HomeMy WebLinkAboutCT 04-10A; POINSETTIA PLACE; WATER ANALYSIS; DWG 469-5; 2010-11-04Water Analysis City of Carlsbad Tract CT 04-lO(A) Poinsettia Place Date Prepared: November 4, 2010 C Introduction The Poinsettia Place project is currently under design for approximately 82 multi-family dwelling units, within 9 separate buildings. The 9 buildings range from 5 to 14 dwelling units per building, and up to 3 stories. The project is located along Cassia Road, west of El Camino Real in the City of Carlsbad. This report herein is to provide a water system analysis to identify the flows required to the buildings, determine meter sizing, and verify system dynamic pressures by conducting a water system model analysis. The criteria used for the analysis is based on the Carlsbad Municipal Water District (CMWD), Uniform Plumbing Code (UPC), and the NFP A standards for sprinkler systems. Demands The demands for the project based on CMWD criteria and are provided below. No. of Ave Day Max Day Peak Hour Units Demands Demands Demands (MFR) (gpm) (gpm) (gpm) Building 1 6 1.04 1.72 3.02 ·-_ .. ____ Building 2 5 0.87 1.43 2.52 -·-·------··------- Building 3 10 1.74 2.86 5.03 ---->-·---··-f-----·----· .. -·-··-------·· Building4 10 1.74 2.86 5.03 ----·· ·-·--·-·--!--·-·--·--·-·-----·---·-·----····----· Building 5 10 1.74 2.86 5.03 --------.. --···-·--.. --------·--·--·····---··----.. --··-----·· Building 6 10 1.74 2.86 5.03 ·--··------------·---·-·---··--··-·---·· ·······--Building 7 11 1.91 3.15 5.54 -------··---------------·-·--------·---·· f..----··----····- Building 8 6 1.04 1.72 3.02 --·····-f------------1--·----··-·--·-- Building 9 14 2.43 4.01 7.05 Total 82 14.24 23.49 41.28 To determine the appropriate meter sizing for each building, the demands .are calculated using the total number of fixtures and fixture loading per the UPC. This method provides the peak flow to each building. These flows are provided in the table below. 0 Peak Flow to Building (gpm) Building 1 65 Building 2 55 Building 3 88 Building 4 88 Building 5 88 Building 6 88 Building 7 100 Building 8 65 ,-·----·--·----- Building 9 100 Fire Hydrants Flows Fire Flow requirements to the fire hydrants within the development have been established to be 2,750 gpm. Total flow is allowed from two hydrants. Preliminary Estimated Fire Sprinkler Flows Fire sprinkler flow requirements have been estimated based on the NFP A standards, as provided in the following table. Total Estimated Total Living Sprinkler Units Area Flow Sq Ft (gpm} 1---·----· ' ·---------- Building 1 6 8,002 400 --· !