Loading...
HomeMy WebLinkAboutCT 04-10A; POINSETTIA PLACE; WATER SYSTEM; DWG 469-5; 2011-04-04------------------·------·--------·· April 4, 2011 TO: G.LfN~:VAtJd~E§l(I, SENIOR CIVIL ENGINEER f From William Plummer, Deputy City Engineer SUBJECT: POINSETTIA PLACE CT 04-lO(A) WATER SYSTEM On behalf of the Carlsbad Municipal Water District, the report .titled Poinsettia Place Potable Water System Analysis, dated March 25, 2011, prepared by Pangaea Land Consultanst, Inc has been reviewed. Following are our comments: 1. Alternative 3 -Split 375 / 550 Pressure zone is acceptable. The 375 pressure zone would apply to Buildings 1, 2, and 3. The 550 pressure zone would apply to Buildings 4, 5, 6, 7, 8, and 9. The District will waive its criteria regarding maximum number of units on a single non-looped pipe in this case. 2. Revise Table 8 Alternative 3 to have a separate meter for each separate building and half building as shown below. Table 8 Alternative 3 Recommended Meters for Each Building 375 I 550 Split Pressure Zone system Building Peak Design Flow Meter Size (gpm) (inches) 1 64 1-1/2 2 60 1-1/2 3A 40 1 38 40 1 4A 53 1-1/2 48 53 1-1/2 SA 53 1-1/2 SB 53 1-1/2 GA 53 1-1/2 GB 53 1-1/2 7A 53 1-1/2 78 64 1-1/2 8 80 1-1/2 9 109 2 cc: Steven Plyler, Water Superintendent Jase Warner, Public Works Supervisor Mario Remillard, Public Works Supervisor Number of Meters 1 1 1 1 1 1 1 1 1 1 1 1 1 1