Purpose Routine Assessment Operator Name Casey Post Completed Yes Comments Pipe Asset ID Pipe Size 8 Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 78.5 Year Laid 2012 Year Renewed Sewer Use Manhole Upstream MH Number 4 Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH Downstream MH Number Depth Downstream MH Downstream MH Location Notes Amount of Flow Signs Of Surcharge No Other Media Number Truck Number Contractor Name Weather VCR Start Index VCR End Index Pressure Test KamPac Serial All Pressure Tests Number - Passed No Pressure of Test Length of Pressure (mBar) Test Material Dry No Test Chamber Size Use Standard (EN 1610) Created with the M report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 11:14:00 AM Asset ID: Location: Slope/Easment Upstream MH Number: 4 Length Surveyed: 78.5 Downstream MH Number: 3 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride ID Number: 4 (78.5) El Total Distance: 78.5 ID Number: 3 Created with the report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 11:14:00 AM Location: Slope/Easment Length Surveyed: 78.5 Run Number: Pipe Size: 8 Asset ID: Upstream MH Number: 4 Downstream MH Number: 3 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride —Fault Observation Ii,it MH 3 Cos tfll 11. :18 ', InspectionEnd . - Severity: None E1i'1 I Fjr Created with the report generator Project Project Name La Costa Village Location Sea Rocket Ln Townhomes Date 5/25/2012 11:06 Direction Of Survey Downstream City Carlsbad P0 Number Run Number Purpose Routine Assessment Operator Name Casey Post Completed Yes Comments Pipe Asset ID Pipe Size 8 Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 99 Year Laid 2012 Year Renewed Sewer Use Manhole Upstream MH Number s Upstream MH Depth UpstreamMH Location ' Upstream MH Notes Downstream MH Downstream MH Number Depth Downstream MH Downstream MH Location Notes Amount of Flow Signs Of Surcharge No Other Media Number Truck Number Contractor Name Weather VCR Start Index VCR End Index Pressure Test KamPac Serial All Pressure Tests Number N Passed Pressure of Test Length of Pressure (mBar) Test Material Dry No Test Chamber Size Use Standard (ENI6IO) Created with the report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 11:06:00 AM Asset ID: Location: Sea Rocket Ln Upstream MH Number: 5 Length Surveyed: 99 Downstream MH Number: 4 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride ID Number: 5 (30.5) LR (36.0) LL - Position: 12 (52.8) LR (57.3) LL - Position: 10 (72.6) LR (80.6) LL - Position: 10 (92.0) LR (95.4) LL - Position: 10 (99.0) El Total Distance: 99 ID Number: 4 Created with the report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 11:06:00 AM Asset ID: Location: Sea Rocket Ln Upstream MH Number: 5 Length Surveyed: 99 Downstream MH Number: 4 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride LDistance 1 Fault Observation Time Picture ' - ( 305 LATERAL RIGHT 0t07 Severity: None T I .jJw (O sIii 36.0 LATERAL LEFT Position: 12 01:43 Severity: None 528 LATERAL Severity: No nHeT 0243 IROWU Distance Fault Observation Time Picture i; If 57.3 LATERAL LEFT Position. 10 03.27 . 1 Severity: None .• _______________ 8 / 72.6 LATERAL RIGHT 04:21 . Severity: None WMTM~ mom ve I [4CA 4' LATERAL LEFT 80.6 Position: 10 04:58 Severity: None Distance Fault Observation Time Picture ErI1J1 ffi PH @MrM 011 I \ its 9z I 92.0 LATERAL 05:39 Severity: No nHeT Ir[A - U 0 LATERAL LEFT 95.4 Position: 10 06:14 Severity: None P .. 