HomeMy WebLinkAboutCT 04-08; LA COSTA VILLAGE TOWNHOMES; PAVEMENT RECOMMENDATIONS; 2012-06-28ro4c GEOCON' INCORPORATED G E 0 1 E C H N I C A I U ENVIRONMENTAL • MATERIAL'S Project No. 07193-32-03A June 28, 2012 City Ventures 1900 Quail Street Newport Beach, Uliforrilla 92660 Attention: Mr. Matthew Jansen Subject: PAVEMENT RECOMMENDATIONS LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3), CT 04-08 EL CAM[NO REAL STATION NOS. 225+62 TO 242+00 -. CARLSBAD, CALIFORNIA Dear Mr: Thnsen: In accordance with the request ofMr Greg Jones, your site supeiintendent, we obtained subgiade soil samples from m El Caino Real adjacent to the subject development i m After collection, we peifoed Resistance Value (R-Value) tests on the samples Based on information provided by C&V Consulting, Inc., the project civil engineer, we understand that a Traffic Index (TI) of 9.0 has been assigned to the subject roadway. Subgrade soil consists predominately of silty to clayey sand, and typically exhibits low to moderate, R-Value characteristics We performed the laboratory R-Value tests in accordance with ASTM D 2844 (California Test Method No. 301). The results of the laboratory tests and the corresponding roadway station numbers are presented in Table 1. Based on laboratory testing, we calculated the pavement sections in accordance with California Department of Transportation Highway Design Manual and the City of Carlsbad Minunumn Structum cii Standaid GS-17 The pavement sections and the Traffic Index are presented in Table 11 Calculations for the pavement sections are presented in Figure 1. Final pavement section approval should be obtained. from the City of Carlsbad. Asphalt concrete should conform to Section 2036 of the Standard Specifications for Public Works Consti lid/on (Greenbook) Class 2 aggregate base maferials should conform to Section 26-1.02A of the Standard Specifications of the-State of California, Department of Transportation (Caltrans) or approved equivalent. Additionally, materials should conforin to City of Carlsbad spe'cifications. Prior to placing base materials for roadways and curb/gutter,-the upper 12 inches of subgrade should be scarified, moistuie conditioned as necessary, and compacted to a dry density of at least 95 percent of the laboratory maximum dry density in accordance with ASTM D 1557. The upper 12 inches of subgrade beneath areas to receive coiicret sidewalks should be compacted to a dry density of at least 90 percent of the laboratory maximum' dry density near to slightly above optimum moisture content. 6960 Flanders Drive • San Diego, California 92121-2974 • Tlephone 858.558.6900 • Fax 858.558.6159 1 '. The base materials should be compacted to a dry density of at least 95 percent of the laboratory maximum dry density near to slightly above optimum moisture content. The asphalt concrete should be compacted to a density of at least 95 percent of the laboratory Hveeni density in accordance with ASTM D 2726. The performance of asphalt concrete pavement is highly dependent on providing positive surface drainage away from the edge of the pavement. Ponding of water on or adjacent to the pavement will likely result in saturation of the subgrade materials and subsequent pavement distress. To reduce the occurrence for such situations, a minimum drainage gradient of at least 1 percent should be maintained for pavement surfaces. Drainage from landscaped areas should be directed to controlled drainage structures. Should you have any questions regarding this correspondence, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCON INCORPORATED Trevor E. Myers S2 No. RCE63773 7m LO Exp.09130/12 ). RCE 63773 TEM:dmc OF C (e-mail) Addressee (e-mail) C&V Consulting, Inc. Attention: Mr. Vince Scarpati (2) City of Carlsbad Attention: Mr. Robert Slenipa (I/del) Carlsbad 3 Job Site Trailer Attention: Mr. Greg Jones r Project No. 07193-32-03A -2- June 28. 