--·-------·--·-----··-·-·-·-·-·-- Building 2 5 7,445 372 _ .. _. -·-- Building 3 10 15,322 766 --··--------·------ Building4 10 15,322 766 --··---- .. Build_ing ~-10 15,322 766 -----· --------- Building 6 10 15,322 766 ------·------------- Building 7 11 16,752 838 Building 8 6 8,886 444 -------· ----···------ Building 9 14 20,750 1,038 -·--·---··-·-------------------------------------------- C Preliminary Meter Service Line Sizing Domestic water service meters are recommended to be 2-inch meters based on the peak flows to each building. Based on the sprinkler flows estimated, 4-inch fire service lines are recommended. Hydraulic Analysis To verify the pipeline and service sizing, a model analysis was performed on the proposed water system. To be conservative, the analysis assumes only two of the three points of connection to the existing system are open. The hydraulic grade at the points of connection is assumed to be 530-feet. (The Zone HGL is 550-ft.) Static pressures in the area range from 121 psi to 131 psi. Three analyses were performed for three conditions: (1) maximum day demands plus hydrant flows, (2) maximum day demands plus the worst case sprinkler flow and hydrant flow, and (3) peak hour demands. For the run (1), the fire flow was conservatively assumed from single hydrant. The run assumed two connections open. The minimum residual pressure is 91 psi. Run (2) assumed the worst case conditions with the maximum sprinkler flow of 1,038 gpm to building 9 with the full hydrant flow to the two hydrants nearest to building 9. The pipeline connection at Drive "C" at Cassia Road is assumed closed. The results yield a pressure of 7 4 psi at the fire line connection to the building, after the fire service meter. The peak hour demands analysis, run (3), conservatively assumes the UPC peak flows to each building due to the small size of the service area. The minimum peak hour pressure at the buildings, after the service meter, was found to be 96 psi. Results of the analysis are provided in the Appendix. Appendix Model Analysis Results / '--, / "°/ / J86 ;g J18 J52 P17 P21 \ RES9002 ,~ c.. '- J26 P33 ; 0 _J78 .... ll') c.. () 0 Run (1) Max Day Demands plus Fire Hydrant Flow C MDD plus Fire -Fire Flow Report ID Static Demand Static Pressure Static Head Fire-Flow Demand Residual Pressure (gpm) (psi) (ft) (gpm) (psi) 1 r J52 0.00 122.28 529.87 2,750.00 113.64 2 r J58 0.00 118.07 529.83 2,750.00 110.39 3 r J60 0.00 116.84 529.97 2,750.00 109.77 4 r J62 0.00 115.09 529.63 2,750.00 91.30 Date: Tuesday, November 02, 2010, Time: 19:23:32, Page 1 C MOD plsu Fire -Junction Report ID Demand Elevation Head Pressure (gpm) (ft) (ft) (psi) 1 r J10 0.00 247.67 524.67 120.03 2 r J12 0.00 249.00 523.36 118.88 3 r J14 0.00 249.00 523.25 118.83. 