HomeMy WebLinkAboutCT 04-15; LA COSTA GREENS NEIGHBORHOOD 1.06 & 1.07; FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING SITE GRADING; 2005-12-29roL1s FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING SITE GRADING VILLAGES OFLA COSTA - THE GREENS NEIGHBORHOODS 1.06 AND 1.07 CARLSBAD, CALIFORNIA PREPARED FOR REAL ESTATE COLLATERAL MANAGEMENT COMPANY % MORROW DEVELOPMENT INCORPORATED CARLSBAD, CALIFORNIA PROGRESS - DECEMBER 29, 2005 PROJECT NO. 06403-52-19B GEOCON ., INCORPORATED - GEOTECHNICAL CONSULTANTS 'V Project No 06403 52-19B December 29 2005 4 a Real Estate Collateral Management Company' % Morrow Development Incorporated 1903 Wright Place, Suite 180. Carlsbad, California 92008 Attention Mr. Tim O'Grady Subject: VILLAGES OF LA COSTA _THE GREENS NEIGHBORHOODS 1.06 AND 1.07 , .'• CARLSBAD, CALIFORNIA .. FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING SITE GRADING Gentlemen In accordance with your request and, our proposal dated March 18, 2005 we have provided compaction testing and observation services during grading of the sulject site. Our services were performed during the period of March 31 through October 31 2005 The scope of our services included the following " - Observing the grading operations including the removal and/or processing of topsoil colluvium, alluvium, landslide debris, and undocumented fill, and undercutting of transition 'lots. Observing the construction of stability fill and buttress fill slopes Performing in-place dry densitS' and moisture content tests in fill placed and compacted at the site. ' Performing laboratory tests to aid in evaluating maximum dry density and optimum moisture content and shear strength of the compacted fill soil. Additionally, laboratory tests were performed on samples of soil present at finish-grade to evaluate expansion characteristics and water-soluble sulfate Preparing an As-Graded Geologic Map Preparing this final report of grading The purpose of this report is to documen(that the grading for Neighborhoods 1.06 and 1.07,which include, respectively, 91 'and 71 single-family residential pads and a recreationpad, has been 6960 Flanders Drive M San Diego, California 92121-2974 • Telephone (858) 558-6900 0 Fax (858) 558-6159 performed in substantial conformance with the recommendations of the project geotechnical report, and that the fill materials have been properly placed and compacted. The grading operations for Neighborhoods 1.06 and 1.07 were performed concurrently with the Southeast Elementary School Site (Neighborhood 1.04) within Phase 2 of The Greens development GENERAL The grading contractor for the project was Sukut Incorporated of Oceanside, California Grading plans for the project were prepared by Hunsaker and Associates and are entitled Grading and Erosion Control Plans for La Costa I Greens Neighborhood 1.06 & 1.07, prepared by Hunsaker and Associates, City of Carlsbad approval date of May 10, 2005 (Drawing No. 427-6A). An electronic version of the grading plan was used as the base map for our "As-Graded" Geologic Map, Figures 1 through 6 (map pocket). The project geotechnical report is entitled Update Soil and Geologic Investigation Villages of La Costa - The Greens Carlsbad California dated June 25, 2001 (Project No 06403-12-03) There is currently a temporary stockpile placed within Hale Place of Neighborhood 1.06. We understand this stockpile will be removed shortly. Geocon representatives should observe the area upon removal of the stockpile to determine impact to the street References to elevations and locations herein were based on surveyors' or grade-checkers' stakes in the field and/or interpolation from the referenced grading plans. Geocon Incorporated does not provide surveying services and, therefore, has no opinion regarding the accuracy of the as-graded elevations or surface geometry with respect to the approved grading plans or proper surface drainage GRADING Neighborhoods 1.06 and 1.07 are located within the Villages of La Costa - The Greens, Phase 2 development. Specifically, the neighborhoods are situated north of the Poinsettia Lane alignment, east of Alicante Road, and west of the Bressi Ranch development. Prior to grading, the site was primarily characterized by moderately sloping hillside terrain dissected by a series of tributary canyons that drain southward and westerly into San Marcos Creek. Grading for the site consisted of daylight cuts and fills to achieve finish-grade elevations A portion of the southwestern margin along Poinsettia Lane within Neighborhood 1.07 was underlain by alluvium due to the presence of a shallow, groundwater table and close proximity to the existing roadway embankment, complete removal of alluvium was not practical and some alluvium was left in place. After fill materials were placed to attain design elevations, the area was surcharged with an additional 5 feet of fill and a settlement-monitoring program was implemented. The settlement- monitoring program included buried settlement plates and surface settlement monuments Further Project No 06403-52-19B 2 December 29. 2005 details of the settlement-monitoring program are discussed herein and the results are presented in Appendix A. Limits of the removals are depicted on the "As-Graded" Geologic Map, (Figure 6). Grading began with the removal of brush and vegetation from the area to be graded. The brush was then exported. Topsoil, colluvium, landslide debris, and alluvial soils were removed to expose formational material, where possible. Within these areas, and prior to placing fill, the exposed (overexcavated) ground surface was scarified, moisture conditioned, and compacted. Fill materials derived from on-site excavations were then placed and compacted in layers until the design elevations were attained. Fill was placed as a result of undercutting the cut portion of cut-fill transition pads. The building pads were undercut a minimum of 3 feet, sloping the bottom of the undercut at a gradient of approximately 1 percent toward the adjacent subdrain or deeper fill. Excavations within the sedimentary Santiago Formation produced. predominately sandy clays and silty sands that were suitable for capping material. Soil fill was placed in lifts no thicker than would allow for adequate bonding and compaction. The soil was moisture conditioned as necessary and mixed during placement and then compacted utilizing conventional heavy-duty, compaction equipment. During grading operations, compaction procedures were observed and in-place density tests were performed to evaluate the dry density and moisture content of the "soil" fill material. The in-place density tests were performed in general conformance with ASTM Test Method D 2922-01, Standard Test Met hod for Density of Soil and Soil-Aggregate in Place by Nuclear Methods. The results of the in-place dry density and moisture content tests are summarized in Table I. Grading for the Neighborhoods 1.06 and 1.07 were performed concurrently with The Greens Neighborhood 1.04 development. The results presented in Table I apply to Neighborhoods 1.06 and 1.07 only. As •. such, the test numbers are not in consecutive order. In general, the in-place dry density test results indicate that the fill soil has a dry density of least 90 percent of the laboratory maximum dry density near to slightly above optimum moisture content at the locations tested. The approximate locations of the in-place dry density tests are shown on the "As-Graded" Geologic Map (Figures 1 through 6). Laboratory tests were performed on samples of material used for fill to evaluate moisture-density relationships, optimum moisture content and maximum dry density (ASTM D 1557-02), shear strength (ASTM D 3080-03) expansion potential (ASTM D 4829-03), and water-soluble sulfate content (California Test No. 417). The results of the laboratory tests are summarized on Tables II through V. . . Project No. 06403-52-19B . - 3 - . December 29, 2005 Slopes The project cut and fill slopes were constructed at inclinations of 2:1 (horizontal: vertical) or flatter with maximum heights of approximately 35 and 48 feet, respectively. All slopes should be planted, drained, and maintained to reduce erosion. Slope irrigation should not be allowed to flow over the top of the slope. Cut slopes were observed and mapped by an engineering geologist for adverse geologic conditions that could affect slope stability. The cut slopes within Neighborhoods 1.06 and 1.07, in general, exposed discontinuous interbeds of sandstone and claystone. Bedding attitudes observed during grading indicate low angle of dips towards the west. It is our opinion that the cut slopes should be stable with respect to deep-seated failure. Based on geologic conditions encountered during our site investigation and grading operations, two buttress fills and five stability fills were constructed in Neighborhoods 1.06 and 1.07. The limits of the buttress and stability fills, including the keyway elevations, are depicted on Figures 1 through 6. Buttress and stability fill backcuts were excavated in general conformance with the design configurations recommended in the previously referenced update geotechnical investigation report. Once the design configuration had been achieved and. observed by an engineering geologist, panel drains were installed on the backcuts approximately 30 feet on center and connected to heel drain systems. Additional panel drains were placed where seepage was observed on the backcuts. Three stability fills with maximum heights ranging up to approximately 40 feet were constructed within Neighborhood 1.06 to mitigate seepage observed at or near the bases of the cut slopes. Stability Fill No. 1A was constructed east of Lots 66 through 68 on a west-facing slope that descends from the adjacent Bressi Ranch development. The heel drain for the northern half of Stability Fill No. 1 was connected to the storm drain system in the easement between Lots 69 and 70; the heel drain for the southern half should be ultimately connected to the storm drain in Halite Place near the northern boundary of Lot 65 by the master developer during improvement phases of development. Stability Fill No. 2 was constructed on the west-facing slope that fronts Alicante Road, west of Lots 82 through 86 in Neighborhood 1.06, to stabilize interbeds of sandstone and claystone which displayed signs surficial sloughage subsequent to grading. The associated heel drain is temporarily outlet at the southern margin of this stability fill for future connection to the storm drain system in Alicante Road. It is our understanding that the heel drain connection will be the responsibility of the master builder during future improvement phases. Stability Fill No. 3 was constructed east of Lots 70 through 74 on a west-facing slope that descends from the Bressi Ranch development. The heel drain is connected to the storm drain in the easement Project No. 06403-52-19B -4- December 29, 2005 between Lots 69 and 70 at the same structure that receives the heel drain for the northern half of Stability Fill No 1 Two stability fills with maximum heights ranging up to approximately 45 feet were constructed with northeastern portion of Neighborhood 1.07. Stability Fill No. 4 was constructed north and east of Lots 5 through 9 on slope faces that descend from Bressi Ranch. The heel drain for Stability Fill No 4 should be outlet into the brow ditch behind Lot 4 Stability' Fill No. 5 was constructed north of Mica Road on a south-facing 'slope that descends to Neighborhood 1.07 from the, adjacent Bressi Ranch development. The heel drain associated with Stability Fill No 4 is connected the storm drain system in Mica Road at two locations near Lot 66 and near lot 9 The two buttresses constructed in Neighborhood 1.06 were required due to the presence of bedding plane shears that were observed during our field investigation for The Greens development As discussed in Sections 6.2.2.3 and 6.2.2.4 of the aforementioned update report, 40-foot-wide buttresses were recommended for the slopes where Buttress Nos. '1 and 2 are now located. As observed during grading operations, the bedding plane surfaces were generally observed to consist of discontinuous remolded clay lenses. Once the design configuration of each buttress had been achieved and observed by an engineering geologist, panel drains were installed on the backcuts and connected to heel drains. Buttress Nos. 1 and 2 were constructed in general' accordance with the recommendations of the project geotechnical report Buttress No. 1 was constructed north of Lots 55, 56, and 65 on a south-facing slope that descends from the Bressi Ranch development; Buttress No. 2 was constructed north of Lots 81 and 82, also on a south-facing slope descending from Bressi Ranch The heel drain for Buttress No 2 has been stubbed out at its low point for future connection to the storm drain system' at the northern terminus of Halite Place. The heel drain for Buttress No. 1 is connected with the heel drain outlet for the southern half of Stability Fill No. 1A. Together, the heel drain should be connected to the storm drain. It is our understanding that the connection will be performed by the master builder during future improvement phases Subdrains Canyon subdrains and heel drains were installed at the general locations shown on the "As-Graded" Geologic Map (Figures 1 through 6). In addition, the subdrains were "as-built" for location and elevation by the project civil engineer. The canyon subdrains generally consisted of a 6-to-8-inch- diameter PVC, Schedule 40, perforated pipe placed in 3/4-inch crushed, aggregate gravel surrounded by Mirafi 140N (or equivalent) filter fabric. The drains were typically placed at least 10 feet below Project No. 06403-52-19B ' ' - 5- December 29, 2005 finish grade and constructed at a flow gradient of at least 1 percent Heel drains from buttresses and stability fills were constructed with 4-inch-diameter Schedule 40 PVC perforated pipe placed within crushed aggregate gravel surrounded by Mirafi 140N (or equivalent)filter fabric. The heel drains that have been temporarily outlet will