Loading...
HomeMy WebLinkAboutCT 04-09; VLC LA COSTA GREENS 1.17; COMPLETION OF GRADING; 2006-09-27GEOCON INCORPORATED GEOTECHNICAL CONSULTANTS 0 Project No. 06403-52-26 September 27, 2006 Warmington Homes 701 Palomar Airport Road, Suite 280 Carlsbad, California 92009 Attention: Mr. Neal Keating Subject: VILLAGES OF LA COSTA - THE GREENS, PHASE 2 NEIGHBORHOOD 1.17 CARLSBAD, CALIFORNIA COMPLETION OF GRADING References: 1. Update Geotechnical Investigation, Villages of La Costa - The Greens, Phase 2, Neighborhood 1. 17, Carlsbad, California, prepared by Geocon Incorporated, dated May 10, 2006 (Project No. 06403-52-26). 2. Final Report of Testing and Observation Services Performed During Site Grading, Villages of La Costa - The Greens, Neighborhoods 1.17— Lots 1 through 107 and Lot 111 (Park Site), Carlsbad, California, prepared by Geocon Incorporated, dated February 24, 2006 (Project No. 06403-52-19A). Gentlemen: In accordance with the request of City of Carlsbad, this letter has been prepared to confirm that grading of Lots 2 through 4 of the subject development is complete. As indicated in the referenced reports, from a geotechnical engineering standpoint, earthwork operations were performed in substantial conformance with the referenced grading plan and project geotechnical report. It is our opinion that all building pads have been properly graded and are ready to receive the planned improvements. All conclusions and recommendations presented in the referenced update report remain applicable. Should you have any questions regarding this letter, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, :t:d CEG 1778 AS:dmc (2) Addressee (I/del) Warmington Homes Attention: Mr. Kyle Isbell !f ftjj 2 S*DR NO.1771 ' CER11F1ED ENGINEERING * GEOLOGIST j \Zp' cM' 6960 Flanders Drive 0 San Diego, California 92121-2974 0 Telephone (858) 558-6900 • Fox (858) 558-6159