4 r J16 0.00 252.00 521.04 116.57 5 r J18 0.00 252.00 520.96 116.54 6 r J20 0.00 256.00 518.78 113.86 7 r J22 0.00 256.00 518.76 113.85 8 r J24 0.00 257.00 518.35 113.24 9 r J26 0.00 258.00 517.92 112.63 10 r J28 0.00 260.00 527.70 115.99 11 r J30 0.00 261.50 492.82 100.23 12 r J32 0.00 261.50 492.13 99.93 13 r J34 0.00 264.00 480.02 93.60 14 r J36 0.00 264.50 480.00 93.37 15· r J38 0.00 264.50 480.00 93.37 16 r J40 0.00 266.00 479.98 92.72 17 r J42 0.00 266.00 479.98 92.72 18 r J44 0.00 267.00 479.97 92.28 19 r J46 0.00 267.00 479.97 92.28 20 r J48 0.00 247.00 527.55 121.56 21 r J50 0.00 247.00 527.45 121.52 22 r J52 0.00 247.67 524.67 120.03 23 r J58 0.00 257.34 518.35 113.10 24 r J60 0.00 260.32 527.70 115.85 25 r J62 2,750.00 264.03 474.74 91.30 26 r J64 46.00 269.40 479.09 90.86 27 r J66 0.00 269.40 479.97 91.24 28 r J68 46.00 269.40 479.18 90.90 29 r J70 0.00 269.40 479.98 91.24 30 r J72 0.00 266.30 480.00 92.59 31 r J74 46.00 266.30 478.95 92.14 32 r J76 0.00 263.70 492.13 98.98 33 r J78 46.00 263.70 491.86 98.86 34 r J80 46.00 257.60 517.88 112.78 35 r J82 0.00 257.60 518.78 113.17 36 r J84 46.00 254.40 520.93 115.49 37 r J86 0.00 254.40 521.04 115.53 38 r J88 46.00 250.70 522.31 117.69 39 r J90 0.00 250.70 523.36 118.14 40 r J92 0.00 248.80 527.45 120.74 41 r J94 46.00 248.80 526.53 120.34 Date: Tuesday, November 02, 2010, Time: 19:24:54, Page 1 C MDD plus Fire -Pipe Report ID From Node To Node Length Diameter Roughness Flow Velocity Head loss HU1000 (ft) (in) (gpm) (ft/s) (ft) (ft/kft) 1 r P101 J22 J24 29.46 8.00 130.00 862.39 5.50 0.41 13.89 2 r P105 J26 J28 138.83 8.00 130.00 -2,071.61 13.22 9.77 70.38 3 r P107 RES9002 J28 32.74 8.00 130.00 2,071.61 13.22 2.30 70.38 4 r P109 J28 J60 26.76 6.00 130.00 0.00 0.00 0.00 0.00 5 r P11 RES9000 J48 123.21 8.00 130.00 1,046.40 6.68 2.45 19.87 6 r P111 J20 J82 17.35 4.00 130.00 0.00 0.00 0.00 0.00 7 r P113 J22 J80 16.81 2.00 130.00 46.00 4.70 0.88 52.20 8 r P115 J24 J26 30.78 8.00 130.00 862.39 5.50 0.43 13.89 9 r P13 J10 J12 71.98 8.00 130.00 1,000.39 6.39 1.32 18.28 10 r P15 J12 J14 6.04 8.00 130.00 1,000.39 6.39 0.11 18.28 11 r P17 J14 J16 131.88 8.00 130.00 954.39 6.09 2.21 16.75 12 r P19 J16 J18 4.58 8.00 130.00 954.39 6.09 0.08 16.75 13 r P21 J18 J20 142.74 8.00 130.00 908.39 5.80 2.18 15.29 14 r P33 J26 J30 187.26 8.00 130.00 2,934.00 18.73 25.11 134.09 15 r P35 J30 J32 5.25 8.00 130.00 2,888.00 18.43 0.68 130.22 