be permanently connected to the storm drain system by the master developer during improvement phases. Settlement Monitoring Program Settlement monuments were installed within the southwestern portion of the Neighborhood 1.07 to monitor potential settlement of the alluvium left in place during grading. The settlement monuments were surveyed on a weekly basis. The monitoring program was concluded when no significant settlement was shown for 4 consecutive weeks Therefore, construction of site improvements and buildings can commence. The results of the settlement- monument program are presented in Appendix A Finish-grade Soil Conditions. Observations and laboratory test results indicate that the prevailing soil conditions within the upper approximately 3 feet of finish-grade of the lots' have an expansion potential of "low" to "high" (Expansion Index of 130 or less) as defined by Uniform Building Code (UBC) Table 18-I-B. Table VI and Table VII presents a summary of the indicated Expansion Index of the prevailing subgrade soil conditions for each lot within both neighborhoods It should be noted that although rocks larger than 6 inch were not intentionally placed within the upper 4 feet of pad grades, some larger rocks might exist at random locations. Samples obtained for expansion testing were also subjected to water-soluble sulfate testing to evaluate the amount of water-soluble sulfates within the finish-grade soils. These test results are used to determine the potential for sulfate attack on normal Portland Cement concrete. The test results indicate sulfate contents that correspond to "negligible" to severe" sulfate exposure ratings. This laboratory data should be provided to the civil and structural engineers for possible modifications to concrete Geocon Incorporated does not, practice corrosion engineering. Therefore, results of these tests should be reviewed by a corrosion consultant, and appropriate recommendations should be implemented during design and construction of proposed improvements The results of the water-soluble sulfate tests are summarized. on Table V. Project No. 06403-52-19B -6- December 29, 2005 SOIL AND GEOLOGIC CONDITIONS The soil and geologic conditions encountered during grading were found to be similar to those described in the project geotechnical report. The Santiago Formation (Ts) was exposed at grade on cut slopes, cut pads, within cleanouts, and in pad undercuts. The Santiago Formation generally varied from very hard to dense silty to sandy claystone to dense silty sandstone Stream-deposited Terrace Deposits (Qt) were exposed within cleanouts in localized portions of Neighborhoods 1.06 and 1.07 and generally consisted of medium dense to dense, silty to clayey sandstone. Alluvium (Qal) was encountered during grading operations on the southwestern margin of the site and generally varied from medium dense to dense, moist to wet, silty to clayey, fine sand. It should be noted that this area of alluvium could not be entirely removed due to the presence ofgioundwater at the time of grading. Previously placed compacted fill soil (Qpf) placed during grading of Bressi Ranch also exists beneath compacted fill materials placed during the grading of Lots 74 through 81 in Neighborhood 1.06. Compacted soil was placed in areas of fill and is designated as Qcf on Figures 1 through 6 In addition, compacted fill soil placed in undercut areas is designated as Quc. Table Vifi and Table IX present a summary of as-graded building pad conditions for each lot for both neighborhoods. The enclosed "AsGraded" Geologic Map (Figures 1 through 6) depicts the general geologic conditions observed No soil or geologic conditions were observed during grading that would preclude the continued development of the property as planned CONCLUSIONS AND RECOMMENDATIONS 1.0 General Based on observations and test results, it is the opinion of Geocon Incorporated that the grading to which this report pertains has been performed in substantial conformance with the recommendations of the previously referenced project soils report and the gotechnical requirements of the grading plans. Soil and geologic conditions encountered during grading that differ from those anticipated in the project soils report are not uncommon. Where such conditions required a significant modification to the recommendations of the project soils report, they have been described herein. 1.2 No soil or geologic conditions were observed during grading that would preclude the continued development of the property as planned. Based on laboratory test results and field observations, it is the opinion of Geocon Incorporated that the fill soils observed and tested as part of the grading for this neighborhood were generally compacted to a dry density of at least 90 percent of the laboratory maximum dry density near to slightly above optimum moisture content Project No. 06403-52-19B 'I December 29, 2005' 2.0 Future Grading 2.1 Any additional grading performed at the site should be accomplished in conjunction with our observation and compaction testing services. Grading plans for any future grading should be reviewed by Geocon Incorporated prior to finalizing. All trench and wall backfill should be compacted to a dry density of at least 90 percent of the laboratory maximum dry density near or above optimum moisture content. This office should be notified at least 48 FA hours prior to commencing additional grading or backfill operations. 3.0 Update Geotechnical Report 3.1 An update geotechnical report should be prepared by Geocôn Incorporated for Neighborhoods 1.06 and 1.07. The report should include foundation recommendations for reducing the detrimental effect of expansive soil and differential fill settlement across individual structures. In addition, retaining wall recommendations and seismic design criteria should be included, as well as other considerations such as concrete flatwork. 4.0 Slope Maintenance 4.1 Slopes that are steeper than 3:1 (horizontal: vertical) may, under conditions that are both difficult to prevent and predict, be susceptible to near-surface (surficial) slope instability. The instability is typically limited to the outer 3 feet of a portion of the slope and usually does not directly impact the improvements on the pad areas above or below the slope. The occurrence of surficial instability is more prevalent on fill slopes and is generally preceded by a period of heavy rainfall, excessive irrigation, or the migration of subsurface seepage. The disturbance and/or loosening of the surficial soils, as might result from root growth, soil expansion, or excavation for irrigation lines and slope planting, may also be a significant contributing factor to surficial instability. It is therefore recommended that to the maximum extent practical: (a) disturbed/loosened surficial soils be either removed or properly recompacted; (b) irrigation systems be periodically inspected and maintained to eliminate leaks and excessive irrigation; and (c) surface drains on and adjacent to slopes be periodically maintained to preclude ponding or erosion. It should be noted that although the incorporation of the above recommendations should reduce the potential for surficial slope instability, it will not eliminate the possibility and, therefore, it may be necessary to rebuild or repair a portion of the project's slopes in the future. Project No. 06403-52-19B - 8 - - . December 29, 2005 • . • .• '• 5.0 Drainage 5.1 Adequate drainage provisions are critical to the future performance of the project. Under no S .circumstances should water be allowed to pond. The building pads and sheet-graded areas - should be properly finish-graded so that drainage water is directed away from foundations, S . - pavements, concrete slabs, and slope tops to controlled drainage devices. . • 5.2 All underground utilities should be leak free. Utility and irrigation lines should be checked periodically for leaks for early detection of water infiltration and detected leaks should be S . repaired promptly. Detrimental soil movement could occur if water is allowed to infiltrate • the soil over a prólonged period. • * .••- 5.3 Landscaping planters adjacent to paved areas are not recommended due to the potential for surface or irrigation water to infiltrate the pavement's subgrade and base course. We recommend that subdrains to collect excess irrigation water and transmit it to drainage structures 6r impervious above-grade planter boxes be used. In addition, where landscaping is planned adjacent to the pavement, we recommend construction of a cutoff wall along the - edge of the pavement that extends.at least 6 inches below the bottom of the base material. : LIMITATIONS The conclusions and recommendations contained herein apply only to our work with respect to . grading and represent conditions at the date of our final . observation on October 31, 2005. Any subsequent grading should be done in conjunction with our observation and testing services. As used herein, the term "observation" implies only that we observed the progress of the work with which we . . agreed to be involved. Our services did not include the evaluation or identification of the potential S presence of hazardous or corrosive materials. Our conclusions and opinions as to whether the work . essentially complies with the job specifications are based on our observations, experience and test . results. Subsurface conditions,' and the accuracy of tests used to measure such conditions, can vary I greatly at any .time. We make no warranty, expressed or implied, except that ,our services were S performed in accordance with engineering principles generally accepted at this time and location. - • - .-..;.. .4 We will accept no responsibility for any subsequent changes made to the site by others, by the I . . uncontrolled action of water, or by the failure of others to properly repair damages caused by the . uncontrolled action of water. The findings and recommendations of this report may be invalidated wholly or partially by changes outside our. control. Therefore, this report is subject to review and should not be relied upon 'after a period of three years. • • . .:--..- H O --• .*. ..,.,- .. .-,.. - Project No. 06403-52719B -9, . . * December 29, 2005 - • • • S Should you have any questions regarding this report, or if we may be of further service, please S contact the undersigned at your convenience. .. Very truly yours, . GEOCON INCORPORATED RO Shanè Rodacker No. 63291 1 Sadr Zbs RCE 63291 Exp. CEG 1778 ~CEG1524 OF J/c I (6/del) Addressee AU cc ____ Project No. 06403-52-I9B . - - 10- December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Test No. Date Location 1 04/01/05 Unit 1.07; Lot 1 I A 04/01/05 Unit 1.07; Lot 1 2 04/01/05 Unit 1.07; Lot I 3 04/01/05 Unit 1.07; Lot 4 04/01/05 Unit 1.07; Lot 1 5 ------------------------------------------------------------------------ 04/14/05 Unit 1.07; Lot 1 6 04/04/05 Unit 1.07; Lot 1 7 04/04/05 Unit 1.07; Lot 1 8 04/04/05 Unit 1.07; Lot 2 9 04/04/05 Unit 1.07; Lot 1 20 04/07/05 Unit 1.06; Lot 92 20 A 04/07/05 Unit 1.06; Lot 92 SZ 21 04/07/05 Unit 1.06; Lot 92 22 04/08/05 Unit 1.06; Pyrite Av 10+60 23 04/08/05 Unit 1.06; Lot 92 24 ------------------------------------------------------------------------ 04/11/05 Unit 1.07; Lot 1 35 04/12/05 Unit 1.07; Lot 60 04/18/05 Unit 1.07; Lot 49 61 04/18/05 Unit 1.07; Lot 47 61 A 04/18/05 Unit 1.07; Lot 47 62 04/18/05 Unit 1.07; Lot 44 63 04/18/05 Unit 1.07; Lot 48 64 04/18/05 Unit 1.07; Lot 46 65 04/18/05 Unit 1.07; Lot 45 66 04/18/05 Unit 1.07; Lot 44 67 04/19/05 Unit 1.07; Lot 45 68 04/19/05 Unit 1.07; Geode St 16+30 69 04/19/05 Unit 1.07; Geode St 16+65 70 04/19/05 Unit 1.07; Geode St 17+35 71 04/19/05 Unit 1.07; Geode St 17+00 72 04/19/05 Unit 1.07; Geode St 15+00 95 04/22/05 Unit 1.07; Lot 2 96 04/22/05 Unit 1.07; Mica Rd 38+90 101 04/25/05 Unit 1.07; Lot 107 04/26/05 Unit 1.07; Lot 3 108 04/26/05 Unit 1.07; Lot 2 116 04/26/05 Unit l.07; Lot 3 120 04/27/05 Unit 1.07; Geode St 16+80 134 05/03/05 Unit 1.07; Lot 33 135 05/03/05 Unit 1.07; Titanite P111+00 142 05/04/05 Unit 1.07; Lot 33 154 05/10/05 Unit 1.07; Lot 50 156 05/10/05 Unit 1.07; Titanitë P112+30 157 05/10/05 Unit 1.07; Titanite P112+80 158 05/10/05 Unit 1.07; Lot 33 Elev. or Depth (ft) Curve No. Plus 3/4" Rock (%) Field Dry Dens. (pcI) Field Moist. Cont. (%) Field Rel. Comp. (%) Req'd. Rel. Comp. (%) 111 16 0 107.2 18.4 89 90 111 16 0 109.4 18.1 91 90 114 16 0 110.2 18.8 92 90 116 16 0 109.9 17.7 92 90 119 16 0 110.8 17.5 92 90 123 16 0 ------------------------------------------------------------------------------------------------ 108.6 17.9 90 90 125 16 0 110.9 17.2 92 90 126 16 0 169.7 17.1 91 90 130 9 0 112.8 14.7 93 90 123 16 0 108.9 18.3 91 90 184 17 0 ------------------------------------------------------------------------------------------------ 102.6 19.8 88 90 184 17 0 104.9 18.6 90 90 187 17 0 105.1 18.3 90 90 190 17 0 104.5 18.8 90 90 186 17 0 105.9 17.4 91 90 133 77 . 0 109.3 17.8 90 90 137 17 0 108.5 16.7 93 90 117 78 0 112.4 17.2 91 90 116 77 0 105.2 20.1 87 90 116 77 0 108.6 19.6 90 90 106 77 0 108.9 18.3 90 90 115 77 0 111.6 16.4 92 90 114 78 0 110.9 14.7 90 90 113 3 0 107.7 17.5 91 90- 110 3 0 106.8 18.9 90 90 112 77 0 ------------------------------------------------------------------------------------------------- 110.4 16.8 91 90 113 77 0 109.9 17.3 91 90 116 82 0 110.3 16.5 92 90 118 82 0 , 109.2 17.8 91 90 119 82 0 110.5 17.1 92 90 115 82 0 ------------------------------------------------------------------------------------------------- 108.7 17.4 91 90 133 75 .0 105.7 17.2 93 90 131 75 0 103.6 18.1 91 90 136 82 0 108.2 17.1 90 90 140 82 0 108.4 15.8 90 90 141 82 0 ------------------------------------------------------------------------------------------------- 109.1 16.3 91 90 145 19 0 101.8 20.1 91 90 121 82 0 109.0 16.3 91 90 108 77 0 110.1 16.6 91 90 110 77 0 109.7 15.5 91 90 111 77 0 110.3 15.3 91 90 114 29 0 110.8 15.2 91 90 118 33 0 107.3 15.1 92 90 119 33 0 106.8 16.2 92 90 120 33 0 108.3 17.5 93 90 Project No. 06403-52-19B December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. Rel. Rel. