Loading...
HomeMy WebLinkAboutCT 05-03; LINCOLN & OAK MIXED USE; AS BUILT PAD ELEVATIONS; 2012-02-02PEACE ENGINEERING, INC., A CALIFORNIA CORPORATION 7525 Metropolitan Drive, Suite 308 San Diego, California 92108 (619) 296-1010 FAX (619) 296-9276 STUART ENGINEERING TRANSPORTATION DEPARENT CM&J DIVISION February 2, 2012 1186-11-00 I it5 Civil Engineering/Surveying/Planning RECEIVED- CITYOFCARBAD FEB 02 2012 Ernie Montana Legacy Building Services 2505 Congress Street San Diego, CA 92110 SUBJECT: LINCOLN AND OAK MIXED USE AS-BUILT PAD ELEVATIONS Dear Ernie, On November 18, 2011, November 21, 2011 and February 1, 2012, Stuart Engineering determined the elevations of the pad in the locations shown on the attached exhibit (enclosure 1). The enclosed table summarizes the results of the field evaluation (enclosure 2). I hereby certify that the finish pad elevations are graded to within a tenth (0.10) of the approved grading plans. Sincerely, STUART ENGINEERING E3143) Stuart Peace President R.C.E. No. 27232 SP/mp Enclosure(s) F:'ADMIN\1186\CL5857R2.DOCX D _II II 11111111111 111111 61 i~ ~~ # Civil Engineering/Surveying/Planning STUART ENGINEERING PEACE ENGINEERING, INC., A CALIFORNIA CORPORATION 7525 Metropolitan Drive, Suite 308 San Diego, California 92108 (619) 296-1010 FAX (619)296-9276 SEstuartengineering.com February 2, 2012 1186-11-00 LINCOLN AND OAK As-Built Pad Elevations DIFFERENCE LOCATION FINISH STRUCTURAL BETWEEN OF FIELD FLOOR SECTION CALCULATED GRADED VARIES BY SHOT PER ELEVATIONS PROVIDED BY PAD L ELEVATIONS AND MORE THAN EXHIBIT PER PLAN OTHERS ELEVATION AS GRADED PROPOSED 0.1 128 49.25 0.75 48.50 48.59 0.09 NO 131 49.25 0.75 48.50 48.57 0.07 NO 133 49.20 0.75 48.45 48.55 0.10 NO 134 49.20 0.75 48.45 48.55 0.10 NO 136 49.00 0.75 48.25 48.29 0.04 NO 137 49.20 0.75 48.45 48.41 -0.04 NO 138 49.20 0.75 48.45 48.36 -0.09 NO 140 49.22 0.75 48.47 48.57 0.10 NO 141 49.50 0.75 48.75 48.68 -0.07 NO 142 49.50 0.75 48.75 48.72 -0.03 NO 144 50.07 0.75 49.32 49.31 -0.01 NO 147 50.07 0.75 49.32 49.22 -0.10 NO 148 50.86 0.75 50.11 50.19 0.08 NO 149 51.00 0.75 50.25 50.29 0.04 NO 150 51.00 0.75 50.25 50.29 0.04 NO 151 50.86 0.75 50.11 50.20 0.09 NO 171 50.20 0.75 49.45 49.55 0.10 NO 172 50.20 0.75 49.45 49.44 -0.01 NO 173 50.20 0.75 49.45 49.44 -0.01 NO 174 50.20 0.75 49.45 49.51 0.06 NO 175 50.20 0.75 49.45 49.49 . 0.04 NO 176 50.20 0.75 49.45 49.48 0.03 NO 177 50.20 0.75 49.45 49.44 -0.01 NO 180 50.20 0.75 49.45 49.38 -0.07 NO 181 50.20 0.75 49.45 49.51 0.06 NO 182 50.20 0.75 49.45 49.49 0.04 NO 221 50.20 0.75 49.45 49.48 0.03 NO 222 50.20 0.75 49.45 49.52 0.07 NO 223 50.27 0.75 49.52 49.47 -0.05 NO 224 50.27 0.75 49.52 49.45 -0.07 NO 226 49.02 0.75 48.27 48.28 0.01 NO Civil Engineering/Surveying/Planning STUART ENGINEERING PEACE ENGINEERING, INC., A CALIFORNIA CORPORATION 7525 Metropolitan Drive, Suite 308 San Diego, California 92108 (619) 296-1010 FAX (619)296-9276 SEstuartenQineerinQ.com February 2, 2012 1186-11-00 LINCOLN AND OAK As-Built Pad Elevations DIFFERENCE LOCATION FINISH STRUCTURAL BETWEEN OF FIELD FLOOR SECTION CALCULATED GRADED VARIES BY SHOT PER ELEVATIONS PROVIDED BY PAD ELEVATIONS AND MORE THAN EXHIBIT PER PLAN OTHERS ELEVATION AS GRADED PROPOSED 0.1' 227 49.04 0.75 48.29 48.22 -0.07 NO 228 49.02 0.75 48.27 48.24 -0.03 NO 229 49.38 0.75 48.63 48.59 -0.04 NO 230 49.39 0.75 48.64 48.58 -0.06 NO