16 r P37 J32 J34 92.99 8.00 130.00 2,888.00 18.43 12.11 130.22 17 r P39 J34 J36 57.02 8.00 130.00 138.00 0.88 0.03 0.47 18 r P41 J36 J38 5.83 8.00 130.00 92.00 0.59 0.00 0.22 19 r P43 J38 J40 73.48 8.00 130.00 92.00 0.59 0.02 0.22 20 r P45 J40 J42 5.81 8.00 130.00 92.00 0.59 0.00 0.22 21 r P47 J42 J44 94.20 8.00 130.00 46.00 0.29 0.01 0.06 22 r P49 J44 J46 5.52 8.00 130.00 46.00 0.29 0.00 0.06 23 r P51 J46 RES9004 215.44 8.00 130.00 0.00 0.00 0.00 0.00 24 r P53 J48 J50 5.48 8.00 130.00 1,000.40 6.39 0.10 18.28 25 r P55 J50 J10 152.00 8.00 130.00 1,000.39 6.39 2.78 18.28 26 r P57 J10 J52 11.72 6.00 130.00 0.00 0.00 0.00 0.00 27 r P61 J24 J58 9.93 6.00 130.00 0.00 0.00 0.00 0.00 28 r P65 J34 J62 10.93 6.00 130.00 2,750.00 31.20 5.28 482.91 29 r P67 J46 J64 16.86 2.00 130.00 46.00 4.70 0.88 52.21 30 r P69 J44 J66 17.34 4.00 130.00 0.00 0.00 0.00 0.00 31 r P71 J42 J68 15.28 2.00 130.00 46.00 4.70 0.80 52.20 32 r P73 J40 J70 16.54 4.00 130.00 0.00 0.00 0.00 0.00 33 r P75 J38 J72 18.15 4.00 130.00 0.00 0.00 0.00 0.00 34 r P77 J36 J74 20.06 2.00 130.00 46.00 4.70 1.05 52.20 35 r P79 J32 J76 17.37 4.00 130.00 0.00 0.00 0.00 0.00 36 r P81 J30 J78 18.38 2.00 130.00 46.00 4.70 0.96 52.21 37 r P87 J18 J84 17.46 4.00 130.00 46.00 1.17 0.03 1.78 38 r P89 J16 J86 18.00 2.00 130.00 0.00 0.00 0.00 0.00 39 r P91 J14 J88 18.03 2.00 130.00 46.00 4.70 0.94 52.20 40 r P93 J12 J90 17.26 4.00 130.00 0.00 0.00 0.00 0.00 41 r P95 J50 J92 18.37 4.00 130.00 0.00 0.00 0.00 0.00 42 r P97 J48 J94 19.66 2.00 130.00 46.00 4.70 1.03 52.21 43 r P99 J20 J22 5.24 I 12.00 100.00 908.39 2.58 0.02 3.45 Date: Tuesday, November 02, 2010, Time: 19:26:04, Page 1 Run (2) Max Day Demands plus Hydrant Flow and Worst Case Sprinkler Flow C MOD plus Sprinkler and Fire Flow -Junction Report ID Demand Elevation Head Pressure (gpm) (ft) (ft) (psi) 1 r J10 0.00 247.67 524.72 120.04 2 r J12 0.00 249.00 523.41 118.90 3 r J14 0.00 249.00 523.30 118.86 4 r J16 0.00 252.00 521.11 116.61 5 r J18 0.00 252.00 521.04 116.57 6 r J20 0.00 256.00 518.88 113.90 7 r J22 0.00 256.00 518.86 113.90 8 r J24 0.00 257.00 518.45 113.29 9 r J26 0.00 258.00 518.03 112.67 10 r J28 0.00 260.00 525.10 114.87 11 r J30 0.00 261.50 498.00 102.48 12 r J32 0.00 261.50 497.46 102.24 13 r J34 0.00 264.00 487.83 96.99 14 r J36 0.00 264.50 486.43 96.16 15 r J38 0.00 264.50 486.29 96.10 16 r J40 0.00 266.00 484.61 94.72 17 r J42 0.00 266.00 484.48 94.67 18 r J44 0.00 267.00 482.48 93.37 19 r J46 0.00 267.00 482.48 93.37 20 r J48 0.00 247.00 527.57 121.57 21 r J50 0.00 247.00 527.47 121.53 22 r J52 0.00 247.67 524.72 120.04 