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location (' N. (%) (pci) (%) (%) (%) 159 05/11/05 Unit 1.07; Lot 50 . 124 82 0 104.1 16.7 87 90 159A 05/11/05 Unit 1.07; Lot 50 124 82 0 108.9 15.8 91 90 160 05/11/05 Unit 1.07; Lot 50 125 82 0 108.8 16.2, 91 90 162 05/11/05 Unit 1.07; Titanite P111+40 126 77 0 110.5 15.6 91 90 164 05/12/05 Unit l.07; Lot 5l 118 77 0 110.2 13.0 91 90 165 05/12/05 Unit 1.07; Titanite P115+35 120 10 0 1 106.1 15.3 93 90 166 05/12/05 Unit 1.07; Titanite P114+00 119 19 0 101.9 18.6 91 90 167 05/12/05 Unit 1.07; Lot 18 122 19 0 102.2 19.3 91 90 190 05/18/05 Unit 1.07; Lot 33 * 124 75 0 103.5 18.8 91 90 191 05/18/05 Unit 1.07; Titanite P113+70 120 75 0 104.7 19.3 92 - 90 192 05/18/05 Unit 1.07; Lot 19 129 75 0 102.4 16.9 90 90 193 05/18/05 Unit i.07; Lot 33 ' 128 77 0 110.8 15.7 92 90 194 05/18/05 Unit 1.07; Titanite P114+70 118 23 0 106.1 18.6 93 90 195 '05/18/05 Unit 1.07; Lot 18 125 23 0 104.4 17.8 91 90 196 05/18/05 Unit 1.07; Lot 19 - 133 23 0 101.2 19.7 89 90 - - 196A 05/19/05 Unit l.07; Lot 19 133 23 0 104.2 18.3 91 90 197 05/18/05 Unit 1.07; Lot 20 - 135 23 0 99.6 20.1 87 90 197 A 05/19/05 Unit 1.07; Lot 20 135 23 0 105.0 19.2 92 90 207 05/20/05 Unit 1.07; Lot 71 155 19 0 104.8 16.3 94 90 210 05/20/05 Unit 1.07; Lot 65 160 86 0 110.2 14.7 91 90 - 212. 05/23/05 Unit 1.07; Lot 67 : 163 86 0 108.6 14.0 90 90 214 05/23/05 Unit 1.07; Lot 67 167 86 0 109.3 15.1 90 90 220 05/24/05 Unit l.07;Lot18 128 86 0 109.9 13.3 91 90 221 05/24/05 Unit l.07; Lot 51 123 86 0 111.1 - 13.8 92 90 222 05/24/05 Unit 1.07; Lot 51 126 86 0 109.5 13.4 91 90 223 05/25/05 Unit 1.07; Lot 17 130 86 0 110.8 15.8 92 90 224 05/25/05 Unit 1.07; Lot 50 127 17 0 105.9 14.1 91 90 225 05/25/05 Unit 1.07; Lot 31 . 130 17 0 106.5 16.2 91 90 226 05/25/05 Unit 1.07; Lot 29 - 133 75 0 102.7 16.6 90 90 227 05/25/05 Unit 1.07; Titanite P111+90 129 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 75 0 103.5 17.4 91 90 228 05/25/05 Unit 1.07; Lot 11 - 153 75 0 - 102.9 16.8 90 90 229 05/25/05 Unit l.07; Lot 22 150 75 0 103.3 17.1 91 90 230 05/25/05 Unit 1.07; Lot 12 ' 156 75 0 104.7 16.2 92 90 231 05/25/05 Unit l.07; Lot ll 158 75 ,0 103.8 16.6 91 90 232 05/26/05 Unit 1.07; Lot 19 . 138 75 0 103.4 16.0 91 90. 233 05/26/05 Unit 1.07; Titanite P114+80 130 19 0 101.6 17.9 91 90 234 05/26/05 Unit 1.07; Lot 20 141 19 0 102.1 18.7 91 90 235 05/26/05 Unit l.07; Lot 13 - 161 19 0 101.5 18.4 91 90 SZ 236 05/26/05 Unit 1.07; Stab Fill #4 174 .. 90 0 104.2 14.6 92 90 SZ 237 05/26/05 Unit 1.07; Stab Fill #4 172 90 0 105.7 - 15.8 93 - - 90 SZ 238 05/26/05 Unit 1.07; Stab Fill #4 178 90 0 106.8 15.5 94 90 SZ 239 05/26/05 Unit 1.07; Stab Fill #4 177 90 0 104.1 16.3 92 90 240 05/27/05 Unit 1.07; Lot 14 163 90 0 103.4 18.0 91 90 241 05/27/05 Unit 1.07; Lot 10 164 90 0 104.6 14.9 92 90' 242 05/27/05 Unit 1.07; Lot 10 166 90 0 103.4 15.8 91 90 Project No. 06403-52-19B December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reqd. - or 3/4' Dry Moist. Re!. Re!. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location ' ' NO. (%) (pcf) (%) (%) (%) 243 05/31/05 Unit 1.07; Lot 19 142 19 0 100.9 19.0 90 90 244 05/31/05 Unit 1.07; Lot 11 169 19 . .0 101.2 16.4 91 90 245 05/31/05 Unit 1.07; Mica Rd 24+75 172 19 0 102.7 18.1 92 90 SZ 246 05/31/05 Unit 1.07; Stab Fill #4 179 90 0 105.4 14.8 93 90 SZ 247 05/31/05 Unit 1.07; Stab Fill #4 174 90 0 106.1 15.2 93 90 SZ 248 05/31/05 Unit 1.06; Lot 92 198 90 0 103.3 17.3 91 90 249 06/01/05 Unit 1.06; Lot 92 194 . 90 0 105.3 17.4 93 90 250 06/01/05 Unit 1.07; Lot 11 ' 171 90 0 102.6 17.6 90 90 251 06/01/05 Unit 1.07; Lot 18 140 17 0 106.5 15.8 91 90 252 06/01/05 Unit 1.07; Lot 20 . 146 , 75 0 104.0 16.9 91 90 253 06/01/05 Unit 1.07; Lot 21 148 17 0 106.3 15.0 91 90 254 06/01/05 Unit l.06; Lot 92 196 17 0 105.6 13.8 91 90 255 06/01/05 Unit 1.06; Halite P1 26+35 , 200 17 0 104.7 14.1 90 90 256 06/01/05 Unit 1.06; Lot 91 201 90 0 101.2 10.6 89 90 256 A 06/01/05 Unit 1.06; Lot 91 201 90 0 103.8 14.5 91 90 258 06/01/05 Unit 1.07; Lot 51 . . . 136 90 0 104.6 14.8 92 90 260 06/02/05 Unit 1.07; Lot 52 138 90. 0 103.1 16.5 91 90 261 06/02/05 Unit 1.07; Lot 51 140 . 90 0 102.5 15.2 90 90 262 06/02/05 Unit 1.06; Halite P125+10 . 198 90 0 102.9 14.8 91 90 263 06/02/05 Unit 1.06; Lot 91 - 201 90 0 104.1 14.3 92 90 265 06/03/05 Unit 1.07; Lot 51 ' 143 90 0 103.7 16.3 91 90 266 06/03/05 Unit 1.07; Lot 52 145 90 0 104.9 15.5 92 90 267 06/03/05 Unit 1.07; Titanite P111+90 131 19 0 102.4 18.9 92 90 268 06/03/05 Unit 1.07; Titanite P112+45 ' 134 19 0 102.5 19.3 92 90 269 06/03/05 Unit 1.07; Lot 53 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 147 19 0 102.1 17.6 91 90 270 06/03/05 Unit 1.06; Lot 91 . 205. 90 0 101.2 8.2 89 90 270 A 06/03/05 Unit 1.06; Lot 91 - 205 90 0 103.7 14.1 91 90 271 06/06/05 Unit 1.07; Lot 12 ' 164 90 0 104.4 17.4 92 90 SZ 272 06/06/05 Unit 1.07; Lot 10 175 90 0 102.7 14.6 90 90 273 06/06/05 Unit 1.07; Lot 10 . 178 19 0 102.1 16.3 91 90 274 06/06/05 Unit 1.07; Mica Rd 25+40 181 19 0 101.9 17.2 91 90 SZ 275 06/07/05 Unit 1.07; Stab Fill #4 182 90 0 103.6 15.7 91 90 SZ 276 06/07/05 Unit 1.07; Stab Fill #4 ., 185 90 0 104.7 14.9 92 90 SZ 277 06/07/05 Unit 1.07; Stab Fill #4 .- . 189 90 0 104.8 15.3 92 90 SZ 278 06/07/05 Unit 1.07; Stab Fill #4 192 90 0 105.1 16.4 92 90 279 06/07/05 Unit 1.07; Lot 5 154 90 0 106.6 14.8 94 90 280 06/07/05 Unit 1.07; Lot 64 168 88 0 105.0 18.9 93 90 281 06/07/05 Unit l.07; Lot 67 170 88 . 0 103.4 , 18.4 91 90 282 06/07/05 Unit 1.07; Lot 69 173 88 0 104.5 19.2 92 90 283 06/07/05 Unit 1 .07; Lot 68 175 88 0 105.1 18.7 93 90 284 06/08/05 Unit 1.07; Lot 6 158 88 0 103.8 16.4 92 90 285 06/08/05 Unit 1.07; Lot 8 166 88 0 102.9 167 91 90 SZ 286 06/08/05 Unit 1.07; Stab Fill #4 195 88 0 102.4 15.9 90 90 SZ 287 06/08/05 Unit 1.07; StabFi1l #4 196 88 0 103.7 17.1 92 90 SZ 288 06/08/05 Unit 1.07; Stab Fill #4 200 19 0 100.9 18.4 90 90 Project No. 06403-52-19B December 29, 2005 • .. , - • . : TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS' S ' • Elev. Plus Field Field Field Reqd. . or ' 3/4 Dry Moist. Rel. Rel. Depth ' Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location ,, ' (ft) , No. (%) (PcO SZ 289 06/08/05 Unit 1.07; Stab Fill #4 '-' 205 19 ' 0 101.3 17.2 91 90 290 .' 06/08/05 Unit 1.07; Lot 65 • , ' 176 19' 0 101.8 16.5 91 90 5 291 06/08/05 Unit 107 Lot 59 158 88 0 1039 166 92 90 292 06/08/05 Unit 1.07; Lot 58 . 155 88 0 104.7 15.5 92 90 • , 296 06/09/05 Unit 1.07; Lot 71 . '. 176 , 88 0 103.3, 17.8 91 90 - 297 06/09/05 Unit 1.07; Lot 66 178 88 0 102.7 16.5 91 90 5 298 06/09/05 Unit 107 Lot 56 156 19 0 1017 164 91 90 S 299 06/09/05 Unit 107 Lot 58 164 88 0 1048 161 93 90 303 06/09/05 Unit 1.07; Lot 63 ' ' 179 19 0 100.9 16.3 90 90 S , 304 06/10/05 Unit 107 Lot 59 171 19 0 1016 173 91 90 • ,. --30---/lo;o5 Unit i.o Lot 7 -16----19 0 102.1 16.5 91 90 S 306 06/10/05 Unit 107 Lot 55 163 19 0 1019 174 91 90 307 06/10/05 Unit 1.07; Lot'53 ' 150 19 0 102.2 16.8 91 ' 90 S ' 308 06/10/05 Unit 1.07; Lot 54 ' , 155 19 0 101.1 17.9 90 90 SZ 309 06/10/05 Unit 1:06; Buttress FiFill#1 ---- --- -- - -, --------103.5 S SZ 310 06/10/05 Unitll.06; Buttress Fill #1 ' 262 88 . 0 102.9 15.7 91 90 - 06/13/05 Unit 1.07; Lot 55 ' :161 88' 0 -104.3 16.2 ' 92 90 5 312 06/13/05 Unit 1.07; Lot 50 150 . 88 ,' 0' 104.8 15.9 93 90 S 313 06/13/05 Unit 1.07; Lot 52 '' ' ' 153 ' 88 0 105.1 15.6 93 90 S SZ 316 06/13/05 Unit 1.06; Buttress Fill #1 266 88 0 104.1 163 92 90 • . 326 ' ' 06/15/05 Unit 1.07; Lot 56 , : 167 88 . 0 104.4 16.9 92 90. 327 06/15/05 Unit 107 'Lot 59 174 88 0 1037 176 92 90 5 328 06/15/05 Unit 107 Lot 22 157 17 0 1085 147 93 90 S . 32906/15/05 Unit 1.07; Lot 19 ' ' - 152 88 0 104.8 16.3 93 90 330 06/15/05 Unit 1.07; Brookite Ct 12+10 '., 166 88' 0 10.7 17.4 . 91 9 331 06/15/05 Unit 1.07; Lot 11 174 88 0 103.1 182 91 ---------------------------- 90 S . 33206/16/05 Unit 1.07; Lot 30 . ' 135 ' .23 0 104.9 16.7 92 ' 90 333 06/16/05 Unit 1.07; Lot 28 . ' " 132 23 0 105.1 16.9 92 ' 90 S . 334 06116/05 Unit 1.07; Lot 48 . 123 ' 23 0 100.2' 12.5 88 90' 334 A 06/16/05 Unit 1.07; Lot 48.' . ' . 123 ' 23' 0 104.2 16.6 ' 91 ' 90 S 335 06/16/05 Unit 1.07; Lot 45 ' . -' . 120 23' '0 103.9 16.8 91 90 336, 06/16/05 Unit 1.07; Lot 32 '. -' 129 88 0 103.3 15.5 91 90 5 337 , 06/17/05 Unit 1.07; Lot 30 - 130 88 0 101.2 16.4 89 90 5 337A 06/17/05 Unit 107 Lot 30 130 88 0 1029 162 91 90 S . 33806/17/05 Unit 1.07; Lot 28 142 77 . 0 109.9 15.4 91 90 339 06/17/05 Unit 1.07; Lot 32 , 134 77 0 110.7' 14.8 92 90 5 340 06/17/05 Unit 1.07; Lot 31 . ' 138 77 0 109.8 16.3 91 90 S' 341 06/17/05 Unit 1.07; Lot 30 140 77 0 110.1 14.5 91 90 S 342 . 06/17/05 Unit 1.07; Lot 29 ' " 146 77 0 ' 109.6 18.5 91 90 343 06/17/05 Unit 107 Lot 28. 150 77 0 1093 181 90 90 5 . 344 06/20/05 Unit 1.07; Lot 22 -------15-------108.5 --5.290 --- 345 06/20/05 Unit 1.07; Lot 14 '. 155 . 88 0 103.1 16.4 91 90 S 346 ' 06/20/05 Unit 1.07; Lot 21 . ' 156 17 0 106.4 17.0 91 90 S . ' 347 06/20/05 Unit 1.07; Lot 18 , '. . 145 , . 17 0 108.1 .17.2 93 90 5 348 06/20/05 Unit 1.07; Lot 18 , . ' 154 88 0 104.5 16.3 92 90 , Project No. 06403-52-19B . , - . ' . -' . . . December 29, 2005 S TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS - Elev.., Plus Field Field Field Reqd. or 3/4 Dry Moist. Rel. Rel. Depth. Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location . (ft) No. (%) (pet) 349 06/20/05 Unit 1.07; Brookite Ct 10+35 156 88 0 105.6 16.9 93 90 350 06/20/05 Unit 1.07; Lot 17 . 147 88 0 107.7 16.1 95 90 351 06/20/05 Unit 1.07; Lot 18 155 19 0 102.7 16.5 92 90 352 06/20/05 Unit l.07; Lot 20 157 19 0 101.9 17.3 91 90 353 06/20/05 Unit 1.07; Lot 13 . 168 19 0 101.2 18.2 91 - 90 354 06/20/05 Unit 1.07; Lot 14 166 19 0 100.7 19.8 90 90 355 06/20/05 Unit 1.07; Lot 46 124 88 0 103.9 17.6 92 90 356 06/21/05. Unit l.07; Lot 42 104 ' 19 0 101.3 18.3 91 90 357 06/21/05 Unit 1.07; Lot 40 107 19 0 102.7 19.1 92 90 358 06/21/05 Unit l.07; Lot 39 106 19 0 101.5 19.9 91 90 359 06/21/05 Unit 1.07; Lot 43 108 17 0 106.2 16.9 91 90 360 06/21/05 Unit 1.07; Lot 41 111 17 0 106.8 19.3 92 90 361 06/21/05 Unit 1.07; Lot 39 112 19 0 103.1 20.2 92 90 SZ 362 06/21/05 Unit 1.07; Lot 42 113 19 0 .101.6 16.3 91 90 363 06/22/05 Unit l.07; Lot 15 , 158 19 0 101.7 15.7 91 90 364 06/22/05 Unit 1.07; Lot 17 150 '19 0 100.9 16.6 90 90 365 06/22/05 Unit 1.07; Lot 17 - 158 88 0 102.9 15.2 91 90 366 06/22/05 Unit 1.07; Lot 18 161 88 0 104.5 16.8 92 90 367 06/22/05 Unit 1.07; Lot 20 160 88 0 103.3 17.1 91 90 368 06/22/05 Unit 1.07; Lot 21 165 88 0 103.5 16.5 91 90 369 06/22/05 Unit 1.07; Lot 23 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ " 170 86 0 112.0 13.6 93 90 370 06/22/05 Unit 1.07; Lot 23 . . 172 '86 0 113.4 13.2 . 94 90 371 06/22/05 Unit 1.07; Lot 19 ' 166 88 ' 0 103.0, 18.5 91 90 372 06/22/05 Unit 1.07; Lot 21 . 170 88 0, 104.9 16.3 93 90 SZ ' 373 06/23/05 Unit 1.07; Lot 21 ' 168 17 0 106.0 14.5 91 ' 90 374 06/23/05 Unit 1.07; Lot 19 173 17 0 107.1 15.6 92 90 375 , 06/23/05 Unit 1.07; ,Lot 43 . 103 - 88 0 103.8 17.7 .92 90 , , 3'76 06/23/05 Unit 1.07; Lot 43 , 96 ' 88 - 0 102.5 ' 16.3 91 90 377 06/23/05 Unit 1.07; Lot 43 , , 100 17 0 108.1 - 15.2 93 90 378 06/23/05 Unit 1.07; Lot 43 106 17 0 106.5 17.0 91 90 379 06/24/05 Unit 1.07; Lot 21 ' 172- '17 0 108.0 14.1 93 90 380 06/24/05 Unit 1.07; Lot 22 , , , 173 88 0 102.5 18.3 - 91 90 381 06/24/05 Unit 1.07; Lot 23 174 88 0 103.6 16.5 92 90 382 06/24/05 Unit 1.07; Lot 34 , 105 - 88 0 102.3 16.5 90 90 383 - 06/24/05 Unit 1.07; Lot 35 ' 109 88 0 103.4 15.5- 91 90 384 06/27/05 Unit 1.07; Geode St 14+30 111 90 0 105.6 15.1 93 , 90 385 06/27/05 Unit 1.07; Lot 43 112 90 0 '103.9 14.5 91 90 386 06/27/05 Unit 1.07; Lot 42 . , 114 90 .' 0 105.8 17.1 93 90 387 06/27/05 Unit 1.07; Lot 40 • 117 90 0 '104.4 15.6 , 92 90 388 06/27/05 Unit 1.07; Stab Fill #5 177 ' 90 - 0 105.2 .14.3 93 ' 90 389 06/27/05 Unit 1.07; Stab Fill #5 • 180 88 0 103.7 17.7 92 90 390 06/27/05 Unit 1.07; Stab Fill #5 182 88 0 102.9 16.2 91 90 393 06/28/05 Unit 1.07; Stab Fill #5 , '. 185 90 0 .102.6 . 14.6 90 90 - - 394 ' 06/28/05 Unit 1.07; Stab Fill #5 ' ' 190 90 . 0 103.9 14.1 91 ' 90 395 06/28/05 Unit 1.07; Stab Fill #5 193 90 0 - 103.2 14.8 91 '90 Project No. 06403-52-19B ' . . . December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Test No. Date LOcation - Elev. or Depth (ft) Curve No. Plus 3/4' Rock (%) Field Dry Dens. (pcO Field Moist. Cont. (%) Field Rd. Comp. Reqd. Rel. Comp. 396 06/28/05 Unit 1.07; Stab Fill #5 195 90 0 104.9 14.3 92 90 397 06/28/05 Unit 1.07; Stab Fill #5 190 90 0 102.5 15.6 90 90 398 06/28/05 Unit 1.07; Lot 17 162 88 0 103.1 16.4 91 90 399 06/28/05 Unit 1.07; Lot 17 165 88 0 102.3 17.1 90 90 400 06/28/05 Unit 1.07; Lot 20 175. 90 0 103.8 17.5 91 90 401 06/28/05 Unit 1.07; Lot 24 178 90 0 104.2 16.7 92 90 402 06/29/05 Unit 1.07; Stab Fill #5 189 88 0 104.1 16.2 92 90 403 06/29/05 Unit 1.07; Stab Fill #5 185 88 0 103.3 15.8 91 90 404 06/29/05 Unit 1.07; Stab Fill #5 193 88 0 102.9 16.5 91 90 405 06/29/05 Unit 1.07; Stab Fill #5 197 90 0 102.7 15.2 90 9 406 06/29/05 Unit 1.07; Stab Fill #5 ------------------------------------------------------------------------------------------------------------------------------------------------------------ 196 90 0 102.6 14.7 90 90 407 06/29/05 Unit l.07; Lot 17 . 169 88 0 103.3 16.1 91 90 408 06/29/05 Unit 1.07; Lot 17 . . 174 88 0 103.8 16.6 92 90 409 06/29/05 Unit 1.07; Lot 16 ' 168 90 0 105.9 14.5 93 90 410 06/29/05 Unit 1.07; Lot 20 - 179 88 0 104.7 16.3 92 . 90 411 06/29/05 Unit 1.07; Lot 14 ----------------------------------------------------------------------------------------------------------------------------------------------------------- 174 88 0 103.0 16.9 91 90 412 06/30/05 Unit 1.07; Lot 15 161 90 0 104.4 15.6 92 90 413 06/30/05 Unit 1.07; BrookiteCt 10+00 . 163 90 0 104.2 18.1 92 90 414 06/30/05 Unit 1.07; Lot 15 165 90 0 103.0 17.9 91 90 415 06/30/05 Unit 1.07; Lot 15 . 171 88 0 102.7 18.8 91 90 416 06/30/05 Unit 1.07; Lot 16 171 88 0 103.1 17.6 91 90 417 06/30/05 Unit L07; Lot 16 175 88 0. 102.3 15.7 90 .. 90 418 06/30/05 Unit 1.07; Lot 17 179 88 0 103.6 16.3 92 90 419 06/30/05 Unit 1.06; Lot 42 . 