2012 FIGURE 1 ) PAVEMENT SECTION CALCULATIONS FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3) El Camino Real - Stations 239+50 to 242+00 Use subgrade R-Value =37 Traffic Index (Ti) = 9 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0:2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(9.0)(100-78.0)+0.2 = 0 83 feet from Table 608.413 Highway Design Manual GE = 083 feet for AC yields actual thickness = 5.29 inches Use 6.0 inches of AC - City Minimum GE for 6.0 inches of AC = 0.95 feet GE for base = (0.0032)(9.0)(I00-37.0) -0.95 = 0.87 feet from Table 608.4B Highway Design Manual with GF for Class 2 base = .1 Base thickness = 9.5 inches Use base thickness = 10 inches Design Street Structural Section -P Asphalt Concrete Thickness = 6 inches Class 2 Aggregate Base Thickness = 10'inches. El Camino Real - Stations 236+50 to 239+50 Use subgrade R-Value = 10 Traffic Index (TI) = 9 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(9.0)(100-78.0)+0.2 = 0.83 feet from Table 608.4B Highway Design Manual GE = 0.83 feet for AC yields actual thickness= 5.29 inches Use 6.0 inches of AC - City Minimüm GE for 6.0 inches of AC = 0.95 feet GE for base = (0.0032)(9.0)(100-10.0) -0.95 = 1.65 feet from Table 608.4B Highway Design Manual with GF for Class 2 base = 1 . Base thickness = 18.0 inches - Use base thickness = 181 inches Design Street Structural Section Asphalt Concrete Thickness = 6 inches. • Class 2 Aggregate Base Thickness = 18 inches. Project No. 07193-32-03A June 28, 2012 FIGURE 1 (Continued) PAVEMENT SECTION CALCULATIONS FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3) El Camino Real - Stations 233+50 to 236+50 Use subgrade R-Value = 28 Traffic Index (Ti) = 9 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(9.0)(100-78.0)+0.2 = 0.83 feet from Table 608.4B Highway Design Manual GE = 0.83 feet for AC yields actual thickness = 5.29 inches Use 6.0 inches of AC - City Minimum GE for 6.0 inches of AC = 0.95 feet GE for base = (0.0032)(9.0)(100-28.0) - 0.95 = 1.13 feet from Table 608.4B Highway Design Manual with GF for Class 2 base = 1.1 Base thickness = 12.3 inches Use base thickness = 13 inches Design Street Structural Section Asphalt Concrete Thickness = 6 inches. Class 2 Aggregate Base Thickness = 13 inches. El Camino Real - Stations 230+50 to 233+50 Use subgrade R-Value = 16 Traffic index (TI) = 9 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(9.0)(100-78.0)+0.2 = 0.83 feet from Table 608.4B Highway Design Manual GE = 0.83 feet for AC yields actual thickness = 5.29 inches Use 6.0 inches of AC - City Minimum GE for 6.0 inches of AC = 0.95 feet GE for base = (0.0032)(9.0)(100-16.0) -0.95 = 1.47 feet frorn Table 608.4B Highway Design Manual with GF for Class 2 base = 1.1 Base thickness = 16.1 inches Use base thickness = 16 inches, Per City of Carlsbad GS-1 7 *** Design Street Structural Section Asphalt Concrete Thickness = 6 inches. Class 2 Aggregate Base Thickness = 16 inches (Per GS-17). Project No. 07193-32-03A June 28, 2012 FIGURE 1 (Continued) PAVEMENT SECTION CALCULATIONS - FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3) El Camino Real — Stations 228+00 to 230+50 Use subgrade R-Value = 11 Traffic Index (TI) = 9 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 -Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(9.0)(100-78.0)+0.2 =0.83 feet from Table 608.4B Highway Design Manual GE = 0.83 feetfor AC yields actual thickness 5.29 inches Use 6.0 inches of AC City Minimum GE for 6.0 inches of AC = 0.95 feet GE for base = (0.0032)(9.0)(100-11.0) - 0.95 = 1.62 feet from Table 608.4B Highway Design Manual with OF for Class 2 base = 1.1 Base thickness = 17.7 inches Use base thickness = 18 inches Design Street Structural Section Asphalt Concrete Thickness = 6 inches. Class 2 Aggrgte Base Thickness = 18 inches. El Camino Real — Stations 225±62 to 228+00 Use subgrade R-Valiie = 16 Traffic Index (TI) = 9 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 — Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(9.0)(100-78.0)+0.2 = 0.83 feet from Table 608.4B Highway Design Manual GE= 0.83 feet for AC yields actual thickness = 5.29 inches •. Use 6.0 inches of AC - City Minimum GE for 6.0 inches of AC = 0.95 feet GE for base = (0.0032)(9.0)(100-16.0) -0.95 = 1.47 feet from Table 608.4B Highway Design Manual'with OF for Class 2 base = 1.1 • Base thickness = 16.1 inches Use base thickness = 16 inches, Per City of Carlsbad GS-17 Design Street Structural Section - Asphalt Concrete Thickness = 6 inches. Class 2 Aggregate Base Thickness = 16 inches (Per GS-17). I b... Project No 07 193-32-03A June 28, 2012 TABLE I SUMMARY OF R-VALUE TEST RESULTS ASTM D 2844-01 (CALIFORNIA TEST METHOD NO. 301) Sample Number Street (Sample Location) R-Value R-7 El Camino Real (241+00) 37 R-8 El Camino Real (238+00) 10 R-9 El Camino Real (235+00) 28 R-I0 El Camino Real (232+00) 16 R-11 El Camino Real (229+00) II R-12 El Camino Real (227+00) 16 TABLE II PAVEMENT SECTION RECOMMENDATIONS Location Traffic Index (TI) R-Value Asphalt Concrete (inches) Class 2* Aggregate Base (inches) El Camino Real (239+50 to 242+00) 9 37 6 10 El Camino Real (236+50 to 239+50) 9 10 6 18 El Camino Real (233+50 to 236+50) 9 28 6 13 El Camino Real (230+50to233+50) 9 16 6 16 ino Real (228+00 to 230+50) 9 II 6 18 EEIalniinoReal (225+62 to 228+00) 9 16 6 16 *Or approved equivalent. Project No. 07193-32-03A June 28, 2012 G]OCON ' 1OLFsr. INCORPORATED' GEOTECHNICAL • ENVIRONMENTAL. MATERIALS Project No. 0719332-03A June 22, 2012 City Ventures 1900 Quail Street Newport Beach, California 92660 Attention; Mr. Matthew Jansen Subject: PAVEMENT RECOMMENDATIONS ' LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3), CT 04-08 INTERIOR STREETS CARLSBAD, CALIFORNIA - Dear Mr. Jansen: In accordalicé with the request of Mr. Greg Jones, your'site superintendent, we obtainedsubgrade soil' samples from the interior roadways within the subject deelopment After collection, we performed Resistance Value (R-Value) tests on the samples Based on information provided by 'C&V Consulting, Inc., the project civil engineer, and Mr. David Rick with the City of Carlsbad, we understand that Traffic Indices (TI) of 4.5 and 5.0 have been-assigned to the subject roadways. Subgrade soil consists predominately of silty, to clayey sand, and typically exhibits low to moderate R-Value characteristics We performed the laboratory R-Value tests in accordance with ASTM D 2844 (California Test Method No 301) The results of the laboratory tests and the corresponding roadway station nä'mbers are presented in' Table I. Based on laboratory testing, we calculated the, pavement sections in accordance with California Dep7Jrtmet of Tñinsp?Jrtation Highway Dign Maual and the City of Carlsbad Minimum Structural Standard GS-17 The pavement sections and the Traffic Index are presented in Table II Calculations forthe pavement sections are- presented in Figure 1. Final pavethent section approval should be obtained from the City of Carlsbad. Asphalt 'óoncrete should conform to Section 20-6of the Standard Specifications for Public Works Constrution (Greenbook) Class ,2 aggregate base materials should conform to Section 26-1 02A of the Stanliard Specifications of the State of California Department of Transportation (Caltrans) or approved equivalent Additionally, materials should conform to City of Carlsbad specifications C> Prior to placing base materials f& roadways and curb/gutt'r, the 6pper 12 inches of subgrade should be scarified, moisture conditioned as necessary, and compacted to a dry density of at least 95 percent of the laboratory maximum dry density in accordance with. ASTM D 1557: The upper 12 inches of subgrade beneath areas'-to receive concrete sidewalks should be compacted to a-dry density of at least 90 percent of the laboratory maximum dry density near to slightly above optimum moisture content.. 