23 r J58 0.00 257.34 518.45 113.14 I 24 r J60 1,375.00 260.32 521.52 113.18 25 r J62 1,375.00 264.03 486.37 96.34 26 r J64 46.00 269.40 481.60 91.95 27 r J66 1,038.00 269.40 439.83 73.85 28 r J68 46.00 269.40 483.68 92.85 29 r J70 0.00 269.40 484.61 93.25 30 r J72 0.00 266.30 486.29 95.32 31 r J74 46.00 266.30 485.38 94.93 32 r J76 0.00 263.70 497.46 101.29 33 r J78 46.00 263.70 497.04 101.11 34 r J80 46.00 257.60 517.98 112.82 35 r J82 0.00 257.60 518.88 113.21 36 r J84 46.00 254.40 521.01 115.52 37 r J86 0.00 254.40 521.11 115.57 38 r J88 46.00 250.70 522.36 117.71 39 r J90 0.00 250.70 523.41 118.17 40 r J92 0.00 248.80 527.47 120.75 41 r J94 46.00 248.80 526.55 120.35 Date: Tuesday, November 02, 2010, Time: 19:35:32, Page 1 C MDD plus Fire and Sprinkler Flow -Pipe Report ID From Node To Node Length Diameter Roughness Flow Velocity Head loss HU1000 (ft) (in) (gpm) (ft/s) (ft) (ft/kft) 1 r P101 J22 J24 29.46 8.00 130.00 857.81 5.48 0.41 13.75 2 r P105 J26 J28 138.83 8.00 130.00 -1,739.19 11.10 7.07 50.91 3 r P107 RES9002 J28 32.74 8.00 130.00 3,114.19 19.88 4.90 149.73 4 r P109 J28 J60 26.76 6.00 130.00 1,375.00 15.60 3.58 133.77 5 r P11 RES9000 J48 123.21 8.00 130.00 1,041.82 6.65 2.43 19.71 6 r P111 J20 J82 17.35 4.00 130.00 0.00 0.00 0.00 0.00 7 r P113 J22 J80 16.81 2.00 130.00 46.00 4.70 0.88 52.21 8 r P115 J24 J26 30.78 8.00 130.00 857.81 5.48 0.42 13.75 9 r P13 J10 J12 71.98 8.00 130.00 995.81 6.36 1.30 18.12 10 r P15 J12 J14 6.04 8.00 130.00 995.81 6.36 0.11 18.13 11 r P17 J14 J16 131.88 8.00 130.00 949.81 6.06 2.19 16.60 12 r P19 J16 J18 4.58 8.00 130.00 949.81 6.06 0.08 16.61 13 r P21 J18 J20 142.74 8.00 130.00 903.81 5.77 2.16 15.15 14 r P33 J26 J30 187.26 8.00 130.00 2,597.00 16.58 20.03 106.97 15 r P35 J30 J32 5.25 8.00 130.00 2,551.00 16.28 0.54 103.48 16 r P37 J32 J34 92.99 8.00 130.00 2,551.00 16.28 9.62 103.48 17 r P39 J34 J36 57.02 8.00 130.00 1,176.00 7.51 1.41 24.66 18 r P41 J36 J38 5.83 8.00 130.00 1,130.00 7.21 0.13 22.90 19 r P43 J38 J40 73.48 8.00 130.00 1,130.00 7.21 1.68 22.91 20 r P45 J40 J42 5.81 8.00 130.00 1,130.00 7.21 0.13 22.90 21 r P47 J42 J44 94.20 8.00 130.00 1,084.00 6.92 2.00 21.21 22 r P49 J44 J46 5.52 8.00 130.00 46.00 0.29 0.00 0.06 23 r P51 J46 RES9004 215.44 8.00 130.00 0.00 0.00 0.00 0.00 24 r P53 J48 J50 5.48 8.00 130.00 995.82 6.36 0.10 18.13 25 r P55 J50 J10 152.00 8.00 130.00 995.81 6.36 2.75 18.12 26 r P57 J10 J52 11.72 6.00 130.00 0.00 0.00 0.00 0.00 27 r P61 J24 J58 9.93 6.00 130.00 0.00 0.00 0.00 0.00 28 r P65 J34 J62 10.93 6.00 130.00 1,375.00 15.60 1.46 133.77 29 r P67 J46 J64 16.86 2.00 