179 90 0 105.2 16.4 93 90 420 06/30/05 Unit 1.07; Lot 23 . 180 90 0 104.1 15.5 92 90 421 06/30/05 Unit 1.07; Lot 18 183 90 0 105.7 14.8 93 90 ST 429 07/01/05 Unit 1.07; Stab Fill #4 194 88 0 103.7 16.9 92 90 ST 430 07/01/05 Unit 1.07; Stab Fill #4 183 88 0 101.9 18.1 90 90 ST 431 07/01/05 Unit 1.07; Stab Fill #4 . 197 88 0 103.1 16.4 91 90 432 07/05/05 Unit 1.07; Lot 34 . 112 90 0 103.8 14.5 91 90 433 07/05/05 Unit 1.07; Lot 39 110 90 0 103.3 14.8 91 90 434 07/05/05 Unit 1.07; Lot 43 114 90 0 101.9 17.4 90 90 435 07/05/05 Unit 1.07; Lot 38 - 115 90 0 102.7 15.3 90 90 436 07/05/05 Unit 1.07; Lot 41 116 90 0 102.1 14.9 90 90 437 07/05/05 Unit 1.07; Lot 43 . 118 90 0 102.9 15.1 91 90 438 07/05/05 Unit 1.07; Lot 36 ------------------------------------------------------------------------------------------------------------------------------------------------------------ 115 90 0 103.2 18.4 91 90 439 07/05/05 Unit 1.07; Lot 34 119 90 0 102.8 17.6 90 90 440 07/05/05 Unit 1.07; Lot 41 . 120 74 0 113.4 14.0 92 90 442 07/06/05 Unit 1.07; Lot 38 118 74 0 111.7 12.4 90 90 443 07/06/05 Unit 1.07; Lot 42 120 74 0 112.6 11.3 91 90 444 07/06/05 Unit 1.07; Lot 43 ------------------------------------------------------------------------------------------------------------------------------------------------------------- 122 74 0 112.2 11.5 91 90 445 07/06/05 Unit 1.07; Geode St 13+70 119 74 0 113.5 11.8 92 90 446 07/06/05 Unit 1.07; Lot 39 121 . 90 0 104.7 14.1 92 90 447 07/06/05 Unit 1.07; Lot 35 123 90 0 102.9 14.9 91 90 448 07/06/05 Unit 1.07; Lot 49 121 90 0 103.6 15.1 91 90 Project No. 06403-52-19W . December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reqd. - ' or 3/4" Dry Moist. Rel. Rel. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location ', t) , No. (%) (pct) (%) (%) (%) 449 07/07/05 Unit 1.07; Lot 47 •' 126 90 0 102.5 14.7 90 90 451 07/07/05 Unit 1.07; Lot 43 124 90 0 103.1 15.8 91 90 452 07/07/05 Unit 1.07; Lot 39 - 126 90 0 102.3 14.3 90 90 453 07/07/05 Unit 1.07; Lot 40 123 90 0 102.8 14.9 90 90 454 07/08/05 Unit 1.07; Lot 34 126 90 0 103.9 14.5 91 90 ,455 07/08/05 Unit 1.07; Lot 43. 127 90 0 102.6 14.7 90 90 456 07/08/05 Unit 1.07; Lot 39, ' )29 17 0 107.7 13.2 92 90 457 07/08/05 Unit 1.07; Lot 38 131 17 0 107.5 13.8 92 90 458 07/08/05 Unit 1.07; Lot 35 . 129 17 0 106.1 14.3 91 90 459 07/08/05 Unit 1.07; Lot 41 130 - 90 0 104.0 14.9 91 90 460 07/08/05 Unit 1.07; Lot 43 : 131 90 0 105.2 14.7 93 90 461 07/08/05 Unit 107 Lot 40 - 133 90 0 1038 155 91 90 462 07/11/05 Unit 107 Lot 50 152 88 0 1029 168 91 90 463 07/11/05 Unit 1.07; Lot 51 155 88 0 102.6 18.0 91 90 464 07/11/05 Unit 1.07; Lot 51 157 88 -0 103.2 16.1 91 90 465 ------------------------------------------------------------------------------------------------------------------------------------------------------------- 07/11/05 Unit 1.07; Lot 53 ' 154 90 0 103.3 14.2 91 90 466 07/11/05 Unit 1.07; Lot 52 . .156 90 0 102.8 14.5 90 90 467 07/11/05 Unit 1.07; Lot 54 157 90 0 102.9 14.8 91 90 468 07/11/05 Unit 1.07; Lot 53 "159 90 0 103.0 14.4 91 90 469 07/11/05 Unit 1.07; Lot 60 ' 176 90 0 104.5 13.9 92 90 470 07/11/05 Unit 1.07; Lot 44 123 90, 0 105.2 15.7 93 90 471 07/11/05 Unit 1.07; Lot 44 r' 126 .90 0 104.7 14.1 92 90 472 07/11/05 Unit l.07; Lot 45 128 88, 0 103.1 16.8 91 90 473 07/11/05 Unit 1.07; Lot 44 . , ' 129 88 0 102.6 17.2 91 90 474 07/11/05 Unit 107 Lot 43 121 90 0 1044 146 92 90 475 07/11/05 Unit 1.07; Lot 40 123 90 0 105.1 15.3 92 90 476 07/11/05 Unit 1.07; Lot 42 . 125 90 0 104.4 14.3 92 90 477 07/11/05 Unit 1.07; Lot 38 ' . 128 90 0 102.7 15.0 90 90 483 07/12/05 Unit 1.07; Lot 15 . .' 176 90 - 0 104.9 15.6 92 90 484 07/12/05 Unit 1.07; Lot 13 179 90 0 102.8 14.1 90 90 485 07/12/05 Unit 1.07; BrookiteCtll+55 "' .181 90 0 103.1 14.0 1 91 . 90 486 07/12/05 Unit 1.07; Lot 15 ' 183 90 0 105.6 14.7 93 90 487 07/12/05 Unit 1.07; Lot 12 185 90 0 ' 104.3 14.5 92 90 488 07/12/05 Unit 1.07; Lot 24 . . . ' 183 90 0 102.2 15.2 90 90 489 '07/12/05 Unit 1.07; Lot 22 . 185 ' .90 , 0 102.7 15.0 90 90 490 ' 07/12/05 Unit 1.07; Lot 17 , ' 181 90 0 103.7 14.9 91 90 491 07/12/05 Unit 1.07; Lot 19 186 90 0 103.9 15.9 91 90 492 07/12/05 Unit 1.07; Lot 20 188 90 0 102.8 15.4 90 90 493 07/13/05 Unit 1.07; BrookiteCt 11+00 187 19 0 102.3 16.9 92 90 494 07/13/05 Unit 1.07; Lot 17 189 19 0 101.8 17.6 91 90 495 07/13/05 Unit l.07; Lot 18 ' . . ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 190 90 0 104.6 15.8 92 90 496 07/13/05 Unit 1.07; Lot 23 -, 188 1,7 0 106.6 13.5 92 90 497 07/13/05 Unit 1.07; Brookite'Ct 13+45 179 17 0 105.9 , 18.2 91 90 498 07/13/05 Unit 1.07; Lot 10 . ' 182 17 0 107.4 15.1 92 90 499 07/13/05 Unit 1.07; Lot 13 188 90 0 '102.2 15.0 90 90 Project No. 06403-52-19B . - . December 29, 2005 TABLE SUMMARY OF FIELD DENSITY TEST RESULTS Test No. Date Location Elev. or Depth ('t) Curve No. Plus 3/4 Rock (°"°) Field Dry Dens. (p) Field Moist. Cont. Field Re!. Comp. Reqd. Re!. Comp. 500 07/13/05 Unit 1.07; Lot 21 190 90 0 104.9 14.3 92 90 501 07/13/05 Unit 1.07; Lot 18 191 190 0 105.1 13.9 92 90 502 07/13/05 Unit 1.07; Lot 15 1187 17 0 106.1 13.9 91 90 SZ 503 07/14/05 Unit 1.06; Lot 44; (Rec Lot) 186 17 0 105.7 14.2 91 90 SZ 504 07/14/05 Unit 1.06; Lot 40 192 17 0 104.5 13.7 90 90 SZ 505 07/14/05 Unit 1.06; Lot 43 . 94 17 0 105.3 14.1 90 90 SZ 506 07/14/05 Unit 1.06; Lot 41 96 . 90 0 103.8 14.5 91 90 SZ 507 07/14/05 Unit 1.06; Lot 40 199 90 0 104.9 16.2 92 90 508 07/14/05 Unit 1.06; Lot 44 197 90 0 102.6 15.9 90 90 509 07/14/05 Unit 1.06; Lot 44; (Rec Lot) - - 200 90 0 102.0 - 14.5 90 90 510 07/14/05 Unit l.07; Lot 13 - 187 88 0 100.7 10.8 89 90 510A 07/14/05 Unit 1.07; Lot 13 187 88 0 101.8 16.9 90 90 511 07/14/05 Unit 1.07; Lot 12 189 88 0 103.5 16.1 91 90 - 512 07/14/05 Unit 1.07; Lot 15 190 88 0 99.8 11.4 88 90 512A 07/14/05 Unit l.07; Lot l5 190 88 0 105.9 17.1 94 90 513 07/14/05 Unit 1.07; Lot 16 . 193 88 0 102.6 18.5 91 90 514 07/14/05 Unit l.07; Lot 27 186 - 90 0 104.3 17.9 92 90 515 07/15/05 Unit 1.06; Mica Rd 24+50 . 185 90 0 103.7 14.9 91 90 516 07/15/05 Unit 1.06; Lot 44 190 90, 0 - 102.8 15.1 90 90 517 07/15/05 Unit 1.06; Lot 44 . 195 90 0 105.7 14.3 93 90 518 07/15/05 Unit 1.06; Lot 44 199 90 0 104.9 17.9 92 90 519 07/15/05 Unit 1.06; Lot 44 . 197 90 0 104.6 15.2 92 90 520 07/15/05 Unit 1.06; Lot 44 202 90 0 102.1 17.4 90 90 521 07/15/05 Unit 1.06; Lot 44 204 90 0 103.2 15.8 91 90 522 07/15/05 Unit 1.06; Lot 43 . 206 90 0 102.6 14.8 90 90 523 07/15/05 Unit 1.06; Lot 41 203 90 0 104.4 14.5 92 90 524 07/18/05 Unit 1.06; Mica Rd 22+80 204 90 0 104.1 14.3 92 90 525 07/18/05 Unit 1.06; Lot 44 - . ..204 90 0 . 105.2 14.9 93 90 526 07/18/05 Unit 1.06; Lot 44 - - 207 19 0 100.6 16.8 90 90 SZ 527 07/18/05 Unit 1.06; Lot 43 208 19 0 101.7 16.2 91 90 528 07/18/05 Unit 1.06; Lot 44 208 19 0 102.3 17.5 92 90 - 529 07/18/05 Unit 1.06; Lot 42 -. 212 90 - 0 104.7 14.6 92 90 530 07/18/05 Unit 1.06; Lot 40 212 - 90 . 0 104.7 14.6 92 90 • 531 07/18/05 Unit 1.06; Lot 43 •. 209 90 0 106.9 15.3 94 90 SZ 532 07/18/05 Unit l.06; Lot 39 213 19 0 101.9 17.5 91 90 533 07/18/05 Unit 1.06; Lot 42 213 :19 0 101.3 16.8 91 90 534 07/18/05 Unit L06; Lot 42 •- - 215 19 0 102.1 17.4 91 90 535 07/18/05 Unit 1.06; Lot 41 216 19 0 102.9 16.6 92 90 SZ 536 07/18/05 Unit l.06; Lot 43 . 212 19 - 0 102.2 16.9 91 90 FG 537 07/18/05 Unit 1.07; Lot 1 - 139 82 0 110.8 13.5 92 90 FG 538 07/18/05 Unit 1.07; Lot 143 82 0 111.2 13.3 93 90 FG 539 07/18/05 Unit 1.07; Lot 3 148 82 0 111.7 12.9 93 90 FG 540 07/19/05 Unit 1.07; Lot4 - 152 19 0 102.4 16.1 92 90 ST 541 07/19/05 Unit 1.07; Stab Fill #5 • . 189 90 0 103.7 14.7 91 90 ST 542 07/19/05 Unit 1.07; Stab Fill #5 186 90 0 102.8 14.9 90 90 Project No. 06403-52-19B . . • December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reqd. or 3/4 Dry Moist. Rel. Rel. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date . . Location . 1't) No. (%) (pcf) (%) (%) (%) ST 543 07/19/05 Unit 1.07; Stab Fill #5 200 , 90 0 103.3 15.5 91 90 ST 544 07/19/05 Unit 1.07; Stab Fill #5 195 90 0 104.1 14.3 92 90 ST 545 07/19/05 Unit 1.07; Lot 38 127 90 - . 0 102.8, 14.2 90 90 ST 546 07/19/05 Unit 1.07; Lot 40 120 90 0 103.1 14.1 91 90 ST 547 07/19/05 Unit 1.07; Lot 43 117 90 0 103.6 14.5 91 90 ST 548 07/19/05 Unit 1.07; Lot 44 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 120 90 0 103.0 14.1 91 90 ST 549 07/19/05 Unit 1.07; Lot 45 126 90 0 101.8 14.5 90 90 ST 550 07/19/05 Unit 1.07; Lot 48 . 124 90 . 0 102.6 14.7 90 90 SZ 551 07/19/05 Unit 1.06; Lot 94 211 90 0 102.2 14.4 90 90 552 07/19/05 Unit 1.06; Lot 43 215 90 0 103.1 15.7 91 90 553 07/19/05 Unit 1.06; Lot 43 . 218 90 0 101.9 14.8 90 90 554 07/19/05 Unit 1.06; Lot 42 - 220 90 0 102.7 15.5 90 90 555 07/19/05 Unit 1.06; Lot 42 . 224 90 0 103.0 14.9 91 90 556 07/19/05 Unit 1.06; Lot 40 ' 223 90 0 102.8 14.4 90 90 557 07/19/05 Unit 1.06; Lot 43 226 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 90 0 , 104.6 15.2 92 90 558 07/19/05 Unit 1.06; Lot 41 , 228 90 0 102.8 17.1 - 90 90 559 07/19/05 Unit 1.06; Lot 40 229 90 0 103.3 18.3 91 90 560 07/20/05 Unit 1.06; Lot 92 208 74 0 111.2 12.5 90 90 561 07/20/05 Unit 1.06; Lot 91 210 17 0 107.4 14.6 92 90 562 07/20/05 Unit 1.06; Lot 90 212 17 0 105.2 15.7 90 90 563 07/20/05 Unit 1.06; Lot 73 209 17 0 105.8 15.9 91 90 564 '07/20/05 Unit 1.06; Lot 90 , 207 17 0 105.0 . 17.9 90 90 FG . 565 07/20/05 Unit 1.07; Lot 61 180 . 90 0 102.5 14.8 90 90 FG 566 07/20/05 Unit 1.07; Lot 60 - 178 90 0 107.6 15.3 95 90 FG 567 07/20/05 Unit 1.07; Lot 59 176 90 0 103.0 14.9 91 90 FG 568 07/20/05 Unit 1.07; Lot 58 . 174 90 0 102.8 15.4 90 90 PG 569 07/20/05 Unit 1.07; Lot 57 172 90 0 . 102.2 15.1 90 90 FG 570 07/20/05 Unit 1.07; Lot 56 169 90 0 104.9 14.2 92 90 FG 571 07/20/05 Unit 1.07; Lot 55- 167 90 0 105.7 14.5 93 - 90 FG 572 07/20/05 Unit 1.07; Lot 54 165 90 0 104.4 14.3 92 90 FG 573 07/20/05 Unit 1.07; Lot 62 . ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 182 90 0 105.2 15.1 93 90 574 07/21/05 Unit 1.06; Lot 92 211 90 0 104.3 16.5 92 90 575 07/21/05 Unit 1.06; Lot 89 213 , 90 0 104.9 15.9 92 90 576 07/21/05 Unit 1.06; Halite P1 27+30 210 17 0 106.3 15.0 91 90 577 07/21/05 Unit 1.06; Lot 92 214 17 0 107.8 14.9 93 90 578 07/21/05 Unit 1.06; Lot 90 . 215 90 0 103.7 16.1 91 90 579 07/21/05 Unit 1.06; Halite P1 25+50 - '213 90 '0 '104.6 ' 17.4 92 90 580 07/21/05 Unit 1.06; Lot 34 . 194 90 0 102.7 14.5 90 90 581 07/21/05 Unit 1:06; Lot 34 198 90 0 103.1 14.9 91 90 582 07/22/05 Unit 106; Lot 91 - 218 17 0 106.4 15.7 91 90 583 07/22/05 Unit l.06; Lot 89 . . - 216 17 0 107.6 13.9 92 90 584 07/22/05 Unit 1.06; Lot 90 ' 219 17 0 106.2 13.1 91 90 585 07/22/05 Unit 1.06; Lot 89 . 220 90 0 103.3 14.5 91 90 586 07/22/05 Unit 1.06; Lot 90 - - 222 - 90 0 102.8 14.1 90 90' 587 07/22/05 Unit 1.06; Lot 90 , - .224 90 - 0 104.0 15.8 91 90 Project No. 06403-52-19B . . ' ' . - ' December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reqd. or 3/4 Dry Moist. Re!. Re!. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location ('t) No. (%) (pcO (%) 588 07/22/05 Unit 1.07; Lot 32 - 135 90 0 103.4 17.9 91 90 589 07/22/05 Unit 1.07; Lot 31 '. 139 90 0 102.8 17.2 90 90 590 07/22/05 Unit 1.07; Lot 30 143 90 0 102.5 18.3 90 90 591 07/25/05 Unit 1.06; Lot 75 . 188 19 0 100.7 18.9 90 90 592 07/25/05 Unit 1.06; Halite P1 28+90 191 19 0 101.4 20.1 91 90 593 07/25/05 Unit 1.06; Halite P1 27+90 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 197 17 0 106.6 17.4 92 90 594 07/25/05 Unit 1.06; Lot 74 194 17 - 0 108.4 17.8 93 90 595 07/25/05 Unit 1.06; SD Easement . 202 17 0. 106.9 14.7 ' 92 90 596 07/25/05 Unit 1.06; Lot 89 217 17 0 106.2 20.1 91 90 597 07/25/05 Unit 1.06; Halite P128+50 . 203 11 . 0 106.6 15.3 92 90 598 07/26/05 Unit 1.06; Lot 75 . 196 19 0 101.3 19.1 91 90 599 07/26/05 Unit 1.06; Lot 77 ' .200 19 0 102.8 17.6 92 90 600 07/26/05 Unit 1.06; Lot 76 .. 204 19 0 100.9 16.3 90 90 601 07/26/05 Unit 1.06; Lot 76 '. 206 19 0 100.4 19.2 90 90 602 07/26/05 Unit 1.06; Halite Pl27+60 209 19 0 101.6 18.5 91 90 603 07/26/05 Unit 1.06; Lot I . 187 90 0 103.8 15.2 91 90 604 07/26/05 Unit 1.06; Halite P1 23+50 .. , . 195 90 0 101.1. 9.4 89 90 604 A 07/26/05 Unit 1.06; Halite P1,23+50 . .195 . 90 0 103.3 14.2 91 ' 90 605 , 07/26/05 Unit 1.06; Lot 69 . 190 90 0 104.1 14.5 92 90 606 07/26/05 Unit 1.06; Halite P124+15 ' 197 90 ' 0 102.4 15.1 90 90 607 07/27/05 Unit 1.06; Lot 69 . 193 90 0 104.6 15.9 92 . 90 608 07/27/05 Unit 1.06; Lot 69 ' ' . - 198 90 0 103.1 14.6 91 90 609 07/27/05 Unit 1.06; Lot 69 : , 200 90 0 102.7 14.4 90 90 610' 07/27/05 Unit 1.06; Lot'70. .. ' 202 ' 90 0 102.4 .15.1 90 90 611 07/27/05 Unit 1.06; Lot 68 '. . , 201 -. 90 0 104.1 14.5 92 90 612 07/27/05 Unit 1.06; Lot 70 '. ' 204. 90 0 ,. 103.3 16.0 91 90 613 07/27/05 Unit 1.06; Lot 69 '' ' ,. ' 206 17 . 0 '106.6 , 15.4 ' 92 90 614 07/27/05 Unit 1.06;, Lot 69 '. ' 208 17 , 0 108.5 14.9 93 90 615 07/27/05 Unit 1.06; Lot 70 . 209 '17 0 107.2 - 14.6 92 90 616 07/27/05 Unit 1.06; Lot 77 ' ' . 208 17 0 105.9 13.8 91 90 FG 617 07/27/05 Unit 1.07; Lot 63 182 , 88 0 . 103.7 ' 16.4 92 90 FG 618 ' 07/27/05 Unit 1.07; Lot 64 ' , . . 181 88 0 104.5 16.1 92 90 FG 619 07/27/05 Unit 1.07; Lot 65 . . 181 . 88 0 104.4 15.6 92 90 FG 620 07/27/05 Unit 1.07; Lot 66 ' ., ' 180 88, 0 105.2 16.1 93 . 90 FG 621 07/28/05 Unit 1.07; Lot 67 ' 180 88 0 . 103.8 17.3 92 90 FG 622 07/28/05 Unit 1.07; Lot 68. ' ' 179 . 88 0 103.7 15.9 92 90 FG 623 07/28/05 Unit 1.07; Lot 69 . . . 179. 88 0 102.9 15.8 91 90 FG 624 07/28/05 Unit 1.07; Lot 70. . , 178 88 0 104.8 16.2 93 ' 90 FG . 625 07/28/05 Unit 1.07; Lot 71 , * 177 88 0 103.3 17.6 91 90 626 07/28/05 Unit 1.06; Lot 76 . * 211 90 0 105.1 14.9' 92. 90 627 07/28/05 Unit 1.06; Lot 75 ' 212 90 0 104.5 15.3 92 90 628 07/28/05 Unit 1.06; Halite P1 28+90 '. ' 213 ' 90 0 ' 103.0 16.5' 91 90 629 07/28/05 Unit 1.06; Lot 77 ' ' 214 90 0 103.8 15.1 91 90 630 07/28/05 Unit 1.06; Halite P129+55 ' 215 90. . 0 102.5 18.4 .90 90 631 07/28/05 Unit 1.06; Lot 88 . 216 90 0 104.8 15.7 92 90 Project No. 06403-52-19B ' . . . . . , December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS - .. Elev. Plus Field Field Field Reqd. or 3/4' Dry - Moist. Rel. Rel. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location ('t) No. (%) (pcO (%) 632 07/29/05 Unit 1.06; Lot 76 216 19 0 100.9 19.8 90 90 633 07/29/05 Unit 1.06; Lot 87 . 217 19 0 101.5 18.3 91 90 634 07/29/05 Unit 1.06; Lot 74 215 19 0 102.0 - 19.6 91 90 635 07/29/05 Unit 1.06; Lot 74 219 19 0 103.2 20.4 92. 90 636 07/29/05 Unit l.06; Lot 75 - 219 19 0 101.7 17.3 91 90 637 07/29/05 Unit 1.06; Lot 76 220 19 0 102.2 16.8 91 90 - 638 07/29/05 Unit 1.06; Lot 88 222 19 0 101.9 16.5 91 90 FG 639 07/29/05 Unit 1.07; Lot 9 . 173 90 0 104.4 14.6 92 90 FG 640 07/29/05 Unit 1.07; Lot 8 168 90 0 105.7 15.2 93 90 FG 641 07/29/05 Unit 1.07; Lot 7 164 90 0 106:3 14.4 93 90 FG 642 07/29/05 Unit 1.07; Lot 6 160 90 0 105.1 14.2 92 90 FG 643 07/29/05 Unit 1:07; Lot 5 . 156 90 0 104.7 15.5 92 90 644 08/01/05 Unit 1.06; Lot 71 . 212 90 0 103.1 18.4 .91 90 SZ 645 08/01/05 Unit 1.06; Stab Fill #3 214 90 0 102.6 18.9 90 90 SZ - 646 08/01/05 Unit 1.06; Stab Fill #3 218 90 0 103.0 16.2 91 90 647 08/01/05 Unit 1.06; Lot 73 ----------------------------------------------------------------------------------------------------------------------------------------------------------------- 214 19 0 101.2 19.3 91 90 648 08/01/05 Unit 1.06; Lot 89 225 19 0 101.7 18.4 91 90 649 08/01/05 Unit 1.06; SD Easement . 220 19 0 101.9 20.1 91 90 650 08/01/05 Unit 1.06; Lot 75 - 224 19 0 102.8 . 16.3 92 90 651 08/01/05 Unit 1.06; Lot 88 223 90 0 103.4 17.6 -- 91 90 652 08/01/05 Unit 1.06; Lot 78 226 90 0 102.6 17.1 90 90 653 08/01/05 Unit 1.06; Lot 76 228 90 0 104.5 16.6 92 90 • 654 08/02/05 Unit 1.06; Lot 72. •. ,: 216 90 0 103.5 15.8 91 90 655 08/02/05 Unit 1.06; Lot 73 . 219 90 0 102.5 17.6 90 90 SZ 656 08/02/05 Unit 1.06; Stab Fill #3 . 220 90 0 103.3 16.8 91 90 SZ 657 08/02/05 Unit 1.06; Stab Fill #3 225 .90 0 104.1 16.3 92 90 658 08/02/05 Unit 1.06; Lot 75 - 229 90 0 105.4 15.0 . 93 90 659 08/02/05 Unit 1.06; Lot 74 . 225 .90 0 104.6 15.5 92 , 90 660 08/02/05 Unit 1.06; Lot 89 - • -. 228 90 0 103.9 17.4 91 90 661 08/02/05, Unit 1.06; Lot 75 232 90 0 105.1 14.6 92 90 662 08/02/05 Unit 1.06; Lot 77 231 . 17 0 107.4 • 13.9 92 90 663 08/02/05 Unit 1.06; Lot 76 - : 235 17 0 105.8 15.3 91 90 664 08/02/05 Unit 1.06; Lot 78 - 238 17 0 106.7 14.9 92 90 665 08/03/05 Unit 1.06; Lot76 . 241 17 0 107.1 16.5 92 90 666 08/03/05 Unit 1.06; Lot 76 . 243 17 0 105.5 17.2 91 90 667 08/03/05 Unit 1.06; Lot 77 , 245 17 0 108.0 14.9 93 90 668 08/03/05 Unit 1.06; Lot 89 231 19 0 102.0 17.4 - 91 90 669 08/03/05 Unit 1.06; Lot 88 232 19 0 101.6 18.2 91 90 670 08/03/05 Unit 1.06; Lot 87 • 236 . 19 0 102.7 19.1 92 90 SZ 671 08/03/05 Unit 1.06; Stab Fill #3 • • 228 90 0 103.6 15.7 91 90 SZ 672 08/03/05 Unit 1.06; Stab Fill #3 . -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 232 90 0 104.3 16.5 92 90 SZ 673 08/03/05 Unit 1.06; Stab Fill #3 . 235 90 0 104.1 15.9 92 90 SZ 674 08/04/05 Unit 1.06; Lot 34 • . 205 1 90 0 102.9 15.1 91 90 SZ 675 08/04/05 Unit 1.06; Lot 34 - 213 90 0 103.8 16.3 - 91 90 SZ 676 08/04/05 Unit 1.06; Lot 36 • . 209 19 0 101.7 17.0 1 91 90 Project No 06403-52-19B December 29 2005 TABLE! SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reqd. - or 3/4" Dry Moist. Rel. Rel. • Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date . Location (ft) No. ('°) (pfl SZ 677 08/04/05 Unit 1.06; Lot 34 211 19 0 101.9 16.3 91 90 SZ 678 08/04/05 Unit 1.06; Lot 35 216 19 01 102.0 16.7 91 90 SZ 679 08/05/05 Unit 1.06; Buttress Fill #2,.268 90 0 103.0 15.8 91 90 SZ 680 08/05/05 Unit 1.06; Buttress Fill #2 271 90 0 102.2 16.1 90 90 SZ 681 08/05/05 Unit 1.06; Buttress Fill #2 278 90 0 103:3 16.9 91 90 SZ 682 08/05/05 Unit 1.06; Buttress Fill #2 275 90 0 104.9 14.8 92 90 SZ 683 08/05/05 Unit 1.06; Buttress Fill #2 283 19 0 100.7 19.3 90 90 SZ 684 08/05/05 Unit 1.06; Buttress Fill #2 , 280 19 0 101.4 18.6 91 90 SZ 685 08/05/05 Unit 1.06; Buttress Fill #2 285 19 0 100.5 19.2 90 90 SZ 686 08/05/05 Unit 1.06; Buttress Fill #2 ' : 291 90 0 104.1 15.6 92 - 90 SZ 687 08/05/05 Unit 1.06; Buttress Fill #2 ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 293 90 0 103.8 16.17 91 90 SZ 688 08/08/05 Unit 1.06; Buttress Fill #2 -, 295 19 0 101.6 16.4. 91 90 SZ 689 08/08/05 Unit 1.06; Buttress Fill #2 298 19 0 101.5 17.9 91 90 SZ 690 08/08/05 Unit 1.06; Buttress Fill #2 303 90. 0 104.0 16.1 91 90 SZ 691 08/08/05 Unit 1.06; Buttress Fill #2 308 90 0 105.9 17.0 93 90 692 08/08/05 Unit l.06; Lot 76 242 90 0 102.8 15.2 90 90 693 08/08/05 Unit 1.06; Lot 78 247 90 0 103.3 16.4 91 90 694 08/08/05 Unit 1:06; Lot 88 . 235 . 19 0 101.3, 17.5 91 90 695 08/08/05 Unit 1.06; Lot 87 . 238 .19V 0 100.8 19.3 90 90 696 08/08/05 Unit 1.06; Lot 86 .., 239 19 0 102.6 17.9 92 90 697 08/08/05 Unit 1.06; Lot 87 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 242 19 0 100:9 18.4 90 90 698 08/09/05 Unit 1.06; Lot 88 237 19 0 101.3 17 5 91 90 699 08/09/05 Unit 1.06; Lot 74 . 228 19 0 100.8 18.4 90 90 ST 700 08/09/05 Unit 1.06; Lot 75 .' 237 19 0 100.9 16.3 90 90 ST .701 08/09/05 Unit 1.06; Stab Fill #3 224 . 90 0 102.8 19.1 90 90 ST 702 08/09/05 Unit 1.06; Stab Fill #3 , 233 90 0 - 103.7 16.8 91 90 ST 703 08/09/05 Unit 1.06; Stab Fill #3 232 90 0- 104.9 -17.2 92 90 SZ 704 08/09/05 Unit 1.06; Lot 3 184 90 0 102.6 15.8, 90 90 SZ 705 08/09/05 Unit 1.06; Lot 3 180 90 0 103.1 14.9 91 90 SZ 706 08/10/05, Unit 1.06; Lot 2 186. 90 - 0 102.8 14.3 90 90 SZ 707 08/10/05 Unit 1.06; Lot 2 - . 190 90 0 104.6 15.1 92 90 708 08/10/05 Unit 1.06; Lot -. 193 90. 0 103.3 14.7 91 90 709 08/10/05 Unit 1.06; Lot 3 196 90 0 102.1 164 90 90 710 08/10/05 Unit 1.06; Lot 79 - . 242 .90 0 - 106.1 14.6 93 90 711 08/10/05 Unit 1.06; Lot 79 - • 246 90 0 107.4 14.8 94 90 712 08/10/05 Unit 1.06; Lot 78 250 90 0 102.6 17.1 90 90 713 08/10/05 Unit 106 Lot 79 255 90 0 1034 153 91 90 714 08/10/05 Unit 1.06; Lot 76 . 245 90 0 102.5 15.7 90 90 715 08/11/05 Unit 1.06; Lot 77 '. ' .' 251 90 0 ' 104.3 16.7 92 90 716 08/11/05 Unit 1.06; Lot 78 ' . 257 - 90 - 0 105.4 17.4 93 90 717 .08/11/05 Unit 1.06; Lot 79 . ' - ' 260 . 90 0 104.9 17.0 92 90 718 08/11/05 Unit 1.06; Lot 86. ' ' 249 90 0 .105.1 17.6 92 90 719 08/11/05 Unit 106 Lot 85 255 17 0 1072 151 92 90 720 08/11/05 Unit 106 Lot 87, 245 90 0 1037 172 91 90 - 721 08/11/05 Unit 1.06; Lot 85 . - 258 90 0 102.0 14.5 90 90 Project No 06403-52-119B December 29 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4 Dry Moist. Re!. Re!. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location (ft)No. (%) (pcf) 722 08/11/05 Unit 1.06; Lot 86 243 90 0 104.9 15.3 92 90 723 08/11/05 Unit 1.06; Halite P1 29+90 240 90 0 106.2 16.7 93 90 .FG 724 08/11/05 Unit 1.07; Lot 50 153 17 0 107.4 13.6 92 90 FG 725 08/11/05 Unit 1.07; Lot 51 159 17 0 106.6 13.9 92 90 FG 726 08/11/05 Unit 1.07; Lot 52 161 17 0 108.5 14.1 93 90 FG 727 08/11/05 Unit 1.07; Lot 53 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 163 17 0 105.2 14.7 90 90 FG 728 08/11/05 Unit 107 Lot 27 188 90 0 1028 156 90 90 FG 729 08/11/05 Unit 1.07; Lot 26 189 90 0 104.5 14.9 92 90 FG 730 08/11/05 Unit l.07; Lot 25 189 90 0 106.1 14.5 93 90 FG 731 08/11/05 Unit 1.07; Lot 24 : 190 17 0 107.3 -14.4 92 90 FG 732 08/11/05 Unit 1.07; Lot 23 190 17 0 107.8. 15.2 93 90 FG 733 08/11/05 Unit 1.07; Lot 22 191 17 0 106.7 14.9 92 90 FG 734 08/11/05 Unit 1.07; Lot 21 191 90 0 104.4 14.3 92 90 FG 735 08/11/05 Unit l.07; Lot 20 . 192 90 0 106.2 14.7 93 90 FG 736 08/11/05 Unit 1.07; Lot 19 193 90 0 103.3 14.5 91 90 FG 737 08/11/05 Unit l.07; Lot i8 194 17 0 106.5 13.8 91 90 FG 738 08/11/05 Unit 1.07; Lot 17 194 17 0 108.3 15.1 93 90 SZ 739 08/12/05 Unit 1.06; Lot 5 . 190 90 0 104.4 15.2 92 90 740 08/12/05 Unit 1.06; Lot 1 202 90 0 103.9 16.7 91 90 SZ 741 08/12/05 Unit 1.06; Lot 204 90 0 101.2 12.5 89 90 SZ 741 A 08/12/05 Unit 1.06; Lot 4 204 19 0 102.1 16.3 91 90 SZ 742. 08/12/05 Unit 1.06;Lot 1 198 19 0 . 101.5 17.8 91 90 743. 08/12/05 Unit 1.06; Lot 198 19 0 100.8 16.4 90 90 SZ 744 08/12/05 Unit 1.06; Lot 3 201 19 0 100.3 15.7 90 90 745 08/12/05 Unit 1.06; Lot 2 207 19 0 101.6 15.8 91 90 SZ 746 08/15/05 Unit 1.06; Lot 5 195 88 0 102.9 16.9 91 90 SZ 747 08/15/05 Unit 1.06; Lot 6 198 88 0 104.1 16.6 92 90 SZ 748 08/15/05 Unit 1.06; Lot - 200 88 0 104.7 17.4 92 90 SZ 749 08/15/05 Unit 1.06; Lot 6/7 . 205 88 0 105.1 15.5 93 90 750 08/15/05 Unit 1.06; Lot 1 205 88 0 102.5 17.0 91 90 751 08/15/05 Unit 1.06; Lot 1 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 208 88 0 103.7 16.8 92 90 752 08/15/05 Unit 1.06; Lot 3 210 88 0 104.4 16.2 92 90 753 08/15/05 Unit 1.06; Lot 2 211 88 0 106.2 17.1 94 90 754 08/15/05 Unit 1.06; Lot 4 213 90 0 102.3 14.8 90 90 755 08/15/05 Unit 1.06; Stab Fill #1A 235 88 0 104.1 16.5 92 90 756 08/15/05 Unit 1.06; Stab Fill #1A 240 88 0 103.6 16.2 92 90 757 08/15/05 Unit 1.06; Stab Fill #IA 245 88 0 102.7 16.0 91 90 SZ 758 08/16/05 Unit 1.06; Lot 6 - 208 : 88 0 104.9 17.4 93 90 759 08/16/05 Unit 1.06; Lot 210, ' 88 0 105.6 16.1 93 90 SZ 760 08/16/05 Unit 1.06; Lot '7 214 88 0 103.6 16.8 92 90 761 08/16/05 Unit 1.06; Stab Fill #1A 243 88. 0 102.1 15.9 90 90 SZ 762 08/16/05 Unit 1.06; Buttress Fill #1 ' ' 270 88 . 0 104.5 17.8 92 90 SZ 763 08/16/05 Unit 1.06; Buttress Fill #1 . ' 273 88 0 102.9 17.2 91 '90 SZ 764 08/16/05 Unit 1.06; Stab Fill #1A 248 88 0 105.1 16.4 93 90 SZ 765 08/16/05 Unit 1.06; Stab Fill #lA ' 283 . 88 0 . 102.7 17.6 91 90 Project No. 06403-52-19B , , . December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reqd. or 3/4" Dry Moist. Rel. Rel. Depth Cum Rock Dens. Cont. Comp. Comp. Test No. Date Location No. (%) (pcf) SZ 766 08/16/05 Unit 1.06; Buttress Fill #1 267 88 ' 0 103.1 16.5 91 90 SZ 767 08/16/05 Unit 1.06; Buttress Fill #1 276 88 0 105.5 16.1 93 90 SZ 768 08/17/05 Unit 1.06; Buttress Fill #1 280 88 0 104.2 16.4 92 90 SZ 769 08/17/05 Unit 1.06; Stab Fill CA 258 88 0 103.9 17.2 92 90 SZ 770 08/17/05 Unit, 1.06; Stab Fill CA 261 88 0 105.1 15.4 93 90 SZ 771 08/17/05 Unit 1.06; Lot 34 216 88 0 103.7 15.5 92 90 SZ 772 08/17/05 Unit 1.06; Lot 37 214 88 0 104.8 17.2 93 90 SZ 773 08/17/05 Unit 1.06; Lot 36 218 88 0 106.1 15.7 94 90 774 08/17/05 Unit 1.06; Lot 35 ' 220 88 0 105.2 14.9 93 90 SZ 775 08/17/05 Unit 1.06; Lot 34 222 88 0 104.4 16.7 / 92 . 90 SZ 776 08/17/05, Unit 1.06; Buttress Fill #1 284 88 0 103.8 16.9 92 90 SZ 777 08/17/05 Unit 1.06; Buttress Fill #1 ' 288 88 0 102.1 16.3 90 90 SZ 778 08/18/05 Unit 1.06; Buttress Fill #1 290 88 0 104.3 15.8 92 90 SZ 779 08/18/05 Unit 106 Lot 35 224 19 0 1019 169 91 90 780 .08/18/05 Unit 1.06; Lot 37/38 221 19 0 103.1 15.8 92 90 781 08/18/05 Unit 1.06; Lot 37 225 88 0 102.7 16.3 91 90 782 08/18/05 Unit 1.06; Lot 35/36 227 88 0 102 .3, 16.1 90 90 783 08/18/05 Unit 1.06; Lot 36 ' ' 231 19 0 100.3 15.7 90 90 784 08/18/05 Unit 1.06; Lot 37/38 ' ' 231 88 0 103.4 16.7 9.1 90 785 08/18/05 Unit 1.06; Lot 34 '. ' -234 88 0 105.0 17.0 93 9 786 08/18/05 Unit 1.06; Lot 39 , . ' - 231 88 0 103.7 16.2 92 90 787 08/19/05 Unit 1.06; Lot 3. -. 212 88 0 102.9 16.7 91 90 788 08/19/05 Unit 1.06; Lot 4 ', ' 218 88 , 0 104.7. 14.7 92 90 789 08/19/05 Unit 1.06; Lot 4 223 88 0 '103.7 148 92 90 790 08/19/05 Unit 1.06; Lot 5 ' ' '' '215 , 88 0 104.3 16.8 92 90 79i 08/19/05 Unit 1.06; Lot 6 ' ' ' ' 220 88 0 102.0 17.6 90 90 SZ 792 08/19/05 Unit 1.06; Lot 67 .' 220 88 ' 0 105.5 ' 15.5 93 90 793 ' 08/22/05 Unit 1.06; Lot 7 . , 233 88 . 0 102.8 16.3, 91 ' 90 794 08/22/05 Unit 1.06; Lot 9 , -, 235 , 88 ' . 0 103.0 15.6 91 90 795 08/22/05 Unit 1.06; Lot 7 ' r' 236 88 0 102.3 16.7 , 90 90 • 796 08/22/05 Unit 1.06; Lot 9 ' , 239 88 0 '104.1 16.5 92 90 797 08/22/05 Unit 1.06; Lot 11 , , - ' •238 88 0 102.4 16.1 90, 90 798 08/22/05 Unit 1.06; Lot 11 . ' ' '241 ' 88 0 104.4 17.2 92 90 799 08/22/05 Unit 1.06; Lot 13 ' . , . 242 88 0 104.9 15.6 93 90 800 ' 08/22/05 Unit 1.06; Lot - 228 88 0 , 102.5 ' 17.9 91 90 801 08/22/05 Unit 1.06; Lot 6. ' ' . ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ ' '232 ' 88 , - 0 ' 103.3 16.7 91 90 ST 802 08/22/05 Unit 1.06; Lot 40 ' . . , 217 88 0 102.1 16.4 90 90 ST 803 08/22/05 Unit 1.06; Lot 41 , ' . 203 88 ' 0 103.6 15.3 92 90 ST 804 08/22/05 Unit 1.06; Lot 43 213 88 0 - 102.8 16.1 91 90 ST 805 08/22/05 Unit 1.06; Lot 43 . ' - 220 88 0 102.5 15.8 91 90 ST 806 08/22/05 Unit 1.06; Lot 44; (Rec Lot) ' 200 88 0 - 103.0 15.7 91 90 SZ 807 08/23/05 Unit 1.06; Lot 21 ' , , . 244 88 0 104.7 16.5 92 90 SZ 808 08/23/05 Unit 1.06; Lot 19 , . 244 . 88 0 105.6 16.1 93 90 SZ 809 08/23/05 Unit 1.06; Lot 18 ,. ' 235 ' . 88' 0 103.6 17.2 92 90 SZ 810 08/23/05 Unit 1.06; Lot 17 - ' 239 . ' 88 0 105.4 15.8 ' 93 90 Project No. 06403-52-19B . December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4 Dry Moist. Rel. Rel. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location No. (%) (pcf) (%) (%) (%) SZ 811 08/23/05 Unit 1.06; Lot 19 240 88 0 102.8 15.5 91 90 812 .08/23/05 Unit 1.06; Lot 16 242 88 0 104.5 16.7 92 90 813 08/23/05 Unit 1.06; Lot 18 244 88 0 102.2 16.5 90 90 814 08/23/05 Unit 1.06; Lot 81 268 88 0 93.8 16.8 83 90, 814A 08/24/05 Unit 1.06; Lot 81 268 88 0 102.1 16.2 90 . 90 815 08/23/05 Unit 1.06; Lot 82 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 269 88 0 104.1 17.3 92 90 816 08/23/05 Unit 1.06; Lot 80 264 88 0 105.8 16.1 93 90 817 08/24/05 Unit l.06; Lot 81 269 88 0 102.8 18.5 91 90 818 08/24/05 Unit 1.06; Lot 80 266 88 0 104.1 16.8 92 90 819 08/24/05 Unit l.06; Lot 79 263 88 0 103.3 17.5 91 90 820 08/24/05 Unit 1.06; Lot 84 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 264 88 0 102.6 18.3 91 90 821 08/24/05 Unit 1.06; Lot 231 88 0 1024 16.6 90 90 822 08/24/05 Unit 1.06; Lot 6 235 88 0 105.1 17.1 93 90 FG 823 08/25/05 Unit 1.06; Lot 35 234 90 0 102.2 16.8 90 90 ST 824 08/25/05 Unit 1.06; Lot 34 218 90 0 102.8 15.1 90 90 ST 825 08/25/05 Unit 1.06; Lot 35 228 90 0 101.9 15.4 90 90 ST 826 08/25/05 Unit 1.06; Lot 37. 227 90 0 102.3 14.5 90 90 827 08/26/05 Unit 1.06; Lot 23 247 90 0 104.2 19.3 92 90 828 08/26/05 Unit 1.06; Lot 22 245 90 0 101.8 20.5 90 90 829 08/26/05 Unit 1.06; Lot 21 246 90 0 103.1 17.8 91 90 SZ 830 08/26/05 Unit 1.06; Stab Fill #2 227 90 0 106.8 18.9 94 90 SZ 831 08/26/05 Unit 1.06; Stab Fill #2 230 90 0 103.5 16.7 91 90 SZ 832 08/26/05 Unit 1.06; Stab Fill #2 234 90 0 104.9 17.1 92 90 SZ 833 08/26/05 Unit 1.06; Stab Fill #2 237 90 0 105.5 17.3 93 90 834 08/29/05 Unit 1.07; Lot 42 132 17 0 108.9 .14.5 93 90 835 08/29/05 Unit 1.07; Lot 39 . 