Loading...
HomeMy WebLinkAboutCT 04-26; ROBERTSON RANCH EAST VILLAGE PA 16, 17, & 18; PRESSURE TEST REPORT; 2009-12-09PRESSURE TEST REPORT c-roj--- -( C.M.W.D. PROJECT NO.:(iT4j-2, DATE:____________ CONTRACTOR: ,cU FOREMAN:______________ SUPERINTENDENT: LIMITS OF OFTEST: SIZE LENGTH LOSS 6" 8" i2ôo ' 10" 12" 14" 16" 18" ALLOWED LOSS TIME PSI MEAS. GAL. Yhts. I2zIZzS I ..- I4r I LENGTH OF TEST: ALLOWED LOSS: GAL. TEST LOSS: GAL. TEST PASSELJ 7EST FAILED INSPECTED BY: (L - NOTES:______________________ J:\FILE MASTER\Forms\Pressuretest.frm .doc