130.00 46.00 4.70 0.88 52.20 30 r P69 J44 J66 17.34 4.00 130.00 1,038.00 26.50 42.64 2,459.17 31 r P71 J42 J68 15.28 2.00 130.00 46.00 ' 4.70 0.80 52.21 32 r P73 J40 J70 16.54 4.00 130.00 0.00 0.00 0.00 0.00 33 r P75 J38 J72 18.15 4.00 130.00 0.00 0.00 0.00 0.00 34 r P77 J36 J74 20.06 2.00 130.00 46.00 4.70 1.05 52.20 35 r P79 J32 J76 17.37 I 4.00 130.00 0.00 0.00 0.00 0.00 36 r P81 J30 J78 18.38 2.00 130.00 46.00 4.70 0.96 52.20 37 r P87 J18 J84 17.46 4.00 130.00 46.00 1.17 0.03 1.79 38 r P89 J16 J86 18.00 I 2.00 130.00 0.00 0.00 0.00 0.00 39 r P91 J14 J88 18.03 2.00 130.00 46.00 4.70 0.94 52.20 40 r P93 J12 J90 17.26 4.00 130.00 0.00 0.00 0.00 0.00 41 r P95 J50 J92 18.37 4.00 130.00 0.00 0.00 0.00 0.00 42 r P97 J48 J94 19.66 2.00 130.00 46.00 4.70 1.03 52.20 143 r P99 J20 J22 5.24 I 12.00 100.00 903.81 2.56 0.02 3.41 I Date: Tuesday, November 02, 2010, Time: 19:36:15, Page 1 C Run (3) Peak Hour Demands Peak Hour Demands -Junction Report ID Demand Elevation Head Pressure (gpm) (ft) (ft) (psi) 1 r J10 0.00 247.67 529.64 122.18 2 r J12 0.00 249.00 529.58 121.58 3 r J14 0.00 249.00 529.58 121.57 4 r J16 0.00 252.00 529.53 120.25 5 r J18 0.00 252.00 529.52 120.25 6 r J20 0.00 256.00 529.52 118.52 7 r J22 0.00 256.00 529.52 118.52 8 r J24 0.00 257.00 529.52 118.08 9 r J26 0.00 258.00 529.53 117.65 10 r J28 0.00 260.00 529.91 116.95 11 r J30 0.00 261.50 529.17 115.98 12 r J32 0.00 261.50 529.16 115.98 13 r J34 0.00 264.00 529.07 114.86 14 r J36 0.00 264.50 529.01 114.61 15 r J38 0.00 264.50 529.01 114.61 16 r J40 0.00 266.00 528.99 113.95 17 r J42 0.00 266.00 528.98 113.95 18 r J44 0.00 267.00 528.97 113.51 19 r J46 0.00 267.00 528.97 113.51 20 r J48 0.00 247.00 529.77 122.53 21 r J50 0.00 247.00 529.77 122.52 22 r J52 0.00 247.67 529.64 122.18 23 r J58 0.00 257.34 529.52 117.94 24 r J60 0.00 260.32 529.91 116.81 25 r J62 0.00 264.03 529.07 114.84 26 r J64 65.00 269.40 506.78 102.86 27 r J66 0.00 269.40 528.97 112.47 28 r J68 55.00 269.40 513.18 105.63 29 r J70 0.00 269.40 528.99 112.48 30 r J72 0.00 266.30 529.01 113.83 31 r J74 88.00 266.30 487.91 96.03 32 r J76 0.00 263.70 529.16 115.03 33 r J78 88.00 263.70 488.36 97.35 34 r J80 88.00 257.60 488.98 100.26 35 r J82 0.00 257.60 529.52 117.82 36 r J84 100.00 254.40 529.39 119.15 37 r J86 0.00 254.40 529.53 119.21 38 r J88 65.00 250.70 507.27 111.17 39 r J90 0.00 250.70. 