134 17 0 106.7 13.9 92 90 836 08/29/05 Unit l.07; Lot 37 . 131 17 0 107.4 15.2 92 90 837 08/29/05 Unit 1.07; Lot 33 130 90 0 103.5 15.6 91 90 90 030 OW-29005 bit1.07, L.t 31 141 90 0 99.0 9.2 00 90 90 FG 039 840 00/29/0 U;i 1.07,,L.,t 30 08/31/05 Unit 1.06; Lot 36 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 144 234 90 88 0 0 101.1 103.3 10.0 16.4 09 91 FG 841 08/31/05 Unit l.06; Lot 37 233 19 0 101.8 15.1 91 90 FG 842 08/31/05 Unit 1.06; Lot 38 233 19 0 100.9 15.6 90 90 FG 843 08/31/05 Unit 1.06; Lot 39 232 88 0 104.8 16.0 93 90 FG 844 08/31/05 Unit 1.06; Lot 40 231 88 0 103.2 16.6 91 90 ST 845 08/31/05 Unit 1.06; Buttress Fill #2 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 283 90 0 102.8 16.5 90 90 ST 846 08/31/05 Unit 1.06; Buttress Fill #2 300 90 0 103.7 15.1 1 91 90 ST 847 08/31/05 Unit 1.06; Buttress Fill #2 285 19 0 101.4 16.7 91 90 ST 848 08/31/05 Unit 1.06; Buttress Fill #2 292 19 0 100.9 17.3 . 90 90 FG 849 09/01/05 Unit 1.07; Lot 44 . .131 90 0 103.4 15.4 91 90 FG 850 09/01/05 Unit 1.07; Lot 45 130 90 0 103.8 16.2 91 90 FG 851 09/01/05 Unit 1.07; Lot 46 130 90 0 105.9 15.7 93 90 FG 852 09/01/05 Unit 1.07; Lot 47 ' 129 88 0 105.3 17.7 93 90 FG 853 09/01/05 Unit 1.07; Lot 48 • 128 88 . 0 105.0 16.4 93 90 FG 854 09/01/05 Unit 1.07; Lot 49 127 88 0 105.2 20.0 93 90 Project No. 06403-52-19B • December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reqd. or 3/4 Dry Moist. Re!. Re!. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location t't) No. (%) (pct) (%) (%) (%) FG 855 09/01/05 Unit 1.07; Lot 42 134 90 0 102.5 16.7 90 90 FG 856 09/01/05 Unit 1.07; Lot 41 135 90 0 103.8 14.5 91 90 ST 857 09/01/05 Unit 1.07; Lot 17 183 19 0 101.6 16.2 91 90 ST 858 09/01/05 Unit 1.07; Lot 171 , 175 . 19 0 102.0 15.9 91 90 ST 859 09/01/05 Unit 1.07; Lot 19 170 19 . 0 101.8 16.3 91 90 ST 860 09/01/05 Unit 1.07; Lot 21 184 90 0 103.5 15.1 91 90 ST 861 09/01/05 Unit 1.07; Lot 24 , 176 90 , 0 102.8 14.4 90 90 SZ 862 09/01/05 Unit 1.07; Stab Fill #2 138 90 0 104.0 15.5 91 90 SZ 863 09/01/05 Unit 1.07; Stab Fill #2 140 90 0 101.9 16.3 90 90 SZ 864 09/02/05 Unit 1.07; Stab Fill #2 141 17 0 108.6 14.1 93 90 SZ 865 09/02/05 Unit 1.07; Stab Fill #2 145 17 0 107.3 13.9 92 90 SZ 866 09/02/05 Unit 1.07; Stab Fill #2 150 17 0 108.2 14.5 93 90 FG 867 09/06/05 Unit 1.07; Lot 40 . 136 17 0 107.4 14.2 92 90 FG 868 09/06/05 Unit 1.07; Lot 39 '. 136 17 0 106.3 13.8 91 90 FG 869 09/06/05 Unit 1.07; Lot 38 ' '137 17 0 109;1 13.6 94 90 FG 870 09/06/05 Unit 1.07; Lot 43 132 17 0 108.5 14.3 93 90 FG 871 09/06/05 Unit 1.07; Lot 37 132 90 0 103.3 15.2 91 90 FG 872 09/06/05 Unit 1.07; Lot 36 . 132 90 0 , 102.6 14.5 90 90 FG 873 09/06/05 Unit 1.07; Lot 35 - 131 90 0 105.1 16.2 92 90 FO - 874 09/06/05 Unit 1.07; Lot 34 131 90 0 - 104.9 .. 17.3 92 90 FG 875 09/06/05 Unit 1.07; Lot 33 130 90 0 103.5 15.9 91 90 FG 876 09/06/05 Unit 1.07; Lot 32 138 90 0 106.2 16.8 93 90 FG 877 09/06/05 Unit 1.07; Lot 31 , 142 90 0 102.7 15.1 90 90 FG 878 09/06/05 Unit 1.07; Lot 30 .146 - 90 0 104.8 14.4 92 90 FG 879 09/06/05 Unit 1.07; Lot 29 ' 150 90 0 103.9 14.5 91 90 FG 880 . 09/06/05 Unit 1.07; Lot 28 154 - 90 0 105.1 14.3 92 90 SZ 881 09/07/05 Unit 1.06; Stab Fill #2 253 90 0 102.7 16.1 90 90 SZ 882 09/07/05 Unit 1.06; Stab Fill #2 256 90 0 104.9 15.8 92 90 SZ 883 09/07/05 Unit 1.06; Stab Fill #2 . 246 90 0 105.5 14.5 93 90 SZ 884 09/08/05 Unit 1.06; Stab Fill #2 260 88 0 105.5 17.4 93 90 885 09/08/05 Unit 1.06; Lot 82 . . ' 265 88 0 106.4 17.5 94 90 SZ 886 09/08/05 Unit 1.06; Stab Fill #2 250 88 0 103.3 16.2 91 90 SZ 887 09/08/05 Unit 1.06; Stab Fill #2 258 88 0 104.8 16.7 93 90 FG 888 09/08/05 Unit 1.06; Lot 81 ' ' ' 270 90 0 106.3 15.1 93 90 FG 889 09/08/05 Unit 1.06; Lot 80 269 90 0 103.4 19.5 91 90 FG 890 09/08/05 Unit 1.06; Lot 79 . 266 . 19 0 101.9 16.5 91 90 SZ 891 09/09/05 Unit 1.06; Stab Fill #2 263 90 0 102.3 15.7 90 90 SZ 892 09/09/05 Unit 1.06; Stab Fill #2 . 255 90 0 103.1 14.9 91 90 893 09/09/05 Unit 1.06; Lot 43 ' 225 88 0 105.2 16.4 ' 93 90 894 09/09/05 Unit 1.06; Lot 42 ' ' ' 227 90 0 106.9 17.6 94 90 895 09/09/05 Unit 1.07; Lot 14 189 90 0 105.7 17.3 93 90 896 09/12/05 Unit 1.06; Lot 83 ' 260 19 . 0 102.8 16.1 92 90 897 09/12/05 Unit l.06; Lot 82 268 19 0 101.1 17.3 ' 90 90 898 09/12/05 Unit 1.06; Lot 83. 267 19 0 101.5 16.8 91 90 FG 899 09/12/05 Unit 1.07; Lot 10 188 88 0 106.2 15.9 94 90 Project No. 06403-52-19B December 29, 2005 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reqd. or 3/4 Dry Moist. Rel. Rel. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location (ft) No. (%) (pci) (%) (%) (%) FG 900 09/12/05 Unit 1.07; Lot 11 FG 901 09/13/05 Unit 1.07; Lot 12 FG 902 09/13/05 Unit 1.07; Lot 13 FG 903 09/13/05 Unit 1.07; Lot 14 FG 904 09/13/05 Unit 1.07; Lot 15 FG 905 -------------------------------------------------------------------------- 09/14/05 Unit 1.07;.Lot 16 FG 906 09/14/05 Unit 1.06; Lot 43 FG 907 09/14/05 Unit 1.06; Lot 42 FG 908 09/14/05 Unit 1.06; Lot 41 FG 909 09/14/05 Unit 1.06; Lot 23 FG 910 09/14/05 Unit 1.06; Lot 22 FG 911 09/14/05 Unit 1.06; Lot 21 FG 912 09/14/05 Unit 1.06; Lot 20 FG 913 09/14/05 Unit 1.06; Lot 19 FG 914 09/14/05 Unit 1.06; Lot 18 PG 915 09/14/05 Unit 1.06; Lot 17 FG 916 09/14/05 Unit 1.06; Lot 15 FG 917 09/14/05 Unit 1.06; Lot 16 FG 918 09/15/05 Unit 1.06; Lot 14 FG 919 09/15/05 Unit 1.06; Lot 13 FG 920 09/15/05 Unit 1.06; Lot 12 FG 921 09/15/05 Unit 1.06; Lot 11 FG 922 09/15/05 Unit 1.06; Lot 10 PG 923 09/15/05 Unit 1.06; Lot 9 FG 924 09/15/05 Unit 1.06; Lot 8 925 09/15/05 Unit 1.06; Lot 56 926 09/16/05 Unit 1.06; Lot 31 927 09/16/05 Unit 1.06; Lot 32 928 09/16/05 Unit 1.06; Lot 32; Stab Fill CA SZ 929 09/16105 Unit 1.06; Stab Fill iflA- SZ 930 09/19/05 Unit 1.06; Lot 66 931 09/19/05 Unit 1.06; Lot 55 PG 932 09/19/05 Unit 1.06; Lot 7 ST 933 09/20/50 Unit 1.06; Lot 7 ST 934 09/20/50 Unit 1.06; Lot 5 ST 935 09/20/50 Unit 1.06; Lot 3 ST 936 09/20/50 Unit 1.06; Lot 1 937 09/21/05 Unit 1.06; Lot 66 938 09/21/05 Unit 1.06; Lot 67 FG 939 09/21/05 Unit 1.06; Lot 6 FG 940 09/21/05 Unit 1.06; Lot FG 941 09/21/05 Unit 1.06; Lot 4 FG 942 09/21/05 Unit 1.06; Lot 3 PG 943 09/21/05 Unit 1.06; Lot 2 FG 944 09/21/05 Unit 1.06; Lot I 189 88 0 105.3 16.4 93 90 190 88 0 104.4 17.3 92 90 191 90 0 102.7 16.7 90 90 191 90 0 102.9 15.2 91 90 194 90 0 103.4 14.9 91 90 194 90 0 105.8 15.2 . 93 90 229 90 0 108.2 14.6 95 90 230 90 0 107.5 14.8 95 90 231 90 0 108.3 15.5 95 90 249 90 0 102.8 16.0 90 90 248 90 0 103.1 ---------------------------------------------------------------------------------- 17.4 91 90 247 90 0 103.0 16.3 91 90 247 88 0 107.7 16.9 95 90 246 88 0 104.8 16.3 93 90 246 88 0 107.2 16.1 95 90 246 88 0 103.3 ----------------------------------------------------------------------------------- 13.7 91 90 244 17 0 107.9 14.1 93 90 245 17 0 109.4 14.5 94 90 244 17 0 106.7 13.9 92 90 243 17 0 107.7 15.2 92 90 243 17 0 108.6 13.7 93 90 242 88 0 102.9 16.4 91 90 241 88 0 103.0 18.1 91 90 241 88 0 104.5 15.5 92 90 240 88 0 104.5 15.5 92 90 258 88 0 104.9 ----------------------------------------------------------------------------------- 16.2 93 90 237 88 0 104.6 15.9 92 90 236 88 0 103.1 16.3 91 90 225 88 0 105.9 16.5 94 90 230 88 0 106.3 17.2 94 90 222 88 0 105.3 16.1 93 90 258 90 0 104.4 14.9 92 90 239 90 0 103.7 15.5 91 90 225 88 0 101.9 16.3 90 90 217 88 0 102.4 17.2 90 90 205 88 0 101.5 16.4 90 90 206 88 0 102.7 17.4 . 91 90 229 88 0 103.3 16.7 91 90 218 88 0 102.6 .18.5 91 90 238 88 . 0 103.5 16.2 91 90 234 88 0 104.2 16.1 92 90 228 88 0 105.9 16.5 94 90 222. 88 0 104.0 15.9 92 90 216 88 0 103.5 15.8 . 91 90 213 88 0 104.1 16.7 92 90 Project No. 06403-52-19B December 29, 2005 .•. . ,.... • 4 4 • .,. ..,.. TABLE I' '• . ) SUMMARY OF FIELD DENSITY TEST RESULTS • Elev. Plus Field Field Field Reqd. or 3/4 Dry Moist. Rel. Rel. • - : Depth Curve Rock- Dens. Cont. Comp. Comp. Test No. Date Location (ft) No. ..('o) (pcf) • FG 945 09/22/05 Unit 1.06; Lot 78 ' .' 260 90 0 103.9 16.8 91 90 FG 946 09/22/05 Unit 1.06; Lot 77 ' 253 90 ' 0 102.7 16.4 90 90 W FG 947 09/22/05 Unit 1.06; Lot 76' . 246 * 19 0 101.9 . 19.2 91 - 90 • FG 948 09/22/05 Unit 1.06; LOt 75 239 '17 0 106.0 16.5 91 90. • FG 949 09/22/05 Unit 1.06; Lot 74 . '. . 231 ' 90 0 102.7 19.1 90 90 ST .950 09/22/05 Unit 1.06; Stab Fill #2 259 19 0 101.2 16.8 91 90 I . ST 951 09/22/05 Unit -1.06; Stab Fill #2 . ' 250 19 0 100.7 ' 16.3 ' 90 90 ST 952 09/22/05 Unit 1.06; Stab Fill #2 -. ' '230 ,' 19 :. 0 101.9 16.9 91 .' 90 I .ST 953 09/23/05 Unit 1.06; Lot 89 ' ' 225 90 ' 0 ' 104.4 15.1 92 90 ST 954 ' • 09/23/05 Unit 1.06; Lot 90 212 90 0 102.7 14.8 90 90 • ST 95.09/23/05 Unit 1.06; Lot 92, 910 0 103.5 114.61 ...91 .. • FG 956 09/26/05 Unit 1.06; Lot 92 ' 216 17 0 ' 107.9 16.1 , 93 .90 • FG 957 09/26/05 Unit 1.06; Lot 91 .• . 221 . 17. 0 110.8, 17.4 95 90 FG, 958 ' 09/26/05 Unit 1.06; Lot 90 . 227 - 19 0 .101.7 18.9. 91 . 90 • ' FG 959 09/26/05 Unit 1.06; Lot 89 .. . , 234 .19. 0 100.8. 19.3 . 90 90, 5 FG 960 09/26/05 Unit 1.06; Lot 88 . - 240 19 ' 0 .101.1 18.2 90 90 FG 961 09/26/05 Unit 1.06; Lot 97 ' 247 17 0 108.6 16.3 ' 93' ' 90 FG . 962 . 09/26/05 Unit 1.06; Lot 86 254 . 19 0 '101.4 ' 16.7 91 ' 90 ' 5 . •. FG 963. 09/26/05 Unit 1.06; Lot 85 • . 262 ' 90 0 104.2 16.9 92 90 FG 964 09/26/05 Unit 1.06; Lot 84 '. 267 90 0 104.7 '15.5 .' . 92 90 FG 965 09/26/05 Unit 1.06; Lot 83 " - ' 270 -90 0 106.5 15.8 94 90 I . FG 966 09/26/05 Unit 1.06; Lot 82 . 271. 90'. 0.. 104.9 16.5 92 90 • ' 967 09/27/05. Unit 1.06; Lot 66 . . - -. 233 ... 17 " '0 107.0 ' 16.6. ' 92 . 90 968 09/27/05 Unit 1.06; L.668 . . ' 213 ' 17 0' 106:5 17.3 91 90 FG 969 09/27/05 Unit 1.06; Lot 66 • ' P236. . 90' . 0 105.5 ' 18.2 ' 93 ' 90 I FG 970 09/27/05 Unit 1 06 Lot 67 r 219 90 0 104.7 16.8 92 90 FG 971 ' 09/27/05 Unit 1.06;'Lot 68. , '" ' 215 90 0 103.9 17.3 ' 91 90 I . FG 972 09/27/05 Unit 1.06; Lot.69 ' - ' .. . 212 ' 17 ' 0' 107.3 15.9 , 92 90 FG 973 09/27/05 Unit 1.06; Lot 70 , ' ' 212 ' 19 ' o: 101.9 18.2 91 90.' 5 FG 974 09/27/05 Unit 1.06; Lot 71 ., ' '214 19 0 102.3 19.5 ' 92 90 - 5 " FG 975 09/27/05 Unit 1.06 Lot 72 , "' ' 218 19 0 .103.8 17.1 ' '93 90 FG 976 09/28/05. Unit 1.06; Lot 73 ' .. 224 ' 19 0- 102.3 17.6 92 90 I FG 977 . 09/28/05, Unit 1.06; Lot 55. . '259 .90 0 . 103.7 15.4 91 •' 90 5 FG 978 09/28/05 Unit 1.06; Lot 56 • ' ' " 259 ' 90 0.,. .102.6 18.0 . 90 ' 90 S FG 979 09/28/05 Unit 1.06; Lot 65 • : 239 90' 0 104.9. 15.5 92 90 FG 980 09/28/05 Unit 1.06; Lot 31 • ' 238 90 0 103.2 18.4 ' 91 90 S FG 981 09/28/05 Unit 1.06; Lot 32' ' .' ' , . 237 90 0 104.6 17.2 92 90 FG 982 09/29/05 Unit 1.06; Lot 33 ' 236 90 - 0 106:1. 16.6 ' 93 90 I FG 983 • 09/29/05 Unit 1.06; Lot 34 • ' - • 235 90 0 102.7 17.9 90 90 - FG 984 09/29/05 Unit 1.06; Lot 44 - • 208 90 ' 0 105.3 15.6 - 93 90 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 5 ST 986 09/29/05 Unit 1.06; Buttress Fill #1 , ' - 282 19' 0 101.5 16.8 91 90 S ST 987 09/29/05 Unit 1.06; Buttress Fill #1' ' * 276 19 , 0 101.7 15.9 91 90 ST 988 ' 09/30/05 Unit 1.06; Buttress Fill #1 , . 265 - ' 90 0 1033 15.2 91 90 ST 989 09/30/05" Unit 1.06; Stab Fill #1A 255 90 0 . 102.7 " 14.9 90 90 December 29, 2005 Project No. 06403-52-19B . .. *• * -. .- -.' • • • . . , • ,-.*. -' '-. . . . .' • • .. = • • TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS • Elev. Plus Field Field Field Reqd. or 3/4 Dry Moist. Rel. Rel. • .. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location (ft) No. (%) (pCf) (%) . ST 990 09/30/05 Unit 1.06; Stab Fill #IA 249 90 . 0 104.6 14.4 92 90 ST 991 09/30/05 Unit 1.06; Stab Fill #1A . 225 90 0 102.9 15.7 91 90 ST 992 09/30/05 Unit 1.06; Lot 92 '208 90 0 104.1 - 15.6 92 90 ST 993 09/30/05 Unit 1.06; Lot 75 " . 233 90 0 102.5 14.4 90 90 • SZ 994 10/03/05 Unit 1.06; Stab Fill #2 230 90 0 104.8 15.3 92 90 SZ 995 10/03/05 Unit 1.06; Stab Fill #2 219 90 0 105.7 16.8 93 90 I SZ 996 10/03/05 Unit 1.06; Stab Fill #2 238 90 . 0 102.9 15.7 91 90 SZ 997 10/03/05 Unit 1.06; Stab Fill #2 236 90, 0 105.5 16.3 93 90 I . SZ 998 10/03/05 Unit 1.06; Stab Fill #2 .. 232 . 90 -- 0 103.2 18.2 91 90 SZ 999 10/03/05 Unit 1.06; Stab Fill #2 . .-------- 246 90 0 104.8 15.3 92 90 • SZ -100---10/04/05 Unit 1.06; Stab Fiji #2 . 25090 --106.917.9-94.9-- SZ 1001 10/04/05 Unit 1.06; Stab Fill #2 ' • • 260 90 0 103.3 14.5 91 90 • SZ 1002 10/04/05 Unit 1.06; Stab Fill #2 .262 90 0 106.1 17.2 .93 90 SZ 1003 10/04/05 Unit 1.06; Stab Fill #2 254 90 - 0 104.9 16.8 92 90 ST 1004 10/05/05 Uuiit 1.06; Stab Fill #2 259 90 0. 102.4 15.2 90 90 ST 1005/ 10/05/05 Unit 1.06; Stab Fill #2 . . 257 90 0 106.9 16.8 94 90 ST 1006 10/05/05 Unit 1.06; Stab Fill #2 246 90 0 105.9 15.6 93 90 ST 1007 10/31/05 Unit 1.06; Lot 1 - . 207 88 0 104.1 17.3 92 90 . ,.. . ' . . • -. - . .: • .. ., • .. :... " • . . .• .. - . . . .. • . .-•' ,... '.. • . ;.,. . • • • :, ..' ,.:.- • . ' ,. . • . • I • . . • . S .. -.. - . . ..,.. I ' • ... .: .