HomeMy WebLinkAboutCT 04-10A; POINSETTIA PLACE; WATER SYSTEM; DWG 469-5; 2011-04-04------------------·------·--------··
April 4, 2011
TO: G.LfN~:VAtJd~E§l(I, SENIOR CIVIL ENGINEER
f From William Plummer, Deputy City Engineer
SUBJECT: POINSETTIA PLACE CT 04-lO(A)
WATER SYSTEM
On behalf of the Carlsbad Municipal Water District, the report .titled Poinsettia Place Potable
Water System Analysis, dated March 25, 2011, prepared by Pangaea Land Consultanst, Inc has
been reviewed. Following are our comments:
1. Alternative 3 -Split 375 / 550 Pressure zone is acceptable. The 375 pressure zone would
apply to Buildings 1, 2, and 3. The 550 pressure zone would apply to Buildings 4, 5, 6, 7,
8, and 9. The District will waive its criteria regarding maximum number of units on a
single non-looped pipe in this case.
2. Revise Table 8 Alternative 3 to have a separate meter for each separate building and
half building as shown below.
Table 8 Alternative 3
Recommended Meters for Each Building
375 I 550 Split Pressure Zone system
Building Peak Design Flow Meter Size
(gpm) (inches)
1 64 1-1/2
2 60 1-1/2
3A 40 1
38 40 1
4A 53 1-1/2
48 53 1-1/2
SA 53 1-1/2
SB 53 1-1/2
GA 53 1-1/2
GB 53 1-1/2
7A 53 1-1/2
78 64 1-1/2
8 80 1-1/2
9 109 2
cc: Steven Plyler, Water Superintendent