529.58 120.84 40 r J92 0.00 248.80 529.77 121.74 41 r J94 100.00 248.80 476.87 98.82 Date: Tuesday, November 02, 2010, Time: 19:44:56, Page 1 Peak Hour Demands -Pipe Report ID From Node To Node Length Diameter Roughness Flow Velocity Head loss HU1000 (ft) (in) (gpm) (ft/s) (ft) (ft/kft) 1 r P101 J22 J24 29.46 8.00 130.00 -63.73 0.41 0.00 0.11 2 r P105 J26 J28 138.83 8.00 130.00 -359.73 2.30 0.38 2.75 3 r P107 RES9002 J28 32.74 8.00 130.00 359.73 2.30 0.09 2.75 4 r P109 J28 J60 26.76 6.00 130.00 0.00 0.00 0.00 0.00 5 r P11 RES9000 J48 123.21 8.00 130.00 289.28 1.85 0.23 1.84 6 r P111 J20 J82 17.35 4.00 130.00 0.00 0.00 0.00 0.00 7 r P113 J22 J80 16.81 2.00 130.00 88.00 8.99 40.54 2,411.04 8 r P115 J24 J26 30.78 8.00 130.00 -63.73 0.41 0.00 0.11 9 r P13 J10 J12 71.98 8.00 130.00 189.28 1.21 0.06 0.84 10 r P15 J12 J14 6.04 8.00 130.00 189.27 1.21 0.01 0.83 11 r P17 J14 J16 131.88 8.00 130.00 124.27 0.79 0.05 0.38 12 r P19 J16 J18 4.58 8.00 130.00 124.27 0.79 0.00 0.39 13 r P21 J18 J20 142.74 8.00 130.00 24.27 0.15 0.00 0.02 14 r P33 J26 J30 187.26 8.00 130.00 296.00 1.89 0.36 1.92 15 r P35 J30 J32 5.25 8.00 130.00 208.00 1.33 0.01 0.99 16 r P37 J32 J34 92.99 8.00 130.00 208.00 1.33 0.09 1.00 17 r P39 J34 J36 57.02 8.00 130.00 208.00 1.33 0.06 1.00 18 r P41 J36 J38 5.83 8.00 130.00 120.00 0.77 0.00 0.36 19 r P43 J38 J40 73.48 8.00 130.00 120.00 0.77 0.03 0.36 20 r P45 J40 J42 5.81 8.00 130.00 120.00 0.77 0.00 0.36 21 r P47 J42 J44 94.20 8.00 130.00 65.00 0.41 0.01 0.12 22 r P49 J44 J46 5.52 8.00 130.00 65.00 0.41 0.00 0.12 23 r P51 J46 RES900~ 215.44 8.00 130.00 0.00 0.00 0.00 0.00 24 r P53 J48 JSO 5.48 8.00 130.00 189.28 1.21 0.00 0.84 25 r PSS JSO J10 152.00 8.00 130.00 189.28 1.21 0.13 0.84 26 r P57 J10 J52 11.72 6.00 130.00 0.00 0.00 0.00 0.00 27 r P61 J24 J58 9.93 6.00 130.00 0.00 0.00 0.00 0.00 28 r P65 J34 J62 10.93 6.00 130.00 0.00 0.00 0.00 0.00 29 r P67 J46 J64 16.86 2.00 130.00 65.00 6.64 22.19 1,316.71 30 r P69 J44 J66 17.34 4.00 130.00 0.00 0.00 0.00 0.00 31 r P71 J42 J68 15.28 2.00 130.00 55.00 5.62 15.81 1,034.37 32 r P73 J40 J70 16.54 4.00 130.00 0.00 0.00 0.00 0.00 33 r P75 J38 J72 18.15 4.00 130.00 0.00 0.00 0.00 0.00 34 r P77 J36 J74 20.06 2.00 130.00 88.00 8.99 41.10 2,049.20 35 r P79 J32 J76 17.37 4.00 130.00 0.00 0.00 0.00 0.00 36 r P81 J30 J78 18.38 2.00 130.00 88.00 8.99 40.81 2,220.77 37 r P87 J18 J84 17.46 4.00 130.00 100.00 2.55 0.13 7.52 38 r P89 J16 J86 18.00 2.00 130.00 0.00 0.00 0.00 0.00 39 r P91 J14 J88 18.03 2.00 130.00 65.00 6.64 22.31 1,237.40 40 r P93 J12 J90 17.26 4.00 130.00 0.00 0.00 0.00 0.00 41 r P95 JSO J92 18.37 4.00 130.00 0.00 0.00 0.00 0.00 42 r P97 J48 J94 19.66 2.00 130.00 100.00 10.21 52.90 2,690.53 43 r P99 J20 I J22 5.24 I 12.00 100.00 24.27 0.07 0.00 0.00 Date: Tuesday, November 02, 2010, Time: 19:47:20, Page 1