• . . S Project No. 06403-52-19B . December 29, 2005 .. . • ,. ... .,•.,- I • • . - TABLE . EXPLANATION OF CODED TERMS - TEST SUFFIX A, B, C, Retest of previous density test failure, following moisture conditioning and/or recompaction STRIKE-OUT Fill in area of density test failure was removed and replaced with properly compacted fill soil - PREFIX CODE DESIGNATION FOR TEST NUMBERS FG FINISH GRADE ST SLOPE TEST SZ SLOPE ZONE • - CURVE NO : Corresponds to curve numbers listed in the summary of laboratory maximum dry density and optimum moisture content test results table for selected fill soil samples encountered during testing and observation - ROCK CORRECTION For density tests with rock percentage greater than zero, laboratory maximum dry density and optimum moisture content were adjusted for rock content. For tests with rock content equal to zero, laboratory maximum dry density and optimum moisture content values are unadjusted : - TYPE OF TEST . SC Sand Cone Test (ASTM D1556) NU Nuclear Density Test (ASTM D2922) OT Other - ELEVATION/DEPTH Test elevations/depths have been rounded to the nearest whole foot • S • • • / • & • • S .' • S S S Project No. 06403-52-19B . December 29, 2005 S TABLE II SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS ASTM D 1557-02 - Sample No. Description . Maximum Dry Density (p f) Optimum Moisture Content (% dry weight) 3 Yellow brown, Silty, fine to medium SAND 119.0 13.2 Light tan brown, Clayey, fine to coarse SAND (Santiago sand) 121.8 : 11.4 10 Olive brown Silty SAND 114 0 13.0 16 Dark brown, Clayey, fine to coarse SAND 120.1 11.9 17 Light yellow brown, Silty, fine to medium SAND 1 165 '13.3 19 Olive gray, Silty, fine SAND 111 8 15.8 23 Olive green to brown, fine, Sandy CLAY 114.1 _16.4- 29 Olive green to brown, Clayey, fine SAND 122.0 12.0 33 Light olive brown, fine SAND 1165 13.5 74 Yellow brown, Silty, fine to medium SAND 123.9 11.0 75 Olive brown, Silty to Clayey, fine to medium SAND 113.9 15.8 77 Olive gray, fine to medium, Sandy CLAY 120.8 13.1 78 Olive brown, Clayey, fine to medium SAND i23.8 106 82 Light olive-brown, fine, Sandy SILT 120.0 13.2 86 Light olive to yellow brown, fine, Sandy SILT with trace clay 120.9 12.9 - 88 Light red brown, Silty to Clayey, fine SAND 113.2 15.9 90 Light yellow brown, fine Sandy SILT. 113.7 14.2 TABLE III SUMMARY OF LABORATORY EXPANSION INDEX TEST RESULTS ASTM D 4829-03 Sample No. Moisture Content Dry Density (pci) Expansion Index Before Test (%) After Test (%) EI-E 11.9 24.8 106.4 87 El-Fa 11.5 22.5 106.4 61 EI-Fb 12.1 25.4 104.6 85 EIFc 12.5 - 27.7 100.3 91 El-G 10.5 22.9 107.9 63 El-H 11.5 23.8 106.0 69 El-1 . 12.1 24.6 105.4 73 EI-J 11.9 23.6 105.1 62 El-K 12.3 25.3 105.3 77 EI-L 12.9 . 28.2 101.5 98 EI-M 11.7 21.8 104.9 32 El-N 11.6 24.0 104.8 60 EI-O 11.5 • 23.6 103.7 48 El-P 13.7 26.0 102.1 75 El-Q 13.9 28.4 95.5 64 EI-R 12.7 24.1 102.5 - 50 El-S 12.2 24.8 : 104.1 62 El-T 12.8 23.9 104.5 59 El-U 12.5 24.4 104.8 67 El-V 11.6 24.9 102.8 63 El-W • 12.2 24.8 102.8 58 EI-X 14.1 32.7 96.3 105 ELY 11.8 . 26.5 102.1 64 EI-Z 11.9 25.0 103.3 61 EI-AA 12.2 25.7 102.9 64 El-AB 12.4 26.5 99.9 60 El-AC 12.3 - 23.8. . 102.7 38 El-AD 12.7 27.3 • 101.5 69 El-AB 14.6 31.8 95.9 93 El-AF 12.3 23.8 103.4 39 El-AG 11.9 23.9 102.4 39 EI-AH • 12.3 23.6 100.4 27 Project No. 06403-52-19B • . December 29, 2005 TABLE III (Continued) SUMMARY OF LABORATORY EXPANSION INDEX TEST RESULTS ASTM D 4829-03 Sample No. Moisture Content Dry Density (pci) Expansion Index Before Test (%) After Test (%) El-Al 133 259 970 34 EI-AJ 12.3 23.5 100.2 22 El-AK 11.4 22.7 105.2 36 El-AL 12.3 22.6 103.0 30 El-AM 11.7 22.3 105.4 49 El-AN 14.3 29.0 95.9 63 EI-AO . 14.1 27.2 96.7 50 El-AP 147 310 962 84 EI-AQ 18.2 37.5 85.2 83 El-AR 13.9 30.5 96.2 57 El-AS 13.4 25.1 99.9 27 El-AT 14.2 31.5 -96.9 86 El-AU 12.7 25.5 102.5 62 EI-AV 124 264 1016 55 Sample No. Dry Density (pci) Moisture Content (%) Unit Cohesion (psi) - Angle of Shear Resistance 3 104.8 15.5 505 30 74 1136 168 150 34 86 108.0 - 13.1 . . 255 33 - 88 . 102.7 15.0 235 36 90 102.8 13.6.11. 70 36 5 Samples were remolded to a dry density of approximately 90 percent of the maximum dry density at near-optimum moisture content. . :.-- .. •- . S - . Project No. 06403-52-19B .. - December 29, 2005 I' a TABLE SUMMARY OF WATER-SOLUBLE SULFATE LABORATORY TEST RESULTS CALIFORNIA TEST NO. 417 Sample No. * Water-Soluble Sulfate (%) Sulfate Exposure 1BC Table 4 El-E 0.096 Negligible El-Fa 0.495 Severe Ei-Pb 0.120 Moderate El-Pc 0.255 Severe EI-G . 0.090 Negligible El-H 0.675 Severe El-I 0.540 Severe El-i 0.735 Severe El-K P0.465 Severe El-L 0.500 Severe El-M 0.630 Severe El-N 0.210 Severe EI-O 0.705 Severe El-P 0.645 Severe El-Q ' 0.765 . Severe El-R . 0.360 Severe El-S 0.600 Severe EI-T 0.405 Severe El-U 0.435 Severe El-V 0.255 Severe El-W. 0.280 Severe EI-X 0.048 Negligible El-Y 0.405 Severe EI-Z 0.340 Severe EI-AA 0.735 Severe El-AB 0.765 Severe El-AC 0.720 Severe El-AD . 0.495 Severe EI-AE 0.675 Severe El-AF 0.705 Severe - El-AG . 0.735 Severe - El-AH - 0.585 - Severe El-AF 0.765 Severe Project No. 06403-52-19B December 29, 2005 TABLE V (Continued) SUMMARY OF WATER-SOLUBLE SULFATE LABORATORY TEST RESULTS CALIFORNIA TEST NO. 417 * Sample No. Water-Soluble Sulfate (C) Sulfate Exposure UBC Table 19-A-4 EI-AJ 0.720 Severe El-AK 0.630 Severe El-AL 0.630 Severe El-AM 0.585 Severe El-AN 0.720 Severe EI-AO 0.660 Severe El-AP 0.525 Severe El-AQ 0.675 Severe El-AR 0.100 Moderate El-AS 0.600 Severe El AT 0.360 Severe El-AU 0.555 Severe EI-AV 0.660 - Severe TABLE VI SUMMARY OF FINISH GRADE EXPANSION INDEX TEST RESULTS VILLAGES OF LA COSTA - THE GREENS NEIGHBORHOOD 1.06 LOTS 1 THROUGH 92, L Sample at Finish Grade Expansion Index UBC Classification 1 through 4 El-AM 49 Low 5 through 8 El-AL . 30 Low 9 through 12 EI-AK 36 Low 13 thrOugh 17. EI-AJ . 22' Low 18 through 22 El-Al 34 Low 23 through 26 EI-AH 27 Low- 27 through 29 El-AG 39 Low 30 through 32 El-AF 39 Low 33 through 36 El-AB 93 High .37 through 40 El-AD 69 Medium 41 through 44 EI-Z. - 61 - Medium 45 through 47 . El-AN 63 Medium 48 through 50 El-AO 50• Low 51 through 54 El-AP - 84 Medium 55 and 56 - El-AS . 27 Low 57 through 60 El-AQ 83 Medium 61 through 64 El-AR 57 Medium 65 . El-AS 27 Low 66 - El-AS - 27 Low 67 through 70 EI-AV 55 - Medium 71 through 73 El-AU 62 Medium 74 through 77 El-AT 86 Medium 78 through 81 EI-Q - 64 Medium 82 through 85 El-AC 38 - Low 86 through 89 El-AB 60 . Medium 90 through 92 - EI-AA 64 Medium TABLE VII SUMMARY OF FINISH GRADE EXPANSION INDEX TEST RESULTS VILLAGES OF LA COSTA - THE GREENS NEIGHBORHOOD 1.07, LOTS 1 THROUGH 71 L 0 0 N . Sample at, Finish Grade Expansion Index UBC Classification 1 through 3 El-E 87 Medium 4 El-Fa 61 Medium 5 EI-Fb 85 Medium 6 El-Fc 91 High 7through 9 EI-G___' 63' Medium 10through13 EI-X 105 High 14through16 EI-Y _. '64 _' Medium 17through19 El-P 75 Medium 20through23 El-0 _' 48 Low 24through27 El-N 60 Medium 28through32 EI-W __' ,58 Medium 33through35 El-V 63 'Medium 36and37 El-U . 67 Medium 38through 41 __. EI-T 59 Medium 42and43 El-U 67 Medium 44. through 46 _"'"El -S 62 Medium 47through 49 EI-R 50 Low 50through53 El-J 62 Medium 54through 57 El-I 73 Medium 58through 61 El-H. 69 Medium 62through66 El-K 77 Medium 67through69 EI-L . .98 High 70 and 71 El-M 32 Low Project No. 06403-524913 .. . December 29, 2005 TABLE VIII SUMMARY OF AS-GRADED BUILDING PAD CONDITIONS VILLAGES OF LA COSTA - THE GREENS NEIGHBORHOOD,,1.06, LOTS 1 THROUGH 92 Lot No. Pad Condition Approximate Maximum Depth of Fill Approximate Depth of Differential Fill 1 Fill 44 28 Fill 31 15 3 Fill 41 20 4 Fill 37 23 5 Fill 32 8 6 Undercut due to cut/fill transition 30 26 7 Undercut due to cut/fill transition 30 22 8 Undercut due to cut/fill transition 27 24 9 Undercut due to cut/fill transition 6 2 10 Undercut due to cut/fill transition 7 4 11 Undercut due to cut/fill transition 13 10 12 Undercut due to cut/fill transition 5 1 13 Undercut due to cut/fill transition 6. 3 14 Undercut due to cut/fill transition 6 2 15 Undercut due to cut/fill transition . 7 . 4 16 Undercut due to cut/fill transition 9 5 17 Undercut due to cut/fill transition 11 8 18 Undercut due to cut/fill transition 13 11 19 Undercut due to cut/fill transition 12 9 20 Undercut due to cut/fill transition 11 7 21 Undercut due to cut/fill transition 7 4 22 Undercut due to cut/fill transition 7 3 23 Undercut due to cut/fill transition - 7 4 24 Cut . N/A N/A 25 Cut N/A N/A 26 Cut N/A •• ZN/A 27 Cut N/A N/A 28 Cut N/A N/A 29 • Cut N/A N/A 30 Cut N/A N/A 31 Undercut due to cut/fill transition 4 1 Project No. 06403-52-19B December 29, 2005 TABLE VIII (Continued) SUMMARY OF AS-GRADED BUILDING PAD CONDITIONS VILLAGES OF LA COSTA - THE GREENS NEIGHBORHOOD 1.06, LOTS 1 THROUGH 92 Lot No Pad Condition . Approximate Maximum Depth of Fill Approximate Depth of Differential Fill 32 Undercut due to cut/fill transition 19 16 33 Undercut due to cut/fill transition 10 7 34 Undercut due to cut/fill transition 20 15 35 Undercut due to cut/fill transition 14 11 36 Undercut due to cut/fill transition 8 3 37 Undercut due to cut/fill transition 9 6 38 Undercut due to cut/fill transition 15 11 39 Undercut due to cut/fill transition 11 8 40 Undercut due to cut/fill transition 22 20 41 Undercut due to cut/fill transition 22 20 42 Undercut due to cut/fill transition 35 32 43 Undercut due to cut/fill transition 35 32 44 Fill (Rec Lot) 34 33 45 cut N/A N/A 46 Cut N/A N/A 47 Cut N/A N/A 48 Cut N/A N/A 49 Cut N/A N/A 50 Cut . N/A N/A 51 Cut N/A N/A 52 Cut N/A N/A 53 Cut N/A N/A 54 Cut N/A • N/A 55 Undercut due to cut/fill transition 4 1 56 Undercut due to cut/fill transition 4 1 57 Cut N/A N/A 58 Cut N/A N/A 59 Cut N/A N/A 60 Cut N/A N/A 61 Cut N/A N/A Project No. 06403-52-19B • December 29, 2005 . • .. . TABLE VIII (Continued) . SUMMARY OF AS-GRADED BUILDING PAD CONDITIONS VILLAGES OF LA COSTA - THE GREENS . 2 NEIGHBORHOOD 1.06, LOTS 1 THROUGH 92 S ., :5 Lot No. Pad Condition 1Approximate - Maximum Depth of Fill Approximate Depth of Differential Fill 62 Cut . N/A N/A 63 __ ______________ Cut '. N/A N/A ' 64 Cut N/A N/A 65 Undercut due to cut/fill transition 4 - 1 66 Undercut due to cut/fill transition 9 6 67 ________________ Undercut due to cut/fill transition 10 7 '68 Undercut due to cut/fill transition 27 ' 20 69 Fill 28 14 70 Undercut due to cut/fill transition 16 13 - 71 Undercut du6 to cut/fill transition 5 • 3 72 Undercut due to cut/fill transition 24 21 73 Undercut due to áut/fill transition 37 34 74- Fill • - :47 33 - 75 Fill . 54 25 76. . Fill • 61 15 77 . Fill • 63 • • 40 78 - Fill , • 60 42 79 . Fill - 56 52 80 • Undercut due to cut/fill transition - 29 25 81 Undercut due to cut/fill transition 20 17 82 Undercut due to cut/fill transition.. 15 12 83 Undercut due to cut/fill transition 12 9 84 Undercut due to cut/fill transition 10 - 7 85 Undercut due to cut/fill transition 13 10 86 f Fill 23 20 87 Fill • • . 32 20 88 Fill- 40 '.- -• 23 89 Fill • - 57 26 90 Fill - 64 - 27 91 . Fill • . 58 15 92 Fill • 50 18 TABLE IX SUMMARY OF AS-GRADED BUILDING PAD CONDITIONS VILLAGES OF LA COSTA —THE GREENS NEIGHBORHOOD 1.07, LOTS V1 THROUGH 71 Lot No. Pad Condition Approximate V Maximum Depth of Fill Approximate Depth of Differential Fill 1 Fill , 36 24 2 Fill 23 9 3 . Fill .21 8 4 Fill 21 16 5 Undercut due to cut/fill transition 4 1 6 Undercut due to cut/fill transition 5 2 7 Undercut due to cut/fill transition 5 * . 2 8 Undercut due to cut/fill transition 16 13 9 Undercut due to cut/fill transition 6 2 10 Fill V 35 32 11 Fill 41 22 12 V Fill V 41 11 13 Fill 44 V 14 14 Fill .. 44 V 16 15 Fill , * 41 18 16 Fill ' 31 V , 26 17 Fill 57 . . 34 18 .. Fill V 69 25 19 Fill . 71 16 20 Fill 66 11 21 Fill . , 59 2 22 . Fill . 46 6 23 Fill 39 12 24 ' Fill' . ' 25 12 25 Fill 13 6 26 . Undercut due to cut/fill transition 7 4 27 Undercut due to cut/fill transition . 4 , 1 28 ' Fill ' .' . 30 ' , 27 29 . Undercut due to cut/fill transition 24 21 30 Undercut due to cut/fill transition 22 19 31 Undercut due to cut/fill transition 24 V 21 32 Undercut due to cut/fill transition 28 25 Project No. 06403-52-19B ' . December 29, 2005 TABLE IX (Continued) SUMMARY OF AS-GRADED BUILDING PAD CONDITIONS VILLAGES OF LA COSTA - THE GREENS NEIGHBORHOOD 1.07, LOTS 1 THROUGH 71 Lot No. - Pad Condition Approximate Maximum Depth of Fill Approximate Depth of Differential Fill 33 Fill 28 12 34 Fill 29 16 35 Fill • - 29 . 18 36 Undercut due to cut/fill transition 17 14 37 Undercut due to cut/fill transition, 9 6 38 Fill 27 24 39 : Fill 26 4 40 Fill 36 15 41 Fill ' 33 20 42 ' Fill 36 27 43 Fill 34 27 44 Fill 31 3 45 Fill ' ' 27 3 46 Fill ' 26 2 47 Fill • 25 2 48 Fill 22 1 49 ' Fill ' 23 3 50 ' Fill 36 7 51 , Fill - 46 5 52 Fill 40 4 53 Fill ' ' 28 - 1' 54 ' Fill , ' 33 7 : 55 Fill' 34 12 56 Fill ; 35 16 57 ' , Fill 38 ' 23 58 ' Fill ' ' 35 20 59 Fill ' ' 33' ' 20 60 Fill 29 18 61 - Undercut due to cut/fill transition 20 17 62 Undercut due to cut/fill transition ' 11 8 ' 63 Undercut due to cut/fill transition 24 20 64 Undercut due to cut/fill transition 39 36 65 Undercut due to cut/fill transition 41 37 Project No. 06403-52-19B . • • ' December 29, 2005 TABLE IX (Continued) SUMMARY OF AS-GRADED BUILDING PAD CONDITIONS VILLAGES OF LA COSTA - THE GREENS NEIGHBORHOOD 1.07, LOTS 1 THROUGH 71 • Approximate Approximate flenfh of . • Lot No. Pad Condition Maximum Lt - Depth of Fill Differential Fill 66 Undercut due to cut/fill transition . 25 22 67 Undercut due to cut/fill transition 29 26 68 Undercut due to cut/fill transition 29 26 69 Undercut due to cut/fill transition 31 28 70 Undercut due to cut/fill transition 30 27 71 Undercut due to cut/fill transition 28 25 1 • • , • ' ' '. ' APPENDIX A . , • 0 SETTLEMENT MONITORING PROGRAM S • Two buried settlement' plates and two surface settlement monuments, as shown on the "As-Graded" • Geologic Map (Figure 6), were installed during grading to monitor the settlement of the fill and 5 underlying alluvium during construction. Buried settlement plates were set at the bottom of the cleanout and compacted fill was placed to achieve design grade. After the placement of the surcharge • fill, the buried plates were then drilled, tagged, and surveyed. The survey data obtained from the • buried settlement plates were used as a baseline for the monitoring program. Three surface • monuments consisting of 1-foot-square steel plates and 4-foot long, 1-inch-diameter steel rods were installed. The monuments were surveyed on a weekly basis by the project civil engineer, Hunsaker 5 and Associates. The results of the' settlement-monitoring program are based on recorded field data for , S each settlement monitoring station. Settlement data presented in Appendix A represents measured S vertical movement in the field. Based on the survey measurements, it is our opinion that the primary 5 settlement was essentially complete after 124 days. , 0 • 0 ' • 0 ,, ' • 0 ' 5 0 • ' ' • 0 ,0 • 0 :5 0, ' ' 0 • • 0 ' '5 ' •" • 0 0 '2 • 0' '0 0 • 0 0, S , 5 0 Project No. 06403-52-19B 0 December 29, 2005 • 0 , Villages of La Costa ,- The Greens Neighborhood 1.07 Settlement Montoring Program Days 0 10 20 30 40 50 60 70 80 90 100 110 120 130 _ 7 J N Ui A..UVVtiILAUl'(ILLQNQ SEE FIGURE 4 GRAPHIC SCALE 0' 20' 40' 60' 80' 120' 160' SCALE 1"— 40' LEGEND Q cf........COMPACTEDFILL Qpf........PREVIOUSLY COMPACTED FILL (Dotted Where Buried) (Leighton thid Associates) Q UC........COMPACTED FILL IN UNDERCUT AREA Q EI........ALLUVIUM (Dotted Where Buried) Qt ........ TERRACE DEPOSITS (Dotted Where Burled) Ts ........ SANTIAGO FORMATION (Dotted Where Buried) ........APPROX. LOCATION OF GEOLOGIC CONTACT (Dotted Where Buried) ST1OQ6,APPROX. LOCATION OF IN-PLACE DENSITY TEST FG ... Finish Grade ST...Slope Test APPROX. LOCATION OF SUBDRAIN APPROX, LOCATION OF BRESSI RANCH SUBDRAIN ..,....APPROX. ELEVATION OF SUBORAIN APPROX. ELEVATION AT BASEOF FILL SP-2 APPROX. LOCATION OF SETTLEMENT MONUMENT AND PLATE 12 APPROX. ATTITUDE OF BEDDING L APPROX LOCATION OF BUTTRESS FILL APPROX LOCATION OF STABILITY FILL 24X36.DWGILADRILLONO GRAPHIC SCALE 0' 20' 40' 60' 80' 120' 160' SCALE 1"— 40' LEGEND Q cf........COMPACTED FILL Qpf........PREVIOUSLY COMPACTED FILL (Dotted Where Burled) (Leighton and Associates) Q UC........COMPACTED FILL IN UNDERCUT AREA Qal........ALLUVIUM (Dotted Where Buried) Qt ........ TERRACE DEPOSITS (Dotted Where Burled) Ts ........ SANTIAGO FORMATION (Dotted Where Burled) APPROX. LOCATION OF GEOLOGIC CONTACT (Dotted Where Buried) ST-bOB6 APPROX. LOCATION OF IN-PLACE DENSITY TEST FG ... Finish Grade ST ... Slope Test APPROX. LOCATION OF SUBDRAIN APPROX. LOCATION OF BRESSI RANCH SUBDRAIN APPROX. ELEVATION OF SUBDRAIN LEJ ........ APPROX. ELEVATION AT BASE OF FILL SP-2 APPROX. LOCATION OF SETTLEMENT MONUMENT AND PLATE 12 APPROX. ATTITUDE OF BEDDING APPROX LOCATION OF BUTTRESS FILL APPROX. LOCATION OF STABILITY FILL AS - GRADED GEOLOGIC MAP VILLAGES OF IA COSTA - THE GREENS NEIGHBORHOOD 1.06 AND 1.07 CARLSBAD, CALIFORNIA -- - IDATE GEOCON ? PROJECT NO. 06403-52--019B INCORPORATED QP O64O3_52_Ol9B GOTEO-1N!CAL CONSULTANTS 6960 FLANDERS DRIVE SAN DECO, CALIFORNIA 92121.2974 PHONE 85855869OO FAX 858558-6159 SHEET 5 OF 6 j 5 Lt') w 0 LL LU LU C,) GRAPHIC SCALE 0' 20' 40' 60' 80' 120' 160' SCALE 1"= 40' LEGEND Q cf........COMPACTED FILL Qpf........PREVIOUSLY COMPACTED FILL (Dotted Where Burled) (Leighton and Associates) Q UC........COMPACTED FILL IN UNDERCUT AREA Q al........ALLUVIUM (Dotted Where Buried) Qt ........ TERRACE DEPOSITS (Dotted Where Buried) Ts ........ SANTIAGO FORMATION (Dotted Where Buried) P • ,,. ........APPROX. LOCATION OF GEOLOGIC CONTACT (Dotted Where Burled) APPROX. LOCATION OF IN-PLACE DENSITY TEST FG ... Finish Grade ST ... Slope Test APPROX. LOCATION OF SUBDRAIN APPROX. LOCATION OF BRESSI RANCH SUBDRAIN APPROX. ELEVATION OF SUBDRAIN APPROX. ELEVATION AT BASE OF FILL SP-2 0 ........ APPROX. LOCATION OF SETTLEMENT MONUMENT AND PLATE 12' APPROX. ATTITUDE OF BEDDING APPROX. LOCATION OF BUTTRESS FILL .APPROX. LOCATION OF STABILITY FILL LL LL LL Ii. ff SEE FIGURE 6 24X36.DWGILADRILL0F40 SEEFIGURE 4 S SEE FIGURE 6 .,~, ' ", 4 N - ... _.......__...._..._ .. . ..... ,.~o ,~ .~ . Lt7d~'_ .. - / * .. - - . - . 1% ". % , I . 3 f .. / N-- ,,",.. \1 `_ I -~~ ...' - - .11, ---I \ ~.,._ 111-~~. 11 ..-\I _.- I _/ . . ., I., ~\\ ~ . \T-,, . /7 /" T TNFN \ \ \ '\ \. I 1. 9 - P \\ \ N\ C 1/i I 61 I' 1 %\ \ \ \ - / \Ik ( N \\ J "7 7 / L 7" - - \A" - N N \\ \ '\ \ \ in N ' \ ) "', m 1.I( (. _`-"---N,, \ \ / ) ; \ / /\ / \ \ /i f.\ /' ' \\ A' : /" , \ N - - - N\ '\ \\ \ j , / / j/ N *'\\~ " t It ,\ \\\ , ", \ ~ I A -.,-, _. - -. % ., ~. \, \ CCDD , . N % C . eA . jr t:, - , , \, ,,- I \ N I , I~ ji ,/ I i, / \\ /A Ln. \ . . . \ / \ ~ *1 •• \\'\s• I I \.. .. % . % \ iN \\\ \\ \\ ) ) j \/ , /1 /•., /j ,/&')" II'\jJ - I.- . 'y .. 1.1 .. . .. ., 'I 11 . .. . *. 1.1. \ .. . - . t %&* Cc (,6 \ 9 -\ 9 U~\ . \1% N I , ~-? . " \ I, .. / / , /I // , 7' / / / / -- \ : I . . o7f .----I . i : % Lr\ '% -, .. . 1, ~_ I / / / -- - - % 'ie -,, - - C-4 . ,..;: , I ,- , 1, ; , %. I %.- .. . \ ". 1. * ., . I ..5r 1. %, .. '_ . , I / / , / /. .i / . I I/ I / ` I - " 1 .4,. 3 .41 . .q , *' : ~ .. , \ t . * - Lk C""D Z\il I , / . ., N (a * ....... . ... I. \1 .. - ... ... . , I I I I \ _~ ------- - \ I %I j \ \ \ \ _..... --.,--- .. ,__: I . . I . ... " 15~ 1-1 "',, \\ ~ - .... L . I 6~ . , . --. . / , , I I , I \ H k \ _. I I 1. ,!,/ ~~ ,\ FAI I- ... . .,. 1~ - ...... kl--., -- * 7 I A :,;.~ 'r ".".:~ . : . ~ i ~ ____~ --,~ . \ -, \ ) -,-----...-.--.--- . -_ -_ ..... . 7 . . ----__ I . . / : .\q i. - _; : . . ... If. , - ~. - Q1 (~ \\ \ I \ ~ . _. .- -_-, 111., ,_--- - __ - 1 ,~4 ! ~" - *1 i . . - ~ .. 1:~--T_ ~_- .. - . ~ , . . (b, "`N. \(_:Yl_'P, *______......__-_ ,_ .'-_q- '. .-..- - I,, . . I ... -. .. I 11 .~..! .. . : ! - : . I . . ::- - Q - If 11. A - . I I . i t . \ :* \ .. ~ \ ,:~ __,~ .. . .... _----__ '.. _- - --.- . . - - .. .:: 1* i : - .-T I - , , . * ~ I - -,; . . .'. I- j .. r 11 k \ __ ..._. .-.______. -___'. . . . a * * * - - N I . ~ I I .. .%, ~~._;k -_ - --, ~-L ~Lj '). N \ I 1 ,1 0 '.., -.-----. _, ", L4 _ ... . I ..... ~. - I f I '--.-- , / f./ .:/ Lj' // ../' N(~D['K \ , , \ " __~, --- . "I \\\ (gz_(St 7~ J-) ..-. - - I 1. I i / I 11 * // /\/ / /% \\ \\\J16 N N N / /.. / // / 1* " . :,;,-\ , , ,~, _____~__ N, . . N' . , I I ) ; It --I V~t. ~ :- "*, * - I .. ~, .,.. \ ---%---- "\ . ,11 1\ /\/ %)/.. tL.1 - ..;_ "~_"._*__~__~ , - __.. '. I -""/ __--_1 l't \ ~ ~ - , .L1 '.. ! ______ ~~ , - /_ . . --,. -..--,l "I '\ . 1. j ~Iu I Q0 _ i~ _. '. , -,'. '\- ______ ° .. ."• .... Cr_'I - - - - / N ,' / : / 2 • W / / --- - - I N. 4 .. - i 'N.. / r•r N i// -. . - - , 1_11 N 'N - - ...,. (9 \ --.. N ,I ), I\z )I / - -i 'N I 1. 'S 'S - -- __ S-.-- -•• . •L // ,'. / .. .. . \S. •••"."N, -.. C \ Z W O -'-- 'x)ll F1i'% ________ I I . I ' 7- .-i - - I / I / - - \ % - .1 - 'N C\21tiN.. . . .. - .5 5 N S.--. •S. \ 'S. -5--- _______ _______ £:/-7-fr,. ' - ' - - / - [' I / . 1_f_) j---I - - - - - - - - - - - - - - - - 1. g .-.L . Y' ' S "\. •• '.J;r I. -S i.:. •.__'\ . • ..• ..; ... .5'-. . ____.___ .....-. .5 5.555 5 ! to I I ,' / .. ) \\ -. N.. '' GRAPHIC SCALE 9 -,-- _n__ -D---- ( ~ ::~,~) ..4 4/N - - I / l :. N , \ I 0' 20' 40' 60' 80' 12 160' - - : i . I q\I "SN .. - -..•-_.------_ " .. I --'.5 >.S, -. , / -- -.+--- -'-.5- ..,(4),.__ '.5 \ N \ '_t-S%..;:Ss .-. S .. . ... •. --• / / / SCALE1" 40' 11 1. li~ 17 % . ,\ 'N__._ I % I - ~ I;IV , . N '.., I. . .N ' --' Jj ) ,- I 1/ ,,/,/,/ f~)_ - 06 1, \ \ ~~O_i_~__., _. t ~t ~ I, lh\ K IE R\ I'll . I - --- /-_ (0- I I X 0 M , 2 \ ; \ \ \ , \P . i %go -y --.0,~;tc- '_-- ~~, 1, N----..---- V *4* M \ l\ Q I . . - / ; \ / LEGEND \ - I 1 I 16 N 0 9 \ . . __ - - - s:::::! 1 w .1 I' ~. - -2`1 ~ ~ - ... - / - - :_ -Ax, - I.-- I , N !, / / ( I' / I / Ocf .. COMPACTED FILL ____. .5. \ . _1 9 ~~ AL~~,,_-_ .... , - , ( N / , I 'it i f P .__ ", , - \11 'I- I - / / , I. I IF 1_11 .-I-,; . - __ -1 .. -..---* . I . 4. , :- . . / / ,". ; -~ 1 i N z ~z I I i . / I .~ \ .. \ \ __- :,c\ " . . -1 * op-- ~ . 1 1 1 Qaj ........ ALLUVIUM (Dotted Where B ried) N111 -S, , 9 - 1___~ . ; - 9 , i,.% ~ \771... ~ QUC ........ CO \ \ X . .--~ ,q " co -n 0 k". . ': I . . . . i --, - Cl - - - . '~ - , I 11~~ - .11 , / . \ N N N '1 ' __ ;' -- -'I - I' \ ,_ - i I F; -LL.- °' " / / (,/ , ) 0.-_, 11 't, I f /A , - ',i / Qt TERRACE DEPOSITS (Dotted Where Buried) 111r) \ \ 11 N I N ' ,' - 'I [14r\ 1/ I 6" m IN .7-1 N / / / / / - - - - - - - -" " Ts SANTIAGO FORMATION (Dotted Where Buried)' - , I ___ . - ! . ~ !. I .1 - . / 00 I N1~1 ,I - ______- / _---- -..-:., • • - - - C)l y u.• ,> ,.,. ,1 / / ,1' / / / - - - _11-- / I (Dotted Where Buned) . \ t ---, _. 1,10 . IN " 11-119, _~~ __ __.-W__~__ I - \ \ ...9 -..-. . ., .1 I '-S / N i o ........ APPROX. LOCATION OF IN-PLACE DENSITY TEST N - Z. N - - __ __-5__ - - - ' / / i : -l- * ___1 . .. .. . . ,0;00,::~~ .. , I ,--- - ; ) - --- - FG Finish Grade ST Slope Test T wowo \ \ .-.-- I - , _2~ 1 ,_ -___ __---- - - I - `7 K ,,.--i ... .. . % ..; .. m , - - 'S ____ - -- - . i -r / APPROX. LOCATION OF SUBDRAIN - -----: " I \_~ ~ " -->'*, - I .-I'~L-2. / - * Z, " . \ , - ... -._'-",-,-._,.._---- - "N. -'..." I .. - , __ - , \ - __) - .--.-- CO-* -_ ., / ., . I __1' _, . _- - .j / / . ,/ ./ L-4 I I ,/ '.. -,-. , I C) - \ '0,.~, ,. /I (~_, -' , 74 . 00 , A - __1 V-.-A. .., , - ./ I/ - A2 ........ APPROX. ELEVATION OF SUBDRAIN I. , ES: 11 ~1._ - I - - r: __ 1. - --,.______ ",~ ,~ . __ .1-1 . ,., ..__'..1__-1' -- . -• '5 _..1\ _1111 . ' N\ •\ 5 I 00 •i_~I._ J5j////._ •..};• 1 1 / 0 ........ APPROX.LOCATION OF SETTLEMENT MONUMENT AND PLATE ,\ \ • -i - - / ' // / V APPROX ATTITUDE OF BEDDING 7 - 1 N /' / N I " ' I " / / / / - /' / ' - 1 / / / N. / - 0 < / / / -- --- \ \ '\ N. - - / / / / - / / - / / / APPROX. LOCATION OF BURESS FILL - - I 11 - -- N. IN,N. - 'S - Z TN "\ ---- N,`, 'N ' -5-- // 1 / / ,/ r --- -- // // / ,/ ,i/ li N \<' .5 N 5'le "~ \ --- , /I \ ' : L / - -, // VV ,//// 7 & APPROX.LOCATION OF STABILITY FILL - - N N N N --- 5' -S - ---- - \ \ N. - -- - - -- i' /'/ ,7 _/// -- - - -' / / / / - . .. .... . .>NN. - 'NS. -- -. - - .--....- '-L__ •- --. -. - \ \ i '-- --:. S 0 /' /7 . z - -11 - ,/ ,/ // I _1 - N N N.11 N..- N - ,_- -- \\ \ \ - ' __- Z. --- ---- - 7 1-11 / ,/ / - - - / - - -" ,' / AS - GRADED GEOLOGIC MAP N - .5 N. -S - / / •5-SN - - ', I 11 . - --- - 7' , Q/ ," ,7 _-- 7 ,' VILLAGES OF1A COSTA - THE GREENS / - _/ 1.11 -.-- - - - _ N. N - - ,/ / \ I I - - -- - N / ,/ // / / - - V CARLSBAD, CALIFORNIA W N N \ - - - / / N - I \ - -- - - / / / / -1 A - - -- r / N N .___\ 5'- .5. 'N.. .. -- / / \ I \ ------ .---- __--------.\ ----- / // ,// ' ..- ... ,' 8CALE140, OA12292005 I / 019B FIGURE Q>)_ - 5' - - - G€OTECHMCAL NSIATANTS _______________________ ---.5--- ......-- S - PHONE 858558-6900- FAX 858558-6159 SHEET 3 OF C 24X36.DWG/LADRIL.L0N0 I %JL..II 2036.0WGILADRILLOWO GRA P/-I/C SCALE 0' 20' 40' 60' 80' 120' 160' SCALE 1"= 40' LEGEND Q cf........COMPACTED FILL Qpf........PREVIOUSLY COMPACTED FILL (Dotted Where Burled) (Leighton and Associates) Q UC........COMPACTED FILL IN UNDERCUT AREA Qal........ALLUVIUM (Dotted Where Burled) Qt ........ TERRACE DEPOSITS (Dotted Where Buried) TS........SANTIAGO FORMATION (Dotted Where Burled) f\. .1........APPDX. LOCATION OF GEOLOGIC CONTACT (Dotted Where Burled) ST-1006 0 ........ APPROX. T-I0060APPROX. LOCATION OF IN-PLACE DENSITY TEST FG ... Finish Grade ST...Slope Test APPROX. LOCATION OF SUBDRAIN APPROX. L0Y,AT10N OF9RESSI RANCH SUCPA!M APPROX. ELEVATION OF SUBDRAIN APPROX. ELEVATION AT BASE OF FILL SP-2 .APPROX. LOCATION OF SETTLEMENT MONUMENT AND PLATE 12' APPROX. ATTITUDE OF BEDDING .APPROX. LOCATION OF BUTTRESS FILL rw .APPROX. LOCATION OF STABILITY FILL AS - GRADED GEOLOGIC MAP VILLAGES OF LA COSTA - THE GREENS NEIGHBORHOOD 1.06 AND 1.07 CARLSBAD, CALIFORNIA GE000N SCALE In = 40' I DA7512 -29-2005 2 -29-2005 INCORPORATED PROJECTNO. 06403 - 52 - FURE G(OTEONCALNSLLTANTS 019B 1 IG i 6960 RA1.S DRNE.SAN DM, CAUrORNIA 92121.2974 RNO85855004AX8585506139 SHEET I OF 6 SEE FIGURE 1 \\/\ 648 .FG59 71/ •.-. /.'.L/ / / / / N Q 0 C\ij —S93 '' 1 i / I / I N \ f/i-s 575 •66,5 fl 6o2\ /.//.659QCfr/:'/..; '/ GRADING LIMITS I N. .. - - 564 225 / / / S. - ---.-. F\ ' : \// / /.. 11.' / \ LA CDSA RiIs\ \ - 1 o' / ---/5/ 111' I / ' I \ - •587 •562 584 !' /•563 óF 976,r (C / ' /1 ' r I / / I \. \ S \\ .... S •'/ / ,i .( / / /217//s:/ / / N I I .• ' / ' r, y / / / / I \ I 225 / I / / \ / 655 / -'4 , f / - / / S ___ ------ o'/\ / •1 ,i // /1/ i'll ' -96 \\ \ \ - 582 : / " / / tlf'__ / / / / / ii ' - - I I 561 / 1 / - ,1 ------ 1 16 I I' /_/ / / .FGb'?_' ' / I - ¶1' / 65 " / I • / \\ :7 .. .. -------- ..-7 -..\ 67 \,-- / / i/I II1::.H 'N -. ( \ - - - - /1 ç -- -' • T9 / •2 •560 - " ,/f' / / ____________/ \ \ / / r 02 .FG.956 • 4 I - N ____ I \\ / ij 4I( I •? 74 y\ N \ \ 9. \t/!J ' 1 \ t\\ \4I 1h ) •' ) I / ) \ ft \r7 2 • \. 64 \ TX - - - - — / / / /7 YN .26\ H\\ \ - --1/, ---- / / NOT EpITE; AVEE \ / 7. ... . .. - .- PART 124 2 ." 4/o / 7 i i r r ' / / / - - I / I iI FG-972 S6O7/[ I - ----- ---i:: -,- \ I . -I I.! -.. ;---_ ' I ,7% .--ii<- / _-- -- ... - - '../"\ I I - I I I A \ V I •605 ' 2 1 I / t / - 7 - - — - / ' ." ,- \ / - -t -- i .?T936 L / / / / - - / ---- 7 -- - - - _- :-fll - rt.614 .6O - •608 ---/,J / ' - - V - -- \ I172 ii' I A:G944L .6Ol -r - / - / LiZ E -• -- 7F1 -- A1 - I / I / / /$ j ,7 - L - - ; :-.' // 7 //jj/ // / / / / - - - 'I I j I / / J _ - -k , - < I - I '/ : / 7/" /1 / / / \ _\ I \ / \J4I 'N/N m •FS43 •753 __,_i]] •968.— - , 7/ //' // ,,,/ / / /, I \, / I_7 hII ' c - / / / / /1" GRAPHIC SCALE 0' 20' 40' 60' 80' 120' 160' SCALE 1"— 40' LEGEND Q cf........COMPACTED FILL Qpf........PREVIOUSLY COMPACTED FILL (Dotted Where Burled) (LeIghton and Associates) Q UC........COMPACTED FILL IN UNDERCUT AREA Qal........ALLUVIUM (Dotted Where Buried) Q t........TERRACE DEPOSITS (Dotted Where Burled) Ts........SANTIAGO FORMATION (Dotted Where Buried) APPROX. LOCATION OF GEOLOGIC CONTACT (Dotted Where Buried) APPROX. LOCATION OF IN-PLACE DENS VY TEST FG...Finlsh Grade ST...Slope Test APPROX. LOCATION OF SUBDRAIN -. APPROX. LOCATION OF BRESSI RANCH SUBORAIN L.1 ........APPROX. ELEVATION OF SUBDRAIN APPROX. ELEVATION AT BASE OF FILL SP-2 APPROX. LOCATION OF SETTLEMENT MONUMENT AND PLATE '1' 12' APPROX.ATflTUDEOFBEDDING I_I_I APPROX. LOCATION OF BUTTRESS FILL U.. " APPROX LOCATION OF STABILITY FILL w w C,) I v I / , / / A' I - - - - - / - - - - - - ' • / \\ - / // j 37 / / / / ' / /1 / / / // / 184 // / / / / FG j/ / \ , \ \ / / / /' // - - // // / / SS I RjJCFI P A I I /1 / / / / /' • / / / '- - - - - - - - - / / f ", / / / /1 // / ,/? / 77 /77 :- - // / / / I, - J / / I / I / - - - -f / / / / I ')' It 229 Cj / 7 / // / / / ')( / / / / // / / \ / 7 /k - // N // / / - ) / // / /' V I I / / / / G-940/ / " / T / /1 / // 16 - /' //" // / - (I (I / I / 6 202 - - - - - - - - - - -, / 1 (ic " / / - /V // I / I 'I I •8Q1 j f/ / /.'-'... . .:.,.. /( .' I --'.; ... / -- . / / I // I' -- - : yl J';: I <\,I ,25 - ___ I ( \ / / / / / / J /_ - - \ — I' :\..\.92\ ( - I 'BUURESSFILL#1-: /25 : ---: 7/f ,. / I / // _ .9 3__-__ /1 \ / 0 i.p / ••••• / - ,-' •FG-98 - .5 - .- --_-,,. AS - GRADED GEOLOGIC MAP VILLAGES OF LA COSTA - THE GREENS NEIGHBORHOOD 1.06 AND 1.07 CARLSBAD, CALIFORNIA SEE FIGURE 3 I GE 00 O11 J SCALE 1" = 40' I DATE12 - 29 - 2005 J _____________________________________ I PROJECT NO. I INCORPORATED 06403 -52- 019B FIGURE I GOTQ-1NICA1CQ'1SUtTANTS I______________________________ 6960 F1.ANDERS DRIVE. SAN DIEGO, CA1IPORNIA 92121.2974 I PMONE85855R-6900FAX858558-6159 SHEET 2 OF 6 2. J L.?IQV.LIfl '.?II.JLlI.5II_I.'.JI 1'..!