HomeMy WebLinkAboutCT 05-01; CRESCENT DEL SOL ESTATES; REVISION NO. 2 UPDATE FOUNDATION REVIEW; 2007-05-31COAST GEOTECHNICAL
CONSULTING ENGINEERS AND GEOLOGISTS 1
May 31, 2007
Crescent del So!, LLC
Wayne Blass
President
7237 Sander-ling Ct
Carlsbad, CA 92011
RE REVISION NO 2 UPDATED FOUNDATION PLAN REVIEW
PLAN CHECK NO 06-0163
Crescent Del So! Estates
234/236 Date Avenue
Carlsbad, California
Eeferences Please see page 3
Dear Mr. Blass: . 0
As requested, we have reviewed the revised projcct foundation plans, Sheet F-2 and Detail Sheets
F-6, F-7 and F-8, dated April 27, 2007, prepared by Collons+Smith Structural Engineers, and
observed that they have, in general, included..the recommendations presented in our Preliminary
Geotechnical Investigation and our Revised Foundation Design Parameters Report, (Job No
P-417054).
COMMENTS
1) The comments from our previous Foundation Plan Reviews, dated February 16, 2006 and
November 22, 2006, remain applicable and are listed below.
779 ACADEMY DRIVE • S.01-ANA BEACH, CALIFORNIA 92075
(858) 755-8622. FAX (858) 755-9126
Page2
All footing excavations should be observed by a geôtechnical engineer orenginèering.
geologist, prior to placement of steel.
Fill placed on top of deepened column pads should be compacted to a minimuth of 90
..
percent of the laboratory maximum dry density.
. . .
4) All flu! should be observed and tested by a representative of this firm.
.................
. LIMITATIONS .. ,• •.• . .. .
The findings and inions presented herein have been made in accordance with generally acepted. :
professional pnncipals in the fields of engineering geology and geotechnical engineering No
-. - warranty is expressed or implied. . . -.
If you have an' questions regarding this report, please contact our offie. Referehce tooir Job No
P-400123 will help expedite a response to your inquiry.
•
2109 FXP. 782
CERTIFIED )*))
Mark Burwell, C.E.& \ ENGINEERING / /1 VithaGEOWGISTya Singhanet'. \Q
• I *1/ Engineering Ge dogis Geotechnical
CA
-. - .•
. -'- •-: - .- ..• '•- .T ;___••*
-___. . - -. - ------- - .--- - - -'•.-•.-
Coast Geotechnical May, Al, 2007
w.o.
Page 3
REFERENCES
PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed Eleven (11) Umt Condominium
236 Date Avenue
Carlsbad, California
Prepared by Coast t}eotechmcal
Dated February 4, 2004
GEOTECHNICAL REVIEW OF PROPOSED DEVELOPMENT
Eight (8) Single Family Residences
236 Date Avenue
Carlsbad, California
Prepared by Coast Geotechmcal
Dated Apnl 4, 2005
SUPPLEMENTAL GEOTECHNICAL INVESTIGATION -
Proposed Eleven (11) Umt Condominium
236 Date Avenue
Carlsbad, California
Prepared by Coast Geotechrncal
Dated September 28, 2005
REVISED FOUNDATION DESIGN PARAMETERS
Crescent Del Sol Estates -
234/236 Date Avenue
Carlsbad, California
P:repared IY:C0 Geotechriical
Dated January 11, 2006
FOUNDATION PLAN REVIEW - PLAN CHECK NO 06-0163
Crescent Del Sol Estates
234/236 Date Avenue -
Carlsbad, California
Prepared by Coast Geotechnical
Dated February 16, 2006
*
---- :
Coast Geotechnical May 31, 2007
WO P-400123
Page 4
GEOTECHNICAL UPDATE LETTER - PLAN CHECK NO 06-0 163
Crescent Del Sol Estates
234/236 Date Avenue
Carlsbad, California
Prepared by Coast Geotechrncal
Dated Febrüar' 16, 2006
GRADiNG PLAN REVIEW
Crescent Del Sol Estates
- 234/236 Pate Avenue -
Carlsbad, California
Prepared by Coast Geotechrncal
Dated February 27, 2006
UPDATED FOUNDATION PLAN REVIEW - PLAN CHECK NO 06-0163 -
Crescent Del Sol Estate
234/236 Date Avenue
Carlsbad, California
Prepared by Coast Geotechnical
Dated November 22, 2006
- - *
-i.-- -•---- - - :- i._. g_