Loading...
HomeMy WebLinkAboutCT 05-07; BRESSI RANCH LOT 40; FOUNDATION PLAN REVIEW; 2005-12-08Cfo1 Southern California Geotechnical St Croix Capital December 8, 2005 4350 Executive Drive, Suite 301 Project No 04G243-4R .. 'San Diego, California 92121 , ,' Plan. file # PC050113 Attention Mr. Jim Jacob Subject Foundation Plan Review : Proposed BusinessPark. 1 , Bressi Ranch Lot 40, Planning Area 5 SWC of Palomar Airport Road and Melrose Drive Carlsbad, California Reference: Géotechnicál Investigation, Proposed Business Park, Bressi Ranch Lot 40; Planning Area V5, SWC of Palomar Airport Road and Melrose Drive -' Carlsbad California, prepared for St Croix Capital by Southern California Geotechnical, dated December 28, 2004, SCG Project No. 04G243-1. Dear Mr. Jacob: In öcordance with th requt of Gar, 'Potter of Smith Cnsulting Architects, and as. required by the City of Carlsbad, we have reviewed the foundation plans for the subject site These plans were reviewed for conformance with the assumptions, conclusions, and recommendations of the above referenced geotechnical report. V The foundation plans for the building were prepared by Prime Structural Engineers, are dated November-2, 2005 and are identified as follows: Sheet S-i, Gneral Notes, Schedules, and Typical Details", V Sheet S-2.i, Building A V V V . Sheet S-3.1, Building B V Sheet S-4.1, BuildingC V V V Sheet 5-5.1. Building D Sheet S6.1,V Building.E V V • :Sheet S-7.1, Building F' V Sheet S-8.1, Building .G V Sheet S-9.1, Building H V Sheet S-10.1, Building I V I V V V V • Sheet Si1.i, Building J V V V .• Sheet S-12.1, Building K . Sheet S-131, Building LM V V Sheet S-14.1, Building N . V V Sheet S-15.i, Building 0 V Sheet SD-11, Details Sheet SD-6, Details V V -, •V fVI V V V V V : - V _.•VV.VV*: L V 1260 North Hancock Street Suite 101 • Anaheim 'California §2807-1951 • (714) 777-0333 • Fax (714) 771-0398 - •V - Our review of the foundations plans indicate that they have incorporated the recommendations of the above referenced geotechnical report. It should be noted that our review was limited to the geotechnical aspects of the project, and no representations as to the suitability of the structural designs are intended. Please note that per the review sheet (provided to us via Smith Consulting Architects on December 1, 2005) prepared by Esgil Corp., the third party reviewer for the city of• Carlsbad, the following note should be added to the foundation plan: "Prior to the contractor requesting a building department foundation inspection, the soils engineer shall advise the building official in writing that: The building pad was prepared in accordance with the soils report The utility trenches have been properly backfilled and compacted and The foundation excavations comply with the intent of the soils report" We appreciate the opportunity to be of continued service on this project. If there are any questions concerning this matter, please contact our office at your convenience. Respectfully Submitted, Southern California Geotechnical, Inc. G. Lbert G. Trazo M.Sc., GE 2655 EXP. 12/31/06 Distribution: (2) Addressee V (2) Smith Consulting Architects, Attn: Mr. Gary Potter (2) Partners Planning and Engineering, Attn: Mr. Martin Yousif Southern CaIiforna .Geotechnical Proposed Lot 40 Business Park - Carlsbad, CA Project No. 04G243-4R