6960 Flanders Drive • San Diego; California 92121-2974 in Telephone'858.558'.6900 0 Fax 858.558.6159 The base materials should be compacted to a dry density of at least 95 percent of the laboratory maximum dry density near to slightly above optimum moisture content. The asphalt concrete should be compacted to a density of at least 95 percent of the laboratory Hveem density in accordance with ASTM D 2726. The performance of asphalt concrete pavement is highly dépendënt on providing positive surface drainage away from the edge of the pavement. Ponding of water on or adjacent to the pavement will likely result in saturation of the subgrade materials and subsequent pavement distress. To reduce the occurrence for such situations, a minimum drainage gradient of at least 1 percent should be maintained for pavement surfaces. Drainage from landscaped areas, should be directed to controlled drainage structures. Should you have any questions regarding this correspondence, or if we may be of further service, please contact the undersigned at your convenience. S S Very truly yours, GEOCON INCORPORATED S S U) DAWID Trevor E. Myers LU M David B. Evans IL No. 1860 S NGINEEIED '9 CIVIL IPA UNG LO i OPC (1) Addressee (3/del) Carlsbad 3 Job Site Trailer S Attention: Mr. Greg Jones . S (e-mail) C&V Consulting, Inc. S Attention: Mr. Vince Scarpati S Project No. 07193-32-03A -2- June 22,2012 FIGURE 1 PAVEMENT SECTION CALCULATIONS FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3) Black Skimmer Drive - Stations 10+40 to 16+50 Use subgrade R-Value = 15 Traffic Index' (TI) = 5 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(5.0)(100-78.0)±0.2 = 0.55 feet from Table 608.4B Highway Design Manual GE = 0.55 feet for AC yields actual thickness = 2.61 inches Use 4.0 inches of AC - City Minimum GE for 4.0 inches of AC = 0.85 feet GE for base = (0.0032)(5.0)(100-15.0) -0.85 = 0.51 feet from Table 608.413 Highway Design Manual with GF for Class 2 base = 1.1 Base thickness = 5.62 inches Use base thickness = 6 inches, City. of Carlsbad minimum Design Street Structural Section Asphalt Concrete Thickness = 4 inches. Class 2 Aggregate Base Thickness = 6 inches. Black Skimmer Drive - Stations 10+40 to 16+50 (Parking Stalls) Use subgrâde R-Value = 15 . Traffic Index (TI) = 4.5 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(4.5)(100-78.0)+0.2 = 0.52 feet from Table 608.413 Highway Design Manual GE = 0.52 feet for AC yields actual thickness = 2.32 inches Use 4.0 inches of AC —City Minimum GE for 4.0 inches of AC = 0.85 feet GE for base = (0.0032)(4.5)(100-15.0) - 0.85 0.33 feet from Table 608.413 Highway Design Manual with GF for Class 2 base'' 1.1 Base thickness = 3.63 inches Use base thickness = 4 inches, City of Carlsbad minimum Design Street Structural Section Asphalt Concrete Thickness = 4 inch,. Class 2 Aggregate Base Thickness =4 inches. Project No. 07193-32-03A June 22, 2012 FIGURE 1 (Continued) PAVEMENT SECTION CALCULATIONS FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3) Black Skimmer Drive - Stations 16+50 to 19+82 Use subgrade R-Value = 25 Traffic Index (TI) = 5 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(5.0)(I00-78.0)+0.2 = 0.55 feet from Table 608.413 Highway Design Manual GE = 0.55'feet for AC yields actual thickness = 2.61 inches Use 4.0 inches of AC - City Minimum GE for 4.0 inches of AC = 0.85 feet GE for base = (0.0032)(5.0)(100-25.0) - 0.85 = 0.35 feet from Table 608.413 Highway Design Manual with GF for Class 2 base = 1.1 Base thickness = 3.87 inches Use base thickness = 4 inches, City of Carlsbad minimum Design Street Structural Section *** Asphalt Concrete Thickness = 4 inches. Class 2 Aggregate Base Thickness = 4 inches. o/1 Black Skimmer Drive - Stations 16+50 to 19+82 (Parking Stalls) Use subgrade R-Value = 25 Traffic Index (TI) = 4.5 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(4.5)(100-78.0)+0.2 = 0.52 feet from Table 608.413 Highway Design Manual GE = 0.52 feet for AC yields actual thickness = 2.32 inches Use 4:0 inches of AC - City Minimum GE for 4.0 inches of AC = 0.85 feet GE for base = (0.0032)(4.5)(100-25.0) - 0.85 = 0.19 feet from Table 608.413 Highway Design Manual with GF for Class 2 base = 1.1 Base thickness = 2.06 inches Use base thickness = 4 inches, City of Carlsbad minimum Design Street Structural Section *** Asphalt Concrete Thickness 4 inches. Class 2 Aggregate Base Thickness = 4 inches. OY— Project No. 07193-32-03A June 22, 2012 FIGURE 1 (Continued) PAVEMENT SECTION CALCULATIONS FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3) Brass Buttons Street and Brant Lane Use subgrade R-Value = 13 Traffic Index (TI) = 4.5 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(4.5)(100-78.0)+0.2 = 0.52 feet from Table 608.4B Highway Design Manual GE = 0.52 feet for AC yields actual thickness = 2.32 inches Use 4.0 inches of AC - City Minimum GE for 4.0 inches of AC = 0.89 feet GE for base = (0.0032)(4.5)(l 00-13.0) -0.89 = 0.36 feet from Table 608.4B Highway Design Manual with GF fo': Class 2 base = 1.1 S Base thickness = 3.95 inches Use base thickness = 4 inches, City of Carlsbad minimum Design Street Structural Section Asphalt Concrete Thickness = 4 inches. S Class 2 Aggregate Base Thickness =,4inches. Black Mustard Lane, Alkali Heath Lane, Arroyo Willow Lane Use subgradeR-Value =/12. Traffic Index (T1) 4.5 Methodology = CALTRANS Highway Design Manual Section 608.4 Safety Factor = 0.2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(4.5)(100-78.0)+0.2 = 0:52 feet from Table 608.4B Highway Design Manual GE= 0.52 feet, for AC yields actual thickness = 2.32 inches Use 4.0 inches of AC- City Minimum GE for 4.0 inches of AC = 0.89 feet GE -for base = (0.0032)(4.5)(100-12.0) - 0.89 =0.3 8 feet from Table 608.4B Highway Design Manual with GF for Class 2 base = 1 .1 Base thickness 4.1 inches Use base thickness = 5 inches, City of Carlsbad minimum Design Street Structural Section Asphalt Concrete Thickness = 4 inches. Class 2 Aggregate Base Thickness = 5liiches. - S Project No. 07193-32-03A June 22. 2012 FIGURE 1 (Continued) PAVEMENT SECTION CALCULATIONS FOR LA COSTA VILLAGE TOWNHOMES (CARLSBAD 3) Sea Rocket Lane, Cliff Swallows Lane : Use subgrade R-Value = 29 Traffic Index (Ti) = 4.5 . . Methodology CALTRANS Highway Design Manual, Section 608.4 Safety Factor = 0.2 - Applied to Asphalt Concrete (AC) GE for AC = (0.0032)(4.5)(100-78.0)+0.2 = 052 feet from Fable 608 4B Highway Design Manual GE =0.52 feet for AC yields actual thickness = 2.32 inches Use 4.0 inches of AC - CityMinimum GE for 4.0 inches of AC = 0.89 feet GE for base = (00032)(4.5)(100-29.0) -0.89 = 0.I3.feet from Table 608 4B Highway Design Manual with GF for 'Class 2 base = 1 1 Base thickness = 1 .43 inches ' Use base thickness = 4 inches, City of Carlsbad miiiiniuni Design Street Structural Section Asphalt Concrete Thickness = 4 inches. . - :Class 2 Aggregate Base Thickness = 4 inches. Project No. .07193-321-03A June22 2012 TABLE I SUMMARY OF R-VALUE TEST RESULTS ASTM D 2844-01 (CALIFORNIA TEST METHOD NO. 301) Sample Number Street (Sample Location) R-Value R-1 Black Skimmer Drive - Station 10+40 to 13+40(11+10) 15 R-2 N Black Skimmer Drive - Station 13+40 to 16+50(15+00) 15 R-3 Black Skimmer Drive— Station 16+50 to 19+82(18+00) 25 R-4 Lane - Station 10+60 to 12+30 (12+25) 13 R-5 Sea Rocket Lane - Station 1+20 to 2+17 (1+75) 29 R-6 Black Mustard Lane - Station 1+15 to 2+30 (1+75) 12 , 4 TABLE II PAVEMENT SECTION RECOMMENDATIONS Traffic Asphalt Class 2* Location Index (TI) R-Value Concrete Aggregate (inches) Base (inches) Black Skimmer Drive 5.0 15 4 6 (Station 10+40 to 16+50) - Roadway Black Skimmer Drive - 4.5 15 4 _10+40_to_16+50) (Station - Parking Stalls Black Skimmer Drive 5.0 25 4 4 (Station 16+50 to 19+82) - Roadway Black Skimmer Drive 4.5 25 4 4 (Station 16+50 to 19+82) - Parking Stalls Brass Buttons Street, Brant Lane 4.5 13 '4 Black Mustard Lane, 4.5 12 4 5 Alkali Heath Lane, Arroyo Willow Lane Sea Rocket Lane, Cliff Swallows Lane 4.5 29 .4 4 *Or approved equivalent. Jok- Project No. 07193-32-03A June 22, 2012