0•40 9 - 99.0 End Inspection Severity: None 06:43 Created with the report generator Project Location Alkali Heath Ln Direction Of Survey Downstream P0 Number Purpose Routine Assessment Completed Yes Project Name Date City Run Number Operator Name Comments La Costa Village Townhomes 5/25/2012 10:33 Carlsbad Casey Post KamPac Serial Number Pressure of Test (mBar) Material Dry Use Standard (ENI6IO) Pipe Pipe Size 8 Polyvinyl Chloride Pipe Shape Circular Total Length 138.2 Year Laid 2012 Sewer Use Manhole 12 Upstream MH Depth Upstream MH Notes 6 Downstream MH Depth Downstream MH Notes Signs Of Surcharge No Other Truck Number Weather VCR End Index Pressure Test All Pressure Tests Passed No Length of Pressure Test No Test Chamber Size Asset ID Pipe Material Lining Method Length Surveyed Year Renewed Upstream MH Number UpstreamMH Location Downstream MH Number Downstream MH Location Amount of Flow Media Number Contractor Name VCR Start Index Created with the report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 10:33:00 AM Asset ID: Location: Alkali Heath Ln Upstream MH Number: 12 Length Surveyed: 138.2 Downstream MH Number: 6 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride ID Number: 12 (4.7) LR (9.0) LL - Position: 10 (24.7) LR (29.5) LL - Position: 10 (46.3) LR (51.4) LL - Position: 10 (73.2) LL - Position: 10 (90.0) LR (94.7) LL - Position: 10 (t38.2) El Total Distance: 138.2 ID Number: 6 Created with the report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 10:33:00 AM Location: Alkali Heath Ln Length Surveyed: 138.2 Run Number: Pipe Size: 8 Asset ID: Upstream MH Number: 12 Downstream MH Number: 6 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride Dis6-n-c'el Fault Observation Time Picture J 'ii II 8,99 1/ 47 LATERAL RIGHT Severity: None 7 tui:l1lf)&12fl= 410VIF1F\. UIVU? -. • lL • ii LATERAL LEFT f' 9.0 Position: 10 01:27 1 Seventy: None WDO .5 ( 247 LATERAL RIGHT 0217 Severity: None _ Distance Fault Observation Time Picture ji R 11 -' LATERAL LEFT I -- I / 29.5 Position: 10 02:48 I Severity: None / •. // / ------' ILLI jjIT7Lg C7i.N &ke 46.3 LATERAL RIGHT 03.. 36 Severity: None j .4 1u __ ;.. LATERAL LEFT 51.4 Position: 10 04:11 - Severity None Distance Fault Observation Time Picture ct 68.6 LATERAL RIGHT 04:56 Severity: None woo VV '_a • 1'JU ti one 6@ LATERAL LEFT / 73.2 Position: 10 05:28 Severity: None / I .1 llr'!J ftffift tO ( 90.0 LATERAL 06:2006:20 None Distance Fault Observation Time Picture N WD 0 LATERAL LEFT 947 0 c1 1 646Severity: None DA @WMft Ii 138.2 End Inspection 08:33Severity: None Created with the report generator k'A.. Project Project Name La Costa Village Townhornes Location Cliffs Swallons Ln Date 5/25/2012 10:15 Direction Of Survey Downstream City Carlsbad P0 Number Run Number Purpose Routine Assessment Operator Name Casey Post Completed Yes Comments • Pipe Asset ID Pipe Size 8 Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method V Total Length Length Surveyed 113.4 Year Laid V 2012 Year Renewed Sewer Use Manhole Upstream MH 17 Upstream MH Depth Number UpstreamMH Upstream MH Notes Location Downstream MH Downstream MH Number Depth Downstream MH Downstream MH V Location Notes Amount of Flow Signs Of Surcharge No Other Media Number Truck Number Contractor Name Weather VCR Start Index V VCR End Index Pressure Test KamPac Serial All Pressure Tests Number V Passed N ° Pressure of Test . Length of Pressure (mBar) Test S Material Dry No Test Chamber Size Use Standard (ENI6I0) V Created with the Pt3M report generator Project Name: La Costa Village Townhomes I Severity Date: 5/25/2012 10:15:00 AM Asset ID: !t€1i1 Location: Cliffs SwaUons Ln Upstream MH Number: 17 Length Surveyed: 113.4 Downstream MH Number: 7 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride ID Number: 17 (6.4) LR (35.0) LL -.Position.- 10 (36.7) LR (56.8) LL - Position: 10 (59.5) LR (77.9) LL - Position: 10 (80.9) LR (113.4) El Total Distance: 113.4 ID Number: 7 Created with the report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 10:15:00 AM Location: Cliffs Swallons Ln Length Surveyed: 113.4 Run Number: Pipe Size: 8 Asset ID: Upstream MH Number: 17 Downstream NIH Number: 7 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride Distance Fault Observation Time Picture C41 T i'.ij II JIE SU /1 64 LATERAL RIGHT 58 Severity: None (f Oi1600 otsa@ 7' LATERAL LEFT 35.0 Position: 10 02:17 Severity: None .. I • I oIv • Oi 4(01 -. E1JJJ Thfll_. - V 36.7 02:47 Distance Fault Observation Time Picture N T1i LATERAL LEFT 56.8 Position: 10 03:43 Severity: None ca 94I • -2RO 8®' 59.5 LATERAL RIGHT 04:22 Severity: None C..? MIVfll t I . ••.i [•Q _____ L LATERAL LEFT \ '; 77.9 05:45 Distance Fault Observation Time Picture W 919 • 809 LATERAL RIGHT 06•22 Severity: None L!J11tIL 1h1I?LT 113.4 End Inspection 08:17Severity: None AL Created with the report generator SM Project Project Name La Costa Village Location Townhomes Black Skimmer Dr Date 5/25/201209:55 Direction Of Survey Downstream City Carlsbad P0 Number Run Number Purpose Routine Assessment Operator Name Casey Post Completed Yes Comments Pipe Asset ID Pipe Size 8 Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 53.8 Year Laid 2012 Year Renewed Sewer Use Manhole Upstream MH 6 Upstream MH Depth Number UpstreamMH Upstream MH Notes Location Downstream MH Downstream MH Number Depth Downstream MH Downstream MH Location Notes Amount of Flow Signs Of Surcharge No Other Media Number Truck Number Contractor Name Weather VCR Start Index - VCR End Index Pressure Test KamPac Serial All Pressure Tests Number Passed N Pressure of Test Length of Pressure (mBar) Test Material Dry No Test Chamber Size Use Standard (EN 1610) Created with the 'PDSIV1 report generator Project Name: La Costa ViHage Townhomes SeverityJ Date: 5/25/2012 9:55:00 AM Asset ID: Location: Black Skimmer Dr Upstream NIH Number: 6 - Length Surveyed: 53.8 Downstream MH Number: 5 Average Run Number: Direction Of Survey: Downstream Heavy Pipe Size: 8 Pipe Material: Polyvinyl Chloride Severe_________ ID Number: 6 (53.8) El Total Distance: 53.8 ID Number: 5 Created with the report generator - Project Name: La Costa Village Townhomes Date: 5/25/2012 9:55:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 6 Length Surveyed: 53.8 Downstream MH Number: 5 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride Fault Observation •li,it Picture / 'MR B MH End Inspection End Inspection 53.8' FT 0 Created with the report generator IULi.k"k Project Project Farne La Costa Village lownhornes Locati on Black Skimmer Dr Date 5/25/2012 09:49 Direction Of Survey Downstream. City Carlsbad P0 Number Run Number Purpose Routine Assessment Operator Name Casey Post Completed Yes Comments Pipe Asset 1D Pipe Size S Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 85.2 Year Laid 2012 Year Renewed Sewer Use Manhole Upstream MH Number UpstreamMH Location Downstream MH Number Downstream MH Location Amount of Flow Media Number Contractor Name VCR Start Index Upstream MH Depth Upstream MH Notes 6 Downstream MH Depth Downstream MH Notes Signs Of Surcharge No Other Truck Number Weather VCR End Index KamPac Serial Number Pressure of Test (mBar) Material Dry Use Standard (EN1610) Pressure Test All Pressure Tests Passed No Length of Pressure Test No Test Chamber Size Created with the PDEM report generator Project Name: La Costa Vi llage Townhomes Date: 5/25/2012 9:49:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 7 Length Surveyed: 85.2 Downstream MH Number: 6 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride ID Number: 7 (85.2) El Total Distance: 85.2 ID Number: 6 Created with the Ovmsm report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 9:49:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 7 Length Surveyed: 85.2 Downstream MH Number: 6 Run umber: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride l'1iii. IIiit Picture MH 7 MH S .O9:53 End Inspection Severity: None ___ k. End Inspectiôr 85.2 FT 0 Created with the EM report generator KamPac Serial Number Pressure of Test (mRar) Material Dry Use Standard (EN 1610) Project La Costa Village Location Black Skimmer Dr I ownhomes 5/25/2012 09:45 Direction Of Survey Downstream Carlsbad P0 Number Purpose Routine Assessment Casey Post Completed Yes Pipe Pipe Size 8 Polyvinyl Chloride Pipe Shape Circular Total Length 48.4 Year Laid 2012 Sewer Use Manhole 8 InQ,.? zli~-i NIH Depth Upstream NIH Notes Downstream NIH Depth Downstream NIH Notes Signs Of Surcharge No Other Truck Number Weather VCR End Index Pressure Test All Pressure Tests Passed No Length of Pressure Test No Test Chamber Size Project Name Date City Run Number Operator Name Comments Asset ID Pipe Material Lining Method Length Surveyed Year Renewed Upstream NIH Number UpstreamMH Location Downstream NIH Number Downstream NIH Location Amount of Flow Media Number Contractor Name VCR Start Index Created with the Ouposm report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 9:45:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 8 Length Surveyed: 48.4 Downstream NIH Number: 7 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride 4. lD Number: 8 Total Distance: 48.4 ID Number: 7 Created with the VROSM report generator Project Name: La Costa Village Townhomes Date: 5/25/2012 9:45:00 AM Asset ID: Location: Black Skimmer Dr Upstream MH Number: 8 Length Surveyed: 48.4 Downstream MH Number: 7 Run Number: Direction Of Survey: Downstream Pipe Size: 8 Pipe Material: Polyvinyl Chloride Distance t Fault Observation Time Picture 484 End Inspection 0229Severity: None Created with the 4UPMSM report generator i:3SM KamPac Serial Number Pressure of Test (mBar) Material Dry Use Standard (ENI6IO) Project La Costa Village Locatiop Brant Ln I ownhornes 5/25/2012 09:22 Direction Of Survey Downstream Carlsbad P0 Number Purpose Routine Assessment Casey Post Completed Yes Pipe Pipe Size 8 Polyvinyl Chloride Pipe Shape Circular Total Length 68.4 Year Laid 2012 Sewer Use Manhole 9 Upstream MH Depth Upstream MH Notes 8 Downstream MH Depth Downstream MH Notes Signs Of Surcharge No Other Truck Number Weather VCR End Index Pressure Test All Pressure Tests Passed No Length of Pressure Test No Test Chamber Size Project Name Date City Run Number Operator Name Comments Asset ID Pipe Material Lining Method Length Surveyed Year Renewed Upstream MH Number UpstreamMH Location Downstream MH Number Downstream MH Location Amount of Flow Media Number Contractor Name VCR Start Index Created with the Ouposm report generator Project Name: La Costa Village Townhomes Severity Date: 5/25/2012 9:22:00 AM Asset ID: Location: Brant Ln Upstream MH Number: 9 Length Surveyed: 68.4 Downstream MH Number: 8 Average Run Number: Direction Of Survey: Downstream Heavy_________ Pipe Size: 8 Pipe Material: Polyvinyl Chloride Severe ID Number: 9 (6.6) LR (28.6) LR (68.4) E Total Distance: 68.4 ID Number: 8 Created with the report generator Project Name: La Date: 5/25/2012 9:22:00 AM Location: Brant Ln Length Surveyed: 68.4 .. M. ....L... e Pipe Size: 8 Costa Village Townhomes Asset D: Upstream MH Number: 9 Downstream MH Number: 8 Direction Of Survey: Downstream Pipe Material: Polyvinyl Chloride Fault Observation Picture LATERAL RIGHT Severity: None .)T E Rfl LRJ1IG Hit BG FJT 0 LATERAL RIGHT I'iR 1 1 Severity: None t_wJ 0 MH 9 TO MH 8 5/25/2012 La Costa Vi I 09:28 68.4 End Inspection Severity: None End Inpection 68.4 FT - 0 Created with the 14MMSM report generator